CN105864521A - Steady pipeline supporting device - Google Patents

Steady pipeline supporting device Download PDF

Info

Publication number
CN105864521A
CN105864521A CN201610491761.0A CN201610491761A CN105864521A CN 105864521 A CN105864521 A CN 105864521A CN 201610491761 A CN201610491761 A CN 201610491761A CN 105864521 A CN105864521 A CN 105864521A
Authority
CN
China
Prior art keywords
screw rod
pipeline
casing
longitudinal axis
box cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610491761.0A
Other languages
Chinese (zh)
Other versions
CN105864521B (en
Inventor
黄爱娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunshan Xinhong Construction Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610491761.0A priority Critical patent/CN105864521B/en
Publication of CN105864521A publication Critical patent/CN105864521A/en
Application granted granted Critical
Publication of CN105864521B publication Critical patent/CN105864521B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/16Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe
    • F16L3/20Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe allowing movement in transverse direction
    • F16L3/205Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe allowing movement in transverse direction having supporting springs
    • F16L3/2056Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe allowing movement in transverse direction having supporting springs the axis of at least one spring being oblique or perpendicular to the direction of the movement of the pipe

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Supports For Pipes And Cables (AREA)
  • Heating, Cooling, Or Curing Plastics Or The Like In General (AREA)

Abstract

The invention discloses a steady pipeline supporting device and a pipeline mounting regulation method adopting the same. The steady pipeline supporting device comprises a fixed base frame (1), a box (11) and a box cover (12), and the box cover (12) is detachably connected with the box (11) which is fixedly connected with the fixed base frame (1). The box cover (12) covers an upper opening of the box (11) to allow a pipeline (2) to pass through the upper opening in detachment, an upper slider clamping cover (9) is fixedly arranged on the outer side of the box cover (12) to slidably clamp an upper slider (91) between the upper slider clamping cover (9) and the box cover (12), and the upper slider (91) is internally provided with a threaded hole for threaded fit with a longitudinal axis operating screw rod (8). The outer side of the longitudinal axis operating screw rod (8) penetrates the upper slider clamping cover (9), and a first regulation allowance (80) is reserved between the longitudinal axis operating screw rod (8) and adjacent two sides of the upper slider clamping cover (9).

Description

A kind of firm formula pipe-supporting device
Technical field
The present invention relates to Pipe installing field, a kind of firm formula pipe-supporting device and use the Pipe installing control method of described device.
Background technology
In Pipe installing field, generally require and pipeline is isolated with surrounding.Transport medium particularly with pipeline and there is the occasion of temperature and requirement of shelter.Pipeline often utilizes the gap portion between isolating device and pipeline effectively to completely cut off.And regulation is often difficult to operate in determining for pipeline, the most unworkable is to be adjusted pipeline on four direction gap.And, often facing the vibration problem that external interference is caused after Pipe installing, this causes damage to isolating device and affects service life and use safety.
Summary of the invention
It is an object of the invention to provide a kind of firm formula pipe-supporting device and use the Pipe installing control method of described device, it can overcome defect of the prior art.
nullOne according to the present invention consolidates formula pipe-supporting device,Including stationary base mount、The casing being connected with described stationary base mount and the Box Cover being removably fixed with described casing,Described Box Cover is covered in the upside opening part of described casing to pass through side opening on described when dismounting for pipeline,The outside of described Box Cover is fixedly installed top shoe clamping lid,In order to be clamped with top shoe slidably between described top shoe clamping lid and described Box Cover,Described top shoe is provided with screw in order to coordinate with longitudinal axis operation screw flight,The described longitudinal axis operation screw rod Outboard Sections through described top shoe clamping lid and and described top shoe clamp lid adjacent both sides there is the first adjustment allowance,The described longitudinal axis operation screw rod inboard portion through described Box Cover and and the adjacent both sides of described Box Cover there is the second adjustment allowance;nullThe right hand external of described casing is installed with fixed block,Described fixed block is provided with screw in order to coordinate with transverse axis operation screw flight,Described transverse axis operation screw rod is connected to rotatably push up pressure head component with the medial end of described longitudinal axis operation screw rod,It is pressed on right side and the upper lateral part of described pipeline in order to top respectively,Sliding block clamping lid it is fixedly installed on the following side of described casing,In order to be clamped with sliding block slidably between described sliding block clamping lid and the following side of described casing,The necking section of described sliding block through described casing following side and and the adjacent both sides of the following side of described casing have the 3rd adjustment allowance,Wherein,The medial end of inside the left side of described casing and described necking section is fixedly connected with elastic top pressure assembly respectively,Wherein,The rotational engagement parts each including being fixed together by securing member in two described rotatable top pressure head component and elastic joint part,Described rotational engagement parts are provided with two thrust bearings,The flange part of corresponding operating screw rod it is bonded between said two thrust bearing,A top adjacent with described elastic joint part in said two thrust bearing is pressed on described elastic joint part,Described elastic joint part is provided with top compression leg by elastomeric element resilientiy stretchable,That one end relative with described elastomeric element on the compression leg of described top is fixedly installed the first impeller of arc-shaped,Described first impeller is in order to engage and to push described pipeline;Two described elastic top pressure assemblies all include housing and the top-pressure part stretched slidably at the medial part of described housing, described top-pressure part by regulation spring and be connected with the lateral wall of described housing thus resilientiy stretchable be installed in described housing, that one end relative with described regulation spring on described top-pressure part is fixedly installed the second impeller of arc-shaped, described second impeller is also in order to engage and to push described pipeline, and described first impeller is identical with described second impeller size and is provided with the recess coordinating described pipeline.
According to the present invention, use the Pipe installing control method of above-mentioned firm formula pipe-supporting device, first, described pipeline is put into described casing from the upper side opening of described casing, after the fixed installation of described Box Cover is put in place, the longitudinal axis positions of described pipeline is adjusted, until described pipeline is in the longitudinal central position of described casing by regulating described longitudinal axis operation screw rod;Afterwards, adjusting the transverse axis position of described pipeline by regulating described transverse axis operation screw rod, described longitudinal axis operation screw rod is subjected to displacement in X direction together with described top shoe and described sliding block, until described pipeline is in the transverse axis center of described casing.
By the present invention, owing to being provided with regulation spring in bottom and left side, it can provide the regulation allowance on the longitudinal axis and transverse axis, thus allows adjusting screw rod to carry out pushing and withstanding regulation.And by arranging the elastic top pressure assembly of the longitudinal axis adjusting screw rod being oppositely installed up and down that can move left and right and auxiliary equipment and bottom, thus ensure the longitudinal axis fixed under conditions of and realize the position adjustments for transverse axis.And by being arranged on the elastomeric element being installed in the pressure head component of each described rotatable top, on the basis of it is in guaranteeing to overcome the pressure on top surface of described regulation spring to be adjusted determining, the vibration occurred on pipeline can be buffered, thus avoid screw thread causing damage and then producing potential safety hazard and increases the service life.
Accompanying drawing explanation
Fig. 1 is the overall structure schematic diagram of the firm formula pipe-supporting device of the present invention;
Fig. 2 is the rotatable exemplary enlarged diagram pushing up pressure head component in Fig. 1;
Fig. 3 is the exemplary enlarged diagram of the elastic top pressure assembly in Fig. 1.
Detailed description of the invention
Below in conjunction with Fig. 1-3, the present invention is described in detail.
nullOne according to embodiment consolidates formula pipe-supporting device,Including stationary base mount 1、The casing 11 being connected with described stationary base mount 1 and the Box Cover 12 being removably fixed with described casing 11,Described Box Cover 12 is covered in the upside opening part of described casing 11 to pass through side opening on described when dismounting for pipeline 2,The outside of described Box Cover 12 is fixedly installed top shoe clamping lid 9,In order to be clamped with top shoe 91 slidably between described top shoe clamping lid 9 and described Box Cover 12,Described top shoe 91 is provided with screw in order to operate screw rod 8 threaded engagement with the longitudinal axis,The described longitudinal axis operation screw rod 8 Outboard Sections through described top shoe clamping lid 9 and and described top shoe clamp lid 9 adjacent both sides there is the first adjustment allowance 80,The described longitudinal axis operation screw rod 8 inboard portion through described Box Cover 12 and and the adjacent both sides of described Box Cover 12 there is the second adjustment allowance 10;nullThe right hand external of described casing 11 is installed with fixed block 31,Described fixed block 31 is provided with screw in order to operate screw rod 3 threaded engagement with transverse axis,Described transverse axis operation screw rod 3 is connected to rotatably push up pressure head component 71 with the medial end of described longitudinal axis operation screw rod 8,7,It is pressed on right side and the upper lateral part of described pipeline 2 in order to top respectively,Sliding block clamping lid 6 it is fixedly installed on the following side of described casing 11,In order to be clamped with sliding block 61 slidably between described sliding block clamping lid 6 and the following side of described casing 11,The necking section 62 of described sliding block 61 through described casing 11 following side and and the adjacent both sides of the following side of described casing 11 have the 3rd adjustment allowance 110,Wherein,The medial end of inside the left side of described casing 11 and described necking section 62 is fixedly connected with elastic top pressure assembly 51 respectively,5,Wherein,Two described rotatable top pressure head component 71,The rotational engagement parts 74 each including being fixed together by securing member 79 in 7 and elastic joint part 75,Described rotational engagement parts 74 are provided with two thrust bearings 72、73,At said two thrust bearing 72、The flange part 78 of corresponding operating screw rod it is bonded between 73,Said two thrust bearing 72、A top adjacent with described elastic joint part 75 in 73 is pressed on described elastic joint part 75,Described elastic joint part 75 is provided with top compression leg 76 by elastomeric element 77 resilientiy stretchable,That one end relative with described elastomeric element 77 on described top compression leg 76 is fixedly installed the first impeller 20 of arc-shaped,Described first impeller 20 is in order to engage and to push described pipeline 2;Two described elastic top pressure assemblies 51, 5 all include housing 52 and the top-pressure part 53 stretched slidably at the medial part of described housing 52, described top-pressure part 53 by regulation spring 54 and be connected with the lateral wall of described housing 52 thus resilientiy stretchable be installed in described housing 52, that one end relative with described regulation spring 54 on described top-pressure part 53 is fixedly installed the second impeller 21 of arc-shaped, described second impeller 21 is also in order to engage and to push described pipeline 2, described first impeller 20 is identical with described second impeller 21 size and is provided with the recess (not shown) coordinating described pipeline 2.
Exemplarily or valuably, wherein, the stiffness factor of described elastomeric element 77 is more than the stiffness factor of described regulation spring 54.
According to embodiment, use the Pipe installing control method of above-mentioned firm formula pipe-supporting device, first, described pipeline 2 is put into described casing 11 from the upper side opening of described casing 11, after the fixed installation of described Box Cover 12 is put in place, the longitudinal axis positions of described pipeline 2 is adjusted, until described pipeline 2 is in the longitudinal central position of described casing 11 by regulating described longitudinal axis operation screw rod 8;Afterwards, the transverse axis position of described pipeline 2 is adjusted by regulating described transverse axis operation screw rod 3, described longitudinal axis operation screw rod 8 is subjected to displacement in X direction together with described top shoe 91 and described sliding block 61, until described pipeline 2 is in the transverse axis center of described casing 11.
By the present invention, owing to being provided with regulation spring in bottom and left side, it can provide the regulation allowance on the longitudinal axis and transverse axis, thus allows adjusting screw rod to carry out pushing and withstanding regulation.And by arranging the elastic top pressure assembly of the longitudinal axis adjusting screw rod being oppositely installed up and down that can move left and right and auxiliary equipment and bottom, thus ensure the longitudinal axis fixed under conditions of and realize the position adjustments for transverse axis.And it is installed on each described rotatable top pressure head component 71 by being arranged on, elastomeric element 77 in 7, on the basis of it is in guaranteeing to overcome the pressure on top surface of described regulation spring to be adjusted determining, the vibration occurred on pipeline can be buffered, thus avoid screw thread causing damage and then producing potential safety hazard and increases the service life.Whole device is installed reliable, easy to adjust and can be effectively improved safety and service life.
By with upper type, those skilled in the art can make various change according to mode of operation within the scope of the invention.

Claims (3)

  1. null1. a firm formula pipe-supporting device,It is characterized in that: include stationary base mount (1)、The casing (11) being connected with described stationary base mount (1) and the Box Cover (12) being removably fixed with described casing (11),Described Box Cover (12) is covered in the upside opening part of described casing (11) to pass through described upper side opening when dismounting for pipeline (2),The outside of described Box Cover (12) is fixedly installed top shoe clamping lid (9),In order to be clamped with top shoe (91) slidably between described top shoe clamping lid (9) and described Box Cover (12),Described top shoe (91) is provided with screw in order to operate screw rod (8) threaded engagement with the longitudinal axis,The described longitudinal axis operation screw rod (8) Outboard Sections through described top shoe clamping lid (9) and and described top shoe clamp lid (9) adjacent both sides there is the first adjustment allowance (80),The described longitudinal axis operation screw rod (8) inboard portion through described Box Cover (12) and and the adjacent both sides of described Box Cover (12) there is the second adjustment allowance (10);nullThe right hand external of described casing (11) is installed with fixed block (31),Described fixed block (31) is provided with screw in order to operate screw rod (3) threaded engagement with transverse axis,Described transverse axis operation screw rod (3) is connected to rotatably push up pressure head component (71 with the medial end of described longitudinal axis operation screw rod (8),7),It is pressed on right side and the upper lateral part of described pipeline (2) in order to top respectively,Sliding block clamping lid (6) it is fixedly installed on the following side of described casing (11),In order to be clamped with sliding block (61) slidably between described sliding block clamping lid (6) and the following side of described casing (11),The necking section (62) of described sliding block (61) through described casing (11) following side and and the adjacent both sides of the following side of described casing (11) have the 3rd adjustment allowance (110),Wherein,Inside the left side of described casing (11) and the medial end of described necking section (62) is fixedly connected with elastic top pressure assembly (51 respectively,5),Wherein,Two described rotatable top pressure head component (71,7) the rotational engagement parts (74) each including being fixed together by securing member (79) in and elastic joint part (75),Described rotational engagement parts (74) are provided with two thrust bearings (72、73),At said two thrust bearing (72、73) flange part (78) of corresponding operating screw rod it is bonded between,Said two thrust bearing (72、73) top adjacent with described elastic joint part (75) in is pressed on described elastic joint part (75),Described elastic joint part (75) is provided with top compression leg (76) by elastomeric element (77) resilientiy stretchable,Upper that one end relative with described elastomeric element (77), described top compression leg (76) is fixedly installed first impeller (20) of arc-shaped,Described first impeller (20) is in order to engage and to push described pipeline (2);Two described elastic top pressure assemblies (51, 5) housing (52) and the top-pressure part (53) stretched slidably at the medial part of described housing (52) are all included, described top-pressure part (53) by regulation spring (54) and be connected with the lateral wall of described housing (52) thus resilientiy stretchable be installed in described housing (52), upper that one end relative with described regulation spring (54) of described top-pressure part (53) is fixedly installed second impeller (21) of arc-shaped, described second impeller (21) is also in order to engage and to push described pipeline (2), described first impeller (20) is identical with described second impeller (21) size and is provided with the recess coordinating described pipeline (2).
  2. Firm formula pipe-supporting device the most according to claim 1, wherein, the stiffness factor of described elastomeric element (77) is more than the stiffness factor of described regulation spring (54).
  3. 3. the Pipe installing control method of the firm formula pipe-supporting device used described in claim 1 or 2, first, described pipeline (2) is put into described casing (11) from the upper side opening of described casing (11), after described Box Cover (12) fixed installation is put in place, the longitudinal axis positions of described pipeline (2) is adjusted, until until described pipeline (2) is in the longitudinal central position of described casing (11) by regulating described longitudinal axis operation screw rod (8);Afterwards, the transverse axis position of described pipeline (2) is adjusted by regulating described transverse axis operation screw rod (3), described longitudinal axis operation screw rod (8) is subjected to displacement in X direction together with described top shoe (91) and described sliding block (61), until described pipeline (2) is in the transverse axis center of described casing (11).
CN201610491761.0A 2016-06-29 2016-06-29 A kind of firm formula pipe-supporting device and Pipe installing adjusting method Expired - Fee Related CN105864521B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610491761.0A CN105864521B (en) 2016-06-29 2016-06-29 A kind of firm formula pipe-supporting device and Pipe installing adjusting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610491761.0A CN105864521B (en) 2016-06-29 2016-06-29 A kind of firm formula pipe-supporting device and Pipe installing adjusting method

Publications (2)

Publication Number Publication Date
CN105864521A true CN105864521A (en) 2016-08-17
CN105864521B CN105864521B (en) 2018-03-13

Family

ID=56655603

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610491761.0A Expired - Fee Related CN105864521B (en) 2016-06-29 2016-06-29 A kind of firm formula pipe-supporting device and Pipe installing adjusting method

Country Status (1)

Country Link
CN (1) CN105864521B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108331972A (en) * 2018-02-05 2018-07-27 魏海勇 A kind of hydraulic engineering is fixed with water pipe buries equipment
CN113073845A (en) * 2021-03-20 2021-07-06 耿艳 Bushing type structure of building heating and ventilation pipeline

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB476871A (en) * 1936-06-12 1937-12-13 Power Ct Company Ltd Improvements in conduits for electric cables
CN101235929A (en) * 2007-01-29 2008-08-06 三星电子株式会社 Tubing support device and air conditioner possessing the device
CN202571884U (en) * 2012-05-05 2012-12-05 光隆精密工业(福州)有限公司 Special fixture for engine exhaust port angle pipe lathe
CN202741944U (en) * 2012-08-14 2013-02-20 安徽省光耀管业有限公司 Automatic welding device for epoxy resin coated composite steel pipe
CN204254037U (en) * 2014-08-27 2015-04-08 张棣 A kind of petroleum pipeline bracket seat of stabilized structure
CN105156763A (en) * 2015-10-22 2015-12-16 蔡旭东 Petroleum pipeline supporting frame

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB476871A (en) * 1936-06-12 1937-12-13 Power Ct Company Ltd Improvements in conduits for electric cables
CN101235929A (en) * 2007-01-29 2008-08-06 三星电子株式会社 Tubing support device and air conditioner possessing the device
CN202571884U (en) * 2012-05-05 2012-12-05 光隆精密工业(福州)有限公司 Special fixture for engine exhaust port angle pipe lathe
CN202741944U (en) * 2012-08-14 2013-02-20 安徽省光耀管业有限公司 Automatic welding device for epoxy resin coated composite steel pipe
CN204254037U (en) * 2014-08-27 2015-04-08 张棣 A kind of petroleum pipeline bracket seat of stabilized structure
CN105156763A (en) * 2015-10-22 2015-12-16 蔡旭东 Petroleum pipeline supporting frame

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108331972A (en) * 2018-02-05 2018-07-27 魏海勇 A kind of hydraulic engineering is fixed with water pipe buries equipment
CN113073845A (en) * 2021-03-20 2021-07-06 耿艳 Bushing type structure of building heating and ventilation pipeline

Also Published As

Publication number Publication date
CN105864521B (en) 2018-03-13

Similar Documents

Publication Publication Date Title
CN105937660A (en) Pipe supporting device
CN105952974A (en) Pipeline supporting device stable in bearing
CN106015749A (en) Pipeline supporting device
CN105864518A (en) High-tightness pipeline supporting device
CN105937659A (en) Novel pipe supporting device
CN106078552A (en) A kind of can the pipeline load bearing equipment of dehumidifier
CN105864521A (en) Steady pipeline supporting device
CN106041784B (en) A kind of pipeline bogey
CN106015757A (en) Dedusting pipeline support device
CN105909874A (en) Bearing device for industrial pipeline
CN105927794A (en) Bearing assembly for pipeline installation
CN105889641A (en) Pipeline supporting device
CN106402494B (en) A kind of pipeline support apparatus
CN106002776A (en) Durable pipeline bearing device
CN105937661A (en) Industrial pipe carrying device
CN105937657A (en) Pipe carrying equipment
CN106122600A (en) A kind of supporting arrangement of Pipe installing
CN106122601B (en) A kind of support equipment of fixed -piping
CN106122604B (en) A kind of bogey for pipeline and the Pipe installing adjusting method using the device
CN105909876A (en) Support apparatus for bearing pipeline
CN106002760A (en) Supporting device for dustproof pipeline
CN105972317A (en) Pipeline supporting equipment
CN105909877A (en) Pipeline support apparatus
CN106090442A (en) A kind of pipe-supporting device guided
CN106015756A (en) Industrial pipeline supporting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Mao Lingbo

Inventor before: Huang Aijuan

TA01 Transfer of patent application right

Effective date of registration: 20180206

Address after: 311835 Shaoxing, Shaoxing, Zhejiang Province, Zhuji City store mouth town shop mouth six Village

Applicant after: Mao Lingbo

Address before: 325215 Zhejiang city of Wenzhou province Ruian City Tao Shan Zhen Liu Jia Cun

Applicant before: Huang Aijuan

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201118

Address after: 226200 Binjiang fine chemical industry park, Nantong, Jiangsu, Qidong

Patentee after: Qidong Binhua water supply Co., Ltd

Address before: 311835 Shaoxing, Shaoxing, Zhejiang Province, Zhuji City store mouth town shop mouth six Village

Patentee before: Mao Lingbo

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201130

Address after: Room 2 and room 3, No. 297, huanlou Road, Kunshan Development Zone, Kunshan City, Suzhou City, Jiangsu Province

Patentee after: KUNSHAN XINHONG CONSTRUCTION ENGINEERING Co.,Ltd.

Address before: 226200 Binjiang fine chemical industry park, Nantong, Jiangsu, Qidong

Patentee before: Qidong Binhua water supply Co., Ltd

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180313

Termination date: 20210629