CN106041784B - A kind of pipeline bogey - Google Patents
A kind of pipeline bogey Download PDFInfo
- Publication number
- CN106041784B CN106041784B CN201610491705.7A CN201610491705A CN106041784B CN 106041784 B CN106041784 B CN 106041784B CN 201610491705 A CN201610491705 A CN 201610491705A CN 106041784 B CN106041784 B CN 106041784B
- Authority
- CN
- China
- Prior art keywords
- casing
- pipeline
- screw rod
- box cover
- top shoe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 claims abstract description 6
- 239000000428 dust Substances 0.000 claims description 15
- 238000004140 cleaning Methods 0.000 claims description 6
- 238000010521 absorption reaction Methods 0.000 claims description 3
- 238000009825 accumulation Methods 0.000 claims description 3
- 230000000712 assembly Effects 0.000 claims description 3
- 238000000429 assembly Methods 0.000 claims description 3
- 238000006073 displacement reaction Methods 0.000 claims description 3
- 238000010586 diagram Methods 0.000 description 3
- 230000003139 buffering effect Effects 0.000 description 2
- 230000007547 defect Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B25—HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
- B25B—TOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING OR HOLDING
- B25B11/00—Work holders not covered by any preceding group in the subclass, e.g. magnetic work holders, vacuum work holders
Abstract
Description
Claims (2)
- A kind of 1. pipeline bogey, it is characterised in that:Including stationary base mount(1)And the stationary base mount(1)Connected casing (11)And with the casing(11)The Box Cover being removably fixed with(12), the Box Cover(12)It is covered in the casing(11) Upside opening with dismounting when supply pipeline(2)Pass through the upper side opening, the Box Cover(12)Outside fixed setting There is top shoe to clamp lid(9), to clamp lid in the top shoe(9)With the Box Cover(12)Between slideably press from both sides Hold top shoe(91), the top shoe(91)In be provided with screw to the longitudinal axis operate screw rod(8)Screw thread coordinates, described vertical Axle operates screw rod(8)Outboard Sections through the top shoe clamping lid(9)And clamp lid with the top shoe(9)Phase There is the first adjustment allowance between adjacent both sides(80), the longitudinal axis operation screw rod(8)Inboard portion pass through the Box Cover (12)And with the Box Cover(12)Adjacent both sides between have second adjustment allowance(10);The casing(11)Right side outside Portion is installed with fixed block(31), the fixed block(31)In be provided with screw to transverse axis operate screw rod(3)Screw thread coordinates, institute State transverse axis operation screw rod(3)Screw rod is operated with the longitudinal axis(8)Medial end be connected to rotatable top pressure head assembly (71,7), to top pressure respectively in the pipeline(2)Right side and upper lateral part on, the casing(11)Following side on it is fixed It is provided with sliding block clamping lid(6), to clamp lid in the sliding block(6)With the casing(11)Following side between Slideably it is clamped with sliding block(61), the sliding block(61)Necking section(62)Through the casing(11)Following side and With the casing(11)Following side adjacent both sides between have the 3rd adjustment allowance(110), wherein wherein, the casing (11)Left side on the inside of and the necking section(62)Medial end be respectively fixedly connected with elastic top pressure component(51, 5), the casing(11)Left side on the inside of lower section be provided with dust catcher(26), the dust catcher(26)Right-hand member be provided with Cleaner head(27), the dust catcher(26)Left end be provided with a cleaning shaft(28), the cleaning shaft(28)Through described Casing(11)And extend to the casing(11)Outside, the dust catcher(26)To by the casing(11)Interior dirt absorption And discharge the casing(11)Outside, so as to prevent the casing(11)The accumulation of interior dust and influence the pipeline(2)Branch Support, wherein, two rotatable top pressure head assemblies(71,7)In each include passing through fastener(79)It is fixed together Rotational engagement part(74)And elastic joint part(75), the rotational engagement part(74)In be provided with two and push away Power bearing(72、73), in described two thrust bearings(72、73)Between be bonded to the flange part of corresponding operating screw rod(78), institute State two thrust bearings(72、73)In with the elastic joint part(75)An adjacent top pressure is in the elastic joint part (75)On, the elastic joint part(75)In pass through elastomeric element(77)And resilientiy stretchable be provided with top pressure post(76), The top pressure post(76)The upper and elastomeric element(77)That relative one end is fixedly installed the first impeller of arc-shaped (20), first impeller(20)To engage and push the pipeline(2);Two elastic top pressure components(51,5) Including housing(52)And in the housing(52)Inside portion at the top-pressure part that slideably stretches(53), the top-pressure part (53)By adjusting spring(54)And with the housing(52)Lateral wall connection so as to resilientiy stretchable be installed on the shell Body(52)In, the top-pressure part(53)The upper and regulation spring(54)That relative one end is fixedly installed the second of arc-shaped Impeller(21), second impeller(21)Also engaging and push the pipeline(2), first impeller(20)With Second impeller(21)Size is identical and is provided with the cooperation pipeline(2)Recess;Wherein, the elastomeric element (77)Stiffness factor be more than the regulation spring(54)Stiffness factor.
- A kind of 2. Pipe installing adjusting method of the pipeline bogey described in usage right requirement 1, first, by the pipeline (2)From the casing(11)Upper side opening be put into the casing(11)In, by the Box Cover(12)After being fixedly mounted in place, Screw rod is operated by adjusting the longitudinal axis(8)And adjust the pipeline(2)Longitudinal axis positions, until the pipeline(2)In institute State casing(11)Longitudinal central position;Afterwards, screw rod is operated by adjusting the transverse axis(3)And adjust the pipeline(2)'s Transverse axis position, the longitudinal axis operate screw rod(8)Together with the top shoe(91)And the sliding block(61)In X direction It is subjected to displacement, until the pipeline(2)In the casing(11)Transverse axis center.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610491705.7A CN106041784B (en) | 2016-06-29 | 2016-06-29 | A kind of pipeline bogey |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610491705.7A CN106041784B (en) | 2016-06-29 | 2016-06-29 | A kind of pipeline bogey |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106041784A CN106041784A (en) | 2016-10-26 |
CN106041784B true CN106041784B (en) | 2017-12-22 |
Family
ID=57166918
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610491705.7A Active CN106041784B (en) | 2016-06-29 | 2016-06-29 | A kind of pipeline bogey |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106041784B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109227377B (en) * | 2017-11-08 | 2021-06-15 | 绍兴市高砚智生物科技有限公司 | Clamping device for machining and manufacturing |
CN110153917A (en) * | 2019-05-17 | 2019-08-23 | 台州学院 | A kind of PP-R pipe fixing device |
CN115043584A (en) * | 2022-05-26 | 2022-09-13 | 信和光能(安徽)有限公司 | High borosilicate glass pipe circular cutting equipment |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10122480A (en) * | 1996-10-22 | 1998-05-15 | Takigen Mfg Co Ltd | Angular positioning unit |
CN102297291B (en) * | 2011-08-09 | 2012-10-03 | 江苏中圣高科技产业有限公司 | Radial vibration-reducing stress-dissipating bracket for pressure pipeline |
CN202292013U (en) * | 2011-11-11 | 2012-07-04 | 天津天易海上工程有限公司 | External pipe aligning device for pipelines |
CN202571884U (en) * | 2012-05-05 | 2012-12-05 | 光隆精密工业(福州)有限公司 | Special fixture for engine exhaust port angle pipe lathe |
CN203907022U (en) * | 2014-06-10 | 2014-10-29 | 宁波中安锻造有限公司 | Pipe installation clamp |
CN204160084U (en) * | 2014-08-07 | 2015-02-18 | 南京南化建设有限公司 | A kind of jacket pipe assembling apparatus |
CN104354039B (en) * | 2014-10-30 | 2017-02-08 | 安徽鼎恒再制造产业技术研究院有限公司 | Clamping-position-adjustable pipe clamping device |
-
2016
- 2016-06-29 CN CN201610491705.7A patent/CN106041784B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN106041784A (en) | 2016-10-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105937660B (en) | A kind of pipeline supporting arrangement | |
CN105952974B (en) | It is a kind of to carry stable pipe-supporting device | |
CN106015749B (en) | A kind of supporting arrangement for pipeline | |
CN106041784B (en) | A kind of pipeline bogey | |
CN106078552B (en) | It is a kind of can dehumidifier pipeline load bearing equipment | |
CN105864518B (en) | A kind of pipe-supporting device of good airproof performance and Pipe installing adjusting method | |
CN106015757B (en) | The pipe-supporting device and Pipe installing adjusting method of a kind of dust removal | |
CN105937659B (en) | A kind of pipe-supporting device and the Pipe installing adjusting method using the device | |
CN106122600B (en) | A kind of supporting arrangement of Pipe installing | |
CN105864521B (en) | A kind of firm formula pipe-supporting device and Pipe installing adjusting method | |
CN106402494B (en) | A kind of pipeline support apparatus | |
CN106122601B (en) | A kind of support equipment of fixed -piping | |
CN106122604B (en) | A kind of bogey for pipeline and the Pipe installing adjusting method using the device | |
CN105889641B (en) | A kind of pipe-supporting device and Pipe installing adjusting method | |
CN106078188B (en) | A kind of security industry tube support arrangement | |
CN105937657B (en) | A kind of load bearing equipment for pipeline and the Pipe installing adjusting method using the equipment | |
CN106002776B (en) | A kind of durable pipe-supporting device | |
CN106051311B (en) | A kind of durable type pipe-supporting device | |
CN106122602B (en) | A kind of loss prevention pipeline bogey | |
CN105909874A (en) | Bearing device for industrial pipeline | |
CN105972317B (en) | A kind of pipe-supporting equipment and the Pipe installing adjusting method using the equipment | |
CN105937661B (en) | A kind of industrial pipeline bogey and the Pipe installing adjusting method using the device | |
CN106122603B (en) | A kind of pipe-supporting component | |
CN106051312B (en) | A kind of pipe-supporting device and Pipe installing adjusting method for being provided with guide rod | |
CN105927793B (en) | A kind of pipeline bearing assembly and the Pipe installing adjusting method using the component |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Wan Peng Inventor before: Pan Yan |
|
CB03 | Change of inventor or designer information | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20171124 Address after: 224006 Longtan Road, North Longgang Town, Yancheng City, Jiangsu Province Applicant after: Yancheng City Shengtai Machinery Co.,Ltd. Address before: 530023 Nanning Road, the Guangxi Zhuang Autonomous Region Qingxiu District building 37 No. 2006 dormitory Applicant before: Pan Yan |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20231204 Address after: 224000 Longtan East Road, beilonggang Town, Yandu District, Yancheng City, Jiangsu Province (R) Patentee after: YANCHENG OUQI MACHINERY CO.,LTD. Address before: 224006 Longtan East Road, Beilonggang Town, Yandu District, Yancheng City, Jiangsu Province Patentee before: Yancheng City Shengtai Machinery Co.,Ltd. |
|
TR01 | Transfer of patent right |