CN106155016B CN201610523104.XA CN201610523104A CN106155016B CN 106155016 B CN106155016 B CN 106155016B CN 201610523104 A CN201610523104 A CN 201610523104A CN 106155016 B CN106155016 B CN 106155016B
Authority
CN
China
Prior art keywords
module
assembly
information
management
work order
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610523104.XA
Other languages
Chinese (zh)
Other versions
CN106155016A (en
Inventor
胡小锋
崔马驰宇
蒋淳
孙世旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jiaotong University
Original Assignee
Shanghai Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jiaotong University filed Critical Shanghai Jiaotong University
Priority to CN201610523104.XA priority Critical patent/CN106155016B/en
Publication of CN106155016A publication Critical patent/CN106155016A/en
Application granted granted Critical
Publication of CN106155016B publication Critical patent/CN106155016B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)

Abstract

The present invention provides a kind of project type Product Assembly process management and control systems, in which: assembly execution module is to instruct the total foundation of assembled in situ;Material part class type, quantity and other technical requirements needed for each work step of material part management modules exhibit judge whether material components are transmitted to assembly execution module in place and by result according to practical dispatching situation;Technological equipment type, quantity needed for each work step of process tools management modules exhibit are equipped with according to scene, actually dispense and receive situation and judge whether it is transmitted to assembly execution module in place and by result;Quality testing module provides each work step assembling process and examines project and inspection result is transmitted to assembly execution module;Assembly master data module includes a large amount of assembly project information;Work order module is associated with the information in assembly master data module with work order, is then passed to assembly execution module to instruct assembled in situ.The present invention instructs assembled in situ operation, quality inspection, recording process information, solves the problems, such as misloading, neglected loading to guarantee quality.

Description

A kind of project type Product Assembly process management and control system
Technical field
The present invention relates to project type engineering goods assembling process field of quality control, specifically, being related to a kind of project type production Product assembling process managing and control system.
Background technique
The manufacturing process of project type engineering goods is the important link of its form of quality, and assembling process is as entire manufacture Can the quality of the last one link of process, assembling quality by the direct total quality for determining final products and meet function Demand.The assembly period of project type product is long, if without it is a set of scientifically manage assembling process system, Assembling Production progress without The problems such as method control, is easy to appear misloading, neglected loading, assemble sequence entanglement, product quality will be difficult to ensure, product high level part one Denier is wrongly installed or damage, bring economic loss are also quite heavy.In order to guarantee assembling quality, the sequence mistakes and omissions of technique road are prevented, Specification assemble flow improves the assembling quality of product, it is necessary to effectively be managed to the Assembling Production process of enterprise.
Through the literature search of existing technologies, Tu Huagang et al. was " HeFei University of Technology's journal " (2011 the 34th Rolled up for the 1st phase) on " plant working control Research of Integrated System " towards the assembling process delivered, this article is related to assembling work Information software system carry out that logic is integrated and physical integration, and pipe is carried out to assembly shop operation process centered on process Control.The technology that this article is related to is primarily present following defect and deficiency: (1) by process centered on, not towards minimum operation unit, The work step execution sequence of in-process subdivision is indefinite and Assembling resource is indefinite.(2) system not can guarantee material allocation, technique dress It is standby whether in place to receive, therefore can not guarantee product quality from assembling process.(3) assembling process quality inspection records papery problem Seriously, lack effective Tracing back of quality questions mechanism, technique and erecting yard can not be fed back.
Summary of the invention
For the defects in the prior art, the present invention provides a kind of project type Product Assembly process management and control system, the system It unites the technique content in assembling process, technological equipment, components, quality examination information accurate correlation to minimum operation unit, And erecting yard is transmitted, for instructing the operation of assembler's assembled in situ, quality inspection, recording process information, guarantee accurate personnel It by accurate technique, accurate resource, is accurately sequentially assembled, solves the problems, such as misloading, neglected loading, to guarantee to assemble Quality.
The present invention is achieved by the following technical solutions:
The present invention provides a kind of project type Product Assembly process management and control system, the system comprises: assembly execution module, object Expect part management module, process tools management module, quality testing module, assembly master data module and work order module;Wherein:
The assembly execution module is the site-assembled total foundation of guidance, for instructing assembled in situ process;
The material part management module, for material part class type, quantity, technical requirements needed for showing each work step Basic data, and be transmitted to assembly master data module;Whether in place material components are judged according to practical dispatching situation, and will be sentenced Disconnected result is transmitted to assembly execution module;
The process tools management module, for safeguard each work step outfit, fixture, measurer technological equipment type, The basic data that quantity and other technologies require, and it is transmitted to assembly master data module;It is equipped with according to scene, reality dispenses and neck Whether in place it is judged with situation, and judging result is transmitted to assembly execution module;
The quality testing module examines project for providing each work step assembling process, including worker's self-test and quality assistant director Specially inspection records the basic data of each check item of assembling process, is transmitted to assembly master data module;And by preamble work step inspected with It is no to be transmitted to assembly execution module;
The assembly master data module, for including material part management module, process tools management module, quality inspection mould Block is transmitted through the basic data information for the assembly project come, and is the basis of project type Product Assembly process management and control system;
The work order module, including production work order and scheduled production two parts are formulated, for the letter in master data module will to be assembled Breath is associated with production work order, assembly execution module is then passed to, to instruct assembled in situ.
Preferably, the assembly execution module, comprising: server, touch screen, thin client and card reader, in which:
Thin client obtains production work order information from server and shows on the touchscreen;Worker selects a production work order Interface is executed into assembly, includes operation, beginning, pause, continuation, self-test, specially inspection, the utility function completed, material components Management module dispatching part in place, process tools management module confirmation tooling receive after the completion of, on worker's point touching screen start, The operation button of pause, and assembling process quality inspection is carried out, quality inspection record passes to quality testing module;Aforesaid operations are both needed to from card reader brush Card passes through, and records the corresponding worker's information of the operation with system, and upload, save to server.
It is highly preferred that worker's information, comprising: ID, name, work post, grade of skill, manufacture odd numbers, operation work step, Operation content, operating time stamp.
Preferably, the material part management module, comprising: handling of goods and materials computer and infrared scan rifle, in which: Handling of goods and materials computer is used for Servicing BOM information;Infrared scan rifle issues infrared radiation to the two dimension of material components On code, reflected light is scanned rifle and receives, and material components type sum number amount information is converted into after processing, to reckon by the piece And mistake proofing, to guarantee that material components needed for assembling process are accurately dispensed into scene;
The material part management module is material components type sum number amount needed for work step each in production work order Compare and judge with practical dispatching situation: in place, then judging result is to pass through and be transmitted to assembly execution module;It is not in place, Then judging result is not pass through, and passes handling of goods and materials department back and urges and send components.
It is highly preferred that the bill of materials information includes: part serial number, detail drawing number, part name, number of components Whether amount assembles.
Preferably, the process tools management module, comprising: tool management computer and infrared scan rifle, in which: work Tubulature manages computer and is used to service procedure equipment master data;Infrared scan rifle issues in infrared radiation to the two dimensional code of tooling, Reflected light is scanned rifle and receives, and tooling type and quantity information is converted into after processing, to guarantee assembling process institute Tooling is needed accurately to receive;
To guarantee that tooling needed for assembling process is accurately received, the process tools management module is work each in production work order Tooling type and quantity needed for step and actually receive situation and compare and judge: in place, then judging result is passes through and passes Give assembly execution module;Not in place, then judging result is not pass through, then needs to receive tooling again.
It is highly preferred that the technological equipment master data includes: workshop is from repair parts line item, specific purpose tool figure number, special tool Sign title, general utility tool figure number, general utility tool title.
Preferably, the quality testing module, including quality inspection management computer and mobile plate, in which:
Quality inspection management computer is used for: being formulated quality inspection access points and is associated with specific work step, determine quality inspection type, gives pledge Inspection standard provides relevant art according to different quality inspection types and requires standard, manages drawing and document information, that is, drawing and document letter Breath piecemeal is associated with work step;Mobile plate and computer interconnect, and assembling process surveys quality detecting data and inserts mobile plate, and is passed to Quality inspection manages in computer;Quality inspection management computer judges whether preamble work step quality check process is completed, and judging result is transmitted to Assemble execution module.
It is highly preferred that the quality inspection type includes: the type of state confirmation, fit dimension, design value measured value.
Preferably, the assembly master data module, including assembly master data server, the assembly master data server In have the database of structuring, and data with figure number for unique major key, under figure number corresponding tables of data include process route information, Material components information, technological equipment information, quality information.
It is highly preferred that the process route information include: product figure number, name of product, operation number, work step number, work post, Technique content, technical requirements, working equipment number.
Preferably, the work order module, including production work order computer and printer, printer and production work order calculate Machine connection, for printing production work order;Wherein: production work order computer assembles in master data module according to manufacture odd numbers, selection Has the qualified figure number of examination & approval to generate production work order, the associated process route information of figure number, material components information, technique dress Standby information, the content of quality information are endowed production work order simultaneously;
The scheduled production is to assign its to the production work order made and produce priority and carry out scheduled production, and by scheduled production Information is transmitted to assembly execution module.
It is highly preferred that the production work order includes: production work order number, part name, drawing number, machining tool, production Work order date created, work order formulation person.
Compared with prior art, the present invention has following profitable fruit:
(1) technique information, process resource information, quality information are associated with minimum operation unit, and to dispatching and received A possibility that whether having done effective control in place, realized accurate assembly, avoid neglected loading, misloading reduces from source and occurs The probability of quality problems;
(2) it replaces paper document to carry out assembling process quality inspection record with mobile device, promotes the workshop level of IT application and life While producing efficiency, the availability of qualitative data and the trackability of quality problems are substantially increased;
(3) the information sub-module management such as technique involved by assembling process, tooling, quality inspection, each department personnel Ge Si Its duty, management get well the module of oneself, feed back and serve production scene, reduce formal process redundancy, improve assembly efficiency.
Detailed description of the invention
Upon reading the detailed description of non-limiting embodiments with reference to the following drawings, other feature of the invention, Objects and advantages will become more apparent upon:
Fig. 1 is the system structure diagram of one embodiment of the invention;
Fig. 2 is that master data schematic diagram is assembled in one embodiment of the invention;
Fig. 3 is that production work order schematic diagram is generated in one embodiment of the invention;
Fig. 4 is that production work order schematic diagram is assigned in one embodiment of the invention;
Fig. 5 is that implementation procedure interface schematic diagram is assembled in one embodiment of the invention;
Fig. 6 is quality inspection inventory schematic diagram in one embodiment of the invention;
In figure: process tools management module 1, material part management module 2, quality testing module 3 assemble master data module 4, Work order module 5 assembles execution module 6, produces work order 7, erecting yard 8, quality inspection record 9.
Specific embodiment
The present invention is described in detail combined with specific embodiments below.Following embodiment will be helpful to the technology of this field Personnel further understand the present invention, but the invention is not limited in any way.It should be pointed out that the ordinary skill of this field For personnel, without departing from the inventive concept of the premise, various modifications and improvements can be made.These belong to the present invention Protection scope.
As shown in Figure 1, for a kind of structural block diagram of project type Product Assembly process management and control system of the present invention, the system packet Include: process tools management module 1, material part management module 2, quality testing module 3, assembly master data module 4, work order module 5, Assemble execution module 6;Wherein:
Material part management module 2 is used to safeguard for managing assembly material inventory information, process tools management module 1 Technological equipment master data, quality testing module 3 examine each check item tool of project, record assembling process for providing each work step assembling process Volume data assembles master data module 4 with figure number for unique major key, the process route information and material components pipe under the figure number Module 2, process tools management module 1 are managed together with the information association of quality testing module 3, forms an assembly master data entry; Work order module 5 selects corresponding figure number according to manufacture odd numbers to generate production work order 7, and to the production work order 7 made It assigns it and produces priority progress scheduled production, and scheduled production information is distributed into assembly execution module 6;Assembly execution module 6 is set It sets in erecting yard 8, carries out assembly manipulation, the function lighted on the touch screen of erecting yard 8 as unit of work step according to technique Can button indication can carry out the operation, that is, indicate the work step material parts delivery in place, technological equipment receive it is complete and tight The quality check process of adjacent preamble work step has been completed, and gray button expression is not available for the feature operation;Quality inspection in assembling process Record 9 will be recorded and stored within quality testing module 3.
In the present embodiment, the material part management module 2, for managing assembly material inventory information and being transmitted to dress With master data module 4;It include: handling of goods and materials computer and infrared scan rifle, handling of goods and materials computer is used for Servicing BOM Information, infrared scan rifle issue in infrared radiation to the two dimensional code of material components, and reflected light is scanned rifle and receives, It is converted into material components type sum number amount information after processing, to reckon by the piece and mistake proofing, to guarantee assembling process required thing Material components are accurately dispensed into scene;
The material part management module 2 is material components type sum number needed for work step each in production work order 7 Amount compares and judges with practical dispatching situation: in place, then judging result is to pass through and be transmitted to assembly execution module;Less than Position, then judging result is not pass through, and passes handling of goods and materials department back and urges and send components;The deterministic process is calculated in handling of goods and materials It is carried out in machine, judging result can intuitively be embodied in assembly execution module 6.
As a preferred embodiment, the assembly material inventory information includes: part serial number, detail drawing Number, part name, number of parts, whether assemble, in which: part serial number is the common parts or auxiliary member of not drawing number " identity card ", such as auxiliary member alloy electrode, Serial No. 18001344 in the present embodiment;Detail drawing number is that have drawing Important part " identity card ", such as part valve seat, drawing number in the present embodiment is 906.30.41.04G01.
In the present embodiment, the process tools management module 1 includes: tool management computer and infrared scan rifle, In:
The tool management computer is used to service procedure equipment master data, and (include: workshop is from repair parts line item, specific purpose tool Figure number, specific purpose tool title, general utility tool figure number, general utility tool title), and it is transmitted to assembly master data module 4;It is described infrared to sweep It retouches rifle to issue in infrared radiation to the two dimensional code of tooling, reflected light is scanned rifle and receives, and is converted into work after processing Type and quantity information are filled, to guarantee that tooling needed for assembling process is accurately received;
The process tools management module 1 is tooling type needed for work step each in production work order 7 and quantity and reality Receive situation to compare and judge: in place, then judging result is to pass through and be transmitted to assembly execution module 6;It is not in place, then judge As a result it not pass through, then needs to receive tooling again;The deterministic process carries out in tool management computer, and judging result exists Assembly execution module 6 can intuitively embody.
In the present embodiment, the quality testing module 3 includes: quality inspection management computer and mobile plate, in which:
The quality inspection management computer is for formulating quality inspection access points and being associated with specific work step;Determine quality inspection type (including: state confirmation, fit dimension, design value measured value);It provides quality testing standard: providing corresponding skill according to different quality inspection types Art requires standard;Manage drawing and document information: drawing and document information piecemeal are associated with work step;
Erecting yard 8 is equipped with the mobile plate with quality inspection management computer interconnection, the 9 filling movement of assembling process quality inspection record Plate, and in incoming quality inspection management computer;Quality inspection management computer judges whether work step correlation quality check process is completed, and will sentence Disconnected result is transmitted to assembly execution module 6;The deterministic process carries out in quality inspection management computer, and judging result is executed in assembly Module 6 can intuitively embody.
As a preferred embodiment, the quality inspection record 9 includes: operation number, work step, tool figure number, scrutineer Member, designation of drawing, pdf title, checks detail at the review time.
As a preferred embodiment, the inspection detail includes: checking that serial number, inspect-type, the scope of examination are retouched It states, design standard.
In the present embodiment, the assembly master data module 4 includes: assembly master data server, the assembly master data There is the database of structuring in server, data are with figure number for unique major key, and corresponding tables of data includes process route under figure number Information, material components information, technological equipment information, quality information.
As a preferred embodiment, the process route information include: product figure number, name of product, operation number, Work step number, work post, technique content, technical requirements, working equipment number.
In the present embodiment, the work order module 5 includes: to produce work order computer and printer, printer and production work Unicomputer connection, for printing production work order 7;Wherein:
For the production work order computer according to manufacture odd numbers, selection, which is assembled, has the qualified figure of examination & approval in master data module 4 Number with generate produce work order 7, the associated process route information of figure number, material components information, technological equipment information, quality information Etc. contents simultaneously be endowed production work order 7;Scheduled production process is that its production is assigned to the production work order 7 that has made is preferential suitable Scheduled production information to carry out scheduled production, and is transmitted to assembly execution module 6 by sequence.
As a preferred embodiment, the production work order 7 includes: production work order number, part name, drawing number, Machining tool, production work order date created, work order formulation person.
In the present embodiment, the assembly execution module 6, for instructing the operation of erecting yard 8;Assemble execution module 6 It include: server, touch screen, thin client and card reader, in which:
Thin client is the client computer for being mounted on erecting yard 8, possesses from server and obtains production 7 information of work order simultaneously Display is on the touchscreen;Worker selects a production work order 7 to enter assembly and executes interface, and material part management module 2 dispenses After the completion of part is in place, process tools management module 1 confirms that tooling receives, the operation such as start, suspend on worker's point touching screen When button, and assembling process quality inspection is carried out, quality inspection record 9 passes to quality testing module 3;Aforesaid operations have to swipe the card from card reader logical It crosses, the corresponding worker's information of the operation is recorded with system, and upload, save to server.
As a preferred embodiment, the assembly execute interface include operation, beginning, pause, continuation, self-test, The utility function specially examined, completed.
As a preferred embodiment, worker's information includes: ID, name, work post, grade of skill, manufacture list Number, operation work step, operation content, operating time stamp.
Based on above-mentioned system structure, following application example is provided, the application is by taking steam turbine valve assembles as an example:
It realizes that assembling process is managed, first has to the accuracy for ensuring to assemble master data, secondary guarantee material components In place, technological equipment in place, quality inspection complete, erecting yard 8 just can be carried out accurate assembly, reduces from source and misloading, neglected loading occurs A possibility that problem;Specific workflow is as follows:
The first, management assembly master data
Technologist fills according to the process route information, material components information, the technique that include in assembly master data module 4 Standby information, quality information, respectively from material part management module 2, process tools management module 1,3 associated data of quality testing module On to corresponding figure number (as shown in Figure 2).
The second, production work order is generated
Manufacturing sector is associated together unique manufacture odd numbers with figure number, and production work order 7, production planning and sequencing person's basis is made Manufactured production work order 7 is associated with upper production sequence priority, assembly execution module 6 is transmitted to, to instruct produced on-site (such as Fig. 3 With shown in Fig. 4).
The situation judgement in place of third, material components and technological equipment and feedback
After the completion of dispatching personnel are by assembling inventory material dispensing, receiving tool by tooling inventory, field worker utilizes infrared Scanner scans the two-dimensional barcode information of material components and technological equipment, and quantity and encoded information are transmitted to material components respectively Management module 2 and process tools management module 1 carry out situation in place and judge, judging result is transmitted to assembly execution module 6;If all arriving Position, " operation " button are lighted, i.e., executable assembly (as shown in Figure 5).
4th, implementation procedure is produced
Worker holds according to accurate technique, material components and technological equipment in production work order 7 by operating unit of work step Row production process, and assembling process quality inspection (as shown in Figure 6) is carried out in quality testing module 3.
A kind of above-mentioned project type Product Assembly process management and control system of the present invention, solves neglected loading misloading in assembling process and asks Topic passes technique content, technological equipment, components, quality examination information accurate correlation in assembling process to minimum operation unit It is delivered to erecting yard, instructs the operation of assembler's assembled in situ, quality inspection, recording process information, guarantees accurate personnel by accurate Technique, accurate resource is accurately sequentially assembled, to guarantee assembling quality.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any to repair Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.

Claims (13)

1. a kind of project type Product Assembly process management and control system, which is characterized in that the system comprises: assembly execution module, object Expect part management module, process tools management module, quality testing module, assembly master data module and work order module;Wherein:
The assembly execution module, as site-assembled total foundation is instructed, for instructing assembled in situ process;
The material part management module, the base for material part class type, quantity, technical requirements needed for showing each work step Plinth data, and it is transmitted to assembly master data module;Whether in place material components are judged according to practical dispatching situation, and judgement is tied Fruit is transmitted to assembly execution module;
The process tools management module, for safeguarding technological equipment type, the quantity of each work step outfit, fixture, measurer And the basic data of technical requirements, and it is transmitted to assembly master data module;It is equipped with according to scene, actually dispenses and receive situation and sentence Whether in place it break, and judging result is transmitted to assembly execution module;
The quality testing module examines project for providing each work step assembling process, the special inspection including worker's self-test and quality assistant director, The basic data for recording each check item of assembling process is transmitted to assembly master data module;And it is passed whether having inspected preamble work step Give assembly execution module;
The assembly master data module is passed for including material part management module, process tools management module, quality testing module The basic data information of the assembly project to come over is the basis of project type Product Assembly process management and control system;
The work order module, including formulate production work order and scheduled production two parts, for will assemble the information in master data module and Work order association is produced, assembly execution module is then passed to, to instruct assembled in situ;
Master data module is assembled with figure number for unique major key, the process route information and material part management under the figure number Module, process tools management module form an assembly master data entry together with the information association of quality testing module;Work order mould Block selects corresponding figure number to generate production work order according to manufacture odd numbers, and assigns its production to the production work order made Priority carries out scheduled production, and scheduled production information is distributed assembly execution module;Assembly execution module is arranged on erecting yard, It carries out assembly manipulation according to technique as unit of work step.
2. a kind of project type Product Assembly process management and control system according to claim 1, which is characterized in that the assembly Execution module, comprising: server, touch screen, thin client and card reader, in which: thin client obtains production work from server Single information is simultaneously shown on the touchscreen;Worker selects a production work order to enter assembly and executes interface, comprising operation, starts, temporarily Stop, continue, self-test, specially examine, complete utility function, material part management module dispense part in place, process tools management After the completion of module confirmation tooling is received, the operation button for starting on worker's point touching screen, suspending, and carry out assembling process matter Inspection, quality inspection record pass to quality testing module;Aforesaid operations, which are both needed to swipe the card from card reader, to be passed through, so that system is able to record lower corresponding behaviour Make the information of worker, and uploads, saves to server.
3. a kind of project type Product Assembly process management and control system according to claim 2, which is characterized in that the worker Information, comprising: ID, name, work post, grade of skill, manufacture odd numbers, operation work step, operation content, operating time stamp.
4. a kind of project type Product Assembly process management and control system according to claim 1, which is characterized in that the material Part management module, comprising: handling of goods and materials computer and infrared scan rifle, in which: handling of goods and materials computer is for safeguarding object Expect inventory information;Infrared scan rifle issues in infrared radiation to the two dimensional code of material components, and reflected light is scanned Rifle receives, and is converted into material components type sum number amount information after processing, to reckon by the piece and mistake proofing, to guarantee assembling process Required material components are accurately dispensed into scene;
The material part management module is material components type sum number amount and reality needed for work step each in production work order Border dispatching situation compares and judges: in place, then judging result is to pass through and be transmitted to assembly execution module;It is not in place, then sentence Disconnected result is not pass through, and passes handling of goods and materials department back and urges and send components.
5. a kind of project type Product Assembly process management and control system according to claim 4, which is characterized in that the material Inventory information includes: whether part serial number detail drawing number, part name, number of parts, assembles.
6. a kind of project type Product Assembly process management and control system according to claim 1, which is characterized in that the technique Military equipment management module, comprising: tool management computer and infrared scan rifle, in which: tool management computer is used to service procedure Equip master data;Infrared scan rifle issues in infrared radiation to the two dimensional code of tooling, and reflected light is scanned rifle and receives, It is converted into tooling type and quantity information after processing, to guarantee that tooling needed for assembling process is accurately received;
To guarantee that tooling needed for assembling process is accurately received, the process tools management module is work step institute each in production work order The tooling type and quantity that need and actually receive situation and compare and judge: in place, then judging result is passes through, and is transmitted to dress With execution module;Not in place, then judging result is not pass through, then needs to receive tooling again.
7. a kind of project type Product Assembly process management and control system according to claim 6, which is characterized in that the technique Equipment master data includes: workshop is from repair parts line item, specific purpose tool figure number, specific purpose tool title, general utility tool figure number, general utility tool Title.
8. a kind of project type Product Assembly process management and control system according to claim 1, which is characterized in that the quality inspection Module, including quality inspection management computer and mobile plate, in which:
Quality inspection management computer is used for: being formulated quality inspection access points and is associated with specific work step, determines quality inspection type, provide quality inspection mark Standard provides relevant art according to different quality inspection types and requires standard, manages drawing and document information, that is, drawing and document information point Block is associated with work step;
Mobile plate and computer interconnect, and assembling process surveys quality detecting data and inserts mobile plate, and incoming quality inspection management calculates In machine;Quality inspection management computer judges whether preamble work step quality check process is completed, and judging result is transmitted to assembly execution module.
9. a kind of project type Product Assembly process management and control system according to claim 8, which is characterized in that the quality inspection Type includes: the type of state confirmation, fit dimension, design value measured value.
10. -9 described in any item a kind of project type Product Assembly process management and control systems according to claim 1, which is characterized in that The assembly master data module, including assembly master data server, it is described to assemble the number for having structuring in master data server According to library, and data with figure number for unique major key, corresponding tables of data includes process route information, material components letter under figure number Breath, technological equipment information, quality information.
11. a kind of project type Product Assembly process management and control system according to claim 10, which is characterized in that the work Skill route information includes: that product figure number, name of product, operation number, work step number, work post, technique content, technical requirements, work are set Standby number.
12. -9 described in any item a kind of project type Product Assembly process management and control systems according to claim 1, which is characterized in that The work order module, including production work order computer and printer, printer is connect with production work order computer, for printing Produce work order;Wherein: for production work order computer according to manufacture odd numbers, selection, which is assembled, has the qualified figure of examination & approval in master data module Number with generate produce work order, the associated process route information of figure number, material components information, technological equipment information, quality information Content be endowed production work order simultaneously;
The scheduled production is to assign its to the production work order made and produce priority and carry out scheduled production, and by scheduled production information It is transmitted to assembly execution module.
13. a kind of project type Product Assembly process management and control system according to claim 12, which is characterized in that the life Producing work order includes: production work order number, part name, drawing number, machining tool, production work order date created, work order formulation person.
CN201610523104.XA 2016-07-05 2016-07-05 A kind of project type Product Assembly process management and control system Active CN106155016B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610523104.XA CN106155016B (en) 2016-07-05 2016-07-05 A kind of project type Product Assembly process management and control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610523104.XA CN106155016B (en) 2016-07-05 2016-07-05 A kind of project type Product Assembly process management and control system

Publications (2)

Publication Number Publication Date
CN106155016A CN106155016A (en) 2016-11-23
CN106155016B true CN106155016B (en) 2019-05-24

Family

ID=58061747

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610523104.XA Active CN106155016B (en) 2016-07-05 2016-07-05 A kind of project type Product Assembly process management and control system

Country Status (1)

Country Link
CN (1) CN106155016B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107728588A (en) * 2017-08-25 2018-02-23 姜肇祺 A kind of intelligence manufacture and quality detecting system and method
CN107767069A (en) * 2017-11-03 2018-03-06 河南科技大学 A kind of assembly line assembling error-preventing method and system based on Bar Code
CN107862469B (en) * 2017-11-23 2021-07-23 深圳市前海文仲信息技术有限公司 Visual operation management method for precisely machined touch screen, mobile terminal and medium
CN107918370A (en) * 2017-11-28 2018-04-17 广东天机机器人有限公司 Robot production data processing method, device, computer equipment and storage medium
CN108303961B (en) * 2018-02-05 2021-04-06 艾凯克斯(嘉兴)信息科技有限公司 Debugging and assembling method based on automatic assembly
CN109086988A (en) * 2018-07-23 2018-12-25 中车青岛四方机车车辆股份有限公司 Assembling product quality information automatic tracking system and method
CN109269458A (en) * 2018-11-08 2019-01-25 中信戴卡股份有限公司 A kind of coordinate measuring machine and method
KR102217922B1 (en) * 2019-01-08 2021-02-19 주식회사 럭스로보 A system for providing assembly information and a module assembly
CN110472905A (en) * 2019-07-02 2019-11-19 湖北北辰时代信息技术有限公司 It is a kind of based on the material quality detecting method for automatically generating two dimensional code intelligent terminal barcode scanning
CN114415613B (en) * 2022-01-07 2022-09-09 深圳市微特精密科技股份有限公司 Automatic production management system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101105821A (en) * 2007-08-23 2008-01-16 上海交通大学 Assemblage process generation method for dummy assembly manipulation process
CN102073771A (en) * 2011-01-13 2011-05-25 北京理工大学 Mechanism modeling method and device
CN102402722A (en) * 2011-09-28 2012-04-04 上海交通大学 Method for improving assembly line efficiency of project machine products
CN102723243A (en) * 2012-06-12 2012-10-10 上海交通大学 Misassembly preventive system for electrical product assembly
CN104252554A (en) * 2013-06-29 2014-12-31 南京晨光集团有限责任公司 Producing method for three-dimensional craft of final product assembly

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006107167A (en) * 2004-10-06 2006-04-20 Kobe Steel Ltd Scheduling system, scheduling program and scheduling method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101105821A (en) * 2007-08-23 2008-01-16 上海交通大学 Assemblage process generation method for dummy assembly manipulation process
CN102073771A (en) * 2011-01-13 2011-05-25 北京理工大学 Mechanism modeling method and device
CN102402722A (en) * 2011-09-28 2012-04-04 上海交通大学 Method for improving assembly line efficiency of project machine products
CN102723243A (en) * 2012-06-12 2012-10-10 上海交通大学 Misassembly preventive system for electrical product assembly
CN104252554A (en) * 2013-06-29 2014-12-31 南京晨光集团有限责任公司 Producing method for three-dimensional craft of final product assembly

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
主推进监控系统项目的装配进度管理研究与应用;陈倍颖;《中国优秀硕士学位论文全文数据库经济与管理科学辑》;20160315(第03期);全文

Also Published As

Publication number Publication date
CN106155016A (en) 2016-11-23

Similar Documents

Publication Publication Date Title
CN106155016B (en) A kind of project type Product Assembly process management and control system
Tompkins et al. Facilities planning
US8606624B2 (en) Risk reports for product quality planning and management
US7079906B2 (en) Paperless tablet automation apparatus and method
US20080103843A1 (en) Integrating information for maintenance
US8195532B2 (en) Generating information for use in performing physical operations
CN111242477A (en) ERP commodity management system and method
Ping Yi et al. Reducing electronic component losses in lean electronics assembly with Six Sigma approach
CN107679807A (en) A kind of processing method and equipment of object storage
CN108846645A (en) A kind of enterprise's flattened management method and system
CN112508314A (en) Uygur medicine manufacturing execution system
CN110570109A (en) Data center full life cycle integrated service test process supervision system
Nelsen et al. Quality glossary
Son Simulation-based manufacturing accounting for modern management
Afriansyah et al. Production planning and control system with just in time and lean production: a review
CN106600225B (en) Method for reversely establishing ERP system by taking core data as center according to business logic
Tseng et al. Accountability centered approach to business process reengineering
Yung et al. A mechanism for the integration of TQM and MRPII
CN114118925B (en) Defective product material management control system and method
Jiang et al. Construction supply chain performance management
Kern et al. Concept for selecting and integrating traceability systems in the continuous improvement process of SMEs
SHEET LOAN DOCUMENT SII
Manarvi et al. A methodology of evolving user requirements to launch erp in aircraft industry environment
Lagerberg Johannisson et al. Interactive Augmented Reality with embedded smart-sensorsas a means of conveying picking information in kit preparation-A comparative analysis of performance and cost against established picking informationsystems
Oliveira et al. Development of standard-based information requirements for the facility management of a canteen.

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant