CN105909874A - Bearing device for industrial pipeline - Google Patents

Bearing device for industrial pipeline Download PDF

Info

Publication number
CN105909874A
CN105909874A CN201610491501.3A CN201610491501A CN105909874A CN 105909874 A CN105909874 A CN 105909874A CN 201610491501 A CN201610491501 A CN 201610491501A CN 105909874 A CN105909874 A CN 105909874A
Authority
CN
China
Prior art keywords
pipeline
casing
screw rod
sliding block
top shoe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610491501.3A
Other languages
Chinese (zh)
Inventor
舒海球
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610491501.3A priority Critical patent/CN105909874A/en
Publication of CN105909874A publication Critical patent/CN105909874A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/16Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/04Devices damping pulsations or vibrations in fluids
    • F16L55/041Devices damping pulsations or vibrations in fluids specially adapted for preventing vibrations

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Supports For Pipes And Cables (AREA)

Abstract

The invention discloses a bearing device for an industrial pipeline and a pipeline mounting and adjusting method using the device. The device comprises a fixing base frame (1), a box body (11) fixedly connected with the fixing base frame (1) and a box body cover (12) removably and fixedly connected with the box body (11); the box body cover (12) covers an upper side opening of the box body (11) so as to allow a pipeline (2) to go through the upper side opening during disassembly; an upper slider clamping cover body (9) is fixedly arranged on the outer side of the box body cover (12) and used for clamping an upper slider (91) in a sliding manner between the upper slider clamping cover body (9) and the box body cover (12); a screw hole is formed in the upper slider (91) for screw-thread fit with a longitudinal axis operating screw (8); an outer side part of the longitudinal axis operating screw (8) penetrates through the upper slider clamping cover body (9) and has first adjusting margins (80) between two adjacent sides of the upper slider clamping cover body (9).

Description

A kind of industrial pipeline load bearing equipment
Technical field
The present invention relates to Pipe installing field, a kind of industrial pipeline load bearing equipment and use the Pipe installing control method of described equipment.
Background technology
In Pipe installing field, generally require and pipeline is isolated with surrounding environment.Transport medium particularly with pipeline and there is the occasion of temperature and requirement of shelter.Pipeline often utilizes the gap portion between isolating device and pipeline effectively to completely cut off.And regulation is often difficult to operate in determining for pipeline, the most unworkable is to be adjusted pipeline on four direction gap.And, often facing the vibration problem that external interference is caused after Pipe installing, this causes damage to isolating device and affects service life and use safety.
Summary of the invention
It is an object of the invention to provide a kind of industrial pipeline load bearing equipment and use the Pipe installing control method of described equipment, it can overcome defect of the prior art.
nullA kind of industrial pipeline load bearing equipment according to the present invention,Including stationary base mount、The casing being connected with described stationary base mount and the Box Cover being removably fixed with described casing,Described Box Cover is covered in the upside opening part of described casing to pass through side opening on described when dismounting for pipeline,The outside of described Box Cover is fixedly installed top shoe clamping lid,In order to be clamped with top shoe slidably between described top shoe clamping lid and described Box Cover,Described top shoe is provided with screw in order to coordinate with longitudinal axis operation screw flight,The described longitudinal axis operation screw rod Outboard Sections through described top shoe clamping lid and and described top shoe clamp lid adjacent both sides there is the first adjustment allowance,The described longitudinal axis operation screw rod inboard portion through described Box Cover and and the adjacent both sides of described Box Cover there is the second adjustment allowance;nullThe right hand external of described casing is installed with fixed block,Described fixed block is provided with screw in order to coordinate with transverse axis operation screw flight,Described transverse axis operation screw rod is connected to rotatably push up pressure head component with the medial end of described longitudinal axis operation screw rod,It is pressed on right side and the upper lateral part of described pipeline in order to top respectively,Sliding block clamping lid it is fixedly installed on the following side of described casing,In order to be clamped with sliding block slidably between described sliding block clamping lid and the following side of described casing,The necking section of described sliding block through described casing following side and and the adjacent both sides of the following side of described casing have the 3rd adjustment allowance,Described first adjusts allowance、Second adjustment allowance and the 3rd adjusts in allowance and is all equipped with telescopic protection cotton pad,Described protection cotton pad adjusts allowance in order to prevent dust from described first、Second adjustment allowance and the 3rd adjusts allowance and enters in described casing,Thus the accumulation of a large amount of dusts in avoiding described casing,Wherein,The medial end of inside the left side of described casing and described necking section is fixedly connected with elastic top pressure assembly respectively,It is provided with, on the end face that described top shoe clamps on the end face that lid contacts with described top shoe and described sliding block clamping lid contacts with described sliding block, the guide chute being slidably matched with described top shoe and described sliding block,Described guide chute is in order to guide the sliding motion of described top shoe and described sliding block,Wherein,The rotational engagement parts each including being fixed together by securing member in two described rotatable top pressure head component and elastic joint part,Described rotational engagement parts are provided with two thrust bearings,The flange part of corresponding operating screw rod it is bonded between said two thrust bearing,A top adjacent with described elastic joint part in said two thrust bearing is pressed on described elastic joint part,Described elastic joint part is provided with top compression leg by elastomeric element resilientiy stretchable,In order to engage and to push described pipeline;Two described elastic top pressure assemblies all include housing and the top-pressure part stretched slidably at the inside portion of described housing, described top-pressure part be connected with the lateral wall of described housing by regulation spring thus resilientiy stretchable be installed in described housing.
According to the present invention, use the Pipe installing control method of above-mentioned industrial pipeline load bearing equipment, first, described pipeline is put into described casing from the upper side opening of described casing, after the fixed installation of described Box Cover is put in place, the longitudinal axis positions of described pipeline is adjusted, until described pipeline is in the longitudinal central position of described casing by regulating described longitudinal axis operation screw rod;Afterwards, adjusting the transverse axis position of described pipeline by regulating described transverse axis operation screw rod, described longitudinal axis operation screw rod is subjected to displacement in X direction together with described top shoe and described sliding block, until described pipeline is in the transverse axis center of described casing.
By the present invention, owing to being provided with regulation spring in bottom and left side, it can provide the regulation allowance on the longitudinal axis and transverse axis, thus allows adjusting screw rod to carry out ejection regulation.And by arranging the elastic top pressure assembly of the longitudinal axis adjusting screw rod being oppositely installed up and down that can move left and right and auxiliary equipment and bottom, thus ensure the longitudinal axis fixed under conditions of and realize the position adjustments for transverse axis.And by being arranged on the elastomeric element being installed in the pressure head component of each described rotatable top, on the basis of it is in guaranteeing to overcome the pressure on top surface of described regulation spring to be adjusted determining, the vibration occurred on pipeline can be buffered, thus avoid screw thread causing damage and then producing potential safety hazard and increases the service life.
Accompanying drawing explanation
Fig. 1 is the overall structure schematic diagram of the industrial pipeline load bearing equipment of the present invention;
Fig. 2 is the rotatable exemplary enlarged diagram pushing up pressure head component in Fig. 1;
Fig. 3 is the exemplary enlarged diagram of the elastic top pressure assembly in Fig. 1.
Detailed description of the invention
Below in conjunction with Fig. 1-3, the present invention is described in detail.
nullA kind of industrial pipeline load bearing equipment according to embodiment,Including stationary base mount 1、The casing 11 being connected with described stationary base mount 1 and the Box Cover 12 being removably fixed with described casing 11,Described Box Cover 12 is covered in the upside opening part of described casing 11 to pass through side opening on described when dismounting for pipeline 2,The outside of described Box Cover 12 is fixedly installed top shoe clamping lid 9,In order to be clamped with top shoe 91 slidably between described top shoe clamping lid 9 and described Box Cover 12,Described top shoe 91 is provided with screw in order to operate screw rod 8 threaded engagement with the longitudinal axis,The described longitudinal axis operation screw rod 8 Outboard Sections through described top shoe clamping lid 9 and and described top shoe clamp lid 9 adjacent both sides there is the first adjustment allowance 80,The described longitudinal axis operation screw rod 8 inboard portion through described Box Cover 12 and and the adjacent both sides of described Box Cover 12 there is the second adjustment allowance 10;nullThe right hand external of described casing 11 is installed with fixed block 31,Described fixed block 31 is provided with screw in order to operate screw rod 3 threaded engagement with transverse axis,Described transverse axis operation screw rod 3 is connected to rotatably push up pressure head component 71 with the medial end of described longitudinal axis operation screw rod 8,7,It is pressed on right side and the upper lateral part of described pipeline 2 in order to top respectively,Sliding block clamping lid 6 it is fixedly installed on the following side of described casing 11,In order to be clamped with sliding block 61 slidably between described sliding block clamping lid 6 and the following side of described casing 11,The necking section 62 of described sliding block 61 through described casing 11 following side and and the adjacent both sides of the following side of described casing 11 have the 3rd adjustment allowance 110,Described first adjusts allowance 80、Second adjustment allowance 10 and the 3rd adjustment allowance 110 are all equipped with telescopic protection cotton pad 90,Described protection cotton pad 90 adjusts allowance 80 in order to prevent dust from described first、Second adjustment allowance 10 and the 3rd adjustment allowance 110 enter in described casing 11,Thus the accumulation of a large amount of dusts in avoiding described casing 11,Wherein,The medial end of inside the left side of described casing 11 and described necking section 62 is fixedly connected with elastic top pressure assembly 51 respectively,5,It is provided with, on the end face that described top shoe clamps on the end face that lid 9 contacts with described top shoe 91 and described sliding block clamping lid 6 contacts with described sliding block 61, the guide chute 25 being slidably matched with described top shoe 91 and described sliding block 61,Described guide chute 25 is in order to guide the sliding motion of described top shoe 91 and described sliding block 61,Wherein,Two described rotatable top pressure head component 71,The rotational engagement parts 74 each including being fixed together by securing member 79 in 7 and elastic joint part 75,Described rotational engagement parts 74 are provided with two thrust bearings 72、73,At said two thrust bearing 72、The flange part 78 of corresponding operating screw rod it is bonded between 73,Said two thrust bearing 72、A top adjacent with described elastic joint part 75 in 73 is pressed on described elastic joint part 75,Described elastic joint part 75 is provided with top compression leg 76 by elastomeric element 77 resilientiy stretchable,In order to engage and to push described pipeline 2;Two described elastic top pressure assemblies 51,5 all include housing 52 and the top-pressure part 53 stretched slidably at the inside portion of described housing 52, described top-pressure part 53 by regulation spring 54 and be connected with the lateral wall of described housing 52 thus resilientiy stretchable be installed in described housing 52.
Exemplarily or valuably, wherein, the stiffness factor of described elastomeric element 77 is more than the stiffness factor of described regulation spring 54.
According to embodiment, use the Pipe installing control method of above-mentioned industrial pipeline load bearing equipment, first, described pipeline 2 is put into described casing 11 from the upper side opening of described casing 11, after the fixed installation of described Box Cover 12 is put in place, the longitudinal axis positions of described pipeline 2 is adjusted, until described pipeline 2 is in the longitudinal central position of described casing 11 by regulating described longitudinal axis operation screw rod 8;Afterwards, the transverse axis position of described pipeline 2 is adjusted by regulating described transverse axis operation screw rod 3, described longitudinal axis operation screw rod 8 is subjected to displacement in X direction together with described top shoe 91 and described sliding block 61, until described pipeline 2 is in the transverse axis center of described casing 11.
By the present invention, owing to being provided with regulation spring in bottom and left side, it can provide the regulation allowance on the longitudinal axis and transverse axis, thus allows adjusting screw rod to carry out ejection regulation.And by arranging the elastic top pressure assembly of the longitudinal axis adjusting screw rod being oppositely installed up and down that can move left and right and auxiliary equipment and bottom, thus ensure the longitudinal axis fixed under conditions of and realize the position adjustments for transverse axis.And it is installed on each described rotatable top pressure head component 71 by being arranged on, elastomeric element 77 in 7, on the basis of it is in guaranteeing to overcome the pressure on top surface of described regulation spring to be adjusted determining, the vibration occurred on pipeline can be buffered, thus avoid screw thread causing damage and then producing potential safety hazard and increases the service life.Whole device is installed reliable, easy to adjust and can be effectively improved security and service life.
By with upper type, those skilled in the art can make various change according to mode of operation within the scope of the invention.

Claims (3)

  1. null1. an industrial pipeline load bearing equipment,It is characterized in that: include stationary base mount (1)、The casing (11) being connected with described stationary base mount (1) and the Box Cover (12) being removably fixed with described casing (11),Described Box Cover (12) is covered in the upside opening part of described casing (11) to pass through described upper side opening when dismounting for pipeline (2),The outside of described Box Cover (12) is fixedly installed top shoe clamping lid (9),In order to be clamped with top shoe (91) slidably between described top shoe clamping lid (9) and described Box Cover (12),Described top shoe (91) is provided with screw in order to operate screw rod (8) threaded engagement with the longitudinal axis,The described longitudinal axis operation screw rod (8) Outboard Sections through described top shoe clamping lid (9) and and described top shoe clamp lid (9) adjacent both sides there is the first adjustment allowance (80),The described longitudinal axis operation screw rod (8) inboard portion through described Box Cover (12) and and the adjacent both sides of described Box Cover (12) there is the second adjustment allowance (10);nullThe right hand external of described casing (11) is installed with fixed block (31),Described fixed block (31) is provided with screw in order to operate screw rod (3) threaded engagement with transverse axis,Described transverse axis operation screw rod (3) is connected to rotatably push up pressure head component (71 with the medial end of described longitudinal axis operation screw rod (8),7),It is pressed on right side and the upper lateral part of described pipeline (2) in order to top respectively,Sliding block clamping lid (6) it is fixedly installed on the following side of described casing (11),In order to be clamped with sliding block (61) slidably between described sliding block clamping lid (6) and the following side of described casing (11),The necking section (62) of described sliding block (61) through described casing (11) following side and and the adjacent both sides of the following side of described casing (11) have the 3rd adjustment allowance (110),Described first adjusts allowance (80)、Second adjustment allowance (10) and the 3rd adjusts in allowance (110) and is all equipped with telescopic protection cotton pad (90),Described protection cotton pad (90) adjusts allowance (80) in order to prevent dust from described first、Second adjustment allowance (10) and the 3rd adjusts allowance (110) and enters in described casing (11),Thus the accumulation of a large amount of dusts in avoiding described casing (11),Wherein,Inside the left side of described casing (11) and the medial end of described necking section (62) is fixedly connected with elastic top pressure assembly (51 respectively,5),It is provided with, on the end face that described top shoe clamps on the end face that lid (9) contacts with described top shoe (91) and described sliding block clamping lid (6) contacts with described sliding block (61), the guide chute (25) being slidably matched with described top shoe (91) and described sliding block (61),Described guide chute (25) is in order to guide the sliding motion of described top shoe (91) and described sliding block (61),Wherein,Two described rotatable top pressure head component (71,7) the rotational engagement parts (74) each including being fixed together by securing member (79) in and elastic joint part (75),Described rotational engagement parts (74) are provided with two thrust bearings (72、73),At said two thrust bearing (72、73) flange part (78) of corresponding operating screw rod it is bonded between,Said two thrust bearing (72、73) top adjacent with described elastic joint part (75) in is pressed on described elastic joint part (75),Described elastic joint part (75) is provided with top compression leg (76) by elastomeric element (77) resilientiy stretchable,In order to engage and to push described pipeline (2);Two described elastic top pressure assemblies (51,5) all include housing (52) and the top-pressure part (53) stretched slidably at the inside portion of described housing (52), described top-pressure part (53) by regulation spring (54) and be connected with the lateral wall of described housing (52) thus resilientiy stretchable be installed in described housing (52).
  2. Industrial pipeline load bearing equipment the most according to claim 1, wherein, the stiffness factor of described elastomeric element (77) is more than the stiffness factor of described regulation spring (54).
  3. 3. the Pipe installing control method of the industrial pipeline load bearing equipment that a kind uses described in claim 1 or 2, first, described pipeline (2) is put into described casing (11) from the upper side opening of described casing (11), after described Box Cover (12) fixed installation is put in place, the longitudinal axis positions of described pipeline (2) is adjusted, until until described pipeline (2) is in the longitudinal central position of described casing (11) by regulating described longitudinal axis operation screw rod (8);Afterwards, the transverse axis position of described pipeline (2) is adjusted by regulating described transverse axis operation screw rod (3), described longitudinal axis operation screw rod (8) is subjected to displacement in X direction together with described top shoe (91) and described sliding block (61), until described pipeline (2) is in the transverse axis center of described casing (11).
CN201610491501.3A 2016-06-29 2016-06-29 Bearing device for industrial pipeline Pending CN105909874A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610491501.3A CN105909874A (en) 2016-06-29 2016-06-29 Bearing device for industrial pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610491501.3A CN105909874A (en) 2016-06-29 2016-06-29 Bearing device for industrial pipeline

Publications (1)

Publication Number Publication Date
CN105909874A true CN105909874A (en) 2016-08-31

Family

ID=56759863

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610491501.3A Pending CN105909874A (en) 2016-06-29 2016-06-29 Bearing device for industrial pipeline

Country Status (1)

Country Link
CN (1) CN105909874A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107830260A (en) * 2017-10-31 2018-03-23 广东骏驰科技股份有限公司 A kind of fixing device for pipe fitting
CN113983041A (en) * 2021-11-02 2022-01-28 西南石油大学 Marine riser vortex-induced vibration suppression device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101235929A (en) * 2007-01-29 2008-08-06 三星电子株式会社 Tubing support device and air conditioner possessing the device
CN102788197A (en) * 2012-07-23 2012-11-21 高勇 Constant force support lifting frame for support lifting of thermal power pipelines
CN204254037U (en) * 2014-08-27 2015-04-08 张棣 A kind of petroleum pipeline bracket seat of stabilized structure
DE102014215394B3 (en) * 2014-08-05 2015-05-21 Poloplast Gmbh & Co. Kg Highly sound insulating pipe fastening device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101235929A (en) * 2007-01-29 2008-08-06 三星电子株式会社 Tubing support device and air conditioner possessing the device
CN102788197A (en) * 2012-07-23 2012-11-21 高勇 Constant force support lifting frame for support lifting of thermal power pipelines
DE102014215394B3 (en) * 2014-08-05 2015-05-21 Poloplast Gmbh & Co. Kg Highly sound insulating pipe fastening device
CN204254037U (en) * 2014-08-27 2015-04-08 张棣 A kind of petroleum pipeline bracket seat of stabilized structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107830260A (en) * 2017-10-31 2018-03-23 广东骏驰科技股份有限公司 A kind of fixing device for pipe fitting
CN113983041A (en) * 2021-11-02 2022-01-28 西南石油大学 Marine riser vortex-induced vibration suppression device
CN113983041B (en) * 2021-11-02 2024-01-12 西南石油大学 Vortex-induced vibration suppression device for marine riser

Similar Documents

Publication Publication Date Title
CN105937660A (en) Pipe supporting device
CN105952974A (en) Pipeline supporting device stable in bearing
CN106015749A (en) Pipeline supporting device
CN105864518A (en) High-tightness pipeline supporting device
CN106078552B (en) It is a kind of can dehumidifier pipeline load bearing equipment
CN105937659A (en) Novel pipe supporting device
CN105909874A (en) Bearing device for industrial pipeline
CN106041784B (en) A kind of pipeline bogey
CN106015757A (en) Dedusting pipeline support device
CN105864521A (en) Steady pipeline supporting device
CN105927794A (en) Bearing assembly for pipeline installation
CN106402494B (en) A kind of pipeline support apparatus
CN105889641A (en) Pipeline supporting device
CN106122604B (en) A kind of bogey for pipeline and the Pipe installing adjusting method using the device
CN106122601B (en) A kind of support equipment of fixed -piping
CN105937661A (en) Industrial pipe carrying device
CN106002776A (en) Durable pipeline bearing device
CN106002760A (en) Supporting device for dustproof pipeline
CN105937657A (en) Pipe carrying equipment
CN105927793A (en) Bearing assembly for pipeline
CN105909876A (en) Support apparatus for bearing pipeline
CN105972317A (en) Pipeline supporting equipment
CN106015756A (en) Industrial pipeline supporting device
CN106090442A (en) A kind of pipe-supporting device guided
CN105909877A (en) Pipeline support apparatus

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160831

RJ01 Rejection of invention patent application after publication