CN106122604B - A kind of bogey for pipeline and the Pipe installing adjusting method using the device - Google Patents
A kind of bogey for pipeline and the Pipe installing adjusting method using the device Download PDFInfo
- Publication number
- CN106122604B CN106122604B CN201610492237.5A CN201610492237A CN106122604B CN 106122604 B CN106122604 B CN 106122604B CN 201610492237 A CN201610492237 A CN 201610492237A CN 106122604 B CN106122604 B CN 106122604B
- Authority
- CN
- China
- Prior art keywords
- casing
- pipeline
- top shoe
- screw rod
- sliding block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 8
- 229920000742 Cotton Polymers 0.000 claims description 6
- 238000009825 accumulation Methods 0.000 claims description 3
- 230000000712 assembly Effects 0.000 claims description 3
- 238000000429 assembly Methods 0.000 claims description 3
- 238000006073 displacement reaction Methods 0.000 claims description 3
- 239000000428 dust Substances 0.000 claims description 3
- 230000006835 compression Effects 0.000 claims 1
- 238000007906 compression Methods 0.000 claims 1
- 239000007787 solid Substances 0.000 claims 1
- 238000010586 diagram Methods 0.000 description 3
- 230000003139 buffering effect Effects 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 230000007547 defect Effects 0.000 description 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
- F16L3/16—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe
- F16L3/20—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe allowing movement in transverse direction
- F16L3/205—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe allowing movement in transverse direction having supporting springs
- F16L3/2056—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe allowing movement in transverse direction having supporting springs the axis of at least one spring being oblique or perpendicular to the direction of the movement of the pipe
Abstract
Description
Claims (2)
- A kind of 1. bogey for pipeline, it is characterised in that:Including stationary base mount(1)And the stationary base mount(1)It is connected Casing(11)And with the casing(11)The Box Cover being removably fixed with(12), the Box Cover(12)It is covered in the case Body(11)Upside opening with dismounting when supply pipeline(2)Pass through the upper side opening, the Box Cover(12)Outside consolidate Surely it is provided with top shoe clamping lid(9), to clamp lid in the top shoe(9)With the Box Cover(12)Between can slide Top shoe is clamped with dynamicly(91), the top shoe(91)In be provided with screw to the longitudinal axis operate screw rod(8)Screw thread coordinates, The longitudinal axis operates screw rod(8)Outboard Sections through the top shoe clamping lid(9)And clamp lid with the top shoe (9)Adjacent both sides between have first adjustment allowance(80), the longitudinal axis operation screw rod(8)Inboard portion pass through the case Body lid(12)And with the Box Cover(12)Adjacent both sides between have second adjustment allowance(10);The casing(11)The right side Fixed block is installed with outside side(31), the fixed block(31)In be provided with screw to transverse axis operate screw rod(3)Screw thread is matched somebody with somebody Close, the transverse axis operates screw rod(3)Screw rod is operated with the longitudinal axis(8)Medial end be connected to rotatable pressure end group Part(71,7), to top pressure respectively in the pipeline(2)Right side and upper lateral part on, the casing(11)Following side on it is solid Surely it is provided with sliding block clamping lid(6), to clamp lid in the sliding block(6)With the casing(11)Following side it Between be slideably clamped with sliding block(61), the sliding block(61)Necking section(62)Through the casing(11)Following side And with the casing(11)Following side adjacent both sides between have the 3rd adjustment allowance(110), the first adjustment allowance (80), second adjustment allowance(10)With the 3rd adjustment allowance(110)In be equipped with telescopic protection cotton pad(90), institute State protection cotton pad(90)To prevent dust from the described first adjustment allowance(80), second adjustment allowance(10)It is abundant with the 3rd adjustment Amount(110)Enter the casing(11)It is interior, so as to avoid the casing(11)The accumulation of interior a large amount of dusts, wherein, the case Body(11)Left side on the inside of and the necking section(62)Medial end be respectively fixedly connected with elastic top pressure component (51,5), the top shoe clamping lid(9)Lid is clamped with the sliding block(6)In be respectively arranged with through the top shoe (91)With the sliding block(61)Guide rod(60), the top shoe(91)With the sliding block(61)In be provided with described in confession Guide rod(60)The perforation passed through, the guide rod(60)To the top shoe(91)With the sliding block(61)Slip Motion is oriented to, wherein, two rotatable top pressure head assemblies(71,7)In each include passing through fastener(79) The rotational engagement part being fixed together(74)And elastic joint part(75), the rotational engagement part(74)In set It is equipped with two thrust bearings(72、73), in described two thrust bearings(72、73)Between be bonded to the flange of corresponding operating screw rod Portion(78), described two thrust bearings(72、73)In with the elastic joint part(75)An adjacent top pressure is in the bullet Property attachment(75)On, the elastic joint part(75)In pass through elastomeric element(77)And resilientiy stretchable be provided with top Compression leg(76), to engage and push the pipeline(2);Two elastic top pressure components(51,5)Include housing(52)With And in the housing(52)Inside portion at the top-pressure part that slideably stretches(53), the top-pressure part(53)By adjusting spring (54)And with the housing(52)Lateral wall connection so as to resilientiy stretchable be installed on the housing(52)In;Wherein, institute State elastomeric element(77)Stiffness factor be more than the regulation spring(54)Stiffness factor.
- A kind of 2. Pipe installing adjusting method of the bogey for pipeline described in usage right requirement 1, first, by described in Pipeline(2)From the casing(11)Upper side opening be put into the casing(11)In, by the Box Cover(12)It is fixedly installed to Behind position, screw rod is operated by adjusting the longitudinal axis(8)And adjust the pipeline(2)Longitudinal axis positions, until the pipeline(2)Place In the casing(11)Longitudinal central position;Afterwards, screw rod is operated by adjusting the transverse axis(3)And adjust the pipeline (2)Transverse axis position, the longitudinal axis operates screw rod(8)Together with the top shoe(91)And the sliding block(61)In transverse axis side It is subjected to displacement upwards, until the pipeline(2)In the casing(11)Transverse axis center.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610492237.5A CN106122604B (en) | 2016-06-29 | 2016-06-29 | A kind of bogey for pipeline and the Pipe installing adjusting method using the device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610492237.5A CN106122604B (en) | 2016-06-29 | 2016-06-29 | A kind of bogey for pipeline and the Pipe installing adjusting method using the device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106122604A CN106122604A (en) | 2016-11-16 |
CN106122604B true CN106122604B (en) | 2018-01-16 |
Family
ID=57284730
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610492237.5A Active CN106122604B (en) | 2016-06-29 | 2016-06-29 | A kind of bogey for pipeline and the Pipe installing adjusting method using the device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106122604B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107795758B (en) * | 2017-10-30 | 2019-10-11 | 中石化重庆天然气管道有限责任公司 | A kind of pipeline geological disaster protective device and its installation and application |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101235929A (en) * | 2007-01-29 | 2008-08-06 | 三星电子株式会社 | Tubing support device and air conditioner possessing the device |
CN102297291A (en) * | 2011-08-09 | 2011-12-28 | 江苏中圣高科技产业有限公司 | Radial vibration-reducing stress-dissipating bracket for pressure pipeline |
CN203907022U (en) * | 2014-06-10 | 2014-10-29 | 宁波中安锻造有限公司 | Pipe installation clamp |
CN204254037U (en) * | 2014-08-27 | 2015-04-08 | 张棣 | A kind of petroleum pipeline bracket seat of stabilized structure |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104254037B (en) * | 2014-09-30 | 2017-08-11 | 广东欧珀移动通信有限公司 | Auricular concha rotating shaft mechanism and its headphone |
-
2016
- 2016-06-29 CN CN201610492237.5A patent/CN106122604B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101235929A (en) * | 2007-01-29 | 2008-08-06 | 三星电子株式会社 | Tubing support device and air conditioner possessing the device |
CN102297291A (en) * | 2011-08-09 | 2011-12-28 | 江苏中圣高科技产业有限公司 | Radial vibration-reducing stress-dissipating bracket for pressure pipeline |
CN203907022U (en) * | 2014-06-10 | 2014-10-29 | 宁波中安锻造有限公司 | Pipe installation clamp |
CN204254037U (en) * | 2014-08-27 | 2015-04-08 | 张棣 | A kind of petroleum pipeline bracket seat of stabilized structure |
Also Published As
Publication number | Publication date |
---|---|
CN106122604A (en) | 2016-11-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105937660B (en) | A kind of pipeline supporting arrangement | |
CN105952974B (en) | It is a kind of to carry stable pipe-supporting device | |
CN106015749B (en) | A kind of supporting arrangement for pipeline | |
CN106078552B (en) | It is a kind of can dehumidifier pipeline load bearing equipment | |
CN106041784B (en) | A kind of pipeline bogey | |
CN105937659B (en) | A kind of pipe-supporting device and the Pipe installing adjusting method using the device | |
CN106015757B (en) | The pipe-supporting device and Pipe installing adjusting method of a kind of dust removal | |
CN106122604B (en) | A kind of bogey for pipeline and the Pipe installing adjusting method using the device | |
CN105864521B (en) | A kind of firm formula pipe-supporting device and Pipe installing adjusting method | |
CN106122601B (en) | A kind of support equipment of fixed -piping | |
CN105909874A (en) | Bearing device for industrial pipeline | |
CN106402494B (en) | A kind of pipeline support apparatus | |
CN106122600B (en) | A kind of supporting arrangement of Pipe installing | |
CN106002776B (en) | A kind of durable pipe-supporting device | |
CN105889641B (en) | A kind of pipe-supporting device and Pipe installing adjusting method | |
CN105937657B (en) | A kind of load bearing equipment for pipeline and the Pipe installing adjusting method using the equipment | |
CN105937661B (en) | A kind of industrial pipeline bogey and the Pipe installing adjusting method using the device | |
CN106051311B (en) | A kind of durable type pipe-supporting device | |
CN106078188B (en) | A kind of security industry tube support arrangement | |
CN105927794A (en) | Bearing assembly for pipeline installation | |
CN106122602B (en) | A kind of loss prevention pipeline bogey | |
CN105927793B (en) | A kind of pipeline bearing assembly and the Pipe installing adjusting method using the component | |
CN106002760B (en) | A kind of dust-proof pipeline supporting arrangement | |
CN106051312B (en) | A kind of pipe-supporting device and Pipe installing adjusting method for being provided with guide rod | |
CN105972317B (en) | A kind of pipe-supporting equipment and the Pipe installing adjusting method using the equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: LAN Yan Ling Inventor before: Pan Yan |
|
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20171221 Address after: 210000 502 room of 32 lanes of Zuo Gang, Gulou District, Nanjing, Jiangsu Applicant after: Nanjing Qiang Si engineering services Co.,Ltd. Address before: 530023 Nanning Road, the Guangxi Zhuang Autonomous Region Qingxiu District building 37 No. 2006 dormitory Applicant before: Pan Yan |
|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Bearing device used for pipeline and pipeline installing and adjusting method using bearing device Effective date of registration: 20190130 Granted publication date: 20180116 Pledgee: Bank of China Limited by Share Ltd. Jiangsu branch Pledgor: Nanjing Qiang Si engineering services Co.,Ltd. Registration number: 2019320000085 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20190926 Granted publication date: 20180116 Pledgee: Bank of China Limited by Share Ltd. Jiangsu branch Pledgor: Nanjing Qiang Si engineering services Co.,Ltd. Registration number: 2019320000085 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Bearing device used for pipeline and pipeline installing and adjusting method using bearing device Effective date of registration: 20190927 Granted publication date: 20180116 Pledgee: Bank of China Limited by Share Ltd. Jiangsu branch Pledgor: Nanjing Qiang Si engineering services Co.,Ltd. Registration number: Y2019320000165 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20200427 Granted publication date: 20180116 Pledgee: Bank of China Limited by Share Ltd. Jiangsu branch Pledgor: Nanjing Qiang Si engineering services Co.,Ltd. Registration number: Y2019320000165 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Bearing device used for pipeline and pipeline installing and adjusting method using bearing device Effective date of registration: 20200507 Granted publication date: 20180116 Pledgee: Bank of China Limited by Share Ltd. Jiangsu branch Pledgor: Nanjing Qiang Si engineering services Co.,Ltd. Registration number: Y2020980002025 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20210624 Granted publication date: 20180116 Pledgee: Bank of China Limited by Share Ltd. Jiangsu branch Pledgor: Nanjing Qiang Si engineering services Co.,Ltd. Registration number: Y2020980002025 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: The utility model relates to a bearing device for pipeline and a pipeline installation and adjustment method using the device Effective date of registration: 20210707 Granted publication date: 20180116 Pledgee: Bank of China Limited by Share Ltd. Jiangsu branch Pledgor: Nanjing Qiang Si engineering services Co.,Ltd. Registration number: Y2021980005822 |
|
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 210003 room 429, building 1, NANDA Sofitel science and Technology Innovation Park, No. 19, Qingjiang South Road, Gulou District, Nanjing, Jiangsu Province Patentee after: Nanjing qiangsi Digital Technology Co.,Ltd. Address before: 210000 Room 502, building 16, Lane 32, shuizuogang, Gulou District, Nanjing, Jiangsu Province Patentee before: Nanjing Qiang Si engineering services Co.,Ltd. |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20220706 Granted publication date: 20180116 Pledgee: Bank of China Limited by Share Ltd. Jiangsu branch Pledgor: Nanjing Qiang Si engineering services Co.,Ltd. Registration number: Y2021980005822 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A bearing device for pipeline and a pipeline installation and adjustment method using the device Effective date of registration: 20220707 Granted publication date: 20180116 Pledgee: Bank of China Limited by Share Ltd. Jiangsu branch Pledgor: Nanjing qiangsi Digital Technology Co.,Ltd. Registration number: Y2022980009989 |