CN105937657B - A kind of load bearing equipment for pipeline and the Pipe installing adjusting method using the equipment - Google Patents
A kind of load bearing equipment for pipeline and the Pipe installing adjusting method using the equipment Download PDFInfo
- Publication number
- CN105937657B CN105937657B CN201610491718.4A CN201610491718A CN105937657B CN 105937657 B CN105937657 B CN 105937657B CN 201610491718 A CN201610491718 A CN 201610491718A CN 105937657 B CN105937657 B CN 105937657B
- Authority
- CN
- China
- Prior art keywords
- casing
- pipeline
- box cover
- screw rod
- longitudinal axis
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
- F16L3/02—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets partly surrounding the pipes, cables or protective tubing
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
- F16L3/16—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe
- F16L3/20—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe allowing movement in transverse direction
- F16L3/205—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe allowing movement in transverse direction having supporting springs
- F16L3/2056—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe allowing movement in transverse direction having supporting springs the axis of at least one spring being oblique or perpendicular to the direction of the movement of the pipe
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Support Of The Bearing (AREA)
Abstract
A kind of load bearing equipment for pipeline and the Pipe installing adjusting method using the equipment, the equipment include stationary base mount(1)And the stationary base mount(1)Connected casing(11)And with the casing(11)The Box Cover being removably fixed with(12), the Box Cover(12)It is covered in the casing(11)Upside opening with dismounting when supply pipeline(2)Pass through the upper side opening, the casing(11)The neighboring gluing of upside opening be fixed with seal washer(18), the seal washer(18)To with the Box Cover(12)Coordinate, so that the casing(11)With the Box Cover(12)Between produce sealing so that the casing(11)With the Box Cover(12)Sealing effectiveness it is more preferable, the seal washer(18)For the rubber washer made of elastomeric material, the Box Cover(12)Outside be fixedly installed top shoe clamping lid(9).
Description
Technical field
The present invention relates to Pipe installing field, specially a kind of load bearing equipment for pipeline and the pipe using the equipment
Road installation and adjustment method.
Background technology
In Pipe installing field, generally require to isolate pipeline with surrounding environment.Medium is transported particularly with pipeline
Occasion with temperature and requirement of shelter.Pipeline often using between isolating device and pipeline gap portion carry out effectively every
Absolutely.And the fixed middle regulation for pipeline is often difficult to operate, more unworkable is that pipeline is entered on four direction gap
Row regulation.Moreover, often face the vibration problem caused by external interference after Pipe installing, this caused damage to isolating device and
Influence service life and safe to use.
The content of the invention
Adjusted it is an object of the invention to provide a kind of load bearing equipment for pipeline and using the Pipe installing of the equipment
Method, the defects of it can overcome in the prior art.
According to a kind of load bearing equipment for pipeline of the present invention, including it is stationary base mount, connected with the stationary base mount
Casing and the Box Cover being removably fixed with the casing, the Box Cover be covered in the upside opening of the casing with
Sealing gasket is fixed with by the upper side opening, the neighboring gluing of the upside opening of the casing for pipeline during dismounting
Circle, the seal washer with the Box Cover to coordinate, so that sealing is produced between the casing and the Box Cover,
So that the sealing effectiveness of the casing and the Box Cover is more preferable, the seal washer is the rubber blanket made of elastomeric material
Enclose, top shoe clamping lid is fixedly installed on the outside of the Box Cover, in top shoe clamping lid and the case
Top shoe is slideably clamped between body lid, screw is provided with the top shoe to match somebody with somebody with longitudinal axis operation screw flight
Close, the Outboard Sections of the longitudinal axis operation screw rod clamp the phase of lid through top shoe clamping lid and with the top shoe
There is the first adjustment allowance between adjacent both sides, the inboard portion of longitudinal axis operation screw rod through the Box Cover and with the case
There is the second adjustment allowance between the adjacent both sides of body lid;The right hand external of the casing is installed with fixed block, the fixed block
In be provided with screw to coordinate with transverse axis operation screw flight, transverse axis operation screw rod operates the interior of screw rod with the longitudinal axis
Side end is connected to rotatable top pressure head assembly, to top pressure is on the right side and upper lateral part of the pipeline respectively, institute
State and sliding block clamping lid is fixedly installed on the following side of casing, in sliding block clamping lid and the casing
Slideably be clamped with sliding block between following side, the necking section of the sliding block through the following side of the casing and with it is described
There is the 3rd adjustment allowance between the adjacent both sides of the following side of casing, wherein, it is on the inside of the left side of the casing and described
The medial end of necking section is respectively fixedly connected with elastic top pressure component, wherein, in two rotatable top pressure head assemblies
Each rotational engagement part and elastic joint part for including being fixed together by fastener, the rotary type connects
Close in part and be provided with two thrust bearings, the flange part of corresponding operating screw rod is bonded between described two thrust bearings,
A top pressure adjacent with the elastic joint part is on the elastic joint part in described two thrust bearings, the bullet
Be provided with top pressure post in property attachment by elastomeric element and resilientiy stretchable, on the top pressure post with the elastomeric element
That relative one end is fixedly installed the first impeller of arc-shaped, and first impeller is engaging and push the pipe
Road;Two elastic top pressure components include housing and the top pressure slideably stretched at the inside portion of the housing
Part, the top-pressure part are installed on the shell to be connected with the lateral wall of the housing by adjusting spring so as to resilientiy stretchable
In body, that one end relative with the regulation spring is fixedly installed the second impeller of arc-shaped on the top-pressure part, described
For second impeller also to engage and push the pipeline, first impeller and the second impeller size are identical and equal
It is provided with the recess for coordinating the pipeline.
According to the present invention, using the Pipe installing adjusting method of the above-mentioned load bearing equipment for pipeline, first, by the pipe
Road is put into the casing from the upper side opening of the casing, after the Box Cover is fixedly mounted in place, by described in regulation
The longitudinal axis operates screw rod and adjusts the longitudinal axis positions of the pipeline, until the pipeline is in the longitudinal central position of the casing;
Afterwards, screw rod is operated to adjust the transverse axis position of the pipeline by adjusting the transverse axis, the longitudinal axis operates screw rod together with institute
State top shoe and the sliding block is subjected to displacement in X direction, until the pipeline is in the transverse axis center of the casing
Position.
By the present invention, due to being provided with regulation spring in bottom and left side, it can be provided on the longitudinal axis and transverse axis
Allowance is adjusted, so as to allow adjusting screw rod to carry out ejection regulation.And what can be moved left and right by setting upper and lower is oppositely installed
Longitudinal axis adjusting screw rod and its auxiliary equipment and the elastic top pressure component of bottom, so as to be realized under conditions of in ensureing that the longitudinal axis is fixed
For the position adjustments of transverse axis.And by being arranged on the elastomeric element being installed in each rotatable top pressure head assembly, its
Guarantee to overcome the pressure on top surface of the regulation spring and be adjusted it is fixed on the basis of, can be to being occurred on pipeline
Vibrate into row buffering, so as to avoid causing damage to screw thread and then produce potential safety hazard and increase the service life.
Brief description of the drawings
Fig. 1 is the overall structure diagram of the load bearing equipment for pipeline of the present invention;
Fig. 2 is the exemplary enlarged diagram of the rotatable top pressure head assembly in Fig. 1;
Fig. 3 is the exemplary enlarged diagram of the elastic top pressure component in Fig. 1.
Embodiment
With reference to Fig. 1-3, the present invention is described in detail.
It is connected according to a kind of load bearing equipment for pipeline of embodiment, including stationary base mount 1 and the stationary base mount 1
Casing 11 and the Box Cover 12 that is removably fixed with the casing 11, the Box Cover 12 be covered in the upper of the casing 11
Side opening is sentenced passes through side opening on described, the neighboring glue of the upside opening of the casing 11 in dismounting for pipeline 2
Conjunction is fixed with seal washer 18, the seal washer 18 to coordinate with the Box Cover 12 so that the casing 11 with
Sealing is produced between the Box Cover 12 so that the sealing effectiveness of the casing 11 and the Box Cover 12 is more preferable, the sealing
Packing ring 18 is the rubber washer made of elastomeric material, and the outside of the Box Cover 12 is fixedly installed top shoe clamping lid 9,
To be clamped in the top shoe top shoe 91, the top shoe are slideably clamped between lid 9 and the Box Cover 12
Screw is provided with 91 to coordinate with longitudinal axis operation screw rod 8 screw thread, the Outboard Sections of the longitudinal axis operation screw rod 8 are described in
Top shoe clamps lid 9 and has the first adjustment allowance 80 between the adjacent both sides of top shoe clamping lid 9, described vertical
The inboard portion of axle operation screw rod 8 has second to adjust through the Box Cover 12 and the adjacent both sides of the Box Cover 12
Whole allowance 10;The right hand external of the casing 11 is installed with fixed block 31, be provided with the fixed block 31 screw to horizontal stroke
Axle operation screw rod 3 screw thread coordinates, and the medial end of the transverse axis operation screw rod 3 and longitudinal axis operation screw rod 8 is connected to
Rotatable top pressure head assembly 71,7, to top pressure is on the right side and upper lateral part of the pipeline 2 respectively, under the casing 11
Sliding block clamping lid 6 is fixedly installed on sidepiece, in the following side of sliding block clamping lid 6 and the casing 11
Between be slideably clamped with sliding block 61, the necking section 62 of the sliding block 61 through the following side of the casing 11 and with institute
Stating between the adjacent both sides of the following side of casing 11 has the 3rd adjustment allowance 110, wherein, on the inside of the left side of the casing 11
And the medial end of the necking section 62 is respectively fixedly connected with elastic top pressure component 51,5, wherein, it can turn described in two
Each rotational engagement part 74 and bullet for including being fixed together by fastener 79 in dynamic top pressure head assembly 71,7
Property attachment 75, two thrust bearings 72,73 are provided with the rotational engagement part 74, in described two thrust bearings
72nd, be bonded to the flange part 78 of corresponding operating screw rod between 73, in described two thrust bearings 72,73 with the flexible engaging portion
An adjacent top pressure of part 75 on the elastic joint part 75, in the elastic joint part 75 by elastomeric element 77 and
It is provided with top pressure post 76, that one end relative with the elastomeric element 77 fixed setting on the top pressure post 76 resilientiy stretchable
There is the first impeller 20 of arc-shaped, first impeller 20 is engaging and push the pipeline 2;Two elastic tops
Pressure component 51,5 includes housing 52 and the top-pressure part 53 slideably to be stretched at the inside portion of the housing 52, the top
Casting die 53 is installed on the housing to be connected with the lateral wall of the housing 52 by adjusting spring 54 so as to resilientiy stretchable
In 52, that one end relative with the regulation spring 54 is fixedly installed the second impeller of arc-shaped on the top-pressure part 53
21, second impeller 21 is also engaging and push the pipeline 2, first impeller 20 and second impeller
21 sizes are identical and are provided with the recess for coordinating the pipeline 2(It is not shown).
Exemplarily or valuably, wherein, the stiffness factor of the elastomeric element 77 is more than the strength of the regulation spring 54
Spend coefficient.
According to embodiment, using the Pipe installing adjusting method of the above-mentioned load bearing equipment for pipeline, first, by the pipe
The upper side opening of road 2 from the casing 11 is put into the casing 11, after the Box Cover 12 is fixedly mounted in place, passes through tune
Save the longitudinal axis operation screw rod 8 and adjust the longitudinal axis positions of the pipeline 2, until the pipeline 2 is in the vertical of the casing 11
Axis center position;Afterwards, screw rod 3 is operated to adjust the transverse axis position of the pipeline 2, the longitudinal axis behaviour by adjusting the transverse axis
Make screw rod 8 to be subjected to displacement in X direction together with the top shoe 91 and the sliding block 61, until the pipeline 2 is in
The transverse axis center of the casing 11.
By the present invention, due to being provided with regulation spring in bottom and left side, it can be provided on the longitudinal axis and transverse axis
Allowance is adjusted, so as to allow adjusting screw rod to carry out ejection regulation.And what can be moved left and right by setting upper and lower is oppositely installed
Longitudinal axis adjusting screw rod and its auxiliary equipment and the elastic top pressure component of bottom, so as to be realized under conditions of in ensureing that the longitudinal axis is fixed
For the position adjustments of transverse axis.And by being arranged on the elastomeric element being installed in each rotatable top pressure head assembly 71,7
77, its guarantee to overcome the pressure on top surface of the regulation spring and be adjusted it is fixed on the basis of, can be to institute on pipeline
Row buffering is entered in the vibration of generation, so as to avoid causing damage to screw thread and then produce potential safety hazard and increase the service life.Entirely
Device installation is reliable, easy to adjust and can effectively improve security and service life.
By that can be made within the scope of the invention according to mode of operation various with upper type, those skilled in the art
Change.
Claims (2)
- A kind of 1. load bearing equipment for pipeline, it is characterised in that:Including stationary base mount(1)And the stationary base mount(1)It is connected Casing(11)And with the casing(11)The Box Cover being removably fixed with(12), the Box Cover(12)It is covered in the case Body(11)Upside opening with dismounting when supply pipeline(2)Pass through the upper side opening, the casing(11)Upper side opening The neighboring gluing at place is fixed with seal washer(18), the seal washer(18)To with the Box Cover(12)Coordinate, So that the casing(11)With the Box Cover(12)Between produce sealing so that the casing(11)With the Box Cover (12)Sealing effectiveness it is more preferable, the seal washer(18)For the rubber washer made of elastomeric material, the Box Cover(12) Outside be fixedly installed top shoe clamping lid(9), to clamp lid in the top shoe(9)With the Box Cover(12) Between be slideably clamped with top shoe(91), the top shoe(91)In be provided with screw to the longitudinal axis operate screw rod(8) Screw thread coordinates, and the longitudinal axis operates screw rod(8)Outboard Sections through the top shoe clamping lid(9)And with the top shoe Clamp lid(9)Adjacent both sides between have first adjustment allowance(80), the longitudinal axis operation screw rod(8)Inboard portion wear Cross the Box Cover(12)And with the Box Cover(12)Adjacent both sides between have second adjustment allowance(10);The casing (11)Right hand external be installed with fixed block(31), the fixed block(31)In be provided with screw to transverse axis operate screw rod (3)Screw thread coordinates, and the transverse axis operates screw rod(3)Screw rod is operated with the longitudinal axis(8)Medial end be connected to and can turn Dynamic top pressure head assembly(71,7), to top pressure respectively in the pipeline(2)Right side and upper lateral part on, the casing(11)'s Sliding block clamping lid is fixedly installed on following side(6), to clamp lid in the sliding block(6)With the casing(11) Following side between be slideably clamped with sliding block(61), the sliding block(61)Necking section(62)Through the casing (11)Following side and with the casing(11)Following side adjacent both sides between have the 3rd adjustment allowance(110), wherein, The casing(11)Left side on the inside of and the necking section(62)Medial end be respectively fixedly connected with elastic top pressure Component(51,5), wherein, two rotatable top pressure head assemblies(71,7)In each include passing through fastener(79)Gu The rotational engagement part to connect together(74)And elastic joint part(75), the rotational engagement part(74)Middle setting There are two thrust bearings(72、73), in described two thrust bearings(72、73)Between be bonded to the flange part of corresponding operating screw rod (78), described two thrust bearings(72、73)In with the elastic joint part(75)An adjacent top pressure is in the elasticity Attachment(75)On, the elastic joint part(75)In pass through elastomeric element(77)And resilientiy stretchable be provided with top pressure Post(76), the top pressure post(76)The upper and elastomeric element(77)What that relative one end was fixedly installed arc-shaped first pushes away Moving part(20), first impeller(20)To engage and push the pipeline(2);Two elastic top pressure components(51, 5)Include housing(52)And in the housing(52)Inside portion at the top-pressure part that slideably stretches(53), the top pressure Part(53)By adjusting spring(54)And with the housing(52)Lateral wall connection be installed on so as to resilientiy stretchable it is described Housing(52)In, the top-pressure part(53)The upper and regulation spring(54)That relative one end is fixedly installed the of arc-shaped Two impellers(21), second impeller(21)Also engaging and push the pipeline(2), first impeller(20) With second impeller(21)Size is identical and is provided with the cooperation pipeline(2)Recess;Wherein, the elastomeric element (77)Stiffness factor be more than the regulation spring(54)Stiffness factor.
- A kind of 2. Pipe installing adjusting method of the load bearing equipment for pipeline described in usage right requirement 1, first, by described in Pipeline(2)From the casing(11)Upper side opening be put into the casing(11)In, by the Box Cover(12)It is fixedly installed to Behind position, screw rod is operated by adjusting the longitudinal axis(8)And adjust the pipeline(2)Longitudinal axis positions, until the pipeline(2)Place In the casing(11)Longitudinal central position;Afterwards, screw rod is operated by adjusting the transverse axis(3)And adjust the pipeline (2)Transverse axis position, the longitudinal axis operates screw rod(8)Together with the top shoe(91)And the sliding block(61)In transverse axis side It is subjected to displacement upwards, until the pipeline(2)In the casing(11)Transverse axis center.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610491718.4A CN105937657B (en) | 2016-06-29 | 2016-06-29 | A kind of load bearing equipment for pipeline and the Pipe installing adjusting method using the equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610491718.4A CN105937657B (en) | 2016-06-29 | 2016-06-29 | A kind of load bearing equipment for pipeline and the Pipe installing adjusting method using the equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105937657A CN105937657A (en) | 2016-09-14 |
CN105937657B true CN105937657B (en) | 2017-12-15 |
Family
ID=56872071
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610491718.4A Active CN105937657B (en) | 2016-06-29 | 2016-06-29 | A kind of load bearing equipment for pipeline and the Pipe installing adjusting method using the equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105937657B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018094550A1 (en) * | 2016-11-22 | 2018-05-31 | 邴兆前 | Pipe support device with good sealability |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101235929A (en) * | 2007-01-29 | 2008-08-06 | 三星电子株式会社 | Tubing support device and air conditioner possessing the device |
CN203907022U (en) * | 2014-06-10 | 2014-10-29 | 宁波中安锻造有限公司 | Pipe installation clamp |
CN204160084U (en) * | 2014-08-07 | 2015-02-18 | 南京南化建设有限公司 | A kind of jacket pipe assembling apparatus |
CN104354039A (en) * | 2014-10-30 | 2015-02-18 | 安徽鼎恒再制造产业技术研究院有限公司 | Clamping-position-adjustable pipe clamping device |
CN204254037U (en) * | 2014-08-27 | 2015-04-08 | 张棣 | A kind of petroleum pipeline bracket seat of stabilized structure |
-
2016
- 2016-06-29 CN CN201610491718.4A patent/CN105937657B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101235929A (en) * | 2007-01-29 | 2008-08-06 | 三星电子株式会社 | Tubing support device and air conditioner possessing the device |
CN203907022U (en) * | 2014-06-10 | 2014-10-29 | 宁波中安锻造有限公司 | Pipe installation clamp |
CN204160084U (en) * | 2014-08-07 | 2015-02-18 | 南京南化建设有限公司 | A kind of jacket pipe assembling apparatus |
CN204254037U (en) * | 2014-08-27 | 2015-04-08 | 张棣 | A kind of petroleum pipeline bracket seat of stabilized structure |
CN104354039A (en) * | 2014-10-30 | 2015-02-18 | 安徽鼎恒再制造产业技术研究院有限公司 | Clamping-position-adjustable pipe clamping device |
Also Published As
Publication number | Publication date |
---|---|
CN105937657A (en) | 2016-09-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105937660B (en) | A kind of pipeline supporting arrangement | |
CN105952974B (en) | It is a kind of to carry stable pipe-supporting device | |
CN106015749B (en) | A kind of supporting arrangement for pipeline | |
CN105864518B (en) | A kind of pipe-supporting device of good airproof performance and Pipe installing adjusting method | |
CN106078552B (en) | It is a kind of can dehumidifier pipeline load bearing equipment | |
CN106041784B (en) | A kind of pipeline bogey | |
CN105937659B (en) | A kind of pipe-supporting device and the Pipe installing adjusting method using the device | |
CN105937657B (en) | A kind of load bearing equipment for pipeline and the Pipe installing adjusting method using the equipment | |
CN106402494B (en) | A kind of pipeline support apparatus | |
CN105864521B (en) | A kind of firm formula pipe-supporting device and Pipe installing adjusting method | |
CN106015757B (en) | The pipe-supporting device and Pipe installing adjusting method of a kind of dust removal | |
CN106002776B (en) | A kind of durable pipe-supporting device | |
CN106122601B (en) | A kind of support equipment of fixed -piping | |
CN106090443A (en) | A kind of sealed support means of pipeline | |
CN105927794A (en) | Bearing assembly for pipeline installation | |
CN105889641B (en) | A kind of pipe-supporting device and Pipe installing adjusting method | |
CN106122602B (en) | A kind of loss prevention pipeline bogey | |
CN106122604B (en) | A kind of bogey for pipeline and the Pipe installing adjusting method using the device | |
CN106051311B (en) | A kind of durable type pipe-supporting device | |
CN105937661B (en) | A kind of industrial pipeline bogey and the Pipe installing adjusting method using the device | |
CN105909876A (en) | Support apparatus for bearing pipeline | |
CN106051312B (en) | A kind of pipe-supporting device and Pipe installing adjusting method for being provided with guide rod | |
CN106122603B (en) | A kind of pipe-supporting component | |
CN106051313B (en) | It is a kind of can feeding lubricating pipe-supporting device and Pipe installing adjusting method | |
CN106002760B (en) | A kind of dust-proof pipeline supporting arrangement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Liu Lizhong Inventor before: Pan Yan |
|
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20171117 Address after: 324000 the 24 third floor of the West Road around the city, Twin Towers street, Jiangshan City, Quzhou, Zhejiang Applicant after: JIANGSHAN HAIWEI TECHNOLOGY CO., LTD. Address before: 530023 Nanning Road, the Guangxi Zhuang Autonomous Region Qingxiu District building 37 No. 2006 dormitory Applicant before: Pan Yan |
|
GR01 | Patent grant | ||
GR01 | Patent grant |