CN205804405U - A kind of frame bridge structure of hysterology construction - Google Patents
A kind of frame bridge structure of hysterology construction Download PDFInfo
- Publication number
- CN205804405U CN205804405U CN201620681064.7U CN201620681064U CN205804405U CN 205804405 U CN205804405 U CN 205804405U CN 201620681064 U CN201620681064 U CN 201620681064U CN 205804405 U CN205804405 U CN 205804405U
- Authority
- CN
- China
- Prior art keywords
- straight wall
- construction
- frame bridge
- base plate
- reinforcement cage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses the frame bridge structure of a kind of hysterology construction, including straight wall, top board and base plate, straight wall is the monolithic construction that standard straight wall and protection straight wall are spaced composition, protection straight wall includes that going deep into basis below frame bridge base plate acts the protection straight wall anchoring section supporting anchorage effect, the while of roof steel bar cage, the steel reinforcement cage level with standard straight wall and protection straight wall upper end overlaps, and baseplate reinforcing bar cage overlaps with the steel reinforcement cage level of standard straight wall lower end.Frame bridge simple in construction of the present utility model, its construction method use straight wall of first constructing, again construct top board, finally construct the mode of base plate, the ingenious supporting role utilizing the soil body, effectively reduce the quantity additionally setting up support;Avoid the large-scale excavation excavation of original construction method simultaneously, simplify construction technology, short construction period, greatly reduce construction costs cost, less to the traffic impact of job location, under wear in the construction of frame bridge there are good economic results in society.
Description
Technical field
This utility model relates to the technical field of bridge engineering in traffic engineering, the framework of a kind of hysterology construction
Bridge construction.
Background technology
Frame bridge is to wear the type of bridge in grade separation or culvert under a kind of being widely used in, and the many employings of traditional handicraft are cast-in-place to be executed
Work or jacking construction.Jacking construction technique wear under being used in more existing line operated frame bridge construction in, because of top cannot in
Breaking off a friendship logical, can only select jacking technique, this construction technological process is complicated, and cost is the highest;At the city intersection of heavy traffic,
Because traffic flow increases, underway mode is often used to form grade separation to alleviate traffic pressure, for convenience of construction, reduction engineering
Cost, the cast-in-place construction schemes using excavation pit support in situ more, but owing to large-scale excavation excavates, deep basal pit protection and mould
Frame such as sets up at the construction link long construction period, often results in and suspends traffic for a long time, and then exacerbates traffic congestion.
Summary of the invention
The purpose of this utility model is contemplated to solve the deficiency that prior art exists, it is provided that a kind of technique is simple, construction
Cycle is short, construction costs is low, the city intersection of heavy traffic is protected, is particularly suited for construction work without support and foundation ditch
Hysterology construction frame bridge structure.
For reaching above-mentioned purpose, this utility model adopts the following technical scheme that the frame bridge structure that a kind of hysterology is constructed,
Including straight wall, top board and base plate, described straight wall, top board and base plate are reinforced concrete structure, and its difference is, described
Straight wall is the monolithic construction that standard straight wall and protection straight wall are spaced composition, and described protection straight wall includes going deep at the bottom of frame bridge
Below plate, the protection straight wall anchoring section supporting anchorage effect is acted on basis, and described roof steel bar cage is simultaneously perpendicular with standard straight wall and protection
The steel reinforcement cage level overlap joint of wall upper end, described baseplate reinforcing bar cage overlaps with the steel reinforcement cage level of standard straight wall lower end.
In technique scheme, described frame bridge structure also includes being arranged at the reinforcing foundation pile in basis below base plate.
In technique scheme, described reinforcing foundation pile includes reinforced concrete square pile, PHC pile tube and cast-in-situ bored pile.
In technique scheme, described straight wall all uses chamfered transition with top board and straight wall with base plate junction.
In technique scheme, the degree of depth of the described protection straight wall anchoring section going deep into basis below frame bridge base plate is 3-
9m。
In technique scheme, the described standard straight wall steel reinforcement cage part longitudinally overlapped with baseplate reinforcing bar cage along frame bridge
The ratio accounting for whole straight wall steel reinforcement cage is 55-80%.
The construction method of frame bridge structure of the present utility model comprises the steps: S1: foundation construction, selected reinforcing foundation pile
Construction location, in conjunction with the concrete geological foundation of job location, select to reinforce base pile installation, complete to reinforce the construction of foundation pile,
Undisturbed soil is finally used to be backfilled to earth's surface;S2: straight wall is constructed, and uses construction of diaphragm wall technique, excavates straight wall foundation ditch, colligation
Straight wall steel reinforcement cage is also transferred to straight wall foundation ditch, reserved standard straight wall lower end steel reinforcement cage with baseplate reinforcing bar cage level overlap joint and
With standard straight wall and the protection straight wall upper end steel reinforcement cage of roof steel bar cage level overlap joint, pour straight wall concrete;S3: top board foundation ditch
Excavation, the soil body above excavation top board forms top board foundation ditch, subsequently the place of top board foundation ditch is carried out cure process;S4: top board
Construction, colligation roof steel bar cage in top board foundation ditch, and overlap with straight wall steel reinforcement cage, installation form, casting concrete forms steel
Reinforced concrete top board;S5: soil excavation, after concrete roof intensity reaches design requirement, between excavation top board and straight wall
The soil body, carries out place cure process subsequently;S6: construction of bottom plates, colligation baseplate reinforcing bar cage also overlaps with standard straight wall steel reinforcement cage, waters
Build concrete and form reinforced concrete floor, finally backfill top board foundation ditch, complete frame bridge construction.
The beneficial effects of the utility model:
(1) the frame bridge simple in construction designed by this utility model, construction technology is the most controlled, it is not necessary to large-scale excavation is opened
Dig, short construction period, less to the traffic impact of job location, it is under a kind of city intersection being applicable to heavy traffic
Wear frame bridge structure.
(2) frame bridge designed by this utility model construction method use first construct straight wall, again construct top board, finally execute
The mode of work base plate, it is to avoid the large-scale excavation excavation in the construction of original frame bridge, simplifies construction technology, greatly reduces
Construction costs cost, has obvious economic benefit.
Accompanying drawing explanation
Fig. 1 is the frame bridge structural representation of hysterology of the present utility model construction;
Fig. 2 is the step schematic diagram of the hysterology construction of frame bridge of the present utility model;
In figure: straight wall 1 (standard straight wall 11, protects straight wall 12, protects straight wall anchoring section 12a), top board 2, base plate 3.
Detailed description of the invention
In order to be better understood from the technical solution of the utility model, new to this practicality with specific embodiment below in conjunction with the accompanying drawings
Type is described in further detail.
As it is shown in figure 1, the frame bridge structure of a kind of hysterology construction, including straight wall 1, top board 2, base plate 3 be arranged at the end
Reinforcing foundation pile in basis below plate 3, described straight wall 1, top board 2 and base plate 3 are reinforced concrete structure, described reinforcing foundation pile
For circular steel reinforced concrete foundation pile, described straight wall 1 is the monoblock type knot that standard straight wall 11 and protection straight wall 12 are spaced composition
Structure, described protection straight wall 12 includes that going deep into basis below frame bridge base plate 3 acts the protection straight wall anchoring section supporting anchorage effect
12a, the while of described top board 2 steel reinforcement cage, the steel reinforcement cage level with standard straight wall 11 and protection straight wall 12 upper end overlaps, described base plate 3
The steel reinforcement cage level overlap joint of steel reinforcement cage and standard straight wall 11 lower end, described gos deep into the protection straight wall on basis below frame bridge base plate 3
The degree of depth of anchoring section 12a is 5m;The described standard straight wall 11 steel reinforcement cage part longitudinally overlapped with base plate 3 steel reinforcement cage along frame bridge accounts for
All the ratio of straight wall 1 steel reinforcement cage is 65%.
As in figure 2 it is shown, the construction method of the frame bridge structure of the present embodiment comprises the steps: S1: foundation construction, according to
Design, the selected position reinforcing foundation pile, in conjunction with the concrete geological foundation of job location, select reinforced concrete pile for reinforcing
Foundation pile, boring, assembling reinforcement cage, casting concrete is reinforced foundation pile, is finally used undisturbed soil to be backfilled to earth's surface;S2: straight wall is constructed,
Using construction of diaphragm wall technique, excavate straight wall foundation ditch, colligation straight wall steel reinforcement cage is also transferred to straight wall foundation ditch, and close
Straight wall framework inner outline side arranges straight wall formwork for placing, straight wall formwork for placing inner face brushing releasing agent, uses rectangle isolation mode
The standard straight wall steel reinforcement cage of plate isolation and baseplate reinforcing bar cage overlap joint, pours straight wall concrete at top board 2 bottom surface height, reserved
The steel reinforcement cage that standard straight wall 11 and protection straight wall 12 upper end overlap with top board 2;S3: top board excavation of foundation pit, according to design drawing
The soil body above the requirement excavation top board of paper forms top board foundation ditch, subsequently the place of top board foundation ditch is carried out cure process;S4: top
Plate is constructed, and installs top board formwork for placing, template inner face brushing releasing agent, colligation roof steel bar cage and straight wall in top board foundation ditch
Steel reinforcement cage overlaps, and casting concrete forms roof support with reinforced concrete;S5: soil excavation, when concrete roof intensity reaches design
After requirement, according to construction design drawing requirement, the bottom surface of the soil body between substep symmetrical excavation top board 2 and straight wall 1 to base plate 3
Highly place, removes top board formwork for placing, straight wall formwork for placing and rectangle isolation template, carries out place cure process subsequently;S6: the end
Plate is constructed, mounting base formwork for placing, and colligation baseplate reinforcing bar cage the steel reinforcement cage level with standard straight wall 11 lower end overlap, and pour
Concrete forms reinforced concrete floor, finally backfill top board foundation ditch, completes frame bridge construction.
The content that this specification is not described in detail belongs to prior art known to professional and technical personnel in the field.On although
State embodiment and this utility model be made that detailed description, but its a part of embodiment that is only this utility model rather than
All embodiments, people can also obtain other embodiments according to the present embodiment under without creative premise, these embodiments
Broadly fall into this utility model protection domain.
Claims (6)
1. a frame bridge structure for hysterology construction, including straight wall (1), top board (2) and base plate (3), described straight wall (1), top
Plate (2) and base plate (3) are reinforced concrete structure, it is characterised in that described straight wall (1) is standard straight wall (11) and protects perpendicular
Wall (12) is spaced the monolithic construction of composition, and described protection straight wall (12) includes going deep into basis, frame bridge base plate (3) lower section
Act protection straight wall anchoring section (12a) supporting anchorage effect, described top board (2) steel reinforcement cage simultaneously with standard straight wall (11) and protection
The steel reinforcement cage level overlap joint of straight wall (12) upper end, described base plate (3) steel reinforcement cage and the steel reinforcement cage level of standard straight wall (11) lower end
Overlap joint.
The frame bridge structure of hysterology the most according to claim 1 construction, it is characterised in that: described frame bridge structure is also wrapped
Include the reinforcing foundation pile being arranged in basis, base plate (3) lower section.
The frame bridge structure of hysterology the most according to claim 2 construction, it is characterised in that: described reinforcing foundation pile includes steel
Muscle concrete square pile, PHC pile tube and cast-in-situ bored pile.
The frame bridge structure of hysterology the most according to claim 1 construction, it is characterised in that: described straight wall (1) and top board
And straight wall (1) and base plate (3) junction all use chamfered transition (2).
The frame bridge structure of hysterology the most according to claim 1 construction, it is characterised in that: described go deep into frame bridge base plate
(3) degree of depth of protection straight wall anchoring section (12a) on basis, lower section is 3-9m.
The frame bridge structure of hysterology the most according to claim 1 construction, it is characterised in that: described along frame bridge longitudinally with
It is 55-80% that standard straight wall (11) the steel reinforcement cage part of base plate (3) steel reinforcement cage overlap joint accounts for the ratio of whole straight wall (1) steel reinforcement cage.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620681064.7U CN205804405U (en) | 2016-06-30 | 2016-06-30 | A kind of frame bridge structure of hysterology construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620681064.7U CN205804405U (en) | 2016-06-30 | 2016-06-30 | A kind of frame bridge structure of hysterology construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205804405U true CN205804405U (en) | 2016-12-14 |
Family
ID=57513235
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620681064.7U Active CN205804405U (en) | 2016-06-30 | 2016-06-30 | A kind of frame bridge structure of hysterology construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205804405U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107237266A (en) * | 2017-06-27 | 2017-10-10 | 中铁第四勘察设计院集团有限公司 | Open cut rock anchor combination foundation and its inverse operation construction method |
-
2016
- 2016-06-30 CN CN201620681064.7U patent/CN205804405U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107237266A (en) * | 2017-06-27 | 2017-10-10 | 中铁第四勘察设计院集团有限公司 | Open cut rock anchor combination foundation and its inverse operation construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205742213U (en) | Foundation pit supporting construction | |
CN103821219A (en) | Top pipe construction modification inspection well construction method | |
CN107338801B (en) | Prestressing force assembled Complex retaining wall structure and construction method | |
CN107246005A (en) | Super-large diameter bores and buries steel pipe hollow foundation pile and its construction method | |
CN103696784A (en) | Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure | |
CN205242436U (en) | Supplementary soleplate traded interim bearing structure who props during system was gone along with sb. to guard him to underground complex | |
WO2017084573A1 (en) | Upheaval-resisting support structure | |
CN102011410A (en) | Prefabricated prestressed underground continuous wall and construction method thereof | |
CN104652444B (en) | Construction method for overall reverse operation of ultra-large type deep foundation pit center island type alternative earth excavation | |
CN203487664U (en) | Prefabricated concrete filled wall suspension type flexible connection | |
CN110273436A (en) | Open trench tunnel utilizes support pile and bear down on one float Structure and its construction method of crown beam | |
CN110004991A (en) | Underground structure anti-floating system and construction method based on raised type tangs plate | |
CN109706952A (en) | Large-scale well-sinking construction method | |
CN107355008A (en) | A kind of prefabricated attachment structure and method of newly-increased steel core concrete column and existing structure | |
CN108035379A (en) | A kind of pipe gallery and its construction method | |
CN108396761A (en) | The non-fully pile foundation cushion cap and production method under precipitation state inside a kind of foundation pit | |
CN106120853B (en) | A kind of inverted construction method of frame bridge | |
CN205804405U (en) | A kind of frame bridge structure of hysterology construction | |
CN107299640A (en) | A kind of variable cross-section well shaft type ground continuous wall base and its construction method | |
CN207452889U (en) | Artificial digging pile assembled retaining wall | |
CN206829136U (en) | A kind of anchor jacked pile envelope pilework of high cushion cap foundation | |
CN106498951B (en) | A kind of shaft excavation construction method | |
CN105484270A (en) | Reinforcement protection construction method of high steep old rubble retaining wall adjacent to deep foundation pit | |
CN210151776U (en) | Structure of balance weight type retaining wall | |
CN204898700U (en) | Bridge foundation structure |