CN106149677B - High-pressure water-enriched goaf grouting reinforcement means - Google Patents

High-pressure water-enriched goaf grouting reinforcement means Download PDF

Info

Publication number
CN106149677B
CN106149677B CN201510179339.7A CN201510179339A CN106149677B CN 106149677 B CN106149677 B CN 106149677B CN 201510179339 A CN201510179339 A CN 201510179339A CN 106149677 B CN106149677 B CN 106149677B
Authority
CN
China
Prior art keywords
goaf
enriched
pressure water
grouting
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510179339.7A
Other languages
Chinese (zh)
Other versions
CN106149677A (en
Inventor
姚裕春
傅毅静
李安洪
魏永幸
刘洋
谭汉义
袁碧玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201510179339.7A priority Critical patent/CN106149677B/en
Publication of CN106149677A publication Critical patent/CN106149677A/en
Application granted granted Critical
Publication of CN106149677B publication Critical patent/CN106149677B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

High-pressure water-enriched goaf grouting reinforcement means, with numerous deficiencies existing for solving existing goaf grouting reinforcement means, make high-pressure water-enriched goaf grouting strengthening construction feasible, quick and save construction cost.This method forms goaf top plate caving zone using artificial explosion on mined out stabilization zone border, by forming curtain reinforcement body using high pressure slip casting in the caving zone under the effect of both sides water under high pressure, solve the problems, such as that slip casting liquid is difficult to form curtain in water under high pressure goaf.Grouting and reinforcing is inwardly promoted to be gradually reduced the pressure influence of mined out stabilization zone periphery water under high pressure and the not section supplement at water source since mined out stabilization zone surrounding, the pressure of goaf water under high pressure can be reduced by carrying out water-pumping/draining using injected hole, so as to avoid each injected hole from using high pressure slip casting, deposit and consolidate beneficial to injection slurry simultaneously, so as to save engineering time and construction cost.

Description

High-pressure water-enriched goaf grouting reinforcement means
Technical field
The present invention relates to Geotechnical Engineering, more particularly to high-pressure water-enriched goaf grouting reinforcement means.
Background technology
Coal mine gob is widely present in China, and water in gob area would generally be formed when goaf buried depth is larger, when depositing Even there is high artesian phenomenon during water water-head in source, so as to form high-pressure water-enriched goaf.When on these goafs When portion builds engineering project, when it is strict to deformation requirements, it is necessary to taking effective measures ensures the safety of top-out, this When most effective and the most frequently used method be that grouting and reinforcing is carried out to goaf.But due to the high-pressure water-enriched feature in goaf, pass The grouting and reinforcing construction technology of system is difficult to carry out:High artesian causes slip casting liquid to enter slip casting liquid in difficult, high artesian It is difficult to that solidification forms reinforcing body, high artesian is difficult to discharge then consolidation effect is poor, goaf is difficult to form reinforcing and encloses curtain after Deng.Therefore, a kind of high-pressure water-enriched goaf grouting reinforcement means for adapting to high-pressure water-enriched feature is urgently needed to solve such ask Topic, and need to have the characteristics that easy for construction, economical, construction is quick, environmentally friendly.
The content of the invention
It is an object of the invention to provide a kind of high-pressure water-enriched goaf grouting reinforcement means, to solve existing goaf grouting Multinomial deficiency existing for reinforcing construction process, make high-pressure water-enriched goaf grouting strengthening construction feasible, quick and save and be constructed into This.
The technical solution adopted for the present invention to solve the technical problems is as follows:
The high-pressure water-enriched goaf grouting reinforcement means of the present invention, comprises the following steps:
1) 10~20m divides an endless belt outside mined out stabilization zone, using geological drilling rig drilling 5 in the range of the endless belt ~10 rows, the top of drilling depth to high-pressure water-enriched goaf, every hole insertion high tensile flexible Grouting Pipe, explosive beam, high tensile flexible Grouting Pipe stretches to the bottom in high-pressure water-enriched goaf;
2) drilled in the range of mined out stabilization zone by design requirement using geological drilling rig to the top in high-pressure water-enriched goaf, Common Grouting Pipe is stretched into high-pressure water-enriched goaf;
3) ignition charge beam is segmented, goaf top plate caving zone is formed in the range of endless belt;
4) high pressure slip casting is carried out in the range of from high tensile flexible Grouting Pipe to endless belt, forms curtain reinforcement body;
5) slip casting, draining are inwardly carried out since the surrounding of mined out stabilization zone by common Grouting Pipe;
6) repeat step 5) goaf grouting reinforcing body is formed in the range of mined out stabilization zone, complete grouting and reinforcing.
The invention has the advantages that goaf top plate caving zone is formed on mined out stabilization zone border using artificial explosion, By forming curtain reinforcement body using high pressure slip casting in the caving zone under the effect of both sides water under high pressure, solve slip casting liquid and exist The problem of being difficult to form curtain in high-pressure water-enriched goaf;Inwardly promote grouting and reinforcing can be by since mined out stabilization zone surrounding The pressure influence of decrescence small mined out stabilization zone periphery water under high pressure and the not section supplement at water source;Water-pumping/draining is carried out using injected hole The pressure of goaf water under high pressure can be reduced, so as to avoid each injected hole from using high pressure slip casting, be beneficial to simultaneously Injection slurry deposits and consolidation, so as to save engineering time and construction cost;The construction technology is simple to operate, speed of application is fast, adopts Dead zone consolidation effect is good, and construction investment saves, and has wide popularizing application prospect.
Brief description of the drawings
This specification includes following two width accompanying drawing:
Fig. 1 is longitudinal sectional schematic diagram of the high-pressure water-enriched goaf grouting reinforcement means of the present invention;
Fig. 2 is the horizontal sectional schematic diagram of the high-pressure water-enriched goaf grouting reinforcement means of the present invention;
Component name and corresponding mark are shown in figure:High tensile flexible Grouting Pipe 1, explosive beam 2, common Grouting Pipe 3, height Press rich water goaf 4, goaf top plate caving zone 5, curtain reinforcement body A, goaf grouting reinforcing body B.
Embodiment
The present invention is further described with reference to the accompanying drawings and examples.
Referring to Figures 1 and 2, the high-pressure water-enriched goaf grouting reinforcement means of the present invention, comprises the following steps:
1) 10~20m divides an endless belt outside mined out stabilization zone, using geological drilling rig drilling 5 in the range of the endless belt ~10 rows, the top of drilling depth to high-pressure water-enriched goaf 4 are high-strength soft every hole insertion high tensile flexible Grouting Pipe 1, explosive beam 2 Property Grouting Pipe 1 stretches to the bottom in high-pressure water-enriched goaf 4;
2) drilled in the range of mined out stabilization zone by design requirement using geological drilling rig to the top in high-pressure water-enriched goaf 4 Portion, common Grouting Pipe 3 is stretched into high-pressure water-enriched goaf 4;
3) ignition charge beam 2 is segmented, goaf top plate caving zone 5 is formed in the range of endless belt;
4) high pressure slip casting is carried out in the range of from high tensile flexible Grouting Pipe 1 to endless belt, forms curtain reinforcement body A;
5) slip casting, draining are inwardly carried out since the surrounding of mined out stabilization zone by common Grouting Pipe 3;
6) repeat step 5) goaf grouting reinforcing body B is formed in the range of mined out stabilization zone, complete grouting and reinforcing.
Do not formed between the goaf top plate caving zone 5 and the top surface in high-pressure water-enriched goaf 4 that are formed in the step 3) Pure hydrous fluids, or pure hydrous fluids are highly no more than 1.0m.
In the step 5), slip casting operation is generally carried out by the common Grouting Pipe 3 of the row of outermost 1~2, the row of adjacent inboard 1~2 is general Logical Grouting Pipe 3 carries out water-pumping/draining operation.
Such as mined out stabilization zone planar range is too big, can be same from the centre of mined out stabilization zone to surrounding by common Grouting Pipe 3 Step carries out slip casting, draining.
The present invention forms goaf top plate caving zone using artificial explosion on mined out stabilization zone border, by both sides high pressure Curtain reinforcement body is formed using high pressure slip casting in goaf top plate caving zone under water effect, solves slip casting liquid in high pressure The problem of being difficult to form curtain in rich water goaf.Inwardly grouting and reinforcing is promoted gradually to subtract since mined out stabilization zone surrounding The pressure influence of small mined out stabilization zone periphery water under high pressure and the not section supplement at water source.Carrying out water-pumping/draining using injected hole can be with Reduce the pressure of goaf water under high pressure, so as to avoid each injected hole from using high pressure slip casting, while be beneficial to slip casting Liquid deposits and consolidation, so as to save engineering time and construction cost;The construction technology is simple to operate, speed of application is fast, goaf Consolidation effect is good, and construction investment saves, and has wide popularizing application prospect.
The high-pressure water-enriched goaf grouting reinforcement means of the present invention is described in detail below by way of specific embodiment, this Grouting strengthening method in embodiment is carried out as follows:
1) 10m scopes divide an endless belt outside mined out stabilization zone, using geological drilling rig drilling 5 in the range of the endless belt Row, spacing of wells 2m, arranged in squares, aperture 130mm, the top of drilling depth to high-pressure water-enriched goaf 4, inserted every hole high Strong flexible grout pipe 1, explosive beam 2.High tensile flexible Grouting Pipe 1 stretches to the bottom in high-pressure water-enriched goaf 4, and its bearing capacity is 3.5MPa.The section arrangement of explosive beam point 3, per internode away from 2m;
2) drilled in the range of mined out stabilization zone by design requirement using geological drilling rig to the top in high-pressure water-enriched goaf 4 Portion, common Grouting Pipe 3 is stretched into high-pressure water-enriched goaf 4.Spacing of wells 7m, arranged in squares, aperture 130mm.Common slip casting The bearing capacity of pipe 3 is 2.0MPa;
3) the explosive beam 2 in the range of the 10m of periphery is ignited in segmentation, forms wide about 10m goaf top plate caving zone 5.Ying Jian Look into goaf top plate caving zone 5 and form whether height meets to require, ignite if being unsatisfactory for and once required to satisfaction again, and with this There is provided for other scope embodiments and ignite reference frame;
4) repeat step 3) successively ignite the other scopes in periphery explosive beam 2, formed outside mined out stabilization zone and continuously adopted Dead zone top plate caving zone 5;
5) high pressure (3.5MPa) slip casting is carried out in the range of from high tensile flexible Grouting Pipe 1 to endless belt, curtain is formed and adds Solid A;
6) slip casting, draining, the row of outermost 2 are inwardly carried out since the surrounding of mined out stabilization zone by common Grouting Pipe 3 The logical slip casting of Grouting Pipe 3, the logical water-pumping/draining of Grouting Pipe 3 of the row of inner side 2 note;
7th, repeat step 6 forms goaf grouting reinforcing body B in the range of mined out stabilization zone, completes grouting and reinforcing.
The present invention is described in detail above, the principle and embodiment of the present invention entered using specific case in text Elaboration is gone, the explanation of following examples is only intended to help the method and its core concept for understanding the present invention.It should be pointed out that pair For those skilled in the art, under the premise without departing from the principles of the invention, the present invention can also be carried out Some improvement and modification, these are improved and modification is also fallen into the protection domain of the claims in the present invention.

Claims (4)

1. high-pressure water-enriched goaf grouting reinforcement means, comprises the following steps:
1) 10~20m divides an endless belt outside mined out stabilization zone, using geological drilling rig drilling 5~10 in the range of the endless belt Row, the top of drilling depth to high-pressure water-enriched goaf (4) are high-strength every hole insertion high tensile flexible Grouting Pipe (1), explosive beam (2) Flexible grout pipe (1) stretches to the bottom of high-pressure water-enriched goaf (4);
2) drilled in the range of mined out stabilization zone by design requirement using geological drilling rig to the top of high-pressure water-enriched goaf (4), Common Grouting Pipe (3) is stretched into high-pressure water-enriched goaf (4);
3) ignition charge beam (2) is segmented, goaf top plate caving zone (5) is formed in the range of endless belt;
4) high pressure slip casting is carried out in the range of from high tensile flexible Grouting Pipe (1) to endless belt, forms curtain reinforcement body (A);
5) slip casting, draining are inwardly carried out since the surrounding of mined out stabilization zone by common Grouting Pipe (3);
6) repeat step 5) goaf grouting reinforcing body (B) is formed in the range of mined out stabilization zone, complete grouting and reinforcing.
2. high-pressure water-enriched goaf grouting reinforcement means as claimed in claim 1, it is characterized in that:Formed in the step 3) Pure hydrous fluids, or pure hydrous fluids height are not formed between goaf top plate caving zone (5) and the top surface of high-pressure water-enriched goaf (4) Degree is no more than 1.0m.
3. high-pressure water-enriched goaf grouting reinforcement means as claimed in claim 1, it is characterized in that:In the step 5), outermost 1 The common Grouting Pipe of~2 rows (3) carries out slip casting operation, and the common Grouting Pipe of the row of adjacent inboard 1~2 (3) carries out water-pumping/draining operation.
4. high-pressure water-enriched goaf grouting reinforcement means as claimed in claim 1, it is characterized in that:In the step 5), pass through Common Grouting Pipe (3) synchronously carries out slip casting, draining from the centre of mined out stabilization zone to surrounding.
CN201510179339.7A 2015-04-16 2015-04-16 High-pressure water-enriched goaf grouting reinforcement means Active CN106149677B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510179339.7A CN106149677B (en) 2015-04-16 2015-04-16 High-pressure water-enriched goaf grouting reinforcement means

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510179339.7A CN106149677B (en) 2015-04-16 2015-04-16 High-pressure water-enriched goaf grouting reinforcement means

Publications (2)

Publication Number Publication Date
CN106149677A CN106149677A (en) 2016-11-23
CN106149677B true CN106149677B (en) 2018-03-23

Family

ID=58057762

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510179339.7A Active CN106149677B (en) 2015-04-16 2015-04-16 High-pressure water-enriched goaf grouting reinforcement means

Country Status (1)

Country Link
CN (1) CN106149677B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106761543B (en) * 2016-12-02 2019-07-19 淮北矿业股份有限公司 A method of drilling misses section by goaf
CN109488340A (en) * 2018-12-30 2019-03-19 平煤神马建工集团有限公司 Advanced pouch pre-pouring grout passes rapidly through the construction method in high prominent down-hole goaf
CN109779657B (en) * 2019-01-08 2021-07-27 中铁二院工程集团有限责任公司 High-pressure water-rich goaf group hole driving, draining, grouting and reinforcing construction method
CN110107348A (en) * 2019-04-02 2019-08-09 中勘资源勘探科技股份有限公司 A kind of underground break-though roadways ground blocking technology
CN110644310A (en) * 2019-09-24 2020-01-03 山东大学 Controllable mold bag grouting method for reinforcing roadbed of underlying goaf

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55105021A (en) * 1979-02-07 1980-08-12 Shigeo Takamura High pressure chemichal liquid grouting method utilizing high frequency vibration pressure
CN103573276B (en) * 2013-11-18 2015-09-09 北京建工土木工程有限公司 A kind of mobilism grouting method
CN204186400U (en) * 2014-10-22 2015-03-04 中铁二院工程集团有限责任公司 High-pressure water-enriched goaf ruggedized construction

Also Published As

Publication number Publication date
CN106149677A (en) 2016-11-23

Similar Documents

Publication Publication Date Title
CN106149677B (en) High-pressure water-enriched goaf grouting reinforcement means
CN103498680B (en) Improve the method for fully mechanized coal face period of beginning mining top-coal recovery rate
CN101581231B (en) Gas drainage method for loosening coal body through cross layer boring and hydraulic fracture
CN103510957B (en) A kind of combined type coal uncovering method
CN103306714B (en) Coal seam group with near interval Di Chou holes in lane the mash gas harnessing method in a hole three
CN106150503A (en) The method of tight roof is administered in a kind of fracturing
CN106321025B (en) A kind of coal and the green harmonic extraction system of oil gas and application process
CN103306713B (en) A kind of high prominent coal seam layer-through drilling networking reinforcement means
CN104405436B (en) A kind of method improving ore body Tight filling rate
CN107120137B (en) A kind of coal roadway tunneling is along seat earth Deephole pre-splitting blasting pumping method
CN105134286B (en) L-type well goaf gas pumping method
CN102587960A (en) Arrangement method of high gas coal seam extraction working face roadway
CN109139100A (en) Substituted supporting room formula pillar recovery method is infused in a kind of
CN112727535A (en) Liquid CO2Coal body cracking and permeability increasing method with cooperative drilling and water filling
CN104074534B (en) A kind of combining adopts/the gob-side entry retaining method of fully mechanized coal face
CN104727847B (en) Filled wall is from the gob-side entry retaining method without coal column eliminated
Zhang et al. Control technology of direct passing karstic collapse pillar in longwall top-coal caving mining
CN106089207A (en) Super high seam work surface gob side entry driving thin coal pillar stays equipment, method
CN106285745A (en) Underground coal mine stress field principal direction of stress Forecasting Methodology
CN103498478B (en) Rock curtain grouting in foundation of dam construction method
CN111005740A (en) Method for controlling surrounding rock of upper and lower walls of stope by medium-length hole pre-grouting
CN104454001A (en) In-tunnel dewatering system and method for tunnel in low-permeability silty-fine sand stratum
CN103670423B (en) A kind of method of tunneling on stratiform phyllite rock mass
CN205444232U (en) Stock - gravity type infiltration retaining wall
CN205532633U (en) Tunnel bottom plate reinforcerment system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant