A kind of pipe-supporting device of good airproof performance
Technical field
The present invention relates to Pipe installing field, the pipe-supporting device of a kind of good airproof performance and use the Pipe installing control method of described device.
Background technology
In Pipe installing field, generally require and pipeline is isolated with surrounding.Transport medium particularly with pipeline and there is the occasion of temperature and requirement of shelter.Pipeline often utilizes the gap portion between isolating device and pipeline effectively to completely cut off.And regulation is often difficult to operate in determining for pipeline, the most unworkable is to be adjusted pipeline on four direction gap.And, often facing the vibration problem that external interference is caused after Pipe installing, this causes damage to isolating device and affects service life and use safety.
Summary of the invention
It is an object of the invention to provide the pipe-supporting device of a kind of good airproof performance and use the Pipe installing control method of described device, it can overcome defect of the prior art.
nullThe pipe-supporting device of a kind of good airproof performance according to the present invention,Including stationary base mount、The casing being connected with described stationary base mount and the Box Cover being removably fixed with described casing,Described Box Cover is covered in the upside opening part of described casing to pass through side opening on described when dismounting for pipeline,The neighboring gluing of the upside opening part of described casing is fixed with seal washer,Described seal washer is in order to coordinate with described Box Cover,Seal so that produce between described casing and described Box Cover,Make described casing more preferable with the sealing effectiveness of described Box Cover,Described seal washer is the rubber washer being made up of elastomeric material,The outside of described Box Cover is fixedly installed top shoe clamping lid,In order to be clamped with top shoe slidably between described top shoe clamping lid and described Box Cover,Described top shoe is provided with screw in order to coordinate with longitudinal axis operation screw flight,The described longitudinal axis operation screw rod Outboard Sections through described top shoe clamping lid and and described top shoe clamp lid adjacent both sides there is the first adjustment allowance,The described longitudinal axis operation screw rod inboard portion through described Box Cover and and the adjacent both sides of described Box Cover there is the second adjustment allowance;nullThe right hand external of described casing is installed with fixed block,Described fixed block is provided with screw in order to coordinate with transverse axis operation screw flight,Described transverse axis operation screw rod is connected to rotatably push up pressure head component with the medial end of described longitudinal axis operation screw rod,It is pressed on right side and the upper lateral part of described pipeline in order to top respectively,Sliding block clamping lid it is fixedly installed on the following side of described casing,In order to be clamped with sliding block slidably between described sliding block clamping lid and the following side of described casing,The necking section of described sliding block through described casing following side and and the adjacent both sides of the following side of described casing have the 3rd adjustment allowance,Wherein,The medial end of inside the left side of described casing and described necking section is fixedly connected with elastic top pressure assembly respectively,Wherein,The rotational engagement parts each including being fixed together by securing member in two described rotatable top pressure head component and elastic joint part,Described rotational engagement parts are provided with two thrust bearings,The flange part of corresponding operating screw rod it is bonded between said two thrust bearing,A top adjacent with described elastic joint part in said two thrust bearing is pressed on described elastic joint part,Described elastic joint part is provided with top compression leg by elastomeric element resilientiy stretchable,In order to engage and to push described pipeline;Two described elastic top pressure assemblies all include housing and the top-pressure part stretched slidably at the medial part of described housing, described top-pressure part be connected with the lateral wall of described housing by regulation spring thus resilientiy stretchable be installed in described housing.
According to the present invention, use the Pipe installing control method of the pipe-supporting device of above-mentioned good airproof performance, first, described pipeline is put into described casing from the upper side opening of described casing, after the fixed installation of described Box Cover is put in place, the longitudinal axis positions of described pipeline is adjusted, until described pipeline is in the longitudinal central position of described casing by regulating described longitudinal axis operation screw rod;Afterwards, adjusting the transverse axis position of described pipeline by regulating described transverse axis operation screw rod, described longitudinal axis operation screw rod is subjected to displacement in X direction together with described top shoe and described sliding block, until described pipeline is in the transverse axis center of described casing.
By the present invention, owing to being provided with regulation spring in bottom and left side, it can provide the regulation allowance on the longitudinal axis and transverse axis, thus allows adjusting screw rod to carry out pushing and withstanding regulation.And by arranging the elastic top pressure assembly of the longitudinal axis adjusting screw rod being oppositely installed up and down that can move left and right and auxiliary equipment and bottom, thus ensure the longitudinal axis fixed under conditions of and realize the position adjustments for transverse axis.And by being arranged on the elastomeric element being installed in the pressure head component of each described rotatable top, on the basis of it is in guaranteeing to overcome the pressure on top surface of described regulation spring to be adjusted determining, the vibration occurred on pipeline can be buffered, thus avoid screw thread causing damage and then producing potential safety hazard and increases the service life.
Accompanying drawing explanation
Fig. 1 is the overall structure schematic diagram of the pipe-supporting device of the good airproof performance of the present invention;
Fig. 2 is the rotatable exemplary enlarged diagram pushing up pressure head component in Fig. 1;
Fig. 3 is the exemplary enlarged diagram of the elastic top pressure assembly in Fig. 1.
Detailed description of the invention
Below in conjunction with Fig. 1-3, the present invention is described in detail.
nullThe pipe-supporting device of a kind of good airproof performance according to embodiment,Including stationary base mount 1、The casing 11 being connected with described stationary base mount 1 and the Box Cover 12 being removably fixed with described casing 11,Described Box Cover 12 is covered in the upside opening part of described casing 11 to pass through side opening on described when dismounting for pipeline 2,The neighboring gluing of the upside opening part of described casing 11 is fixed with seal washer 18,Described seal washer 18 is in order to coordinate with described Box Cover 12,Seal so that produce between described casing 11 and described Box Cover 12,Make described casing 11 more preferable with the sealing effectiveness of described Box Cover 12,Described seal washer 18 is the rubber washer being made up of elastomeric material,The outside of described Box Cover 12 is fixedly installed top shoe clamping lid 9,In order to be clamped with top shoe 91 slidably between described top shoe clamping lid 9 and described Box Cover 12,Described top shoe 91 is provided with screw in order to operate screw rod 8 threaded engagement with the longitudinal axis,The described longitudinal axis operation screw rod 8 Outboard Sections through described top shoe clamping lid 9 and and described top shoe clamp lid 9 adjacent both sides there is the first adjustment allowance 80,The described longitudinal axis operation screw rod 8 inboard portion through described Box Cover 12 and and the adjacent both sides of described Box Cover 12 there is the second adjustment allowance 10;nullThe right hand external of described casing 11 is installed with fixed block 31,Described fixed block 31 is provided with screw in order to operate screw rod 3 threaded engagement with transverse axis,Described transverse axis operation screw rod 3 is connected to rotatably push up pressure head component 71 with the medial end of described longitudinal axis operation screw rod 8,7,It is pressed on right side and the upper lateral part of described pipeline 2 in order to top respectively,Sliding block clamping lid 6 it is fixedly installed on the following side of described casing 11,In order to be clamped with sliding block 61 slidably between described sliding block clamping lid 6 and the following side of described casing 11,The necking section 62 of described sliding block 61 through described casing 11 following side and and the adjacent both sides of the following side of described casing 11 have the 3rd adjustment allowance 110,Wherein,The medial end of inside the left side of described casing 11 and described necking section 62 is fixedly connected with elastic top pressure assembly 51 respectively,5,Wherein,Two described rotatable top pressure head component 71,The rotational engagement parts 74 each including being fixed together by securing member 79 in 7 and elastic joint part 75,Described rotational engagement parts 74 are provided with two thrust bearings 72、73,At said two thrust bearing 72、The flange part 78 of corresponding operating screw rod it is bonded between 73,Said two thrust bearing 72、A top adjacent with described elastic joint part 75 in 73 is pressed on described elastic joint part 75,Described elastic joint part 75 is provided with top compression leg 76 by elastomeric element 77 resilientiy stretchable,In order to engage and to push described pipeline 2;Two described elastic top pressure assemblies 51,5 all include housing 52 and the top-pressure part 53 stretched slidably at the medial part of described housing 52, described top-pressure part 53 by regulation spring 54 and be connected with the lateral wall of described housing 52 thus resilientiy stretchable be installed in described housing 52.
Exemplarily or valuably, wherein, the stiffness factor of described elastomeric element 77 is more than the stiffness factor of described regulation spring 54.
According to embodiment, use the Pipe installing control method of the pipe-supporting device of above-mentioned good airproof performance, first, described pipeline 2 is put into described casing 11 from the upper side opening of described casing 11, after the fixed installation of described Box Cover 12 is put in place, the longitudinal axis positions of described pipeline 2 is adjusted, until described pipeline 2 is in the longitudinal central position of described casing 11 by regulating described longitudinal axis operation screw rod 8;Afterwards, the transverse axis position of described pipeline 2 is adjusted by regulating described transverse axis operation screw rod 3, described longitudinal axis operation screw rod 8 is subjected to displacement in X direction together with described top shoe 91 and described sliding block 61, until described pipeline 2 is in the transverse axis center of described casing 11.
By the present invention, owing to being provided with regulation spring in bottom and left side, it can provide the regulation allowance on the longitudinal axis and transverse axis, thus allows adjusting screw rod to carry out pushing and withstanding regulation.And by arranging the elastic top pressure assembly of the longitudinal axis adjusting screw rod being oppositely installed up and down that can move left and right and auxiliary equipment and bottom, thus ensure the longitudinal axis fixed under conditions of and realize the position adjustments for transverse axis.And it is installed on each described rotatable top pressure head component 71 by being arranged on, elastomeric element 77 in 7, on the basis of it is in guaranteeing to overcome the pressure on top surface of described regulation spring to be adjusted determining, the vibration occurred on pipeline can be buffered, thus avoid screw thread causing damage and then producing potential safety hazard and increases the service life.Whole device is installed reliable, easy to adjust and can be effectively improved safety and service life.
By with upper type, those skilled in the art can make various change according to mode of operation within the scope of the invention.