CN106122604B - A kind of bogey for pipeline and the Pipe installing adjusting method using the device - Google Patents

A kind of bogey for pipeline and the Pipe installing adjusting method using the device Download PDF

Info

Publication number
CN106122604B
CN106122604B CN201610492237.5A CN201610492237A CN106122604B CN 106122604 B CN106122604 B CN 106122604B CN 201610492237 A CN201610492237 A CN 201610492237A CN 106122604 B CN106122604 B CN 106122604B
Authority
CN
China
Prior art keywords
casing
pipeline
top shoe
screw rod
sliding block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610492237.5A
Other languages
Chinese (zh)
Other versions
CN106122604A (en
Inventor
兰艳玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Qiangsi Digital Technology Co ltd
Original Assignee
Nanjing Chance Engineering Technology Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Chance Engineering Technology Service Co Ltd filed Critical Nanjing Chance Engineering Technology Service Co Ltd
Priority to CN201610492237.5A priority Critical patent/CN106122604B/en
Publication of CN106122604A publication Critical patent/CN106122604A/en
Application granted granted Critical
Publication of CN106122604B publication Critical patent/CN106122604B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/16Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe
    • F16L3/20Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe allowing movement in transverse direction
    • F16L3/205Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe allowing movement in transverse direction having supporting springs
    • F16L3/2056Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe allowing movement in transverse direction having supporting springs the axis of at least one spring being oblique or perpendicular to the direction of the movement of the pipe

Abstract

A kind of bogey for pipeline and the Pipe installing adjusting method using described device, described device include stationary base mount(1)And the stationary base mount(1)Connected casing(11)And with the casing(11)The Box Cover being removably fixed with(12), the Box Cover(12)It is covered in the casing(11)Upside opening with dismounting when supply pipeline(2)Pass through the upper side opening, the Box Cover(12)Outside be fixedly installed top shoe clamping lid(9), to clamp lid in the top shoe(9)With the Box Cover(12)Between be slideably clamped with top shoe(91), the top shoe(91)In be provided with screw to the longitudinal axis operate screw rod(8)Screw thread coordinates, and the longitudinal axis operates screw rod(8)Outboard Sections through the top shoe clamping lid(9)And clamp lid with the top shoe(9)Adjacent both sides between have first adjustment allowance(80).

Description

A kind of bogey for pipeline and the Pipe installing adjusting method using the device
Technical field
The present invention relates to Pipe installing field, specially a kind of bogey for pipeline and the pipe using described device Road installation and adjustment method.
Background technology
In Pipe installing field, generally require to isolate pipeline with surrounding environment.Medium is transported particularly with pipeline Occasion with temperature and requirement of shelter.Pipeline often using between isolating device and pipeline gap portion carry out effectively every Absolutely.And the fixed middle regulation for pipeline is often difficult to operate, more unworkable is that pipeline is entered on four direction gap Row regulation.Moreover, often face the vibration problem caused by external interference after Pipe installing, this caused damage to isolating device and Influence service life and safe to use.
The content of the invention
Adjusted it is an object of the invention to provide a kind of bogey for pipeline and using the Pipe installing of described device Method, the defects of it can overcome in the prior art.
According to a kind of bogey for pipeline of the present invention, including it is stationary base mount, connected with the stationary base mount Casing and the Box Cover being removably fixed with the casing, the Box Cover be covered in the upside opening of the casing with For pipeline by the upper side opening during dismounting, top shoe clamping lid is fixedly installed on the outside of the Box Cover, to Top shoe is slideably clamped between the top shoe clamping lid and the Box Cover, screw is provided with the top shoe To coordinate with longitudinal axis operation screw flight, the Outboard Sections of longitudinal axis operation screw rod through top shoe clamping lid and There is the first adjustment allowance, the inboard portion of the longitudinal axis operation screw rod between the adjacent both sides of top shoe clamping lid There is the second adjustment allowance through the Box Cover and with the Box Cover adjacent both sides;The right hand external of the casing Fixed block is installed with, screw is provided with the fixed block to coordinate with transverse axis operation screw flight, the transverse axis operates spiral shell The medial end of bar and longitudinal axis operation screw rod is connected to rotatable top pressure head assembly, to top pressure respectively in the pipe On the right side and upper lateral part in road, sliding block clamping lid is fixedly installed on the following side of the casing, under described Sliding block clamps and is slideably clamped with sliding block between lid and the following side of the casing, and the necking section of the sliding block passes through The following side of the casing and with the following side of the casing between adjacent both sides have the 3rd adjustment allowance, it is described first adjust Telescopic protection cotton pad, the protection cotton pad are equipped with whole allowance, the second adjustment allowance and the 3rd adjustment allowance To prevent dust from being entered from the described first adjustment allowance, the second adjustment allowance and the 3rd adjustment allowance in the casing, from And the accumulation of a large amount of dusts in the casing is avoided, wherein, the inner side of on the inside of the left side of the casing and necking section End is respectively fixedly connected with elastic top pressure component, distinguishes in the top shoe clamping lid and sliding block clamping lid The guide rod of the top shoe and the sliding block is provided through, is provided with the top shoe and the sliding block described in confession The perforation that guide rod passes through, the guide rod to be oriented to the sliding motion of the top shoe and the sliding block, its In, each rotational engagement part for including being fixed together by fastener in two rotatable top pressure head assemblies And elastic joint part, be provided with two thrust bearings in the rotational engagement part, described two thrust bearings it Between be bonded to the flange part of corresponding operating screw rod, a top adjacent with the elastic joint part in described two thrust bearings It is pressed on the elastic joint part, in the elastic joint part top pressure is provided with by elastomeric element and resilientiy stretchable Post, to engage and push the pipeline;Two elastic top pressure components include housing and in the inner sides of the housing The top-pressure part slideably to be stretched at portion, the top-pressure part are connected so as to bullet by adjusting spring with the lateral wall of the housing Property is telescopically installed in the housing.
According to the present invention, using the Pipe installing adjusting method of the above-mentioned bogey for pipeline, first, by the pipe Road is put into the casing from the upper side opening of the casing, after the Box Cover is fixedly mounted in place, by described in regulation The longitudinal axis operates screw rod and adjusts the longitudinal axis positions of the pipeline, until the pipeline is in the longitudinal central position of the casing; Afterwards, screw rod is operated to adjust the transverse axis position of the pipeline by adjusting the transverse axis, the longitudinal axis operates screw rod together with institute State top shoe and the sliding block is subjected to displacement in X direction, until the pipeline is in the transverse axis center of the casing Position.
By the present invention, due to being provided with regulation spring in bottom and left side, it can be provided on the longitudinal axis and transverse axis Allowance is adjusted, so as to allow adjusting screw rod to carry out ejection regulation.And what can be moved left and right by setting upper and lower is oppositely installed Longitudinal axis adjusting screw rod and its auxiliary equipment and the elastic top pressure component of bottom, so as to be realized under conditions of in ensureing that the longitudinal axis is fixed For the position adjustments of transverse axis.And by being arranged on the elastomeric element being installed in each rotatable top pressure head assembly, its Guarantee to overcome the pressure on top surface of the regulation spring and be adjusted it is fixed on the basis of, can be to being occurred on pipeline Vibrate into row buffering, so as to avoid causing damage to screw thread and then produce potential safety hazard and increase the service life.
Brief description of the drawings
Fig. 1 is the overall structure diagram of the bogey for pipeline of the present invention;
Fig. 2 is the exemplary enlarged diagram of the rotatable top pressure head assembly in Fig. 1;
Fig. 3 is the exemplary enlarged diagram of the elastic top pressure component in Fig. 1.
Embodiment
With reference to Fig. 1-3, the present invention is described in detail.
It is connected according to a kind of bogey for pipeline of embodiment, including stationary base mount 1 and the stationary base mount 1 Casing 11 and the Box Cover 12 that is removably fixed with the casing 11, the Box Cover 12 be covered in the upper of the casing 11 Side opening is sentenced in dismounting for pipeline 2 by side opening on described, and the outside of the Box Cover 12 is fixedly installed top shoe Lid 9 is clamped, top shoe 91 is slideably clamped between lid 9 and the Box Cover 12 to be clamped in the top shoe, Screw is provided with the top shoe 91 to coordinate with longitudinal axis operation screw rod 8 screw thread, the outside portion of the longitudinal axis operation screw rod 8 Divide and clamp lid 9 through the top shoe and have the first adjustment abundant the adjacent both sides of top shoe clamping lid 9 Amount 80, the inboard portion of longitudinal axis operation screw rod 8 through the Box Cover 12 and with the adjacent both sides of the Box Cover 12 it Between have second adjustment allowance 10;The right hand external of the casing 11 is installed with fixed block 31, is provided with the fixed block 31 Screw with transverse axis operation screw rod 3 screw thread to coordinate, the medial extremity of the transverse axis operation screw rod 3 and longitudinal axis operation screw rod 8 Portion is connected to rotatable top pressure head assembly 71,7, to top pressure is on the right side and upper lateral part of the pipeline 2 respectively, institute State and sliding block clamping lid 6 is fixedly installed on the following side of casing 11, in sliding block clamping lid 6 and the case Sliding block 61 is slideably clamped between the following side of body 11, the necking section 62 of the sliding block 61 passes through the casing 11 Following side and between the adjacent both sides of the following side of the casing 11 have the 3rd adjustment allowance 110, it is described first adjustment it is abundant The adjustment allowance 10 and the 3rd of amount 80, second, which adjusts, is equipped with telescopic protection cotton pad 90, the protection in allowance 110 Cotton pad 90 to prevent dust from described first adjustment allowance 80, second adjust allowance 10 and the 3rd adjust allowance 110 enter In the casing 11, so as to avoid the accumulation of a large amount of dusts in the casing 11, wherein, on the inside of the left side of the casing 11 with And the medial end of the necking section 62 is respectively fixedly connected with elastic top pressure component 51,5, the top shoe clamps lid 9 The guide rod 60 being respectively arranged with lid 6 through the top shoe 91 and the sliding block 61, institute are clamped with the sliding block The perforation for being provided with top shoe 91 and the sliding block 61 and being passed through for the guide rod 60 is stated, the guide rod 60 is to institute The sliding motion for stating top shoe 91 and the sliding block 61 is oriented to, wherein, two rotatable top pressure head assemblies 71,7 In each rotational engagement part 74 and elastic joint part 75 for including being fixed together by fastener 79, it is described Two thrust bearings 72,73 are provided with rotational engagement part 74, phase is bonded between described two thrust bearings 72,73 The flange part 78 of screw rod should be operated, one adjacent with the elastic joint part 75 top in described two thrust bearings 72,73 It is pressed on the elastic joint part 75, is set by elastomeric element 77 in the elastic joint part 75 and resilientiy stretchable There is top pressure post 76, to engage and push the pipeline 2;Two elastic top pressure components 51,5 include housing 52 and The top-pressure part 53 slideably to be stretched at the inside portion of the housing 52, the top-pressure part 53 by adjust spring 54 and with it is described The lateral wall connection of housing 52 is installed in the housing 52 so as to resilientiy stretchable.
Exemplarily or valuably, wherein, the stiffness factor of the elastomeric element 77 is more than the strength of the regulation spring 54 Spend coefficient.
According to embodiment, using the Pipe installing adjusting method of the above-mentioned bogey for pipeline, first, by the pipe The upper side opening of road 2 from the casing 11 is put into the casing 11, after the Box Cover 12 is fixedly mounted in place, passes through tune Save the longitudinal axis operation screw rod 8 and adjust the longitudinal axis positions of the pipeline 2, until the pipeline 2 is in the vertical of the casing 11 Axis center position;Afterwards, screw rod 3 is operated to adjust the transverse axis position of the pipeline 2, the longitudinal axis behaviour by adjusting the transverse axis Make screw rod 8 to be subjected to displacement in X direction together with the top shoe 91 and the sliding block 61, until the pipeline 2 is in The transverse axis center of the casing 11.
By the present invention, due to being provided with regulation spring in bottom and left side, it can be provided on the longitudinal axis and transverse axis Allowance is adjusted, so as to allow adjusting screw rod to carry out ejection regulation.And what can be moved left and right by setting upper and lower is oppositely installed Longitudinal axis adjusting screw rod and its auxiliary equipment and the elastic top pressure component of bottom, so as to be realized under conditions of in ensureing that the longitudinal axis is fixed For the position adjustments of transverse axis.And by being arranged on the elastomeric element being installed in each rotatable top pressure head assembly 71,7 77, its guarantee to overcome the pressure on top surface of the regulation spring and be adjusted it is fixed on the basis of, can be to institute on pipeline Row buffering is entered in the vibration of generation, so as to avoid causing damage to screw thread and then produce potential safety hazard and increase the service life.Entirely Device installation is reliable, easy to adjust and can effectively improve security and service life.
By that can be made within the scope of the invention according to mode of operation various with upper type, those skilled in the art Change.

Claims (2)

  1. A kind of 1. bogey for pipeline, it is characterised in that:Including stationary base mount(1)And the stationary base mount(1)It is connected Casing(11)And with the casing(11)The Box Cover being removably fixed with(12), the Box Cover(12)It is covered in the case Body(11)Upside opening with dismounting when supply pipeline(2)Pass through the upper side opening, the Box Cover(12)Outside consolidate Surely it is provided with top shoe clamping lid(9), to clamp lid in the top shoe(9)With the Box Cover(12)Between can slide Top shoe is clamped with dynamicly(91), the top shoe(91)In be provided with screw to the longitudinal axis operate screw rod(8)Screw thread coordinates, The longitudinal axis operates screw rod(8)Outboard Sections through the top shoe clamping lid(9)And clamp lid with the top shoe (9)Adjacent both sides between have first adjustment allowance(80), the longitudinal axis operation screw rod(8)Inboard portion pass through the case Body lid(12)And with the Box Cover(12)Adjacent both sides between have second adjustment allowance(10);The casing(11)The right side Fixed block is installed with outside side(31), the fixed block(31)In be provided with screw to transverse axis operate screw rod(3)Screw thread is matched somebody with somebody Close, the transverse axis operates screw rod(3)Screw rod is operated with the longitudinal axis(8)Medial end be connected to rotatable pressure end group Part(71,7), to top pressure respectively in the pipeline(2)Right side and upper lateral part on, the casing(11)Following side on it is solid Surely it is provided with sliding block clamping lid(6), to clamp lid in the sliding block(6)With the casing(11)Following side it Between be slideably clamped with sliding block(61), the sliding block(61)Necking section(62)Through the casing(11)Following side And with the casing(11)Following side adjacent both sides between have the 3rd adjustment allowance(110), the first adjustment allowance (80), second adjustment allowance(10)With the 3rd adjustment allowance(110)In be equipped with telescopic protection cotton pad(90), institute State protection cotton pad(90)To prevent dust from the described first adjustment allowance(80), second adjustment allowance(10)It is abundant with the 3rd adjustment Amount(110)Enter the casing(11)It is interior, so as to avoid the casing(11)The accumulation of interior a large amount of dusts, wherein, the case Body(11)Left side on the inside of and the necking section(62)Medial end be respectively fixedly connected with elastic top pressure component (51,5), the top shoe clamping lid(9)Lid is clamped with the sliding block(6)In be respectively arranged with through the top shoe (91)With the sliding block(61)Guide rod(60), the top shoe(91)With the sliding block(61)In be provided with described in confession Guide rod(60)The perforation passed through, the guide rod(60)To the top shoe(91)With the sliding block(61)Slip Motion is oriented to, wherein, two rotatable top pressure head assemblies(71,7)In each include passing through fastener(79) The rotational engagement part being fixed together(74)And elastic joint part(75), the rotational engagement part(74)In set It is equipped with two thrust bearings(72、73), in described two thrust bearings(72、73)Between be bonded to the flange of corresponding operating screw rod Portion(78), described two thrust bearings(72、73)In with the elastic joint part(75)An adjacent top pressure is in the bullet Property attachment(75)On, the elastic joint part(75)In pass through elastomeric element(77)And resilientiy stretchable be provided with top Compression leg(76), to engage and push the pipeline(2);Two elastic top pressure components(51,5)Include housing(52)With And in the housing(52)Inside portion at the top-pressure part that slideably stretches(53), the top-pressure part(53)By adjusting spring (54)And with the housing(52)Lateral wall connection so as to resilientiy stretchable be installed on the housing(52)In;Wherein, institute State elastomeric element(77)Stiffness factor be more than the regulation spring(54)Stiffness factor.
  2. A kind of 2. Pipe installing adjusting method of the bogey for pipeline described in usage right requirement 1, first, by described in Pipeline(2)From the casing(11)Upper side opening be put into the casing(11)In, by the Box Cover(12)It is fixedly installed to Behind position, screw rod is operated by adjusting the longitudinal axis(8)And adjust the pipeline(2)Longitudinal axis positions, until the pipeline(2)Place In the casing(11)Longitudinal central position;Afterwards, screw rod is operated by adjusting the transverse axis(3)And adjust the pipeline (2)Transverse axis position, the longitudinal axis operates screw rod(8)Together with the top shoe(91)And the sliding block(61)In transverse axis side It is subjected to displacement upwards, until the pipeline(2)In the casing(11)Transverse axis center.
CN201610492237.5A 2016-06-29 2016-06-29 A kind of bogey for pipeline and the Pipe installing adjusting method using the device Active CN106122604B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610492237.5A CN106122604B (en) 2016-06-29 2016-06-29 A kind of bogey for pipeline and the Pipe installing adjusting method using the device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610492237.5A CN106122604B (en) 2016-06-29 2016-06-29 A kind of bogey for pipeline and the Pipe installing adjusting method using the device

Publications (2)

Publication Number Publication Date
CN106122604A CN106122604A (en) 2016-11-16
CN106122604B true CN106122604B (en) 2018-01-16

Family

ID=57284730

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610492237.5A Active CN106122604B (en) 2016-06-29 2016-06-29 A kind of bogey for pipeline and the Pipe installing adjusting method using the device

Country Status (1)

Country Link
CN (1) CN106122604B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107795758B (en) * 2017-10-30 2019-10-11 中石化重庆天然气管道有限责任公司 A kind of pipeline geological disaster protective device and its installation and application

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101235929A (en) * 2007-01-29 2008-08-06 三星电子株式会社 Tubing support device and air conditioner possessing the device
CN102297291A (en) * 2011-08-09 2011-12-28 江苏中圣高科技产业有限公司 Radial vibration-reducing stress-dissipating bracket for pressure pipeline
CN203907022U (en) * 2014-06-10 2014-10-29 宁波中安锻造有限公司 Pipe installation clamp
CN204254037U (en) * 2014-08-27 2015-04-08 张棣 A kind of petroleum pipeline bracket seat of stabilized structure

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104254037B (en) * 2014-09-30 2017-08-11 广东欧珀移动通信有限公司 Auricular concha rotating shaft mechanism and its headphone

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101235929A (en) * 2007-01-29 2008-08-06 三星电子株式会社 Tubing support device and air conditioner possessing the device
CN102297291A (en) * 2011-08-09 2011-12-28 江苏中圣高科技产业有限公司 Radial vibration-reducing stress-dissipating bracket for pressure pipeline
CN203907022U (en) * 2014-06-10 2014-10-29 宁波中安锻造有限公司 Pipe installation clamp
CN204254037U (en) * 2014-08-27 2015-04-08 张棣 A kind of petroleum pipeline bracket seat of stabilized structure

Also Published As

Publication number Publication date
CN106122604A (en) 2016-11-16

Similar Documents

Publication Publication Date Title
CN105937660B (en) A kind of pipeline supporting arrangement
CN105952974B (en) It is a kind of to carry stable pipe-supporting device
CN106015749B (en) A kind of supporting arrangement for pipeline
CN106078552B (en) It is a kind of can dehumidifier pipeline load bearing equipment
CN106041784B (en) A kind of pipeline bogey
CN105937659B (en) A kind of pipe-supporting device and the Pipe installing adjusting method using the device
CN106015757B (en) The pipe-supporting device and Pipe installing adjusting method of a kind of dust removal
CN106122604B (en) A kind of bogey for pipeline and the Pipe installing adjusting method using the device
CN105864521B (en) A kind of firm formula pipe-supporting device and Pipe installing adjusting method
CN106122601B (en) A kind of support equipment of fixed -piping
CN105909874A (en) Bearing device for industrial pipeline
CN106402494B (en) A kind of pipeline support apparatus
CN106122600B (en) A kind of supporting arrangement of Pipe installing
CN106002776B (en) A kind of durable pipe-supporting device
CN105889641B (en) A kind of pipe-supporting device and Pipe installing adjusting method
CN105937657B (en) A kind of load bearing equipment for pipeline and the Pipe installing adjusting method using the equipment
CN105937661B (en) A kind of industrial pipeline bogey and the Pipe installing adjusting method using the device
CN106051311B (en) A kind of durable type pipe-supporting device
CN106078188B (en) A kind of security industry tube support arrangement
CN105927794A (en) Bearing assembly for pipeline installation
CN106122602B (en) A kind of loss prevention pipeline bogey
CN105927793B (en) A kind of pipeline bearing assembly and the Pipe installing adjusting method using the component
CN106002760B (en) A kind of dust-proof pipeline supporting arrangement
CN106051312B (en) A kind of pipe-supporting device and Pipe installing adjusting method for being provided with guide rod
CN105972317B (en) A kind of pipe-supporting equipment and the Pipe installing adjusting method using the equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: LAN Yan Ling

Inventor before: Pan Yan

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20171221

Address after: 210000 502 room of 32 lanes of Zuo Gang, Gulou District, Nanjing, Jiangsu

Applicant after: Nanjing Qiang Si engineering services Co.,Ltd.

Address before: 530023 Nanning Road, the Guangxi Zhuang Autonomous Region Qingxiu District building 37 No. 2006 dormitory

Applicant before: Pan Yan

GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Bearing device used for pipeline and pipeline installing and adjusting method using bearing device

Effective date of registration: 20190130

Granted publication date: 20180116

Pledgee: Bank of China Limited by Share Ltd. Jiangsu branch

Pledgor: Nanjing Qiang Si engineering services Co.,Ltd.

Registration number: 2019320000085

PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20190926

Granted publication date: 20180116

Pledgee: Bank of China Limited by Share Ltd. Jiangsu branch

Pledgor: Nanjing Qiang Si engineering services Co.,Ltd.

Registration number: 2019320000085

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Bearing device used for pipeline and pipeline installing and adjusting method using bearing device

Effective date of registration: 20190927

Granted publication date: 20180116

Pledgee: Bank of China Limited by Share Ltd. Jiangsu branch

Pledgor: Nanjing Qiang Si engineering services Co.,Ltd.

Registration number: Y2019320000165

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20200427

Granted publication date: 20180116

Pledgee: Bank of China Limited by Share Ltd. Jiangsu branch

Pledgor: Nanjing Qiang Si engineering services Co.,Ltd.

Registration number: Y2019320000165

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Bearing device used for pipeline and pipeline installing and adjusting method using bearing device

Effective date of registration: 20200507

Granted publication date: 20180116

Pledgee: Bank of China Limited by Share Ltd. Jiangsu branch

Pledgor: Nanjing Qiang Si engineering services Co.,Ltd.

Registration number: Y2020980002025

PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20210624

Granted publication date: 20180116

Pledgee: Bank of China Limited by Share Ltd. Jiangsu branch

Pledgor: Nanjing Qiang Si engineering services Co.,Ltd.

Registration number: Y2020980002025

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: The utility model relates to a bearing device for pipeline and a pipeline installation and adjustment method using the device

Effective date of registration: 20210707

Granted publication date: 20180116

Pledgee: Bank of China Limited by Share Ltd. Jiangsu branch

Pledgor: Nanjing Qiang Si engineering services Co.,Ltd.

Registration number: Y2021980005822

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 210003 room 429, building 1, NANDA Sofitel science and Technology Innovation Park, No. 19, Qingjiang South Road, Gulou District, Nanjing, Jiangsu Province

Patentee after: Nanjing qiangsi Digital Technology Co.,Ltd.

Address before: 210000 Room 502, building 16, Lane 32, shuizuogang, Gulou District, Nanjing, Jiangsu Province

Patentee before: Nanjing Qiang Si engineering services Co.,Ltd.

PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20220706

Granted publication date: 20180116

Pledgee: Bank of China Limited by Share Ltd. Jiangsu branch

Pledgor: Nanjing Qiang Si engineering services Co.,Ltd.

Registration number: Y2021980005822

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A bearing device for pipeline and a pipeline installation and adjustment method using the device

Effective date of registration: 20220707

Granted publication date: 20180116

Pledgee: Bank of China Limited by Share Ltd. Jiangsu branch

Pledgor: Nanjing qiangsi Digital Technology Co.,Ltd.

Registration number: Y2022980009989