CN106041784B - A kind of pipeline bogey - Google Patents

A kind of pipeline bogey Download PDF

Info

Publication number
CN106041784B
CN106041784B CN201610491705.7A CN201610491705A CN106041784B CN 106041784 B CN106041784 B CN 106041784B CN 201610491705 A CN201610491705 A CN 201610491705A CN 106041784 B CN106041784 B CN 106041784B
Authority
CN
China
Prior art keywords
casing
pipeline
screw rod
box cover
top shoe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610491705.7A
Other languages
Chinese (zh)
Other versions
CN106041784A (en
Inventor
万鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yancheng Ouqi Machinery Co ltd
Original Assignee
Yancheng City Shengtai Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yancheng City Shengtai Machinery Co Ltd filed Critical Yancheng City Shengtai Machinery Co Ltd
Priority to CN201610491705.7A priority Critical patent/CN106041784B/en
Publication of CN106041784A publication Critical patent/CN106041784A/en
Application granted granted Critical
Publication of CN106041784B publication Critical patent/CN106041784B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25BTOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING OR HOLDING
    • B25B11/00Work holders not covered by any preceding group in the subclass, e.g. magnetic work holders, vacuum work holders

Abstract

A kind of pipeline bogey and the Pipe installing adjusting method using described device, described device include stationary base mount(1)And the stationary base mount(1)Connected casing(11)And with the casing(11)The Box Cover being removably fixed with(12), the Box Cover(12)It is covered in the casing(11)Upside opening with dismounting when supply pipeline(2)Pass through the upper side opening, the Box Cover(12)Outside be fixedly installed top shoe clamping lid(9), to clamp lid in the top shoe(9)With the Box Cover(12)Between be slideably clamped with top shoe(91), the top shoe(91)In be provided with screw to the longitudinal axis operate screw rod(8)Screw thread coordinates, and the longitudinal axis operates screw rod(8)Outboard Sections through the top shoe clamping lid(9)And clamp lid with the top shoe(9)Adjacent both sides between have first adjustment allowance(80).

Description

A kind of pipeline bogey
Technical field
The present invention relates to Pipe installing field, specially a kind of pipeline bogey and the Pipe installing using described device Adjusting method.
Background technology
In Pipe installing field, generally require to isolate pipeline with surrounding environment.Medium is transported particularly with pipeline Occasion with temperature and requirement of shelter.Pipeline often using between isolating device and pipeline gap portion carry out effectively every Absolutely.And the fixed middle regulation for pipeline is often difficult to operate, more unworkable is that pipeline is entered on four direction gap Row regulation.Moreover, often face the vibration problem caused by external interference after Pipe installing, this caused damage to isolating device and Influence service life and safe to use.
The content of the invention
A kind of Pipe installing adjusting method it is an object of the invention to provide pipeline bogey and using described device, its The defects of can overcoming in the prior art.
According to the present invention a kind of pipeline bogey, including stationary base mount, with the stationary base mount be connected casing with And the Box Cover being removably fixed with the casing, the Box Cover are covered in the upside opening of the casing with dismounting For pipeline by the upper side opening, top shoe clamping lid is fixedly installed on the outside of the Box Cover, on described Sliding block clamps and is slideably clamped with top shoe between lid and the Box Cover, be provided with the top shoe screw to Longitudinal axis operation screw flight coordinates, the Outboard Sections of longitudinal axis operation screw rod through top shoe clamping lid and with it is described There is the first adjustment allowance, the inboard portion of the longitudinal axis operation screw rod passes through institute between the adjacent both sides of top shoe clamping lid State Box Cover and there is the second adjustment allowance with the Box Cover between adjacent both sides;The right hand external of the casing is installed with Fixed block, screw is provided with the fixed block to coordinate with transverse axis operation screw flight, the transverse axis operation screw rod and institute The medial end for stating longitudinal axis operation screw rod is connected to rotatable top pressure head assembly, to top pressure respectively on the right side of the pipeline On sidepiece and upper lateral part, sliding block clamping lid is fixedly installed on the following side of the casing, to be pressed from both sides in the sliding block Hold and be slideably clamped with sliding block between the following side of lid and the casing, the necking section of the sliding block passes through the case The following side of body and with the following side of the casing between adjacent both sides have the 3rd adjustment allowance, wherein, the casing The medial end of on the inside of the left side and necking section is respectively fixedly connected with elastic top pressure component, the left side of the casing Lower section on the inside of portion is provided with dust catcher, and the right-hand member of the dust catcher is provided with cleaner head, and the left end of the dust catcher is provided with One cleaning shaft, the cleaning shaft are extended to outside the casing through the casing, and the dust catcher is to by described in Dirt absorption in casing and discharge outside the casing, influence the pipeline so as to prevent the accumulation of dust in the casing Support, wherein, each rotation for including being fixed together by fastener in two rotatable top pressure head assemblies Formula attachment and elastic joint part, two thrust bearings are provided with the rotational engagement part, described two Be bonded to the flange part of corresponding operating screw rod between thrust bearing, in described two thrust bearings with the elastic joint part phase An adjacent top pressure is on the elastic joint part, in the elastic joint part by elastomeric element and resilientiy stretchable It is provided with top pressure post, that one end relative with the elastomeric element is fixedly installed the first of arc-shaped and promoted on the top pressure post Part, first impeller is engaging and push the pipeline;Two elastic top pressure components include housing and The top-pressure part slideably to be stretched at the inside portion of the housing, the top-pressure part is by adjusting spring and outer with the housing Side wall connection is installed in the housing so as to resilientiy stretchable, on the top-pressure part with relative that of the regulation spring End is fixedly installed the second impeller of arc-shaped, and second impeller is also to engage and push the pipeline, and described the One impeller is identical with the second impeller size and is provided with the recess for coordinating the pipeline.
According to the present invention, using the Pipe installing adjusting method of above-mentioned pipeline bogey, first, by the pipeline from institute The upper side opening for stating casing is put into the casing, after the Box Cover is fixedly mounted in place, is grasped by adjusting the longitudinal axis Make screw rod and adjust the longitudinal axis positions of the pipeline, until the pipeline is in the longitudinal central position of the casing;Afterwards, lead to Overregulate the transverse axis operation screw rod and adjust the transverse axis position of the pipeline, the longitudinal axis operates screw rod together with the top shoe And the sliding block is subjected to displacement in X direction, until the pipeline is in the transverse axis center of the casing.
By the present invention, due to being provided with regulation spring in bottom and left side, it can be provided on the longitudinal axis and transverse axis Allowance is adjusted, so as to allow adjusting screw rod to carry out ejection regulation.And what can be moved left and right by setting upper and lower is oppositely installed Longitudinal axis adjusting screw rod and its auxiliary equipment and the elastic top pressure component of bottom, so as to be realized under conditions of in ensureing that the longitudinal axis is fixed For the position adjustments of transverse axis.And by being arranged on the elastomeric element being installed in each rotatable top pressure head assembly, its Guarantee to overcome the pressure on top surface of the regulation spring and be adjusted it is fixed on the basis of, can be to being occurred on pipeline Vibrate into row buffering, so as to avoid causing damage to screw thread and then produce potential safety hazard and increase the service life.
Brief description of the drawings
Fig. 1 is the overall structure diagram of the pipeline bogey of the present invention;
Fig. 2 is the exemplary enlarged diagram of the rotatable top pressure head assembly in Fig. 1;
Fig. 3 is the exemplary enlarged diagram of the elastic top pressure component in Fig. 1.
Embodiment
With reference to Fig. 1-3, the present invention is described in detail.
According to a kind of pipeline bogey of embodiment, including stationary base mount 1, the casing connected with the stationary base mount 1 11 and the Box Cover 12 that is removably fixed with the casing 11, the Box Cover 12 be covered in the upper side opening of the casing 11 Sentence in dismounting for pipeline 2 by side opening on described, the outside of the Box Cover 12 is fixedly installed top shoe clamp cover Body 9, top shoe 91 is slideably clamped between lid 9 and the Box Cover 12 to be clamped in the top shoe, it is described on Screw is provided with sliding block 91 to coordinate with longitudinal axis operation screw rod 8 screw thread, the Outboard Sections of the longitudinal axis operation screw rod 8 pass through The top shoe clamps lid 9 and has the first adjustment allowance 80, institute between the adjacent both sides of top shoe clamping lid 9 The inboard portion of longitudinal axis operation screw rod 8 is stated through the Box Cover 12 and the adjacent both sides of the Box Cover 12 with the Two adjustment allowances 10;The right hand external of the casing 11 is installed with fixed block 31, be provided with the fixed block 31 screw to Coordinate with transverse axis operation screw rod 3 screw thread, the medial end of the transverse axis operation screw rod 3 and longitudinal axis operation screw rod 8 connects respectively Rotatable top pressure head assembly 71,7 is connected to, to top pressure is on the right side and upper lateral part of the pipeline 2 respectively, the casing 11 Following side on be fixedly installed sliding block clamping lid 6, under the sliding block clamping lid 6 and the casing 11 Slideably be clamped with sliding block 61 between sidepiece, the necking section 62 of the sliding block 61 through the following side of the casing 11 and There is the 3rd adjustment allowance 110 between the adjacent both sides of the following side of the casing 11, wherein, the left side of the casing 11 The medial end of inner side and the necking section 62 is respectively fixedly connected with elastic top pressure component 51,5, a left side for the casing 11 Lower section on the inside of sidepiece is provided with dust catcher 26, and the right-hand member of the dust catcher 26 is provided with cleaner head 27, the dust catcher 26 Left end is provided with a cleaning shaft 28, and the cleaning shaft 28 is extended to outside the casing 11, institute through the casing 11 Dust catcher 26 is stated the dirt absorption in the casing 11 is discharged outside the casing 11, so as to prevent the casing 11 The accumulation of interior dust and influence the support of the pipeline 2, wherein, in two rotatable top pressure head assemblies 71,7 it is each Including the rotational engagement part 74 and elastic joint part 75 being fixed together by fastener 79, the rotational engagement Two thrust bearings 72,73 are provided with part 74, corresponding operating screw rod is bonded between described two thrust bearings 72,73 Flange part 78, a top pressure adjacent with the elastic joint part 75 is in the bullet in described two thrust bearings 72,73 On property attachment 75, top pressure post is provided with the elastic joint part 75 by elastomeric element 77 and resilientiy stretchable 76, that one end relative with the elastomeric element 77 is fixedly installed the first impeller 20 of arc-shaped on the top pressure post 76, First impeller 20 is engaging and push the pipeline 2;Two elastic top pressure components 51,5 include housing 52 And the top-pressure part 53 slideably to be stretched at the inside portion of the housing 52, the top-pressure part 53 by adjust spring 54 and Be connected with the lateral wall of the housing 52 so as to resilientiy stretchable be installed in the housing 52, on the top-pressure part 53 with institute State the second impeller 21 that relative that one end of regulation spring 54 is fixedly installed arc-shaped, second impeller 21 also to Engage and push the pipeline 2, first impeller 20 is identical with the size of the second impeller 21 and is provided with cooperation The recess of the pipeline 2(It is not shown).
Exemplarily or valuably, wherein, the stiffness factor of the elastomeric element 77 is more than the strength of the regulation spring 54 Spend coefficient.
According to embodiment, using the Pipe installing adjusting method of above-mentioned pipeline bogey, first, by the pipeline 2 from The upper side opening of the casing 11 is put into the casing 11, after the Box Cover 12 is fixedly mounted in place, by adjusting State longitudinal axis operation screw rod 8 and adjust the longitudinal axis positions of the pipeline 2, until the pipeline 2 is in the longitudinal axis of the casing 11 Heart position;Afterwards, screw rod 3 is operated to adjust the transverse axis position of the pipeline 2 by adjusting the transverse axis, the longitudinal axis operates spiral shell Bar 8 is subjected to displacement together with the top shoe 91 and the sliding block 61 in X direction, until the pipeline 2 is in described The transverse axis center of casing 11.
By the present invention, due to being provided with regulation spring in bottom and left side, it can be provided on the longitudinal axis and transverse axis Allowance is adjusted, so as to allow adjusting screw rod to carry out ejection regulation.And what can be moved left and right by setting upper and lower is oppositely installed Longitudinal axis adjusting screw rod and its auxiliary equipment and the elastic top pressure component of bottom, so as to be realized under conditions of in ensureing that the longitudinal axis is fixed For the position adjustments of transverse axis.And by being arranged on the elastomeric element being installed in each rotatable top pressure head assembly 71,7 77, its guarantee to overcome the pressure on top surface of the regulation spring and be adjusted it is fixed on the basis of, can be to institute on pipeline Row buffering is entered in the vibration of generation, so as to avoid causing damage to screw thread and then produce potential safety hazard and increase the service life.Entirely Device installation is reliable, easy to adjust and can effectively improve security and service life.
By that can be made within the scope of the invention according to mode of operation various with upper type, those skilled in the art Change.

Claims (2)

  1. A kind of 1. pipeline bogey, it is characterised in that:Including stationary base mount(1)And the stationary base mount(1)Connected casing (11)And with the casing(11)The Box Cover being removably fixed with(12), the Box Cover(12)It is covered in the casing(11) Upside opening with dismounting when supply pipeline(2)Pass through the upper side opening, the Box Cover(12)Outside fixed setting There is top shoe to clamp lid(9), to clamp lid in the top shoe(9)With the Box Cover(12)Between slideably press from both sides Hold top shoe(91), the top shoe(91)In be provided with screw to the longitudinal axis operate screw rod(8)Screw thread coordinates, described vertical Axle operates screw rod(8)Outboard Sections through the top shoe clamping lid(9)And clamp lid with the top shoe(9)Phase There is the first adjustment allowance between adjacent both sides(80), the longitudinal axis operation screw rod(8)Inboard portion pass through the Box Cover (12)And with the Box Cover(12)Adjacent both sides between have second adjustment allowance(10);The casing(11)Right side outside Portion is installed with fixed block(31), the fixed block(31)In be provided with screw to transverse axis operate screw rod(3)Screw thread coordinates, institute State transverse axis operation screw rod(3)Screw rod is operated with the longitudinal axis(8)Medial end be connected to rotatable top pressure head assembly (71,7), to top pressure respectively in the pipeline(2)Right side and upper lateral part on, the casing(11)Following side on it is fixed It is provided with sliding block clamping lid(6), to clamp lid in the sliding block(6)With the casing(11)Following side between Slideably it is clamped with sliding block(61), the sliding block(61)Necking section(62)Through the casing(11)Following side and With the casing(11)Following side adjacent both sides between have the 3rd adjustment allowance(110), wherein wherein, the casing (11)Left side on the inside of and the necking section(62)Medial end be respectively fixedly connected with elastic top pressure component(51, 5), the casing(11)Left side on the inside of lower section be provided with dust catcher(26), the dust catcher(26)Right-hand member be provided with Cleaner head(27), the dust catcher(26)Left end be provided with a cleaning shaft(28), the cleaning shaft(28)Through described Casing(11)And extend to the casing(11)Outside, the dust catcher(26)To by the casing(11)Interior dirt absorption And discharge the casing(11)Outside, so as to prevent the casing(11)The accumulation of interior dust and influence the pipeline(2)Branch Support, wherein, two rotatable top pressure head assemblies(71,7)In each include passing through fastener(79)It is fixed together Rotational engagement part(74)And elastic joint part(75), the rotational engagement part(74)In be provided with two and push away Power bearing(72、73), in described two thrust bearings(72、73)Between be bonded to the flange part of corresponding operating screw rod(78), institute State two thrust bearings(72、73)In with the elastic joint part(75)An adjacent top pressure is in the elastic joint part (75)On, the elastic joint part(75)In pass through elastomeric element(77)And resilientiy stretchable be provided with top pressure post(76), The top pressure post(76)The upper and elastomeric element(77)That relative one end is fixedly installed the first impeller of arc-shaped (20), first impeller(20)To engage and push the pipeline(2);Two elastic top pressure components(51,5) Including housing(52)And in the housing(52)Inside portion at the top-pressure part that slideably stretches(53), the top-pressure part (53)By adjusting spring(54)And with the housing(52)Lateral wall connection so as to resilientiy stretchable be installed on the shell Body(52)In, the top-pressure part(53)The upper and regulation spring(54)That relative one end is fixedly installed the second of arc-shaped Impeller(21), second impeller(21)Also engaging and push the pipeline(2), first impeller(20)With Second impeller(21)Size is identical and is provided with the cooperation pipeline(2)Recess;Wherein, the elastomeric element (77)Stiffness factor be more than the regulation spring(54)Stiffness factor.
  2. A kind of 2. Pipe installing adjusting method of the pipeline bogey described in usage right requirement 1, first, by the pipeline (2)From the casing(11)Upper side opening be put into the casing(11)In, by the Box Cover(12)After being fixedly mounted in place, Screw rod is operated by adjusting the longitudinal axis(8)And adjust the pipeline(2)Longitudinal axis positions, until the pipeline(2)In institute State casing(11)Longitudinal central position;Afterwards, screw rod is operated by adjusting the transverse axis(3)And adjust the pipeline(2)'s Transverse axis position, the longitudinal axis operate screw rod(8)Together with the top shoe(91)And the sliding block(61)In X direction It is subjected to displacement, until the pipeline(2)In the casing(11)Transverse axis center.
CN201610491705.7A 2016-06-29 2016-06-29 A kind of pipeline bogey Active CN106041784B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610491705.7A CN106041784B (en) 2016-06-29 2016-06-29 A kind of pipeline bogey

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610491705.7A CN106041784B (en) 2016-06-29 2016-06-29 A kind of pipeline bogey

Publications (2)

Publication Number Publication Date
CN106041784A CN106041784A (en) 2016-10-26
CN106041784B true CN106041784B (en) 2017-12-22

Family

ID=57166918

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610491705.7A Active CN106041784B (en) 2016-06-29 2016-06-29 A kind of pipeline bogey

Country Status (1)

Country Link
CN (1) CN106041784B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109227377B (en) * 2017-11-08 2021-06-15 绍兴市高砚智生物科技有限公司 Clamping device for machining and manufacturing
CN110153917A (en) * 2019-05-17 2019-08-23 台州学院 A kind of PP-R pipe fixing device
CN115043584A (en) * 2022-05-26 2022-09-13 信和光能(安徽)有限公司 High borosilicate glass pipe circular cutting equipment

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10122480A (en) * 1996-10-22 1998-05-15 Takigen Mfg Co Ltd Angular positioning unit
CN102297291B (en) * 2011-08-09 2012-10-03 江苏中圣高科技产业有限公司 Radial vibration-reducing stress-dissipating bracket for pressure pipeline
CN202292013U (en) * 2011-11-11 2012-07-04 天津天易海上工程有限公司 External pipe aligning device for pipelines
CN202571884U (en) * 2012-05-05 2012-12-05 光隆精密工业(福州)有限公司 Special fixture for engine exhaust port angle pipe lathe
CN203907022U (en) * 2014-06-10 2014-10-29 宁波中安锻造有限公司 Pipe installation clamp
CN204160084U (en) * 2014-08-07 2015-02-18 南京南化建设有限公司 A kind of jacket pipe assembling apparatus
CN104354039B (en) * 2014-10-30 2017-02-08 安徽鼎恒再制造产业技术研究院有限公司 Clamping-position-adjustable pipe clamping device

Also Published As

Publication number Publication date
CN106041784A (en) 2016-10-26

Similar Documents

Publication Publication Date Title
CN105937660B (en) A kind of pipeline supporting arrangement
CN105952974B (en) It is a kind of to carry stable pipe-supporting device
CN106015749B (en) A kind of supporting arrangement for pipeline
CN106041784B (en) A kind of pipeline bogey
CN106078552B (en) It is a kind of can dehumidifier pipeline load bearing equipment
CN105864518B (en) A kind of pipe-supporting device of good airproof performance and Pipe installing adjusting method
CN106015757B (en) The pipe-supporting device and Pipe installing adjusting method of a kind of dust removal
CN105937659B (en) A kind of pipe-supporting device and the Pipe installing adjusting method using the device
CN106122600B (en) A kind of supporting arrangement of Pipe installing
CN105864521B (en) A kind of firm formula pipe-supporting device and Pipe installing adjusting method
CN106402494B (en) A kind of pipeline support apparatus
CN106122601B (en) A kind of support equipment of fixed -piping
CN106122604B (en) A kind of bogey for pipeline and the Pipe installing adjusting method using the device
CN105889641B (en) A kind of pipe-supporting device and Pipe installing adjusting method
CN106078188B (en) A kind of security industry tube support arrangement
CN105937657B (en) A kind of load bearing equipment for pipeline and the Pipe installing adjusting method using the equipment
CN106002776B (en) A kind of durable pipe-supporting device
CN106051311B (en) A kind of durable type pipe-supporting device
CN106122602B (en) A kind of loss prevention pipeline bogey
CN105909874A (en) Bearing device for industrial pipeline
CN105972317B (en) A kind of pipe-supporting equipment and the Pipe installing adjusting method using the equipment
CN105937661B (en) A kind of industrial pipeline bogey and the Pipe installing adjusting method using the device
CN106122603B (en) A kind of pipe-supporting component
CN106051312B (en) A kind of pipe-supporting device and Pipe installing adjusting method for being provided with guide rod
CN105927793B (en) A kind of pipeline bearing assembly and the Pipe installing adjusting method using the component

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Wan Peng

Inventor before: Pan Yan

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20171124

Address after: 224006 Longtan Road, North Longgang Town, Yancheng City, Jiangsu Province

Applicant after: Yancheng City Shengtai Machinery Co.,Ltd.

Address before: 530023 Nanning Road, the Guangxi Zhuang Autonomous Region Qingxiu District building 37 No. 2006 dormitory

Applicant before: Pan Yan

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20231204

Address after: 224000 Longtan East Road, beilonggang Town, Yandu District, Yancheng City, Jiangsu Province (R)

Patentee after: YANCHENG OUQI MACHINERY CO.,LTD.

Address before: 224006 Longtan East Road, Beilonggang Town, Yandu District, Yancheng City, Jiangsu Province

Patentee before: Yancheng City Shengtai Machinery Co.,Ltd.

TR01 Transfer of patent right