CN106122601B CN201610491713.1A CN201610491713A CN106122601B CN 106122601 B CN106122601 B CN 106122601B CN 201610491713 A CN201610491713 A CN 201610491713A CN 106122601 B CN106122601 B CN 106122601B
Authority
CN
China
Prior art keywords
casing
screw rod
pipeline
box cover
top shoe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610491713.1A
Other languages
Chinese (zh)
Other versions
CN106122601A (en
Inventor
王士伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Lanbo Water Supply Equipment Co ltd
Original Assignee
Anhui Lan Bo Water Supply Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Lan Bo Water Supply Equipment Co Ltd filed Critical Anhui Lan Bo Water Supply Equipment Co Ltd
Priority to CN201610491713.1A priority Critical patent/CN106122601B/en
Publication of CN106122601A publication Critical patent/CN106122601A/en
Application granted granted Critical
Publication of CN106122601B publication Critical patent/CN106122601B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/16Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe
    • F16L3/20Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe allowing movement in transverse direction
    • F16L3/205Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe allowing movement in transverse direction having supporting springs
    • F16L3/2056Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe allowing movement in transverse direction having supporting springs the axis of at least one spring being oblique or perpendicular to the direction of the movement of the pipe

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Supports For Pipes And Cables (AREA)

Abstract

A kind of support equipment of fixed -piping and the Pipe installing adjusting method using the equipment, the equipment include stationary base mount(1)And the stationary base mount(1)Connected casing(11)And with the casing(11)The Box Cover being removably fixed with(12), the Box Cover(12)It is covered in the casing(11)Upside opening with dismounting when supply pipeline(2)Pass through the upper side opening, the Box Cover(12)Outside be fixedly installed top shoe clamping lid(9), to clamp lid in the top shoe(9)With the Box Cover(12)Between be slideably clamped with top shoe(91), the top shoe(91)In be provided with screw to the longitudinal axis operate screw rod(8)Screw thread coordinates, and the longitudinal axis operates screw rod(8)Outboard Sections through the top shoe clamping lid(9)And clamp lid with the top shoe(9)Adjacent both sides between have first adjustment allowance(80).

Description

A kind of support equipment of fixed -piping
Technical field
The present invention relates to Pipe installing field, the support equipment of specially a kind of fixed -piping and the pipe using the equipment Road installation and adjustment method.
Background technology
In Pipe installing field, generally require to isolate pipeline with surrounding environment.Medium is transported particularly with pipeline Occasion with temperature and requirement of shelter.Pipeline often using between isolating device and pipeline gap portion carry out effectively every Absolutely.And the fixed middle regulation for pipeline is often difficult to operate, more unworkable is that pipeline is entered on four direction gap Row regulation.Moreover, often face the vibration problem caused by external interference after Pipe installing, this caused damage to isolating device and Influence service life and safe to use.
The content of the invention
Adjusted it is an object of the invention to provide a kind of support equipment of fixed -piping and using the Pipe installing of the equipment Method, the defects of it can overcome in the prior art.
According to the present invention a kind of fixed -piping support equipment, including stationary base mount, with the stationary base mount be connected Casing and the Box Cover being removably fixed with the casing, the Box Cover be covered in the upside opening of the casing with For pipeline by the upper side opening during dismounting, top shoe clamping lid is fixedly installed on the outside of the Box Cover, to Top shoe is slideably clamped between the top shoe clamping lid and the Box Cover, screw is provided with the top shoe To coordinate with longitudinal axis operation screw flight, the Outboard Sections of longitudinal axis operation screw rod through top shoe clamping lid and There is the first adjustment allowance, the inboard portion of the longitudinal axis operation screw rod between the adjacent both sides of top shoe clamping lid There is the second adjustment allowance through the Box Cover and with the Box Cover adjacent both sides;The right hand external of the casing Fixed block is installed with, screw is provided with the fixed block to coordinate with transverse axis operation screw flight, the transverse axis operates spiral shell The medial end of bar and longitudinal axis operation screw rod is connected to rotatable top pressure head assembly, to top pressure respectively in the pipe On the right side and upper lateral part in road, sliding block clamping lid is fixedly installed on the following side of the casing, under described Sliding block clamps and is slideably clamped with sliding block between lid and the following side of the casing, and the necking section of the sliding block passes through The following side of the casing and with the following side of the casing between adjacent both sides have the 3rd adjustment allowance, it is described first adjust Telescopic protection cotton pad, the protection cotton pad are equipped with whole allowance, the second adjustment allowance and the 3rd adjustment allowance To prevent dust from being entered from the described first adjustment allowance, the second adjustment allowance and the 3rd adjustment allowance in the casing, from And the accumulation of a large amount of dusts in the casing is avoided, wherein, the inner side of on the inside of the left side of the casing and necking section End is respectively fixedly connected with elastic top pressure component, wherein, each include in two rotatable top pressure head assemblies The rotational engagement part and elastic joint part being fixed together by fastener, set in the rotational engagement part There are two thrust bearings, the flange part of corresponding operating screw rod, described two thrusts are bonded between described two thrust bearings A top pressure adjacent with the elastic joint part is on the elastic joint part in bearing, in the elastic joint part It is provided with top pressure post by elastomeric element, that one end relative with the elastomeric element on the top pressure post and resilientiy stretchable It is fixedly installed the first impeller of arc-shaped, first impeller is engaging and push the pipeline;Two bullets Property top pressure component include housing and the top-pressure part slideably to be stretched at the inside portion of the housing, the top-pressure part leads to Overregulate spring and be connected with the lateral wall of the housing and be installed on so as to resilientiy stretchable in the housing, the top-pressure part It is upper with second impeller for adjusting relative that one end of spring and being fixedly installed arc-shaped, second impeller also to Engage and push the pipeline, first impeller is identical with the second impeller size and is provided with the cooperation pipe The recess in road.
According to the present invention, using the Pipe installing adjusting method of the support equipment of above-mentioned fixed -piping, first, by the pipe Road is put into the casing from the upper side opening of the casing, after the Box Cover is fixedly mounted in place, by described in regulation The longitudinal axis operates screw rod and adjusts the longitudinal axis positions of the pipeline, until the pipeline is in the longitudinal central position of the casing; Afterwards, screw rod is operated to adjust the transverse axis position of the pipeline by adjusting the transverse axis, the longitudinal axis operates screw rod together with institute State top shoe and the sliding block is subjected to displacement in X direction, until the pipeline is in the transverse axis center of the casing Position.
By the present invention, due to being provided with regulation spring in bottom and left side, it can be provided on the longitudinal axis and transverse axis Allowance is adjusted, so as to allow adjusting screw rod to carry out ejection regulation.And what can be moved left and right by setting upper and lower is oppositely installed Longitudinal axis adjusting screw rod and its auxiliary equipment and the elastic top pressure component of bottom, so as to be realized under conditions of in ensureing that the longitudinal axis is fixed For the position adjustments of transverse axis.And by being arranged on the elastomeric element being installed in each rotatable top pressure head assembly, its Guarantee to overcome the pressure on top surface of the regulation spring and be adjusted it is fixed on the basis of, can be to being occurred on pipeline Vibrate into row buffering, so as to avoid causing damage to screw thread and then produce potential safety hazard and increase the service life.
Brief description of the drawings
Fig. 1 is the overall structure diagram of the support equipment of the fixed -piping of the present invention;
Fig. 2 is the exemplary enlarged diagram of the rotatable top pressure head assembly in Fig. 1;
Fig. 3 is the exemplary enlarged diagram of the elastic top pressure component in Fig. 1.
Embodiment
With reference to Fig. 1-3, the present invention is described in detail.
It is connected according to a kind of support equipment of fixed -piping of embodiment, including stationary base mount 1 and the stationary base mount 1 Casing 11 and the Box Cover 12 that is removably fixed with the casing 11, the Box Cover 12 be covered in the upper of the casing 11 Side opening is sentenced in dismounting for pipeline 2 by side opening on described, and the outside of the Box Cover 12 is fixedly installed top shoe Lid 9 is clamped, top shoe 91 is slideably clamped between lid 9 and the Box Cover 12 to be clamped in the top shoe, Screw is provided with the top shoe 91 to coordinate with longitudinal axis operation screw rod 8 screw thread, the outside portion of the longitudinal axis operation screw rod 8 Divide and clamp lid 9 through the top shoe and have the first adjustment abundant the adjacent both sides of top shoe clamping lid 9 Amount 80, the inboard portion of longitudinal axis operation screw rod 8 through the Box Cover 12 and with the adjacent both sides of the Box Cover 12 it Between have second adjustment allowance 10;The right hand external of the casing 11 is installed with fixed block 31, is provided with the fixed block 31 Screw with transverse axis operation screw rod 3 screw thread to coordinate, the medial extremity of the transverse axis operation screw rod 3 and longitudinal axis operation screw rod 8 Portion is connected to rotatable top pressure head assembly 71,7, to top pressure is on the right side and upper lateral part of the pipeline 2 respectively, institute State and sliding block clamping lid 6 is fixedly installed on the following side of casing 11, in sliding block clamping lid 6 and the case Sliding block 61 is slideably clamped between the following side of body 11, the necking section 62 of the sliding block 61 passes through the casing 11 Following side and between the adjacent both sides of the following side of the casing 11 have the 3rd adjustment allowance 110, it is described first adjustment it is abundant The adjustment allowance 10 and the 3rd of amount 80, second, which adjusts, is equipped with telescopic protection cotton pad 90, the protection in allowance 110 Cotton pad 90 to prevent dust from described first adjustment allowance 80, second adjust allowance 10 and the 3rd adjust allowance 110 enter In the casing 11, so as to avoid the accumulation of a large amount of dusts in the casing 11, wherein, on the inside of the left side of the casing 11 with And the medial end of the necking section 62 is respectively fixedly connected with elastic top pressure component 51,5, wherein, two are described rotatable Each rotational engagement part 74 and elasticity for including being fixed together by fastener 79 in top pressure head assembly 71,7 Attachment 75, two thrust bearings 72,73 are provided with the rotational engagement part 74, in described two thrust bearings 72nd, be bonded to the flange part 78 of corresponding operating screw rod between 73, in described two thrust bearings 72,73 with the flexible engaging portion An adjacent top pressure of part 75 on the elastic joint part 75, in the elastic joint part 75 by elastomeric element 77 and It is provided with top pressure post 76, that one end relative with the elastomeric element 77 fixed setting on the top pressure post 76 resilientiy stretchable There is the first impeller 20 of arc-shaped, first impeller 20 is engaging and push the pipeline 2;Two elastic tops Pressure component 51,5 includes housing 52 and the top-pressure part 53 slideably to be stretched at the inside portion of the housing 52, the top Casting die 53 is installed on the housing to be connected with the lateral wall of the housing 52 by adjusting spring 54 so as to resilientiy stretchable In 52, that one end relative with the regulation spring 54 is fixedly installed the second impeller of arc-shaped on the top-pressure part 53 21, second impeller 21 is also engaging and push the pipeline 2, first impeller 20 and second impeller 21 sizes are identical and are provided with the recess for coordinating the pipeline 2(It is not shown).
Exemplarily or valuably, wherein, the stiffness factor of the elastomeric element 77 is more than the strength of the regulation spring 54 Spend coefficient.
According to embodiment, using the Pipe installing adjusting method of the support equipment of above-mentioned fixed -piping, first, by the pipe The upper side opening of road 2 from the casing 11 is put into the casing 11, after the Box Cover 12 is fixedly mounted in place, passes through tune Save the longitudinal axis operation screw rod 8 and adjust the longitudinal axis positions of the pipeline 2, until the pipeline 2 is in the vertical of the casing 11 Axis center position;Afterwards, screw rod 3 is operated to adjust the transverse axis position of the pipeline 2, the longitudinal axis behaviour by adjusting the transverse axis Make screw rod 8 to be subjected to displacement in X direction together with the top shoe 91 and the sliding block 61, until the pipeline 2 is in The transverse axis center of the casing 11.
By the present invention, due to being provided with regulation spring in bottom and left side, it can be provided on the longitudinal axis and transverse axis Allowance is adjusted, so as to allow adjusting screw rod to carry out ejection regulation.And what can be moved left and right by setting upper and lower is oppositely installed Longitudinal axis adjusting screw rod and its auxiliary equipment and the elastic top pressure component of bottom, so as to be realized under conditions of in ensureing that the longitudinal axis is fixed For the position adjustments of transverse axis.And by being arranged on the elastomeric element being installed in each rotatable top pressure head assembly 71,7 77, its guarantee to overcome the pressure on top surface of the regulation spring and be adjusted it is fixed on the basis of, can be to institute on pipeline Row buffering is entered in the vibration of generation, so as to avoid causing damage to screw thread and then produce potential safety hazard and increase the service life.Entirely Device installation is reliable, easy to adjust and can effectively improve security and service life.
By that can be made within the scope of the invention according to mode of operation various with upper type, those skilled in the art Change.

Claims (2)

  1. A kind of 1. support equipment of fixed -piping, it is characterised in that:Including stationary base mount(1)And the stationary base mount(1)It is connected Casing(11)And with the casing(11)The Box Cover being removably fixed with(12), the Box Cover(12)It is covered in the case Body(11)Upside opening with dismounting when supply pipeline(2)Pass through the upper side opening, the Box Cover(12)Outside consolidate Surely it is provided with top shoe clamping lid(9), to clamp lid in the top shoe(9)With the Box Cover(12)Between can slide Top shoe is clamped with dynamicly(91), the top shoe(91)In be provided with screw to the longitudinal axis operate screw rod(8)Screw thread coordinates, The longitudinal axis operates screw rod(8)Outboard Sections through the top shoe clamping lid(9)And clamp lid with the top shoe (9)Adjacent both sides between have first adjustment allowance(80), the longitudinal axis operation screw rod(8)Inboard portion pass through the case Body lid(12)And with the Box Cover(12)Adjacent both sides between have second adjustment allowance(10);The casing(11)The right side Fixed block is installed with outside side(31), the fixed block(31)In be provided with screw to transverse axis operate screw rod(3)Screw thread is matched somebody with somebody Close, the transverse axis operates screw rod(3)Screw rod is operated with the longitudinal axis(8)Medial end be connected to rotatable pressure end group Part(71,7), to top pressure respectively in the pipeline(2)Right side and upper lateral part on, the casing(11)Following side on it is solid Surely it is provided with sliding block clamping lid(6), to clamp lid in the sliding block(6)With the casing(11)Following side it Between be slideably clamped with sliding block(61), the sliding block(61)Necking section(62)Through the casing(11)Following side And with the casing(11)Following side adjacent both sides between have the 3rd adjustment allowance(110), the first adjustment allowance (80), second adjustment allowance(10)With the 3rd adjustment allowance(110)In be equipped with telescopic protection cotton pad(90), institute State protection cotton pad(90)To prevent dust from the described first adjustment allowance(80), second adjustment allowance(10)It is abundant with the 3rd adjustment Amount(110)Enter the casing(11)It is interior, so as to avoid the casing(11)The accumulation of interior a large amount of dusts, wherein, the case Body(11)Left side on the inside of and the necking section(62)Medial end be respectively fixedly connected with elastic top pressure component (51,5), wherein, two rotatable top pressure head assemblies(71,7)In each include passing through fastener(79)It is connected in Rotational engagement part together(74)And elastic joint part(75), the rotational engagement part(74)In be provided with two Individual thrust bearing(72、73), in described two thrust bearings(72、73)Between be bonded to the flange part of corresponding operating screw rod (78), described two thrust bearings(72、73)In with the elastic joint part(75)An adjacent top pressure is in the elasticity Attachment(75)On, the elastic joint part(75)In pass through elastomeric element(77)And resilientiy stretchable be provided with top pressure Post(76), the top pressure post(76)The upper and elastomeric element(77)What that relative one end was fixedly installed arc-shaped first pushes away Moving part(20), first impeller(20)To engage and push the pipeline(2);Two elastic top pressure components(51, 5)Include housing(52)And in the housing(52)Inside portion at the top-pressure part that slideably stretches(53), the top pressure Part(53)By adjusting spring(54)And with the housing(52)Lateral wall connection be installed on so as to resilientiy stretchable it is described Housing(52)In, the top-pressure part(53)The upper and regulation spring(54)That relative one end is fixedly installed the of arc-shaped Two impellers(21), second impeller(21)Also engaging and push the pipeline(2), first impeller(20) With second impeller(21)Size is identical and is provided with the cooperation pipeline(2)Recess;Wherein, the elastomeric element (77)Stiffness factor be more than the regulation spring(54)Stiffness factor.
  2. A kind of 2. Pipe installing adjusting method of the support equipment of the fixed -piping described in usage right requirement 1, first, by described in Pipeline(2)From the casing(11)Upper side opening be put into the casing(11)In, by the Box Cover(12)It is fixedly installed to Behind position, screw rod is operated by adjusting the longitudinal axis(8)And adjust the pipeline(2)Longitudinal axis positions, until the pipeline(2)Place In the casing(11)Longitudinal central position;Afterwards, screw rod is operated by adjusting the transverse axis(3)And adjust the pipeline (2)Transverse axis position, the longitudinal axis operates screw rod(8)Together with the top shoe(91)And the sliding block(61)In transverse axis side It is subjected to displacement upwards, until the pipeline(2)In the casing(11)Transverse axis center.
CN201610491713.1A 2016-06-29 2016-06-29 A kind of support equipment of fixed -piping Active CN106122601B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610491713.1A CN106122601B (en) 2016-06-29 2016-06-29 A kind of support equipment of fixed -piping

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610491713.1A CN106122601B (en) 2016-06-29 2016-06-29 A kind of support equipment of fixed -piping

Publications (2)

Publication Number Publication Date
CN106122601A CN106122601A (en) 2016-11-16
CN106122601B true CN106122601B (en) 2018-03-02

Family

ID=57286153

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610491713.1A Active CN106122601B (en) 2016-06-29 2016-06-29 A kind of support equipment of fixed -piping

Country Status (1)

Country Link
CN (1) CN106122601B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114838211A (en) * 2022-06-14 2022-08-02 南京工业大学 Lightweight FRP water pipe and processing technology thereof

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2945640A1 (en) * 1979-11-12 1981-05-21 Deutsche Babcock Ag, 4200 Oberhausen Boiler tube supporting equipment on enclosing structure - has spring tappet acting on wedge and coupled to tube
JP4044977B2 (en) * 1995-10-18 2008-02-06 三和テッキ株式会社 Leaf spring vibration type magnetic damper
KR20080071030A (en) * 2007-01-29 2008-08-01 삼성전자주식회사 Pipe supporter and air conditioning device
CN202324770U (en) * 2011-11-18 2012-07-11 中国石油化工集团公司 Adjustable limiting device
CN202571884U (en) * 2012-05-05 2012-12-05 光隆精密工业(福州)有限公司 Special fixture for engine exhaust port angle pipe lathe
CN203561792U (en) * 2013-11-05 2014-04-23 辛砚 Slide glass moving device used for microscope slide glass stand
CN105180804B (en) * 2015-08-10 2018-07-03 苏州优谱德精密仪器科技有限公司 A kind of photoelectric detection system

Also Published As

Publication number Publication date
CN106122601A (en) 2016-11-16

Similar Documents

Publication Publication Date Title
CN105937660B (en) A kind of pipeline supporting arrangement
CN105952974B (en) It is a kind of to carry stable pipe-supporting device
CN106015749B (en) A kind of supporting arrangement for pipeline
CN106078552B (en) It is a kind of can dehumidifier pipeline load bearing equipment
CN106041784B (en) A kind of pipeline bogey
CN105937659B (en) A kind of pipe-supporting device and the Pipe installing adjusting method using the device
CN105864521B (en) A kind of firm formula pipe-supporting device and Pipe installing adjusting method
CN106122601B (en) A kind of support equipment of fixed -piping
CN106015757B (en) The pipe-supporting device and Pipe installing adjusting method of a kind of dust removal
CN106122604B (en) A kind of bogey for pipeline and the Pipe installing adjusting method using the device
CN106402494B (en) A kind of pipeline support apparatus
CN106122600B (en) A kind of supporting arrangement of Pipe installing
CN106051311B (en) A kind of durable type pipe-supporting device
CN106002776B (en) A kind of durable pipe-supporting device
CN105937657B (en) A kind of load bearing equipment for pipeline and the Pipe installing adjusting method using the equipment
CN105909874A (en) Bearing device for industrial pipeline
CN105889641B (en) A kind of pipe-supporting device and Pipe installing adjusting method
CN106122602B (en) A kind of loss prevention pipeline bogey
CN106078188B (en) A kind of security industry tube support arrangement
CN105937661B (en) A kind of industrial pipeline bogey and the Pipe installing adjusting method using the device
CN106002760B (en) A kind of dust-proof pipeline supporting arrangement
CN105927793B (en) A kind of pipeline bearing assembly and the Pipe installing adjusting method using the component
CN106051313B (en) It is a kind of can feeding lubricating pipe-supporting device and Pipe installing adjusting method
CN106051312B (en) A kind of pipe-supporting device and Pipe installing adjusting method for being provided with guide rod
CN105909875B (en) Keep the pipe-supporting device and Pipe installing adjusting method of inner air circulation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Wang Shiwei

Inventor before: Pan Yan

TA01 Transfer of patent application right

Effective date of registration: 20180111

Address after: 233500 east side of Chuang-tzu Avenue, South District of Mengcheng County Economic Development Zone, Bozhou City, Anhui Province, Hebei side of red flag

Applicant after: ANHUI LANBO WATER SUPPLY EQUIPMENT Co.,Ltd.

Address before: 530023 Nanning Road, the Guangxi Zhuang Autonomous Region Qingxiu District building 37 No. 2006 dormitory

Applicant before: Pan Yan

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Support equipment for fixing pipes

Effective date of registration: 20221227

Granted publication date: 20180302

Pledgee: Mengcheng County revitalize the financing Company limited by guarantee

Pledgor: ANHUI LANBO WATER SUPPLY EQUIPMENT Co.,Ltd.

Registration number: Y2022980029175

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20231228

Granted publication date: 20180302

Pledgee: Mengcheng County revitalize the financing Company limited by guarantee

Pledgor: ANHUI LANBO WATER SUPPLY EQUIPMENT Co.,Ltd.

Registration number: Y2022980029175