CN106193075A - A kind of concrete cofferdam and steel sheet-pile cofferdam combination type cofferdam structure and construction method - Google Patents

A kind of concrete cofferdam and steel sheet-pile cofferdam combination type cofferdam structure and construction method Download PDF

Info

Publication number
CN106193075A
CN106193075A CN201610718807.8A CN201610718807A CN106193075A CN 106193075 A CN106193075 A CN 106193075A CN 201610718807 A CN201610718807 A CN 201610718807A CN 106193075 A CN106193075 A CN 106193075A
Authority
CN
China
Prior art keywords
cofferdam
steel sheet
pile
concrete
annular
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610718807.8A
Other languages
Chinese (zh)
Inventor
宋伟俊
张涛
刘绍石
张明刚
刘伟
王勇
杨金强
于峥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Bridge Engineering Bureau Group Co Ltd
Original Assignee
China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Bridge Engineering Bureau Group Co Ltd filed Critical China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority to CN201610718807.8A priority Critical patent/CN106193075A/en
Publication of CN106193075A publication Critical patent/CN106193075A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/02Restraining of open water
    • E02D19/04Restraining of open water by coffer-dams, e.g. made of sheet piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention provides a kind of concrete cofferdam and steel sheet-pile cofferdam combination type cofferdam structure, including the steel sheet-pile cofferdam pouring into a mould looped concrete cofferdam and top thereof;The top of described concrete cofferdam is provided with U-type groove mouth, and each steel sheet pile that described steel sheet-pile cofferdam includes is inserted in described U-type groove mouth, and is cast with cement mortar in U-type groove mouth;It is provided with annular inside described steel sheet-pile cofferdam and encloses purlin, enclose in annular and inside purlin, be provided with internal stay.The invention is big by concrete cofferdam rigidity, is placed in the bottom that water pressure is bigger, and steel sheet-pile cofferdam is placed in the less top of water pressure, makes total stress more reasonable, and structural safety is reliable.Overcome the drawback of conventional concrete cofferdam construction cycle length, the combined cofferdam that the invention provides decreases concrete cofferdam and pours height, steel sheet pile is installed and is not required to inserted to play of burying, installation rate greatly speeds up, can complete in 18 meters of cofferdam for general about 30 days, can possess the ability of bearing platform construction faster.

Description

A kind of concrete cofferdam and steel sheet-pile cofferdam combination type cofferdam structure and construction method
Technical field
The invention belongs to bridge construction technical field, especially relates to a kind of concrete cofferdam and steel sheet-pile cofferdam group Box-like cofferdam structure and construction method.
Background technology
In rich groundwater or rift region deep basal pit bearing platform construction, during for guaranteeing that cushion cap excavates stability of slope and Effectively sealing, using cofferdam is indispensable temporary structure.Concrete cofferdam submergence depth is big, and globality is strong, good stability, Bigger vertical load and horizontal loading can be born, without arranging internal stay in circular concrete cofferdam sinking watching, simple to operate, Have and be easily moulded shape, the feature that water sealing effect is good, current domestic general employing concrete open caisson cofferdam, steel sheet-pile cofferdam, underground Diaphragm wall, multi-stage light well-points dewatering open cut put the technology construction deep basal pit cushion caps such as slope, but above-mentioned technology all exists certain fitting The property used scope, has limitation, and its construction period is longer, cost is high.Steel sheet-pile cofferdam have light, readily removable remove, repeatable profit By the low feature of, short construction period and cost, but globality is poor, and the horizontal loading born is less, for the deep base more than 15 meters Cheat inapplicable.Therefore research is needed badly a kind of in Muddy Bottoms geology, it is possible to adapt to that the excavation of foundation pit degree of depth is deep, speed of application fast, make Novel cofferdam structure that valency is low and convenient and reliable and construction method.
Summary of the invention
In view of this, the invention be directed to a kind of concrete cofferdam and steel sheet-pile cofferdam combination type cofferdam structure and Construction method, simple in construction, reasonable in design, economize on resources.
For reaching above-mentioned purpose, the technical scheme of the invention is achieved in that
A kind of concrete cofferdam and steel sheet-pile cofferdam combination type cofferdam structure, including pour into a mould looped concrete cofferdam and The steel sheet-pile cofferdam on top;The top of described concrete cofferdam is provided with U-type groove mouth, each steel sheet pile that described steel sheet-pile cofferdam includes It is inserted in described U-type groove mouth, and is cast with cement mortar in U-type groove mouth;It is provided with annular inside described steel sheet-pile cofferdam to enclose Purlin, encloses in annular and is provided with internal stay inside purlin.
Further, the width >=40cm of described U-type groove mouth, degree of depth 70-90cm.
Further, described steel sheet pile uses Larsen IV shaped steel plate pile.
Further, described steel sheet-pile cofferdam short transverse arranges one annular every 3-5m and encloses purlin, and enclose in annular Internal stay is set in purlin.
Further, described annular encloses purlin employing H profile steel.
A kind of concrete cofferdam and the construction method of steel sheet-pile cofferdam combination type cofferdam structure, comprise the steps:
Place at the most smooth pier position, pours batardeau concrete, reserved the most U-shaped in concrete cofferdam end face centre Notch;
2. by U-type groove mouth reserved for steel sheet pile lifting to concrete cofferdam top layer top, when steel sheet pile is installed, to groove Mouth inter-sync cementing mortar;
3., after steel sheet pile all installs, purlin and internal stay are enclosed in the internally installed annular of steel sheet pile;
4. utilize grab bucket or suction dredge equipment to be removed by the earth in cofferdam, allow sinking of cofferdam to behind designed elevation position, Back cover carries out bearing platform construction.
Further, described annular encloses purlin in steel sheet-pile cofferdam short transverse every 3-5m setting one.
Further, step 4. in, earth in removing cofferdam symmetrically and evenly.
Relative to prior art, the invention has the advantage that
1) concrete cofferdam rigidity is big, is placed in the bottom that water pressure is bigger, and steel sheet-pile cofferdam is placed in the less top of water pressure, Making total stress more reasonable, structural safety is reliable.
2) overcoming the drawback of conventional concrete cofferdam construction cycle length, the combined cofferdam that the invention provides decreases Concrete cofferdam pours height, and steel sheet pile is installed and is not required to inserted to play of burying, and installation rate greatly speeds up, general 30 days left sides, 18 meters of cofferdam Can complete in the right side, can possess the ability of bearing platform construction faster.
3) combined cofferdam that the invention provides uses steel sheet pile to substitute top concrete cofferdam, greatly reduces coagulation Earth cofferdam makes height, simple to operate, it is easy to implements, effectively reduces difficulty of construction.
4) the combined cofferdam top that the invention provides uses steel sheet pile, uses vibration hammer to pull out after bearing platform construction Go out steel sheet pile, recycling, substantial amounts of fund can be saved.
Accompanying drawing explanation
The accompanying drawing of the part constituting the invention is used for providing being further appreciated by the invention, and the present invention creates The schematic description and description made, for explaining the invention, is not intended that the improper restriction to the invention.? In accompanying drawing:
Fig. 1 is the structural representation of the invention;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is cast concrete cofferdam construction schematic diagram;
Fig. 4 is steel sheet pile cofferdam construction schematic diagram;
Fig. 5 is combination type sinking of cofferdam construction schematic diagram;
Fig. 6 is combination type cofferdam bearing platform construction schematic diagram.
Description of reference numerals:
1, concrete cofferdam;2, steel sheet-pile cofferdam;3, internal stay;4, U-type groove mouth;5, ring-like purlin is enclosed;6, cushion cap;7, inhale mud to set Standby.
Detailed description of the invention
It should be noted that in the case of not conflicting, the embodiment in the invention and the feature in embodiment can To be mutually combined.
In the description of the invention, it is to be understood that term " " center ", " longitudinally ", " laterally ", " on ", D score, Orientation or the position relationship of the instruction such as "front", "rear", "left", "right", " vertically ", " level ", " top ", " end ", " interior ", " outward " are Based on orientation shown in the drawings or position relationship, it is for only for ease of description the invention and simplifies description rather than instruction Hint indication device or element must have specific orientation, with specific azimuth configuration and operation, be not understood that For the restriction to the invention.Additionally, term " first ", " second " etc. are only used for describing purpose, and it is not intended that indicate Or imply relative importance or the implicit quantity indicating indicated technical characteristic.Thus, " first ", " second " etc. are defined Feature can express or implicitly include one or more this feature.In the description of the invention, unless separately Being described, " multiple " are meant that two or more.
In the description of the invention, it should be noted that unless otherwise clearly defined and limited, term " peace Dress ", should be interpreted broadly " being connected ", " connection ", for example, it may be fix connection, it is also possible to be to removably connect, or integratedly Connect;Can be to be mechanically connected, it is also possible to be electrical connection;Can be to be joined directly together, it is also possible to be indirectly connected to by intermediary, It can be the connection of two element internals.For the ordinary skill in the art, on can being understood by concrete condition State term concrete meaning in the invention.
Describe the invention below with reference to the accompanying drawings and in conjunction with the embodiments in detail.
A kind of concrete cofferdam and steel sheet-pile cofferdam combination type cofferdam structure, as shown in Figures 1 to 6, looped including pouring into a mould The steel sheet-pile cofferdam 2 on concrete cofferdam 1 and top thereof;The top of described concrete cofferdam 1 is provided with U-type groove mouth 4, described steel sheet pile Each steel sheet pile that cofferdam 2 includes is inserted in described U-type groove mouth 4, and is cast with cement mortar in U-type groove mouth 4;Described steel plate It is provided with annular inside pile cofferdam and encloses purlin 5, enclose in annular and inside purlin 5, be provided with internal stay 3.
Width >=the 40cm of above-mentioned U-type groove mouth 4, degree of depth 70-90cm.Above-mentioned steel sheet pile uses Larsen IV shaped steel plate pile.U-shaped Notch can well accommodate steel sheet pile, and utilizes cement mortar to fix.
Wherein, described steel sheet-pile cofferdam 2 short transverse arranges one annular every 3-5m and encloses purlin 5, and enclose in annular Internal stay 3 is set in purlin 5.
Above-mentioned annular is enclosed purlin 5 and is used H profile steel, and concrete model can determine according to different operating modes.Described internal stay 3 is steel pipe, Concrete model can determine according to different operating modes.
A kind of concrete cofferdam and the construction method of steel sheet-pile cofferdam combination type cofferdam structure, comprise the steps:
Place at the most smooth pier position, pours batardeau concrete, reserved the most U-shaped in concrete cofferdam end face centre Notch;During construction, first formwork erection assembling reinforcement, pour first joint batardeau concrete, then according to foundation depth, submergence depth and on connect Steel sheet pile length, remaining joint batardeau concrete cast-in-place.It should be noted that the cast-in-place necessary cyclization of concrete cofferdam, along height side To can placement layer by layer, typically can be by mono-layer of placement layer by layer of 3m along short transverse;
2. by U-type groove mouth reserved for steel sheet pile lifting to concrete cofferdam top layer top, when steel sheet pile is installed, it is anti- Only subsoil water or river flow in cofferdam from notch, need to synchronize to U-type groove mouth inter-sync cementing mortar when installing steel sheet pile, Cement mortar had both played resistance effect, can effectively be consolidated by steel sheet pile footing again, it is ensured that it is stable;Steel sheet pile can utilize shoe Band lifting;
The construction method of U-type groove mouth is, uses bamboo slab rubber or steel form, reserved one 40cm width, and the groove that 80cm is deep, mixed Solidifying soil should be noted the firm of rebate former when pouring, it is ensured that non-rising when it pours, position does not offsets, and must not have mixed in notch Solidifying soil flows into, and removes rebate former, rubbish in cleaning groove immediately, be used for installing steel to be formed after epimerite batardeau concrete solidifies The U-type groove mouth of sheet pile;
3., after steel sheet pile all installs, purlin and internal stay are enclosed in the internally installed annular of steel sheet pile;
4. utilize grab bucket or suction dredge etc. to inhale mud equipment 7 to be removed by the earth in this combination type cofferdam, allow sinking of cofferdam extremely Behind designed elevation position, back cover carries out cushion cap 6 and constructs.In this step, should be noted earth in removing cofferdam symmetrically and evenly.
Preferably, above-mentioned annular encloses purlin in steel sheet-pile cofferdam short transverse every 3-5m setting one.
Conventional concrete cofferdam construction step is: and formwork erection → reinforcing bar binding → pour → wait is strong → sink → and next controls work → sink down into designed elevation, generally, 18 meters of cofferdam are it is generally required to about 50 days, and the combination type cofferdam knot that the invention provides Structure, decreases concrete cofferdam and pours height, and steel sheet pile is installed and is not required to inserted to play of burying, and installation rate also greatly speeds up, and 18 meters are enclosed Weir the most only needs about 30 days, can possess the ability of bearing platform construction faster.
The combination type cofferdam structure that the invention provides, make use of concrete cofferdam and steel sheet-pile cofferdam respective excellent Point, reaches the purpose adapting to do the scope of operation compared with deep basal pit bearing platform construction, stagnant water effect formation good, relatively rapid, and structural safety can Lean on, easy construction, saving fund, the most limited, rich groundwater, rift, silt soil strata, the degree of depth are big In the deep basal pit bearing platform construction of 15 meters, it it is a kind of effective method.
The foregoing is only the preferred embodiment of the invention, not in order to limit the invention, all at this Within the spirit of innovation and creation and principle, any modification, equivalent substitution and improvement etc. made, should be included in the invention Protection domain within.

Claims (8)

1. a concrete cofferdam and steel sheet-pile cofferdam combination type cofferdam structure, it is characterised in that: include pouring into a mould looped coagulation Earth cofferdam and the steel sheet-pile cofferdam on top thereof;The top of described concrete cofferdam is provided with U-type groove mouth, and described steel sheet-pile cofferdam includes Each steel sheet pile be inserted in described U-type groove mouth, and be cast with cement mortar in U-type groove mouth;Inside described steel sheet-pile cofferdam It is provided with annular and encloses purlin, enclose in annular and inside purlin, be provided with internal stay.
A kind of concrete cofferdam the most according to claim 1 and steel sheet-pile cofferdam combination type cofferdam structure, it is characterised in that: Width >=the 40cm of described U-type groove mouth, degree of depth 70-90cm.
A kind of concrete cofferdam the most according to claim 1 and steel sheet-pile cofferdam combination type cofferdam structure, it is characterised in that: Described steel sheet pile uses Larsen IV shaped steel plate pile.
A kind of concrete cofferdam the most according to claim 1 and steel sheet-pile cofferdam combination type cofferdam structure, it is characterised in that: Described steel sheet-pile cofferdam short transverse arranges one annular every 3-5m and encloses purlin, and internal stay is set in annular encloses purlin.
5., according to a kind of concrete cofferdam described in claim 1 or 4 and steel sheet-pile cofferdam combination type cofferdam structure, its feature exists In: described annular is enclosed purlin and is used H profile steel.
6. the concrete cofferdam described in claim 1 and a construction method for steel sheet-pile cofferdam combination type cofferdam structure, it is special Levy and be, comprise the steps:
Place at the most smooth pier position, pours batardeau concrete, reserves one U-type groove in concrete cofferdam end face centre Mouthful;
2. by U-type groove mouth reserved for steel sheet pile lifting to concrete cofferdam top layer top, when steel sheet pile is installed, in notch Synchronize cementing mortar;
3., after steel sheet pile all installs, purlin and internal stay are enclosed in the internally installed annular of steel sheet pile;
4. utilize grab bucket or suction dredge equipment to be removed by the earth in cofferdam, allow sinking of cofferdam to behind designed elevation position, back cover Carry out bearing platform construction.
A kind of concrete cofferdam the most according to claim 6 and the construction method of steel sheet-pile cofferdam combination type cofferdam structure, It is characterized in that: described annular is enclosed purlin and arranged together every 3-5m in described steel sheet-pile cofferdam short transverse.
A kind of concrete cofferdam the most according to claim 6 and the construction method of steel sheet-pile cofferdam combination type cofferdam structure, It is characterized in that: step 4. in, earth in removing cofferdam symmetrically and evenly.
CN201610718807.8A 2016-08-24 2016-08-24 A kind of concrete cofferdam and steel sheet-pile cofferdam combination type cofferdam structure and construction method Pending CN106193075A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610718807.8A CN106193075A (en) 2016-08-24 2016-08-24 A kind of concrete cofferdam and steel sheet-pile cofferdam combination type cofferdam structure and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610718807.8A CN106193075A (en) 2016-08-24 2016-08-24 A kind of concrete cofferdam and steel sheet-pile cofferdam combination type cofferdam structure and construction method

Publications (1)

Publication Number Publication Date
CN106193075A true CN106193075A (en) 2016-12-07

Family

ID=57524392

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610718807.8A Pending CN106193075A (en) 2016-08-24 2016-08-24 A kind of concrete cofferdam and steel sheet-pile cofferdam combination type cofferdam structure and construction method

Country Status (1)

Country Link
CN (1) CN106193075A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836247A (en) * 2017-02-24 2017-06-13 中铁十九局集团第七工程有限公司 Combined type cofferdam and its construction method
CN110565666A (en) * 2019-09-24 2019-12-13 上海市水利工程集团有限公司 Construction method of flat combined sheet pile ground connecting wall type water retaining cofferdam
CN114482100A (en) * 2022-03-01 2022-05-13 先高路桥有限公司 Reinforcing structure of cofferdam and construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040039271A (en) * 2004-04-22 2004-05-10 한국하이웰산업주식회사 Shoe coffering method for new construction and repair, reinforcement of bridge open caisson foundation
CN203834492U (en) * 2014-05-13 2014-09-17 中交第三公路工程局有限公司 Major diameter round steel sheet pile cofferdam in water
CN104988930A (en) * 2015-07-16 2015-10-21 中铁大桥局集团有限公司 Construction method of combined cofferdam suitable for weak geology deep foundation pit
CN205046564U (en) * 2015-09-21 2016-02-24 中铁建大桥工程局集团第一工程有限公司 Modular cofferdam structure
CN206090593U (en) * 2016-08-24 2017-04-12 中国铁建大桥工程局集团有限公司 Concrete cofferdam and steel sheet piling cofferdam combination formula cofferdam structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040039271A (en) * 2004-04-22 2004-05-10 한국하이웰산업주식회사 Shoe coffering method for new construction and repair, reinforcement of bridge open caisson foundation
CN203834492U (en) * 2014-05-13 2014-09-17 中交第三公路工程局有限公司 Major diameter round steel sheet pile cofferdam in water
CN104988930A (en) * 2015-07-16 2015-10-21 中铁大桥局集团有限公司 Construction method of combined cofferdam suitable for weak geology deep foundation pit
CN205046564U (en) * 2015-09-21 2016-02-24 中铁建大桥工程局集团第一工程有限公司 Modular cofferdam structure
CN206090593U (en) * 2016-08-24 2017-04-12 中国铁建大桥工程局集团有限公司 Concrete cofferdam and steel sheet piling cofferdam combination formula cofferdam structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836247A (en) * 2017-02-24 2017-06-13 中铁十九局集团第七工程有限公司 Combined type cofferdam and its construction method
CN110565666A (en) * 2019-09-24 2019-12-13 上海市水利工程集团有限公司 Construction method of flat combined sheet pile ground connecting wall type water retaining cofferdam
CN114482100A (en) * 2022-03-01 2022-05-13 先高路桥有限公司 Reinforcing structure of cofferdam and construction method
CN114482100B (en) * 2022-03-01 2024-03-19 先高路桥有限公司 Reinforcing structure of cofferdam and construction method

Similar Documents

Publication Publication Date Title
CN107524138B (en) Construction method of ultra-deep foundation pit underground diaphragm wall
CN107747308B (en) A kind of diaphram wall and construction method
CN102162253B (en) Precipitation construction method employing pipe embedded in deep foundation pits
CN102561402B (en) Treatment method for construction joint between top plate and wall of individual underground civil air defense project constructed by covered top-down excavation method
CN105239578B (en) Water-rich sand layer deep foundation pit underwater construction method
CN106193075A (en) A kind of concrete cofferdam and steel sheet-pile cofferdam combination type cofferdam structure and construction method
KR100665984B1 (en) The construction method of basement self drainage
CN107165173A (en) A kind of foundation pit supporting system and its construction method
CN109339079A (en) A kind of foundation pit water-stopping system and its construction technology close to river permeable stratum
CN108798775A (en) A kind of jacking construction active well
CN206090593U (en) Concrete cofferdam and steel sheet piling cofferdam combination formula cofferdam structure
CN105155421B (en) Complete embedding circular construction method in a kind of single pile Single column pier river course shallow water
CN110397044A (en) The prominent foundation ditch construction method and foundation pit structure gushed of anti-artesian water
CN104074234B (en) The interior river intake structure of electric power plant circulating water system and construction method thereof
CN108104112B (en) A kind of underground wall body construction method based on the slurrying of original soil original position
CN106120853B (en) A kind of inverted construction method of frame bridge
CN204898700U (en) Bridge foundation structure
CN213477808U (en) Structure is found fast to steel construction underground garage
CN103866787A (en) Process for constructing impervious concrete wall by using open excavation and inverted construction method
CN107299640A (en) A kind of variable cross-section well shaft type ground continuous wall base and its construction method
CN112627231A (en) Construction device for deep guide wall of soft soil
CN206902721U (en) A kind of foundation pit supporting system
CN208473930U (en) A kind of jacking construction active well
CN205804405U (en) A kind of frame bridge structure of hysterology construction
CN106013238B (en) A kind of big earthing open trench tunnel subsidence control method of soft stratum

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161207