CN106149768A - 一种围护桩结合冠梁的地下结构的抗浮结构及其施工方法 - Google Patents
一种围护桩结合冠梁的地下结构的抗浮结构及其施工方法 Download PDFInfo
- Publication number
- CN106149768A CN106149768A CN201610709511.XA CN201610709511A CN106149768A CN 106149768 A CN106149768 A CN 106149768A CN 201610709511 A CN201610709511 A CN 201610709511A CN 106149768 A CN106149768 A CN 106149768A
- Authority
- CN
- China
- Prior art keywords
- guan liang
- underground structure
- fender post
- main body
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/10—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure
- E02D31/12—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure against upward hydraulic pressure
Abstract
本发明公开了一种围护桩结合冠梁的地下结构的抗浮结构及其施工方法,包括地下结构主体和围护桩,地下结构主体两侧设置有两对称的耳板,围护桩设置在地下结构主体的两侧并紧贴地下结构主体,并在其桩顶固定连接的冠梁,冠梁紧靠地下结构主体一侧设置有水平卧置的凹槽,耳板嵌入到凹槽内。本发明仅采用围护桩、带凹槽的冠梁、地下结构主体的耳板组成构成抗浮结构,通过耳板嵌入到凹槽实现地下结构主体与围护桩的一体连接,水平卧置的U槽型冠梁兼具有压地下结构主体顶梁的作用,能很好的实现地下工程的抗浮作用,结构简单,施工简单,同时能保证地下结构抗浮受力的整体稳定性,抗浮效果好,本发明还具有施工成本低的特点。
Description
技术领域
本发明涉及一种围护桩结合冠梁的地下结构的抗浮结构及其施工方法,属于地下工程抗浮技术领域。
背景技术
随着国民经济的不断发展,我国城市化进程的不断加快,城市地下空间及轨道交通开发利用受到相关部门的重视。许多城市结合城市建设,建设各类地下工程。在高水位地区,地下结构覆土较少或没有覆土的情况时有发生。这种情况下,地下工程的抗浮问题特别突出。因此,地下工程的抗浮设计对地下工程而言显得更加重要。目前,地下工程采用的抗浮措施有增大覆土法、设置抗拔桩、设置抗浮压顶梁。但是在现场施工过程中,由于地下结构主体的顶板接近地面或者地下结构主体为闯口型式时,常规的抗浮压顶梁则较难施作,结构复杂,成本高,或者需要通过减薄地下结构主体侧墙的方式来设置抗浮压顶梁,存在安全隐患。
发明内容
本发明要解决的技术问题是:提供一种围护桩结合冠梁的地下结构的抗浮结构及其施工方法,结构简单,施工简单,施工成本低,安全性更高,以解决现有技术中存在的问题。
本发明采取的技术方案为:地下结构主体和围护桩,地下结构主体两侧设置有两对称的耳板,围护桩设置在地下结构主体的两侧并紧贴地下结构主体,并在其桩顶固定连接的冠梁,冠梁紧靠地下结构主体一侧设置有水平卧置的凹槽,耳板嵌入到凹槽内。
优选的,上述围护桩还可替换为围护墙。
优选的,上述围护桩内部设置有伸向冠梁的连接钢筋。
一种围护桩结合冠梁的地下结构的抗浮结构的施工方法,该方法包括以下步骤:
(1)围护桩的施工:根据实际施工工况及地质情况,依据建筑基坑支护技术规程进行围护结构计算分析,并结合深基坑软件计算结果进行配筋,在地下结构主体结构左右外侧设置围护桩或围护墙,并根据设计构造要求预留其与冠梁的连接钢筋,将围护桩的纵筋全部锚入冠梁内;
(2)冠梁的施工:待围护桩施工完成后,围护桩桩身混凝土强度达到70%后,再进行冠梁的施工,将冠梁施作成带有水平卧置的凹槽的冠梁;
(3)地下结构主体的施工:待冠梁浇筑完成并养护达到设计强度时,进行基坑开挖,先架设基坑支撑,再进行基坑开挖,且从上至下依次架设基坑支撑和开挖基坑,当基坑开挖至基坑底时,由下至上依次施作垫层、防水层,现浇防水地下结构主体,在冠梁的凹槽高度位置的地下结构主体伸出耳板锚入冠梁,再与地下结构主体一起浇筑。
本发明的有益效果:与现有技术相比,本发明的效果如下:
(1)本发明仅采用围护桩、带凹槽的冠梁、地下结构主体的耳板组成构成抗浮结构,通过耳板嵌入到凹槽实现地下结构主体与围护桩的一体连接,水平卧置的U槽型冠梁兼具有压地下结构主体顶梁的作用,能很好的实现地下工程的抗浮作用,结构简单,施工简单,同时能保证地下结构抗浮受力的整体稳定性,抗浮效果好,有效解决了现有技术中存在的结构复杂、施工难、施工成本高和安全性差的问题,本发明还具有施工成本低的特点;
(2)本发明在后续的施工过程中,利用既有围护桩结构,无需额外增加构件,减少施工步骤,提高施工效率,缩短了施工工期,且也大大减低了施工成本;
(3)本发明可适用于不同类型的地下工程,特别是顶板上无覆土或闯口的地下结构,在满足抗浮要求的前提下,不会减薄地下结构主体侧墙的厚度,避免地下结构主体受力受到影响,提高地下结构主体安全性,有效解决了现有技术中因地下主体结构减薄造成的安全性差的问题。
附图说明
图1是本发明的抗浮结构整体示意图;
图2是本发明用于抗浮作用的结构示意图;
图3是图2的俯视结构示意图;
图4是图2中的基坑支撑处侧视结构示意图;
图5是图2中的地下结构主体处侧视结构示意图。
图中,1-地下结构主体,2-围护桩,3-冠梁,4-耳板,5-凹槽,6-基坑支撑。
具体实施方式
下面结合附图及具体的实施例对本发明进行进一步介绍。
实施例1:如图1-图5所示,括地下结构主体1和围护桩2,地下结构主体1两侧设置有两对称的耳板4,围护桩2设置在地下结构主体1的两侧并紧贴地下结构主体1,并在其桩顶固定连接的冠梁3,冠梁3紧靠地下结构主体1一侧设置有水平卧置的凹槽5,耳板4嵌入到凹槽5内。
优选的,上述围护桩2还可替换为围护墙。
优选的,上述围护桩2内部设置有伸向冠梁3的连接钢筋,提高连接刚度和强度,保证冠梁的稳定性和连接可靠性。
实施例2:一种围护桩结合冠梁的地下结构的抗浮结构的施工方法,该方法包括以下步骤:
(1)围护桩2的施工:根据实际施工工况及地质情况,依据建筑基坑支护技术规程进行围护结构计算分析,并结合深基坑软件计算结果进行配筋,在主体结构1左右外侧设置围护桩,并根据设计构造要求预留其与冠梁3的连接钢筋,将围护桩2的纵筋全部锚入冠梁3内;
(2)冠梁3的施工:待围护桩2施工完成后,围护桩2桩身混凝土强度达到70%后,再进行冠梁3的施工,将冠梁3施作成带有水平卧置的凹槽5的冠梁;
(3)地下结构主体1的施工:待冠梁3浇筑完成并养护达到设计强度时,进行基坑开挖,先架设基坑支撑6,再进行基坑开挖,且从上至下依次架设基坑支撑6和开挖基坑,当基坑开挖至基坑底时,由下至上依次施作垫层、防水层,现浇防水地下结构主体,在冠梁3的凹槽高度位置的地下结构主体1伸出耳板4锚入冠梁,再与地下结构主体1一起浇筑。
实施例3:一种围护桩结合冠梁的地下结构的抗浮结构的施工方法,该方法包括以下步骤:
(1)围护墙的施工:根据实际施工工况及地质情况,依据建筑基坑支护技术规程进行围护结构计算分析,并结合深基坑软件计算结果进行配筋,在主体结构1左右外侧设置围护墙,并根据设计构造要求预留其与冠梁3的连接钢筋,将围护墙的纵筋全部锚入冠梁3内;
(2)冠梁3的施工:待围护墙施工完成后,围护桩2桩身混凝土强度达到70%后,再进行冠梁3的施工,将冠梁3施作成带有水平卧置的凹槽5的冠梁;
(3)地下结构主体1的施工:待冠梁3浇筑完成并养护达到设计强度时,进行基坑开挖,先架设基坑支撑,再进行基坑开挖,且从上至下依次架设基坑支撑和开挖基坑,当基坑开挖至基坑底时,由下至上依次施作垫层、防水层,现浇防水地下结构主体,在冠梁3的凹槽5高度位置的地下结构主体1伸出耳板4锚入冠梁,再与地下结构主体1一起浇筑。
以上所述,仅为本发明的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,可轻易想到变化或替换,都应涵盖在本发明的保护范围之内,因此,本发明的保护范围应以所述权利要求的保护范围为准。
Claims (4)
1.一种围护桩结合冠梁的地下结构的抗浮结构,其特征在于:包括地下结构主体(1)和围护桩(2),地下结构主体(1)两侧设置有两对称的耳板(4),围护桩(2)设置在地下结构主体(1)的两侧并紧贴地下结构主体(1),并在其桩顶固定连接的冠梁(3),冠梁(3)紧靠地下结构主体(1)一侧设置有水平卧置的凹槽(5),耳板(4)嵌入到凹槽(5)内。
2.根据权利要求1所述的一种围护桩结合冠梁的地下结构的抗浮结构,其特征在于:围护桩(2)还可替换为围护墙。
3.根据权利要求1所述的一种围护桩结合冠梁的地下结构的抗浮结构,其特征在于:围护桩(2)内部设置有伸向冠梁(3)的连接钢筋。
4.根据权利要求1-3任一所述的一种围护桩结合冠梁的地下结构的抗浮结构的施工方法,其特征在于:该方法包括以下步骤:
(1)围护桩(2)的施工:根据实际施工工况及地质情况,依据建筑基坑支护技术规程进行围护结构计算分析,并结合深基坑软件计算结果进行配筋,在地下结构主体结构(1)左右外侧设置围护桩或围护墙,并根据设计构造要求预留其与冠梁(3)的连接钢筋,将围护桩(2)的纵筋全部锚入冠梁(3)内;
(2)冠梁(3)的施工:待围护桩(2)施工完成后,围护桩(2)桩身混凝土强度达到70%后,再进行冠梁(3)的施工,将冠梁(3)施作成带有水平卧置的凹槽(5)的冠梁;
(3)地下结构主体(1)的施工:待冠梁(3)浇筑完成并养护达到设计强度时,进行基坑开挖,先架设基坑支撑(6),再进行基坑开挖,且从上至下依次架设基坑支撑和开挖基坑,当基坑开挖至基坑底时,由下至上依次施作垫层、防水层,现浇防水地下结构主体,在冠梁(3)的凹槽(5)高度位置的地下结构主体(1)伸出耳板(4)锚入冠梁,再与地下结构主体(1)一起浇筑。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610709511.XA CN106149768B (zh) | 2016-08-24 | 2016-08-24 | 一种围护桩结合冠梁的地下结构的抗浮结构及其施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610709511.XA CN106149768B (zh) | 2016-08-24 | 2016-08-24 | 一种围护桩结合冠梁的地下结构的抗浮结构及其施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106149768A true CN106149768A (zh) | 2016-11-23 |
CN106149768B CN106149768B (zh) | 2018-09-21 |
Family
ID=57342374
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610709511.XA Active CN106149768B (zh) | 2016-08-24 | 2016-08-24 | 一种围护桩结合冠梁的地下结构的抗浮结构及其施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106149768B (zh) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109208937A (zh) * | 2018-10-26 | 2019-01-15 | 中铁第勘察设计院集团有限公司 | 地铁车站既有结构未预留抗浮条件的榫槽体系及施工方法 |
CN109403391A (zh) * | 2018-11-05 | 2019-03-01 | 中铁二十二局集团轨道工程有限公司 | 一种富水条件下半地下厅车站抗浮的方法 |
CN110004991A (zh) * | 2019-04-29 | 2019-07-12 | 中铁第一勘察设计院集团有限公司 | 基于外凸式翼脚板的地下结构抗浮体系及构建方法 |
CN110185295A (zh) * | 2019-05-31 | 2019-08-30 | 中国十七冶集团有限公司 | 一种仅有支护桩的抗浮地下车库及其施工方法 |
CN110273439A (zh) * | 2019-07-16 | 2019-09-24 | 成都市建筑设计研究院 | 地下车站主体与附属结构接口处抗浮结构及其施工方法 |
CN114108694A (zh) * | 2021-11-11 | 2022-03-01 | 中冶集团武汉勘察研究院有限公司 | 一种微扰动抗浮地下圆筒式结构及其施工方法 |
CN115126008A (zh) * | 2022-06-17 | 2022-09-30 | 广州地铁设计研究院股份有限公司 | 一种后做车站抗浮装置及其工法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202430711U (zh) * | 2012-01-31 | 2012-09-12 | 中铁十三局集团第五工程有限公司 | 地下工程用带有抗浮齿槽的围护桩 |
CN104088295A (zh) * | 2014-06-12 | 2014-10-08 | 广州市市政工程设计研究院 | 盖挖逆作中围护墙与中板的嵌入式连接结构及其施工方法 |
JP2014221991A (ja) * | 2013-05-14 | 2014-11-27 | Jfeスチール株式会社 | 鋼製矢板締切構造およびその施工方法 |
CN105625480A (zh) * | 2016-03-16 | 2016-06-01 | 上海市城市建设设计研究总院 | 敞开段隧道结构的抗浮方法及抗浮结构 |
CN205934994U (zh) * | 2016-08-24 | 2017-02-08 | 贵州理工学院 | 一种围护桩结合冠梁的地下结构的抗浮结构 |
-
2016
- 2016-08-24 CN CN201610709511.XA patent/CN106149768B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202430711U (zh) * | 2012-01-31 | 2012-09-12 | 中铁十三局集团第五工程有限公司 | 地下工程用带有抗浮齿槽的围护桩 |
JP2014221991A (ja) * | 2013-05-14 | 2014-11-27 | Jfeスチール株式会社 | 鋼製矢板締切構造およびその施工方法 |
CN104088295A (zh) * | 2014-06-12 | 2014-10-08 | 广州市市政工程设计研究院 | 盖挖逆作中围护墙与中板的嵌入式连接结构及其施工方法 |
CN105625480A (zh) * | 2016-03-16 | 2016-06-01 | 上海市城市建设设计研究总院 | 敞开段隧道结构的抗浮方法及抗浮结构 |
CN205934994U (zh) * | 2016-08-24 | 2017-02-08 | 贵州理工学院 | 一种围护桩结合冠梁的地下结构的抗浮结构 |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109208937A (zh) * | 2018-10-26 | 2019-01-15 | 中铁第勘察设计院集团有限公司 | 地铁车站既有结构未预留抗浮条件的榫槽体系及施工方法 |
CN109403391A (zh) * | 2018-11-05 | 2019-03-01 | 中铁二十二局集团轨道工程有限公司 | 一种富水条件下半地下厅车站抗浮的方法 |
CN110004991A (zh) * | 2019-04-29 | 2019-07-12 | 中铁第一勘察设计院集团有限公司 | 基于外凸式翼脚板的地下结构抗浮体系及构建方法 |
CN110004991B (zh) * | 2019-04-29 | 2023-12-08 | 中铁第一勘察设计院集团有限公司 | 基于外凸式翼脚板的地下结构抗浮体系及构建方法 |
CN110185295A (zh) * | 2019-05-31 | 2019-08-30 | 中国十七冶集团有限公司 | 一种仅有支护桩的抗浮地下车库及其施工方法 |
CN110273439A (zh) * | 2019-07-16 | 2019-09-24 | 成都市建筑设计研究院 | 地下车站主体与附属结构接口处抗浮结构及其施工方法 |
CN114108694A (zh) * | 2021-11-11 | 2022-03-01 | 中冶集团武汉勘察研究院有限公司 | 一种微扰动抗浮地下圆筒式结构及其施工方法 |
CN115126008A (zh) * | 2022-06-17 | 2022-09-30 | 广州地铁设计研究院股份有限公司 | 一种后做车站抗浮装置及其工法 |
Also Published As
Publication number | Publication date |
---|---|
CN106149768B (zh) | 2018-09-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106149768A (zh) | 一种围护桩结合冠梁的地下结构的抗浮结构及其施工方法 | |
CN105041349B (zh) | 一种在地铁区间盾构隧道基础上扩挖车站的暗挖施工方法 | |
CN105064397B (zh) | 一种在地铁区间盾构隧道基础上扩挖车站的明挖施工方法 | |
CN101092850A (zh) | 一种建筑物或古建筑物/群整体顶升的方法和装置 | |
CN105089670B (zh) | 一种在并行区间盾构隧道基础上扩挖地铁车站施工方法 | |
CN103306301A (zh) | 基于围护桩与地下室底板的桩基基础结构及其施工方法 | |
CN204849851U (zh) | 一种围护桩结合抗浮块的地铁车站抗浮结构 | |
CN105370288A (zh) | 浅埋大跨隧道施工方法 | |
CN210598987U (zh) | 基于单层四导洞和中导洞内桩基础的地铁车站 | |
CN103104102B (zh) | 一种地下增层改造施工方法 | |
CN109183838B (zh) | 一种高抗浮抗裂性能地下室底板结构及其设计方法 | |
CN109056810A (zh) | 既有建筑下方明挖或盖挖地下主体结构的横向扩挖构造及其施工方法 | |
CN105586985A (zh) | 一种地铁围护结构的修建方法及一种地铁围护结构 | |
CN205422733U (zh) | 大跨度高边墙侧洞扣拱分台阶地铁车站支护结构 | |
CN112813983B (zh) | 一种坑中坑深浅同期实施的悬挑梁柱体系及施工方法 | |
CN205934994U (zh) | 一种围护桩结合冠梁的地下结构的抗浮结构 | |
CN207267986U (zh) | 一种免隔离结构的基坑分区支护结构 | |
CN106120542A (zh) | 可应用于抗震设防烈度较高区域的装配式墩及其施工工艺 | |
CN208815566U (zh) | 既有建筑下方明挖或盖挖地下主体结构的横向扩挖构造 | |
CN111236325A (zh) | 地铁车站与物业开发地下室底板分离的抗浮系统及方法 | |
CN201495555U (zh) | 房心立塔砼灌注高桩的承台塔基 | |
CN206693242U (zh) | 基坑工程中一种悬索式支撑梁竖向承载结构 | |
CN206189968U (zh) | 一种内衬塑料阶梯状预制装配式地下粮仓 | |
CN209837040U (zh) | 下穿隧道抗拔结构 | |
CN107476315A (zh) | 一种针对紧邻型基坑的预制式构件及其施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |