CN106120850A - 一种高速铁路无砟轨道桩板式挡土墙的设计方法 - Google Patents
一种高速铁路无砟轨道桩板式挡土墙的设计方法 Download PDFInfo
- Publication number
- CN106120850A CN106120850A CN201610452887.7A CN201610452887A CN106120850A CN 106120850 A CN106120850 A CN 106120850A CN 201610452887 A CN201610452887 A CN 201610452887A CN 106120850 A CN106120850 A CN 106120850A
- Authority
- CN
- China
- Prior art keywords
- state
- foundation soil
- soil
- stake
- design
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
Landscapes
- Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Foundations (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
一种高速铁路无砟轨道桩板式挡土墙的设计方法,以有效解决了桩板式挡土墙传统设计方法中无法考虑的桩身锚固段地基土层侧向变形时间效应的控制问题。按如下步骤进行:通过地勘手段获得设计工点地基土层的原状土样,进行室内三轴试验测得土样的强度指标c和同时进行室内长期三轴试验测得快速稳定状态对应的状态阈值参数λ;根据所得状态阈值参数λ计算得到桩前地基土的状态强度参数c1和根据所得状态强度参数计算得到桩前地基土变形状态的横向承载力σp 1;按传统的锚固桩设计计算方法拟定锚固桩截面尺寸与锚固段长度,计算锚固桩对桩前地基土的侧压力σy;比较地面以下1/3锚固段长度处的σy与σp;进行锚固桩的配筋设计,完成设计流程。
Description
技术领域
本发明专利涉及一种高速铁路无砟轨道桩板式挡土墙的设计方法。属岩土工程支挡结构设计技术领域。
背景技术
桩板式挡土墙是利用锚固于地基中的锚固段提供抗滑力抵抗填土的侧压力,其主要优点在于墙高不受一般挡墙的高度限制,悬臂段可高达15m,地基承载力的不足可通过锚固段的埋深得以补偿。但是,当锚固桩悬臂段较长时,桩体锚固段微小的侧向变形就会在桩顶处被放大,若墙后土体与挡墙发生协调变形,则挡墙的侧向变形势必会引起路堤的附加沉降。当桩板墙应用于高速铁路无砟轨道路堤支挡时,要求锚固段地基土的变形处于快速稳定状态(变形无时间效应),控制路基的附加沉降,以满足无砟轨道在少维修条件下的平顺性要求。我国TB10025-2006《铁路路基支挡结构设计规范》规定:桩板墙地面以下锚固段长度1/3处的桩前抗力应不大于地基土横向允许承载力[σH],并要求桩顶侧向位移小于悬臂段长度的1%,且不宜超过100mm。这一强度及位移控制标准与锚固段地基土的变形状态要求——“快速稳定”状态并不匹配,难以适应无砟轨道条件下高速铁路的要求。因此,研究适用于高速铁路无砟轨道基于变形状态控制的桩板式挡土墙设计方法,是高速铁路路基工程建设亟待解决的关键技术问题。
发明专利内容
本发明专利的主要目的是提供一种高速铁路无砟轨道桩板式挡土墙的设计方法,以有效解决了桩板式挡土墙传统设计方法中无法考虑的桩身锚固段地基土层侧向变形时间效应的控制问题。
本发明解决上述技术问题所采用的技术方案如下:
本发明的一种高速铁路无砟轨道桩板式挡土墙的设计方法,按如下步骤进行:
(1)通过地勘手段获得设计工点地基土层的原状土样,进行室内三轴试验测得土样的强度指标c和同时进行室内长期三轴试验测得快速稳定状态对应的状态阈值参数λ,无条件进行室内长期三轴试验时λ取15%;
(2)根据所得状态阈值参数λ计算得到桩前地基土的状态强度参数c1和计算公式为:
式中—地基土处于第一状态时的状态强度参数,内摩擦角,°;
c1—地基土处于第一状态时的状态强度参数,黏聚力,kPa;
—地基土实际强度参数,内摩擦角,°;
c—地基土实际强度参数,黏聚力,kPa;
λ1—处于第一状态时的状态阈值参数;
(3)根据所得状态强度参数计算得到桩前地基土变形状态的横向承载力σp 1,计算公式为:
式中σp 1—地基土处于第一状态时的横向承载力,kPa;
γ—地基土的重度,kN/m3;
y—距地表深度,m;
(4)按传统的锚固桩设计计算方法拟定锚固桩截面尺寸与锚固段长度,计算锚固桩对桩前地基土的侧压力σy;
(5)比较地面以下1/3锚固段长度处的σy与σp 1,若σy≤σp 1表明桩前地基土在锚固桩的作用下不会出现有时间效应的变形,可以进行下一步设计计算;若σy>σp 1时则需调整桩间距或桩的截面尺寸等参数重新计算,直至满足σy≤σp 1;
(6)进行锚固桩的配筋设计,完成设计流程。
本发明的有益效果是,从控制桩前地基土层有时间效应的侧向变形出发,构建新型的桩板墙设计方法,克服了传统设计方法的缺点,可以满足高速铁路无砟轨道的要求。
附图说明
图1是变形状态强度参数计算简图;
图2是工点横断面图;
图3是锚固桩对地基土侧应力分布图;
图4-1是锚固段剪力分布图;
图4-2是锚固段弯矩分布图;
图5是桩前地基土侧应力σy与变形状态承载力图。
具体实施方式
下面结合具体实施方式对本发明专利作进一步的详细说明。
当高速铁路无砟轨道通过斜坡地基时,常在下坡一侧修建支挡结构,桩板墙是最为常用的选择之一。但是,高速铁路无砟轨道对路基工后沉降值要求极其严格,即要求路基在自重作用及列车荷载作用下的沉降变形没有时间效应。因此,要求桩板墙不能产生有时间效应的侧向变形。传统的桩板墙设计方法是以保证支挡结构稳定为核心目的,并未控制结构是否会出现有时间效应的侧向变形。这将为高速铁路无砟轨道路基的工后沉降控制带来隐患。本发明专利从控制桩前地基土层有时间效应的侧向变形出发,构建新型的桩板墙设计方法,克服了传统设计方法的缺点,满足高速铁路无砟轨道的要求。
控制无砟轨道桩板式挡土墙的侧向变形时间效应的关键在于控制桩体锚固地段地基土层所受桩体的侧向压力不能超过土层本身“快速稳定”状态所对应的荷载水平阈值,这一阈值可以用极限荷载水平(最大荷载水平)的百分比来表达。针对设计工点,通过地勘手段获得工点地基土层的原状土样,进行室内三轴试验测得土样的强度指标,进行室内长期三轴试验测得“快速稳定”状态对应的状态阈值参数λ,大量的实测表明细粒土的“快速稳定”状态对应的状态阈值参数λ一般为15%,即桩身锚固段作用在土层的侧向压力不超过土层侧向极限承载力(最大侧向荷载水平)的15%时,地基土层的侧向变形处于快速稳定状态,不具有时间效应,满足高速铁路无砟轨道的要求。根据所得状态阈值参数λ计算得到桩前地基土的状态强度参数c1和土体变形状态强度参数的确定是根据摩尔-库仑准则,对极限荷载按荷载水平阈值λ进行折减,从而得到与荷载水平阈值相对应的土体变形状态的强度参数c1和计算简图如图1所示。
图1中,实线表示摩尔-库仑抗剪强度线,虚线表示按荷载水平折减后的土体变形状态强度线,由几何关系,可推导出土体变形状态的强度参数c1和
由上述公式可以变换得到公式:
根据所得状态强度参数c1和计算得到桩前地基土变形状态的横向承载力σp 1,计算公式为
再按传统的锚固桩设计计算方法拟定锚固桩截面尺寸与锚固段长度,计算锚固桩对桩前地基土的侧压力σy。比较地面以下1/3锚固段长度处(该处桩体给予地基土层的侧向压力最大)的σy与σp 1。若σy≤σp 1段表明桩前地基土在锚固桩的作用下不会出现有时间效应的变形,可以进行下一步设计计算;若σy>σp 1时则需调整桩间距或桩的截面尺寸等参数重新计算,直至满足σy≤σp 1。然后进行锚固桩的配筋设计完成设计流程。
根据以上推导,本发明的一种高速铁路无砟轨道桩板式挡土墙的设计方法,按如下步骤进行:
(1)通过地勘手段获得设计工点地基土层的原状土样,进行室内三轴试验测得土样的强度指标c和同时进行室内长期三轴试验测得快速稳定状态对应的状态阈值参数λ(指荷载作用下土样的变形很快稳定,不随时间延长而持续发展,即变形不具有时间效应)对应的状态阈值参数λ,无条件进行室内长期三轴试验时λ取15%,即土体承受荷载不超过最大荷载值的15%时其变形将处于快速稳定状态;
(2)根据所得状态阈值参数λ计算得到桩前地基土的状态强度参数c1
和计算公式为:
式中—地基土处于第一状态时的状态强度参数,内摩擦角,°;
c1—地基土处于第一状态时的状态强度参数,黏聚力,kPa;
—地基土实际强度参数,内摩擦角,°;
c—地基土实际强度参数,黏聚力,kPa;
λ1—处于第一状态时的状态阈值参数;
(3)根据所得状态强度参数计算得到桩前地基土变形状态的横向承载力σp 1,计算公式为:
式中σp 1—地基土处于第一状态时的横向承载力,kPa;
γ—地基土的重度,kN/m3;
y—距地表深度,m;
(4)按传统的锚固桩设计计算方法拟定锚固桩截面尺寸与锚固段长度,计算锚固桩对桩前地基土的侧压力σy;
(5)比较地面以下1/3锚固段长度处的σy与σp 1,若σy≤σp 1表明桩前地基土在锚固桩的作用下不会出现有时间效应的变形,可以进行下一步设计计算;若σy>σp 1时则需调整桩间距或桩的截面尺寸等参数重新计算,直至满足σy≤σp 1;
(6)进行锚固桩的配筋设计,完成设计流程。
实施例
1、计算参数
某高速铁路无砟轨道工点,如图2所示。墙后填土为A、B组填料,容重γ1=23kN/m3,(综合内摩擦角);在锚固桩锚固段范围内,地基土共有两层组成,第一层为粉质黏土,层厚h2-1≈10m,天然容重γ2-1=18.7kN/m3,c2=40.3kPa,液性指数IL=0.1;第二层为强风化页岩,饱和状态,层厚h2-2=6m,按第一层土在0.95压实度下以及饱和状态下的参数取值,即γ2-2=19.8kN/m3,其力学参数与第一层土差异较小,为方便计算,该层土物理力学参数与第一层土取相同值,但地基系数随深度变化的比例系数m取值较第一层土可适当提高。初步拟定锚固桩悬臂段高度h1=8m,锚固段深度h2=16m。
桩前地基系数随深度变化的比例系数m按TB10023-1006《铁路路基支挡结构设计规范》取值,如表1所列。初步拟定锚固桩截面为长方形,宽B=2m,截面高度3m,桩身为C35钢筋混凝土浇筑而成,抗弯刚度EI≈1.4×108kN·m2,桩中心间距L=5m。
表1地基系数随深度变化的比例系数m参考值
根据GB50021-2001《岩土工程勘察规范》(2009修订版),地基粉质黏土液性指数0<IL=0.1≤0.25时,为硬塑状态,则地基系数随深度变化的比例系数m1取值范围为2000~4200kN/m4,计算时取其平均值,则m1=3100kN/m4,对于强风化页岩,m较粉质黏土提高一档取值,即m2取值范围为3000~7000kN/m4,计算时取其平均值,则m2=5000kN/m4。根据规范,锚固段h2范围内土的换算m值为:
偏应力水平λ根据试验结果取0.15,根据公式可得c2 1,如表2所列。
表2偏应力水平λ1对应的变形状态强度参数
2、计算过程与结果
a)墙背土压力
朗金主动土压力系数ka1=0.2,可得:
b)刚性桩与弹性桩的判断
根据TB10023-1006《铁路路基支挡结构设计规范》,刚性桩与弹性桩的判断方法为:
式中:α—桩的变形系数,m-1;
h—桩的锚固深度,m;
m—地基土水平抗力的比例系数,kN/m4;
Bp—桩的计算宽度,m;Bp=B+1;
B—桩的宽度,m;
E—桩的弹性模量,kPa;
I—桩的截面惯性矩,m4。
则根据计算参数,可得:
αh2=0.155×16=2.48<2.5,属刚性桩。
c)锚固桩内力计算
锚固桩的转动中心y0及锚固桩转角φ:
锚固段距地面y深度处锚固桩对地基土侧应力σy为:
σy=my(y0-y)φ=4258×4.2×10-4×(11.7-y)y=21y-1.8y2
则锚固桩对地基土最大侧应力σymax=61.2kPa,相应的y=5.8m,沿锚固段深度分布如图3所示。
锚固桩锚固段剪力及弯矩分布,如图4所示。
锚固段剪力Qy:
锚固段弯矩My:
计算得到的锚固段最大弯矩距地面的距离是5.8m。
d)桩前地基变形状态评价
距地面以下(1/3)h2深度及h2深度处锚固桩对地基侧应力σy,结果如表3所列,不同深度处的σp1与土侧应力σy沿锚固段深度的分布如图5所示。计算过程如下:
y=1/3h2深度处的[σH i];
y=h2深度处的[σH i];
表3地基侧应力σy 单位:kPa
由表3及图5可知,计算得到的距地面以下锚固桩各深度处桩侧土应力σy小于该深度处快速稳定状态下的地基土横向承载力σp1,因此可认为所拟桩的尺寸合理,墙桩前地基土变形处于快速稳定状态。再按桩身强度控制要求进行配筋计算,完成设计。
Claims (1)
1.一种高速铁路无砟轨道桩板式挡土墙的设计方法,按如下步骤进行:
(1)通过地勘手段获得设计工点地基土层的原状土样,进行室内三轴试验测得土样的强度指标c和同时进行室内长期三轴试验测得快速稳定状态对应的状态阈值参数λ,无条件进行室内长期三轴试验时λ取15%;
(2)根据所得状态阈值参数λ计算得到桩前地基土的状态强度参数c1和计算公式为:
式中—地基土处于第一状态时的状态强度参数,内摩擦角,°;
c1—地基土处于第一状态时的状态强度参数,黏聚力,kPa;
—地基土实际强度参数,内摩擦角,°;
c—地基土实际强度参数,黏聚力,kPa;
λ1—处于第一状态时的状态阈值参数;
(3)根据所得状态强度参数计算得到桩前地基土变形状态的横向承载力σp 1,计算公式为:
式中σp 1—地基土处于第一状态时的横向承载力,kPa;
γ—地基土的重度,kN/m3;
y—距地表深度,m;
(4)按传统的锚固桩设计计算方法拟定锚固桩截面尺寸与锚固段长度,计算锚固桩对桩前地基土的侧压力σy;
(5)比较地面以下1/3锚固段长度处的σy与σp 1,若σy≤σp 1表明桩前地基土在锚固桩的作用下不会出现有时间效应的变形,可以进行下一步设计计算;若σy>σp 1时则需调整桩间距或桩的截面尺寸等参数重新计算,直至满足σy≤σp 1;
(6)进行锚固桩的配筋设计,完成设计流程。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610452887.7A CN106120850A (zh) | 2016-06-22 | 2016-06-22 | 一种高速铁路无砟轨道桩板式挡土墙的设计方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610452887.7A CN106120850A (zh) | 2016-06-22 | 2016-06-22 | 一种高速铁路无砟轨道桩板式挡土墙的设计方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106120850A true CN106120850A (zh) | 2016-11-16 |
Family
ID=57470523
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610452887.7A Pending CN106120850A (zh) | 2016-06-22 | 2016-06-22 | 一种高速铁路无砟轨道桩板式挡土墙的设计方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106120850A (zh) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107447774A (zh) * | 2017-06-21 | 2017-12-08 | 中铁二院工程集团有限责任公司 | 双排桩基悬臂式挡土墙整体稳定性计算方法 |
CN109902320A (zh) * | 2017-12-07 | 2019-06-18 | 中铁二院工程集团有限责任公司 | 一种陡坡路基椅式桩锚固深度设计计算方法 |
CN111199070A (zh) * | 2020-01-27 | 2020-05-26 | 贵州星隆迪岩土工程有限公司 | 桩托二层挡土墙的设计方法 |
CN111274695A (zh) * | 2020-01-17 | 2020-06-12 | 中铁二院工程集团有限责任公司 | 一种高速铁路路肩桩板墙结构的设计方法 |
CN111539051A (zh) * | 2020-03-16 | 2020-08-14 | 中铁二院工程集团有限责任公司 | 一种架空式桩板结构的三维静力计算方法 |
CN111678810A (zh) * | 2020-06-18 | 2020-09-18 | 西南交通大学 | 一种基于直剪试验的压实土水平残余应力的估算方法 |
CN113047335A (zh) * | 2021-04-18 | 2021-06-29 | 中铁二院工程集团有限责任公司 | 一种铁路路肩挡土墙墙顶位移控制标准的确定方法 |
CN113378283A (zh) * | 2021-07-01 | 2021-09-10 | 中铁二院工程集团有限责任公司 | 锚固点增强型桩结构计算方法 |
CN114372302A (zh) * | 2021-11-24 | 2022-04-19 | 中铁二院工程集团有限责任公司 | 时速400km+高速铁路路肩重力式挡土墙设计方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100313721B1 (ko) * | 1998-11-26 | 2001-12-28 | 김징완 | 가설흙막이구조물을이용한합성지하옹벽설계방법및건축물지하옹벽공사방법 |
CN101691724A (zh) * | 2009-09-17 | 2010-04-07 | 西南交通大学 | 高速铁路无砟轨道液化土地基抗震路桥过渡段构造 |
CN202194037U (zh) * | 2011-08-26 | 2012-04-18 | 中铁一局集团有限公司 | 高速铁路无砟道岔横向调整定位装置 |
-
2016
- 2016-06-22 CN CN201610452887.7A patent/CN106120850A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100313721B1 (ko) * | 1998-11-26 | 2001-12-28 | 김징완 | 가설흙막이구조물을이용한합성지하옹벽설계방법및건축물지하옹벽공사방법 |
CN101691724A (zh) * | 2009-09-17 | 2010-04-07 | 西南交通大学 | 高速铁路无砟轨道液化土地基抗震路桥过渡段构造 |
CN202194037U (zh) * | 2011-08-26 | 2012-04-18 | 中铁一局集团有限公司 | 高速铁路无砟道岔横向调整定位装置 |
Non-Patent Citations (1)
Title |
---|
李浩: "高速铁路无砟轨道路肩桩板墙侧向位移特征及状态控制设计方法研究", 《中国博士学位论文全文数据库(工程科技Ⅱ辑)》 * |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107447774A (zh) * | 2017-06-21 | 2017-12-08 | 中铁二院工程集团有限责任公司 | 双排桩基悬臂式挡土墙整体稳定性计算方法 |
CN109902320A (zh) * | 2017-12-07 | 2019-06-18 | 中铁二院工程集团有限责任公司 | 一种陡坡路基椅式桩锚固深度设计计算方法 |
CN109902320B (zh) * | 2017-12-07 | 2023-04-07 | 中铁二院工程集团有限责任公司 | 一种陡坡路基椅式桩锚固深度设计计算方法 |
CN111274695B (zh) * | 2020-01-17 | 2022-11-18 | 中铁二院工程集团有限责任公司 | 一种高速铁路路肩桩板墙结构的设计方法 |
CN111274695A (zh) * | 2020-01-17 | 2020-06-12 | 中铁二院工程集团有限责任公司 | 一种高速铁路路肩桩板墙结构的设计方法 |
CN111199070A (zh) * | 2020-01-27 | 2020-05-26 | 贵州星隆迪岩土工程有限公司 | 桩托二层挡土墙的设计方法 |
CN111199070B (zh) * | 2020-01-27 | 2024-04-26 | 贵州星隆迪岩土工程有限公司 | 桩托二层挡土墙的设计方法 |
CN111539051A (zh) * | 2020-03-16 | 2020-08-14 | 中铁二院工程集团有限责任公司 | 一种架空式桩板结构的三维静力计算方法 |
CN111678810A (zh) * | 2020-06-18 | 2020-09-18 | 西南交通大学 | 一种基于直剪试验的压实土水平残余应力的估算方法 |
CN111678810B (zh) * | 2020-06-18 | 2021-11-09 | 西南交通大学 | 一种基于直剪试验的压实土水平残余应力的估算方法 |
CN113047335A (zh) * | 2021-04-18 | 2021-06-29 | 中铁二院工程集团有限责任公司 | 一种铁路路肩挡土墙墙顶位移控制标准的确定方法 |
CN113378283B (zh) * | 2021-07-01 | 2022-10-04 | 中铁二院工程集团有限责任公司 | 锚固点增强型桩结构计算方法 |
CN113378283A (zh) * | 2021-07-01 | 2021-09-10 | 中铁二院工程集团有限责任公司 | 锚固点增强型桩结构计算方法 |
CN114372302A (zh) * | 2021-11-24 | 2022-04-19 | 中铁二院工程集团有限责任公司 | 时速400km+高速铁路路肩重力式挡土墙设计方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106120850A (zh) | 一种高速铁路无砟轨道桩板式挡土墙的设计方法 | |
US20140314497A1 (en) | Polymer grouting method for constructing gravel pile | |
CN100371537C (zh) | 加固深厚软基的砼芯砂石桩复合地基法 | |
CN102518135A (zh) | 水平旋喷土锚和灌注桩复合基坑支护施工工法 | |
Wang et al. | Working characteristics of concrete-cored deep cement mixing piles under embankments | |
CN107604770A (zh) | 无砟轨道低路堤基底膨胀土桩基加固后隆起量的确定方法 | |
Le Kouby et al. | Subgrade improvement method for existing railway lines–an experimental and numerical study | |
Finno et al. | Saturated clay response during braced cut construction | |
CN107841908A (zh) | 用于消除高速铁路陡坡高路堤横向差异沉降的路基结构 | |
CN208293531U (zh) | 一种可控制差异沉降的微型桩土组合结构 | |
Zhan et al. | Design method of pile-slab structure roadbed of ballastless track on soil subgrade | |
Zhang et al. | Field study on performance of new technique of geosynthetic-reinforced and pile-supported embankment at bridge approach | |
CN106096307B (zh) | 台背加筋治理桥头跳车病害的土工格栅铺筑间隔的计算方法 | |
CN102433887A (zh) | 一种砂置换型搅拌桩防渗墙的施工方法 | |
CN206052770U (zh) | 一种使用钻孔灌注桩结合压密注浆的挡土墙 | |
CN111395062B (zh) | 一种等载置换轻质土帮宽路基结构、设计及施工方法 | |
CN111676740B (zh) | 路堑地段无砟轨道抗上拱路基结构的施工及设计方法 | |
Wei et al. | Design parameter optimization of beam foundation on soft soil layer with nonlinear finite element | |
Chunshan et al. | Selection of reasonable scheme of entering into a working well in shield construction | |
Karlsrud | Geotechnical Engineering for Transportation Infrastructure, Barends et al.(eds)© 1999 Balkema, Rotterdam, ISBN 90 5809 047 7 | |
Grindheim et al. | Full-scale pullout tests of rock anchors in limestone testing rock mass uplift failure | |
Guo et al. | Numerical Simulation of New Support Structure for High In-Situ Stress Tunnel of Sichuan—Tibet Railway | |
Heitz et al. | Embankment project on soft subsoil with grouted stone columns and geogrids | |
Gautray | Influence of smear and compaction zones on the performance of stone columns in lacustrine clay | |
Bukowski et al. | Influence of mechanical pre-consolidation of soil on the assessment of stress level in geotechnical practice |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20161116 |