CN107604770A - 无砟轨道低路堤基底膨胀土桩基加固后隆起量的确定方法 - Google Patents

无砟轨道低路堤基底膨胀土桩基加固后隆起量的确定方法 Download PDF

Info

Publication number
CN107604770A
CN107604770A CN201710819589.1A CN201710819589A CN107604770A CN 107604770 A CN107604770 A CN 107604770A CN 201710819589 A CN201710819589 A CN 201710819589A CN 107604770 A CN107604770 A CN 107604770A
Authority
CN
China
Prior art keywords
mrow
msub
pile foundation
sigma
swelled ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710819589.1A
Other languages
English (en)
Other versions
CN107604770B (zh
Inventor
陈伟志
李安洪
龚建辉
王智猛
姚裕春
周成
叶世斌
郭在旭
孙晓
向俐蓉
李高明
任华锋
曾锐
付铭川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201710819589.1A priority Critical patent/CN107604770B/zh
Publication of CN107604770A publication Critical patent/CN107604770A/zh
Application granted granted Critical
Publication of CN107604770B publication Critical patent/CN107604770B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

无砟轨道低路堤基底膨胀土桩基加固后隆起量的确定方法,以为无砟轨道低路堤基底膨胀土桩基加固设计提供支撑,使膨胀土桩基加固设计更有针对性,从而有效提高膨胀土地基抗隆起加固效果。包括以下步骤:通过实际取样实测或调查,确定膨胀土地基的大气影响深度或浸水影响深度l,单位m;通过现场实际勘察,确定加固桩基的中性点深度l0,单位m,所述中性点为地基土的隆起量与加固基桩的上拔量相等的位置;通过以下公式确定无砟轨道低路堤基底膨胀土桩基加固后隆起量se s e = Σ i = 1 n Δs e i = Σ i = 1 n - C s i H i 1 + e 0 i l o g [ σ y 0 + ( 1 - m ) σ s f + Δσ y + σ u σ y 0 + ( 1 - m ) σ s 0 ] i .

Description

无砟轨道低路堤基底膨胀土桩基加固后隆起量的确定方法
技术领域
本发明涉及高速铁路无砟轨道路基技术领域,特别涉及无砟轨道低路堤基底膨胀土桩基加固后隆起量的确定。
技术背景
伴随着高速铁路作为中国一张名片走出国门的到来,高速铁路勘察设计的设计理论、计算方法、设计流程極需加以配套完备,以便提高中国高速铁路在海外市场的竞争力。高速无砟轨道对变形控制要求严格,隆起或下沉变形均会造成线路不平顺性加剧,加大高速铁路后期维护工作量,甚至可能危及高速列车正常运营,引发重大安全事故。
在工程建设中,膨胀土大都属于非饱和土范畴,在大气降雨或外界渗水条件下,非饱和膨胀土吸水产生隆起变形。低路堤基底膨胀土隆起变形极易导致路基面隆起,引发无砟轨道板开裂,造成重大无砟轨道病害。目前,在减弱或消除无砟轨道低路堤基底膨胀土隆起变形方面,桩基加固是一种常用的方法之一,所述桩基包括CFG桩、水泥搅拌桩、素混凝土桩、钢筋混凝土桩等。然而,桩基加固膨胀土的工作机理及加固后地基隆起变形量的确定尚不明确,也缺乏相应的计算理论作为支撑,在面对国内外咨询专家质询时难以有效响应。因此,针对上述面临的难题,有必要提出一种无砟轨道低路堤基底膨胀土桩基加固后隆起量的确定方法,为膨胀土区域桩基加固措施提供理论计算支撑。
发明内容
本发明所要解决的技术问题是提供一种无砟轨道低路堤基底膨胀土桩基加固后隆起量的确定方法,以为无砟轨道低路堤基底膨胀土桩基加固设计提供支撑,使膨胀土桩基加固设计更有针对性,从而有效提高膨胀土地基抗隆起加固效果。
本发明解决上述技术所采用的技术方案如下:
本发明的一种无砟轨道低路堤基底膨胀土桩基加固后隆起量的确定方法,包括以下步骤:
①通过实际取样实测或调查,确定膨胀土地基的大气影响深度或浸水影响深度l,单位m;通过现场实际勘察,确定加固桩基的中性点深度l0,单位m,所述中性点为地基土的隆起量与加固基桩的上拔量相等的位置。
②通过以下公式确定无砟轨道低路堤基底膨胀土桩基加固后隆起量se
式中,se为桩基加固后低路堤基底膨胀土的隆起量,单位mm;Δsei为桩基加固后低路堤基底第i层土的隆起量,单位mm;Csi为第i层土的膨胀指数;Hi为第i层土的分层厚度,单位m;e0i为干旱季节第i层土的初始孔隙比;σy0为原位净上覆应力,单位kPa;m为桩土面积置换率;σs0为干旱季节天然非饱和膨胀土的初始膨胀力,单位kPa;σsf为外界降雨或浸水作用后天然非饱和膨胀土的剩余膨胀力,单位kPa;Δσy为低路堤填土产生的总应力变化,单位kPa。σu为桩基加固赋予膨胀土地基的锚固力,单位kPa。
本发明的有益效果是,提出了可行的无砟轨道低路堤基底膨胀土桩基加固后隆起量确定方法,解决了桩基加固膨胀土地基缺乏设计基础的难题,填补了地基处理设计规范的空白,使无砟轨道低路堤基底膨胀土桩基加固设计更有针对性和更为科学,对国内外高速无砟铁路设计具有重要的指导意义。
附图说明
图1是本发明无砟轨道低路堤基底膨胀土桩基加固的横断面图。
图中示出构件和对应的标记:低路堤1,桩基2,膨胀土D。
具体实施方式
下面通过具体的实施例并结合附图进一步说明本发明。
本发明方法通过桩基加固膨胀土的工作机理、应力路径研究,从而得到了低矮路堤荷载作用下桩基加固后膨胀土地基的隆起变形计算公式,适用于无砟轨道低路堤基底膨胀土桩基加固后隆起量的确定。
本发明的无砟轨道低路堤基底膨胀土桩基加固后隆起量的确定方法,包括以下步骤:
①通过实际取样实测或调查,确定膨胀土地基的大气影响深度或浸水影响深度l,单位m;通过现场实际勘察,确定加固桩基的中性点深度l0,单位m,所述中性点为地基土的隆起量与加固基桩的上拔量相等的位置。
②通过以下公式确定无砟轨道低路堤基底膨胀土桩基加固后隆起量se
式中,se为桩基加固后低路堤基底膨胀土的隆起量,单位mm;Δsei为桩基加固后低路堤基底第i层土的隆起量,单位mm;Csi为第i层土的膨胀指数;Hi为第i层土的分层厚度,单位m;e0i为干旱季节第i层土的初始孔隙比;σy0为原位净上覆应力,单位kPa;m为桩土面积置换率;σs0为干旱季节天然非饱和膨胀土的初始膨胀力,单位kPa;σsf为外界降雨或浸水作用后天然非饱和膨胀土的剩余膨胀力,单位kPa;Δσy为低路堤填土产生的总应力变化,单位kPa;σu为桩基加固赋予膨胀土地基的锚固力,单位kPa。
所述步骤(2)中,桩土面积置换率m可通过以下公式确定
式中,Ap为桩的平均截面积,单位m2;Ae为单桩所承担的处理地基面积,单位m2
所述步骤(2)中,第i层土的膨胀指数Csi、干旱季节第i层土的初始孔隙比e0i、原位净上覆应力σy0、干旱季节天然非饱和膨胀土的初始膨胀力σs0、外界降雨或浸水作用后天然非饱和膨胀土的剩余膨胀力σsf、桩基加固赋予地基的锚固力σu是通过现场地质钻孔调查及室内土工测试确定。
所述步骤(2)中,低路堤填土产生的总应力变化Δσy是通过Boussinesq理论计算确定。
实施例:
参照图1,南昆客运专线某一低路堤1填筑高度为2.70m,膨胀土D地基上低路堤1顶面宽度为13.4m,低路堤1边坡比为1:1.5。该低路堤1基底膨胀土D地基具有中-强膨胀势,基底隆起变形极易导致低路堤1顶面产生上升位移,导致无砟轨道板开裂,影响线路平顺性。
为减弱该低路堤1基底隆起变形,拟采用桩基2进行地基加固,所述桩基2包括CFG桩、水泥搅拌桩、素混凝土桩、钢筋混凝土桩等,所述桩基2按正方形布置、桩间距1.2m、桩径0.5m、桩长6m。下面对桩基2加固的低路堤1基底膨胀土D的隆起量进行确定,具体步骤如下:
①通过实际取样实测,确定膨胀土D地基的浸水影响深度l为4.5m;通过现场实际勘察,确定加固基桩2的中性点深度l0为3.0m。
②通过以下公式确定无砟轨道低路堤1基底膨胀土D桩基2加固后隆起量se
式中,se为桩基2加固后低路堤1基底膨胀土D的隆起量,单位mm;Δsei为桩基2加固后低路堤1基底第i层土的隆起量,单位mm;Csi为第i层土的膨胀指数;Hi为第i层土的分层厚度,单位m;e0i为干旱季节第i层土的初始孔隙比;σy0为原位净上覆应力,单位kPa;m为桩土面积置换率;σs0为干旱季节天然非饱和膨胀土D的初始膨胀力,单位kPa;σsf为外界降雨或浸水作用后天然非饱和膨胀土D的剩余膨胀力,单位kPa;Δσy为低路堤1填土产生的总应力变化,单位kPa。σu为桩基2加固赋予膨胀土D地基的锚固力,单位kPa。
所述步骤(2)中,第i层土的膨胀指数Csi、干旱季节第i层土的初始孔隙比e0i、原位净上覆应力σy0、干旱季节天然非饱和膨胀土D的初始膨胀力σs0、外界降雨或浸水作用后天然非饱和膨胀土D的剩余膨胀力σsf、桩基2加固赋予膨胀土D地基的锚固力σu是通过现场地质钻孔调查及室内土工测试,确定,结果见表1。
所述步骤(2)中,桩土面积置换率m是通过以下公式确定
式中,Ap为桩的平均截面积,单位m2;Ae为单桩所承担的处理地基面积,单位m2;d为桩径,单位m;s为桩间距,单位m。
所述步骤(2)中,无砟轨道低路堤1基底第i层土的隆起量Δsei的详细计算过程见表1,表1计算过程中若Δsei<0时,Δsei取0。
据表1,可得无砟轨道低路堤1基底膨胀土D桩基2加固后隆起量se
依次可得该低路堤1基桩2加固后基底膨胀土D的隆起量为3.21mm。
表1低路堤1基底隆起变形计算
本发明方法适用于高速无砟铁路、高速有咋铁路、高速公路、高速磁悬浮低路堤1桩基2加固后基底膨胀土D隆起量的确定。
以上所述只是采用图解说明本发明无砟轨道低路堤基底膨胀土桩基加固后隆起量的确定方法的一些原理,并非是要将本发明局限在所示和所述方法和适用范围内,故凡是所有可能被利用的相应修改,均属于本发明所申请的专利范围。

Claims (2)

1.无砟轨道低路堤基底膨胀土桩基加固后隆起量的确定方法,包括以下步骤:
①通过实际取样实测或调查,确定膨胀土(D)地基的大气影响深度或浸水影响深度l,单位m;通过现场实际勘察,确定加固桩基(2)的中性点深度l0,单位m;
②通过以下公式确定无砟轨道低路堤(1)基底膨胀土(D)桩基(2)加固后隆起量se
<mrow> <msub> <mi>s</mi> <mi>e</mi> </msub> <mo>=</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>n</mi> </munderover> <msub> <mi>&amp;Delta;s</mi> <mrow> <mi>e</mi> <mi>i</mi> </mrow> </msub> <mo>=</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>n</mi> </munderover> <mfrac> <mrow> <mo>-</mo> <msub> <mi>C</mi> <mrow> <mi>s</mi> <mi>i</mi> </mrow> </msub> <msub> <mi>H</mi> <mi>i</mi> </msub> </mrow> <mrow> <mn>1</mn> <mo>+</mo> <msub> <mi>e</mi> <mrow> <mn>0</mn> <mi>i</mi> </mrow> </msub> </mrow> </mfrac> <mi>log</mi> <msub> <mrow> <mo>&amp;lsqb;</mo> <mfrac> <mrow> <msub> <mi>&amp;sigma;</mi> <mrow> <mi>y</mi> <mn>0</mn> </mrow> </msub> <mo>+</mo> <mrow> <mo>(</mo> <mn>1</mn> <mo>-</mo> <mi>m</mi> <mo>)</mo> </mrow> <msub> <mi>&amp;sigma;</mi> <mrow> <mi>s</mi> <mi>f</mi> </mrow> </msub> <mo>+</mo> <msub> <mi>&amp;Delta;&amp;sigma;</mi> <mi>y</mi> </msub> <mo>+</mo> <msub> <mi>&amp;sigma;</mi> <mi>u</mi> </msub> </mrow> <mrow> <msub> <mi>&amp;sigma;</mi> <mrow> <mi>y</mi> <mn>0</mn> </mrow> </msub> <mo>+</mo> <mrow> <mo>(</mo> <mn>1</mn> <mo>-</mo> <mi>m</mi> <mo>)</mo> </mrow> <msub> <mi>&amp;sigma;</mi> <mrow> <mi>s</mi> <mn>0</mn> </mrow> </msub> </mrow> </mfrac> <mo>&amp;rsqb;</mo> </mrow> <mi>i</mi> </msub> </mrow>
式中,se为桩基(2)加固后低路堤(1)基底膨胀土(D)的隆起量,单位mm;Δsei为桩基(2)加固后低路堤(1)基底第i层土的隆起量,单位mm;Csi为第i层土的膨胀指数;Hi为第i层土的分层厚度,单位m;e0i为干旱季节第i层土的初始孔隙比;σy0为原位净上覆应力,单位kPa;m为桩土面积置换率;σs0为干旱季节天然非饱和膨胀土(D)的初始膨胀力,单位kPa;σsf为外界降雨或浸水作用后天然非饱和膨胀土(D)的剩余膨胀力,单位kPa;Δσy为低路堤(1)填土产生的总应力变化,单位kPa。σu为桩基(2)加固赋予膨胀土(D)地基的锚固力,单位kPa。
2.根据权利要求1所述的无砟轨道低路堤基底膨胀土桩基加固后隆起量的确定方法,其特征在于:所述步骤(2)中,所述第i层土的膨胀指数Csi、干旱季节第i层土的初始孔隙比e0i、原位净上覆应力σy0、干旱季节天然非饱和膨胀土(D)的初始膨胀力σs0、外界降雨或浸水作用后天然非饱和膨胀土(D)的剩余膨胀力σsf、桩基(2)加固赋予膨胀土(D)地基的锚固力σu是通过现场地质钻孔调查及室内土工测试确定。
CN201710819589.1A 2017-09-13 2017-09-13 无砟轨道低路堤基底膨胀土桩基加固后隆起量的确定方法 Active CN107604770B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710819589.1A CN107604770B (zh) 2017-09-13 2017-09-13 无砟轨道低路堤基底膨胀土桩基加固后隆起量的确定方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710819589.1A CN107604770B (zh) 2017-09-13 2017-09-13 无砟轨道低路堤基底膨胀土桩基加固后隆起量的确定方法

Publications (2)

Publication Number Publication Date
CN107604770A true CN107604770A (zh) 2018-01-19
CN107604770B CN107604770B (zh) 2019-04-12

Family

ID=61063045

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710819589.1A Active CN107604770B (zh) 2017-09-13 2017-09-13 无砟轨道低路堤基底膨胀土桩基加固后隆起量的确定方法

Country Status (1)

Country Link
CN (1) CN107604770B (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108589434A (zh) * 2018-05-07 2018-09-28 中铁二院工程集团有限责任公司 一种路基底部膨胀土复合桩基的抗隆起设计方法
CN108647424A (zh) * 2018-05-07 2018-10-12 中铁二院工程集团有限责任公司 一种抗隆起复合加筋桩竖向土工格栅抗拉力的确定方法
CN108914909A (zh) * 2018-07-24 2018-11-30 中铁二院工程集团有限责任公司 一种盐渍土地基盐胀量的测算方法
CN108999221A (zh) * 2018-05-07 2018-12-14 中铁二院工程集团有限责任公司 一种地基隆起作用下路基填土消能系数的测算方法
CN109086513A (zh) * 2018-07-24 2018-12-25 中铁二院工程集团有限责任公司 一种膨胀土路堑基床底部隆起量的测算方法
CN110457636A (zh) * 2018-05-07 2019-11-15 中铁二院工程集团有限责任公司 一种长短微型桩加固膨胀土地基后路基基底隆起量的确定方法
CN111155369A (zh) * 2020-02-11 2020-05-15 中铁二院工程集团有限责任公司 一种无砟轨道基床结构及其条形基础宽度的确定方法
CN111395064A (zh) * 2020-03-25 2020-07-10 中铁二院工程集团有限责任公司 一种抗隆起u型路基结构及其设计方法
CN113089636A (zh) * 2021-04-25 2021-07-09 中铁二院工程集团有限责任公司 一种膨胀土地基路堤桩板墙的加固桩设计方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5796123A (en) * 1980-12-08 1982-06-15 Aijietsuku Kk Soil stirring shaft with casing and stabilization work for soft ground
JPH0827463A (ja) * 1994-07-14 1996-01-30 Serutetsuku Plan Kk 軟弱地盤強化パイル基礎工法
CN104693413A (zh) * 2015-03-24 2015-06-10 中国铁道科学研究院铁道建筑研究所 一种用于高速铁路无砟轨道结构沉降修复的聚氨酯修补材料
CN105181204A (zh) * 2015-09-08 2015-12-23 长沙理工大学 膨胀土侧向膨胀力综合测试装置
CN105868484A (zh) * 2016-04-11 2016-08-17 中铁二院工程集团有限责任公司 膨胀土地基胀缩作用下无砟轨道低矮路堤顶面升降量计算方法
CN106934145A (zh) * 2017-03-08 2017-07-07 中铁二院工程集团有限责任公司 无砟轨道膨胀岩土路堑及低路堤基底最小换填厚度的确定方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5796123A (en) * 1980-12-08 1982-06-15 Aijietsuku Kk Soil stirring shaft with casing and stabilization work for soft ground
JPH0827463A (ja) * 1994-07-14 1996-01-30 Serutetsuku Plan Kk 軟弱地盤強化パイル基礎工法
CN104693413A (zh) * 2015-03-24 2015-06-10 中国铁道科学研究院铁道建筑研究所 一种用于高速铁路无砟轨道结构沉降修复的聚氨酯修补材料
CN105181204A (zh) * 2015-09-08 2015-12-23 长沙理工大学 膨胀土侧向膨胀力综合测试装置
CN105868484A (zh) * 2016-04-11 2016-08-17 中铁二院工程集团有限责任公司 膨胀土地基胀缩作用下无砟轨道低矮路堤顶面升降量计算方法
CN106934145A (zh) * 2017-03-08 2017-07-07 中铁二院工程集团有限责任公司 无砟轨道膨胀岩土路堑及低路堤基底最小换填厚度的确定方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
范臻辉等: "膨胀土地基中桩荷载传递规律的解析分析", 《铁道科学与工程学报》 *
黄华县,张春顺: "膨胀土膨胀变形时程特性研究", 《湖南工业大学学报》 *

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108647424A (zh) * 2018-05-07 2018-10-12 中铁二院工程集团有限责任公司 一种抗隆起复合加筋桩竖向土工格栅抗拉力的确定方法
CN108999221A (zh) * 2018-05-07 2018-12-14 中铁二院工程集团有限责任公司 一种地基隆起作用下路基填土消能系数的测算方法
CN110457636A (zh) * 2018-05-07 2019-11-15 中铁二院工程集团有限责任公司 一种长短微型桩加固膨胀土地基后路基基底隆起量的确定方法
CN108589434A (zh) * 2018-05-07 2018-09-28 中铁二院工程集团有限责任公司 一种路基底部膨胀土复合桩基的抗隆起设计方法
CN110457636B (zh) * 2018-05-07 2022-09-16 中铁二院工程集团有限责任公司 一种长短微型桩加固膨胀土地基后路基基底隆起量的确定方法
CN109086513B (zh) * 2018-07-24 2022-05-10 中铁二院工程集团有限责任公司 一种膨胀土路堑基床底部隆起量的测算方法
CN108914909A (zh) * 2018-07-24 2018-11-30 中铁二院工程集团有限责任公司 一种盐渍土地基盐胀量的测算方法
CN109086513A (zh) * 2018-07-24 2018-12-25 中铁二院工程集团有限责任公司 一种膨胀土路堑基床底部隆起量的测算方法
CN111155369A (zh) * 2020-02-11 2020-05-15 中铁二院工程集团有限责任公司 一种无砟轨道基床结构及其条形基础宽度的确定方法
CN111155369B (zh) * 2020-02-11 2024-06-04 中铁二院工程集团有限责任公司 一种无砟轨道基床结构及其条形基础宽度的确定方法
CN111395064B (zh) * 2020-03-25 2021-04-27 中铁二院工程集团有限责任公司 一种抗隆起u型路基结构及其设计方法
CN111395064A (zh) * 2020-03-25 2020-07-10 中铁二院工程集团有限责任公司 一种抗隆起u型路基结构及其设计方法
CN113089636A (zh) * 2021-04-25 2021-07-09 中铁二院工程集团有限责任公司 一种膨胀土地基路堤桩板墙的加固桩设计方法

Also Published As

Publication number Publication date
CN107604770B (zh) 2019-04-12

Similar Documents

Publication Publication Date Title
CN107604770B (zh) 无砟轨道低路堤基底膨胀土桩基加固后隆起量的确定方法
Greenwood Load tests on stone columns
Zhao et al. Application of construction waste in the reinforcement of soft soil foundation in coastal cities
CN102425082A (zh) 高速铁路岩溶强烈发育车站道岔区路基加固构造
WO2021072941A1 (zh) 一种滨海淤泥软土地基二次强夯碎石置换加固方法
CN102519811A (zh) 强度衰减路基变形和应力变化规律试验模型及试验方法
CN108108507B (zh) 一种高强土工布加固铁路岩溶路基的设计方法
Huang et al. Geogrid-reinforced pile-supported railway embankments: A three-dimensional numerical analysis
CN202372418U (zh) 强度衰减路基变形和应力变化规律试验模型
CN102031743A (zh) 泥岩填筑路堤的施工方法
Gao et al. Bearing Capacity Characteristics of Compacted Cement Stabilized Gravel Pile Composite Foundation
De Wit et al. Full scale test on environmental impact of diaphragm wall trench installation in Amsterdam-the final results
Karunawardena et al. Performance of highway embankments constructed over Sri Lankan peaty soils
Budania et al. Experimental study of rectangular footing resting over geo-grid reinforced sand
CN108049438A (zh) 一种无砟轨道路基基底膨胀土中抗隆起桩基的锚固力测算方法
CN106703013A (zh) 用于处治已建黄土路基沉陷病害的隔水帷幕
Morgan The influence of variation in effective stress on the serviceability of soil nailed slopes
Derghoum et al. Coupled finite element modelling of geosynthetic reinforced embankment slope on soft soils considering small and large displacement analyses
Hoppe et al. Performance of a pile-supported embankment.
Özkeskin Settlement reduction and stress concentration factors in rammed aggregate piers determined from full-scale load tests
Nodine et al. I-690 Syracuse: Rigid Inclusion Design and Performance Monitoring for an MSE Wall Viaduct Replacement
Allen et al. Use of stone columns to support I-90 cut and cover tunnel
CN101387096A (zh) 一种高速公路填筑稳定路基的控制方法
Saye et al. Analysis of geotechnical instrumentation to assess foundation performance of I-15
Zhan Settlement Prediction Method of Bridge Pile Foundation on Soft Soil Foundation Based on Hyperbolic Method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant