CN106002776B - A kind of durable pipe-supporting device - Google Patents

A kind of durable pipe-supporting device Download PDF

Info

Publication number
CN106002776B
CN106002776B CN201610491750.2A CN201610491750A CN106002776B CN 106002776 B CN106002776 B CN 106002776B CN 201610491750 A CN201610491750 A CN 201610491750A CN 106002776 B CN106002776 B CN 106002776B
Authority
CN
China
Prior art keywords
casing
pipeline
screw rod
box cover
longitudinal axis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610491750.2A
Other languages
Chinese (zh)
Other versions
CN106002776A (en
Inventor
毛利英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huzhou Juye Incubator Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610491750.2A priority Critical patent/CN106002776B/en
Publication of CN106002776A publication Critical patent/CN106002776A/en
Application granted granted Critical
Publication of CN106002776B publication Critical patent/CN106002776B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25BTOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING OR HOLDING
    • B25B11/00Work holders not covered by any preceding group in the subclass, e.g. magnetic work holders, vacuum work holders
    • B25B11/02Assembly jigs

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Paper (AREA)
  • Supports For Pipes And Cables (AREA)

Abstract

A kind of durable pipe-supporting device and the Pipe installing adjusting method using described device, described device include stationary base mount(1)And the stationary base mount(1)Connected casing(11)And with the casing(11)The Box Cover being removably fixed with(12), the Box Cover(12)It is covered in the casing(11)Upside opening with dismounting when supply pipeline(2)Pass through the upper side opening, the Box Cover(12)Outside be fixedly installed top shoe clamping lid(9), to clamp lid in the top shoe(9)With the Box Cover(12)Between be slideably clamped with top shoe(91), the top shoe(91)In be provided with screw to the longitudinal axis operate screw rod(8)Screw thread coordinates, and the longitudinal axis operates screw rod(8)Outboard Sections through the top shoe clamping lid(9)And clamp lid with the top shoe(9)Adjacent both sides between have first adjustment allowance(80).

Description

A kind of durable pipe-supporting device
Technical field
The present invention relates to Pipe installing field, specially a kind of durable pipe-supporting device and the pipeline using described device Installation and adjustment method.
Background technology
In Pipe installing field, generally require to isolate pipeline with surrounding environment.Medium is transported particularly with pipeline Occasion with temperature and requirement of shelter.Pipeline often using between isolating device and pipeline gap portion carry out effectively every Absolutely.And the fixed middle regulation for pipeline is often difficult to operate, more unworkable is that pipeline is entered on four direction gap Row regulation.Moreover, often face the vibration problem caused by external interference after Pipe installing, this caused damage to isolating device and Influence service life and safe to use.
The content of the invention
A kind of Pipe installing regulation side it is an object of the invention to provide durable pipe-supporting device and using described device Method, the defects of it can overcome in the prior art.
According to a kind of durable pipe-supporting device of the present invention, including stationary base mount, the case connected with the stationary base mount Body and the Box Cover being removably fixed with the casing, the Box Cover are covered in the upside opening of the casing to tear open For pipeline by the upper side opening when unloading, top shoe clamping lid is fixedly installed on the outside of the Box Cover, in institute State and be slideably clamped with top shoe between top shoe clamping lid and the Box Cover, screw use is provided with the top shoe To coordinate with longitudinal axis operation screw flight, the Outboard Sections of longitudinal axis operation screw rod through top shoe clamping lid and with There is the first adjustment allowance, the inboard portion of the longitudinal axis operation screw rod is worn between the adjacent both sides of the top shoe clamping lid Cross the Box Cover and there is the second adjustment allowance with the Box Cover between adjacent both sides;The right hand external of the casing is consolidated Provided with fixed block, screw is provided with the fixed block to coordinate with transverse axis operation screw flight, the transverse axis operates screw rod Rotatable top pressure head assembly is connected to the medial end of longitudinal axis operation screw rod, to top pressure respectively in the pipeline Right side and upper lateral part on, be fixedly installed on the following side of the casing sliding block clamping lid, in the downslide Block clamps and is slideably clamped with sliding block between lid and the following side of the casing, and the necking section of the sliding block passes through institute State the following side of casing and there is the 3rd adjustment allowance with the following side of the casing between adjacent both sides, wherein, the case The medial end of on the inside of the left side of the body and necking section is respectively fixedly connected with elastic top pressure component, wherein, two Each rotational engagement part and bullet for including being fixed together by fastener in the rotatable top pressure head assembly Property attachment, two thrust bearings are provided with the rotational engagement part, are engaged between described two thrust bearings There is a flange part of corresponding operating screw rod, a top pressure adjacent with the elastic joint part is in institute in described two thrust bearings State on elastic joint part, be provided with top pressure post in the elastic joint part and resilientiy stretchable by elastomeric element, use To engage and push the pipeline;Two elastic top pressure components include housing and can at the inside portion of the housing Slidably flexible top-pressure part, the top-pressure part are connected so as to which elasticity can stretch by adjusting spring with the lateral wall of the housing It is installed in the housing to contracting, the top pressure post that one end and the top-pressure part away from the elastomeric element are away from described That one end of regulation spring is provided with rubber blanket, and the rubber blanket with the pipeline to offset, so as to prevent the top pressure Post and the top-pressure part make it that the pipe surface produces abrasion, makes to the pipeline because of long-time and the tube contacts The service life of the pipeline is reduced into abrasion.
According to the present invention, using the Pipe installing adjusting method of above-mentioned durable pipe-supporting device, first, by the pipeline It is put into from the upper side opening of the casing in the casing, it is described vertical by adjusting after the Box Cover is fixedly mounted in place Axle operates screw rod and adjusts the longitudinal axis positions of the pipeline, until the pipeline is in the longitudinal central position of the casing;It Afterwards, screw rod is operated to adjust the transverse axis position of the pipeline by adjusting the transverse axis, the longitudinal axis operates screw rod together with described Top shoe and the sliding block are subjected to displacement in X direction, until the pipeline is in the transverse axis centre bit of the casing Put.
By the present invention, due to being provided with regulation spring in bottom and left side, it can be provided on the longitudinal axis and transverse axis Allowance is adjusted, so as to allow adjusting screw rod to carry out ejection regulation.And what can be moved left and right by setting upper and lower is oppositely installed Longitudinal axis adjusting screw rod and its auxiliary equipment and the elastic top pressure component of bottom, so as to be realized under conditions of in ensureing that the longitudinal axis is fixed For the position adjustments of transverse axis.And by being arranged on the elastomeric element being installed in each rotatable top pressure head assembly, its Guarantee to overcome the pressure on top surface of the regulation spring and be adjusted it is fixed on the basis of, can be to being occurred on pipeline Vibrate into row buffering, so as to avoid causing damage to screw thread and then produce potential safety hazard and increase the service life.
Brief description of the drawings
Fig. 1 is the overall structure diagram of the durable pipe-supporting device of the present invention;
Fig. 2 is the exemplary enlarged diagram of the rotatable top pressure head assembly in Fig. 1;
Fig. 3 is the exemplary enlarged diagram of the elastic top pressure component in Fig. 1.
Embodiment
With reference to Fig. 1-3, the present invention is described in detail.
According to a kind of durable pipe-supporting device of embodiment, including stationary base mount 1, it is connected with the stationary base mount 1 Casing 11 and the Box Cover 12 being removably fixed with the casing 11, the Box Cover 12 are covered in the upside of the casing 11 Opening by side opening on described, the outside of the Box Cover 12 for pipeline 2 in dismounting to be fixedly installed top shoe folder Lid 9 is held, top shoe 91, institute are slideably clamped between lid 9 and the Box Cover 12 to be clamped in the top shoe State and screw is provided with top shoe 91 to coordinate with longitudinal axis operation screw rod 8 screw thread, the Outboard Sections of the longitudinal axis operation screw rod 8 Lid 9 is clamped through the top shoe and there is the first adjustment allowance the adjacent both sides of top shoe clamping lid 9 80, the inboard portion of the longitudinal axis operation screw rod 8 is through the Box Cover 12 and the adjacent both sides of the Box Cover 12 With the second adjustment allowance 10;The right hand external of the casing 11 is installed with fixed block 31, and spiral shell is provided with the fixed block 31 Hole with transverse axis operation screw rod 3 screw thread to coordinate, the medial end of the transverse axis operation screw rod 3 and longitudinal axis operation screw rod 8 Rotatable top pressure head assembly 71,7 is connected to, it is described on the right side and upper lateral part of the pipeline 2 to top pressure respectively Sliding block clamping lid 6 is fixedly installed on the following side of casing 11, in sliding block clamping lid 6 and the casing Sliding block 61 is slideably clamped between 11 following side, the necking section 62 of the sliding block 61 is passed through under the casing 11 Sidepiece and between the adjacent both sides of the following side of the casing 11 have the 3rd adjustment allowance 110, wherein, the casing 11 The medial end of on the inside of the left side and necking section 62 is respectively fixedly connected with elastic top pressure component 51,5, wherein, two Each rotational engagement portion for including being fixed together by fastener 79 in the individual rotatable top pressure head assembly 71,7 Part 74 and elastic joint part 75, two thrust bearings 72,73 are provided with the rotational engagement part 74, described two Be bonded to the flange part 78 of corresponding operating screw rod between individual thrust bearing 72,73, in described two thrust bearings 72,73 with it is described An adjacent top pressure of elastic joint part 75 passes through bullet on the elastic joint part 75 in the elastic joint part 75 Top pressure post 76 is provided with, to engage and push the pipeline 2 property part 77 and resilientiy stretchable;Two elastic top pressures Component 51,5 includes housing 52 and the top-pressure part 53 slideably to be stretched at the inside portion of the housing 52, the top pressure Part 53 is installed on the housing 52 to be connected with the lateral wall of the housing 52 by adjusting spring 54 so as to resilientiy stretchable In, the top pressure post 76 that one end and the top-pressure part 53 away from the elastomeric element 77 are away from the regulation spring 54 That one end is provided with rubber blanket 22, the rubber blanket 22 to be offseted with the pipeline 2, so as to prevent the top pressure post 76 with And the top-pressure part 53 make it that the surface of pipeline 2 produces abrasion because long-time is contacted with the pipeline 2, to the pipeline 2 Cause to wear and reduce the service life of the pipeline 2.
Exemplarily or valuably, wherein, the stiffness factor of the elastomeric element 77 is more than the strength of the regulation spring 54 Spend coefficient.
According to embodiment, using the Pipe installing adjusting method of above-mentioned durable pipe-supporting device, first, by the pipeline 2 are put into the casing 11 from the upper side opening of the casing 11, after the Box Cover 12 is fixedly mounted in place, pass through regulation The longitudinal axis operates screw rod 8 and adjusts the longitudinal axis positions of the pipeline 2, until the pipeline 2 is in the longitudinal axis of the casing 11 Center;Afterwards, screw rod 3 is operated to adjust the transverse axis position of the pipeline 2, the longitudinal axis operation by adjusting the transverse axis Screw rod 8 is subjected to displacement together with the top shoe 91 and the sliding block 61 in X direction, until the pipeline 2 is in institute State the transverse axis center of casing 11.
By the present invention, due to being provided with regulation spring in bottom and left side, it can be provided on the longitudinal axis and transverse axis Allowance is adjusted, so as to allow adjusting screw rod to carry out ejection regulation.And what can be moved left and right by setting upper and lower is oppositely installed Longitudinal axis adjusting screw rod and its auxiliary equipment and the elastic top pressure component of bottom, so as to be realized under conditions of in ensureing that the longitudinal axis is fixed For the position adjustments of transverse axis.And by being arranged on the elastomeric element being installed in each rotatable top pressure head assembly 71,7 77, its guarantee to overcome the pressure on top surface of the regulation spring and be adjusted it is fixed on the basis of, can be to institute on pipeline Row buffering is entered in the vibration of generation, so as to avoid causing damage to screw thread and then produce potential safety hazard and increase the service life.Entirely Device installation is reliable, easy to adjust and can effectively improve security and service life.
By that can be made within the scope of the invention according to mode of operation various with upper type, those skilled in the art Change.

Claims (3)

  1. A kind of 1. durable pipe-supporting device, it is characterised in that:Including stationary base mount(1)And the stationary base mount(1)Connected Casing(11)And with the casing(11)The Box Cover being removably fixed with(12), the Box Cover(12)It is covered in the casing (11)Upside opening with dismounting when supply pipeline(2)Pass through the upper side opening, the Box Cover(12)Outside fix It is provided with top shoe clamping lid(9), to clamp lid in the top shoe(9)With the Box Cover(12)Between slidably Ground is clamped with top shoe(91), the top shoe(91)In be provided with screw to the longitudinal axis operate screw rod(8)Screw thread coordinates, institute State longitudinal axis operation screw rod(8)Outboard Sections through the top shoe clamping lid(9)And clamp lid with the top shoe(9) Adjacent both sides between have first adjustment allowance(80), the longitudinal axis operation screw rod(8)Inboard portion pass through the casing Lid(12)And with the Box Cover(12)Adjacent both sides between have second adjustment allowance(10);The casing(11)Right side Outside is installed with fixed block(31), the fixed block(31)In be provided with screw to transverse axis operate screw rod(3)Screw thread coordinates, The transverse axis operates screw rod(3)Screw rod is operated with the longitudinal axis(8)Medial end be connected to rotatable top pressure head assembly (71,7), to top pressure respectively in the pipeline(2)Right side and upper lateral part on, the casing(11)Following side on it is fixed It is provided with sliding block clamping lid(6), to clamp lid in the sliding block(6)With the casing(11)Following side between Slideably it is clamped with sliding block(61), the sliding block(61)Necking section(62)Through the casing(11)Following side and With the casing(11)Following side adjacent both sides between have the 3rd adjustment allowance(110), wherein wherein, the casing (11)Left side on the inside of and the necking section(62)Medial end be respectively fixedly connected with elastic top pressure component(51, 5), wherein, two rotatable top pressure head assemblies(71,7)In each include passing through fastener(79)It is fixed together Rotational engagement part(74)And elastic joint part(75), the rotational engagement part(74)In be provided with two and push away Power bearing(72、73), in described two thrust bearings(72、73)Between be bonded to the flange part of corresponding operating screw rod(78), institute State two thrust bearings(72、73)In with the elastic joint part(75)An adjacent top pressure is in the elastic joint part (75)On, the elastic joint part(75)In pass through elastomeric element(77)And resilientiy stretchable be provided with top pressure post(76), To engage and push the pipeline(2);Two elastic top pressure components(51,5)Include housing(52)And described Housing(52)Inside portion at the top-pressure part that slideably stretches(53), the top-pressure part(53)By adjusting spring(54)And with The housing(52)Lateral wall connection so as to resilientiy stretchable be installed on the housing(52)In, the top pressure post(76)Far From the elastomeric element(77)That one end and the top-pressure part(53)Away from the regulation spring(54)That one end be all provided with It is equipped with rubber blanket(22), the rubber blanket(22)To with the pipeline(2)Offset, so as to prevent the top pressure post(76)And The top-pressure part(53)Because of long-time and the pipeline(2)Contact and cause the pipeline(2)Surface produces abrasion, to the pipe Road(2)Cause to wear and reduce the pipeline(2)Service life.
  2. 2. durable pipe-supporting device according to claim 1, wherein, the elastomeric element(77)Stiffness factor be more than The regulation spring(54)Stiffness factor.
  3. A kind of 3. Pipe installing adjusting method of the durable pipe-supporting device described in usage right requirement 1 or 2, first, by institute State pipeline(2)From the casing(11)Upper side opening be put into the casing(11)In, by the Box Cover(12)It is fixedly mounted After in place, screw rod is operated by adjusting the longitudinal axis(8)And adjust the pipeline(2)Longitudinal axis positions, until the pipeline(2) In the casing(11)Longitudinal central position;Afterwards, screw rod is operated by adjusting the transverse axis(3)And adjust the pipeline (2)Transverse axis position, the longitudinal axis operates screw rod(8)Together with the top shoe(91)And the sliding block(61)In transverse axis side It is subjected to displacement upwards, until the pipeline(2)In the casing(11)Transverse axis center.
CN201610491750.2A 2016-06-29 2016-06-29 A kind of durable pipe-supporting device Active CN106002776B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610491750.2A CN106002776B (en) 2016-06-29 2016-06-29 A kind of durable pipe-supporting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610491750.2A CN106002776B (en) 2016-06-29 2016-06-29 A kind of durable pipe-supporting device

Publications (2)

Publication Number Publication Date
CN106002776A CN106002776A (en) 2016-10-12
CN106002776B true CN106002776B (en) 2017-12-22

Family

ID=57084927

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610491750.2A Active CN106002776B (en) 2016-06-29 2016-06-29 A kind of durable pipe-supporting device

Country Status (1)

Country Link
CN (1) CN106002776B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107095561B (en) * 2017-07-04 2018-09-25 慈溪市启承机械科技有限公司 A kind of new-type letter box arrangement

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2872029Y (en) * 2005-11-02 2007-02-21 宝钢集团上海第一钢铁有限公司 Shock absorber of pipeline
CN204235435U (en) * 2014-10-31 2015-04-01 欧阳庆丰 A kind of protective casing clamping device

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08300267A (en) * 1995-03-04 1996-11-19 Sandoo:Kk Pipe holder
KR100932775B1 (en) * 2009-09-01 2009-12-21 한국뉴매틱(주) Vacuum-cup assembly
KR20120007348A (en) * 2010-07-14 2012-01-20 대우버스(주) Jig for detaching steering wheel

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2872029Y (en) * 2005-11-02 2007-02-21 宝钢集团上海第一钢铁有限公司 Shock absorber of pipeline
CN204235435U (en) * 2014-10-31 2015-04-01 欧阳庆丰 A kind of protective casing clamping device

Also Published As

Publication number Publication date
CN106002776A (en) 2016-10-12

Similar Documents

Publication Publication Date Title
CN105952974B (en) It is a kind of to carry stable pipe-supporting device
CN105937660B (en) A kind of pipeline supporting arrangement
CN106015749B (en) A kind of supporting arrangement for pipeline
CN106078552B (en) It is a kind of can dehumidifier pipeline load bearing equipment
CN105864518B (en) A kind of pipe-supporting device of good airproof performance and Pipe installing adjusting method
CN105937659B (en) A kind of pipe-supporting device and the Pipe installing adjusting method using the device
CN106041784B (en) A kind of pipeline bogey
CN106002776B (en) A kind of durable pipe-supporting device
CN106402494B (en) A kind of pipeline support apparatus
CN106015757B (en) The pipe-supporting device and Pipe installing adjusting method of a kind of dust removal
CN105864521B (en) A kind of firm formula pipe-supporting device and Pipe installing adjusting method
CN105937661B (en) A kind of industrial pipeline bogey and the Pipe installing adjusting method using the device
CN106122602B (en) A kind of loss prevention pipeline bogey
CN105889641B (en) A kind of pipe-supporting device and Pipe installing adjusting method
CN105937657B (en) A kind of load bearing equipment for pipeline and the Pipe installing adjusting method using the equipment
CN106122601B (en) A kind of support equipment of fixed -piping
CN106122604B (en) A kind of bogey for pipeline and the Pipe installing adjusting method using the device
CN105909874A (en) Bearing device for industrial pipeline
CN106078188B (en) A kind of security industry tube support arrangement
CN106051311B (en) A kind of durable type pipe-supporting device
CN106002760B (en) A kind of dust-proof pipeline supporting arrangement
CN106051312B (en) A kind of pipe-supporting device and Pipe installing adjusting method for being provided with guide rod
CN106051313B (en) It is a kind of can feeding lubricating pipe-supporting device and Pipe installing adjusting method
CN105972317B (en) A kind of pipe-supporting equipment and the Pipe installing adjusting method using the equipment
CN106041514B (en) A kind of pipe-supporting device with safeguard function

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Mao Liying

Inventor before: Huang Aijuan

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20171123

Address after: 311813 Shaoxing City, Zhejiang Province, Zhuji City, Wangjia well town conference bridge village

Applicant after: Mao Liying

Address before: 325215 Zhejiang city of Wenzhou province Ruian City Tao Shan Zhen Liu Jia Cun

Applicant before: Huang Aijuan

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20181016

Address after: 313000 10A, 1088 Dagang Road, Zhili Town, Huzhou, Zhejiang.

Patentee after: HUZHOU JOUKING ELECTRONIC Co.,Ltd.

Address before: 311813 conference village, Wangjia Town, Zhuji City, Shaoxing, Zhejiang

Patentee before: Mao Liying

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201130

Address after: Room 399, No. 5999, Wuxing Avenue, Zhili Town, Wuxing District, Huzhou City, Zhejiang Province

Patentee after: HUZHOU JUYE INCUBATOR Co.,Ltd.

Address before: 313000 10A, 1088 Dagang Road, Zhili Town, Huzhou, Zhejiang.

Patentee before: HUZHOU JOUKING ELECTRONIC Co.,Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A durable pipe support device

Effective date of registration: 20211217

Granted publication date: 20171222

Pledgee: Huzhou Wuxing Rural Commercial Bank Co.,Ltd. high tech Zone Green sub branch

Pledgor: HUZHOU JUYE INCUBATOR Co.,Ltd.

Registration number: Y2021330002571

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20231013

Granted publication date: 20171222

Pledgee: Huzhou Wuxing Rural Commercial Bank Co.,Ltd. high tech Zone Green sub branch

Pledgor: HUZHOU JUYE INCUBATOR Co.,Ltd.

Registration number: Y2021330002571