CN106120822A - A kind of method for protecting support preventing mud stone from coming down and device - Google Patents

A kind of method for protecting support preventing mud stone from coming down and device Download PDF

Info

Publication number
CN106120822A
CN106120822A CN201610699637.3A CN201610699637A CN106120822A CN 106120822 A CN106120822 A CN 106120822A CN 201610699637 A CN201610699637 A CN 201610699637A CN 106120822 A CN106120822 A CN 106120822A
Authority
CN
China
Prior art keywords
slope
drain pipe
anchor pole
concrete cavity
mud stone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610699637.3A
Other languages
Chinese (zh)
Other versions
CN106120822B (en
Inventor
欧阳章智
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Construction Engineering Eighth Construction Group Co ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201610699637.3A priority Critical patent/CN106120822B/en
Publication of CN106120822A publication Critical patent/CN106120822A/en
Application granted granted Critical
Publication of CN106120822B publication Critical patent/CN106120822B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
    • E02D3/103Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains by installing wick drains or sand bags
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/76Anchorings for bulkheads or sections thereof in as much as specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/30Miscellaneous comprising anchoring details

Abstract

The invention discloses a kind of method for protecting support preventing mud stone from coming down and device, design excavation line is located at beyond the outer abutment wall 2M of distance building on the top of slope and locates by the present invention;From top to bottom being put slope, slope ratio excavated by design requirement during construction, every 1.5m of excavation downwards suspends excavation, and this layer carries out interim suspension roof support, and squeezes into drain pipe in the body of slope and carry out drainage sunk well;To limit excavation limit supporting and draining until reaching at the bottom of slope under successively;Then excavating foundation trench at the bottom of slope, foundation trench outer wall is concreting body, utilizes the mud stone material excavated to be filled with compacting in foundation trench;On foundation trench, use the mode constructing concrete cavity of placement layer by layer afterwards, and tamp in being filled in cavity with mud stone material, until top, slope;Finally anchor pole and drain pipe are fixed outside concrete cavity.Present configuration is simple, cost is relatively low, waste is few, security performance is high, constructing operation is quick.

Description

A kind of method for protecting support preventing mud stone from coming down and device
Technical field
The present invention relates to a kind of method for protecting support preventing mud stone from coming down and device, belong to civil engineering support engineering technical field.
Background technology
Southwestern China area is widely distributed mud stone.Mud stone has the feature of easy-weathering, aquation.Mud stone intensity after air slaking Significantly reduce, the geological disaster such as avalanche and shallow failure easily occurs.Along with developing rapidly of China's economy, the most all kinds of civil engineering works Journey is throughout whole southwest, and in civil engineering area, Daxing, Artificial Side-slope is difficult to avoid that with the generation on landslide.All kinds of In civil engineering, Artificial Side-slope and landslide engineering frequently involve to be needed to ensure top, slope existing building safety problem, especially for mud Rock side slope is this is that the form of the non-rock of rock should more be paid attention to, and the safety of the whole engineering of guarantee advances.But, existing mud The protection on rockslide slope or support pattern still can not meet the needs producing and constructing.
Summary of the invention
It is an object of the invention to, it is provided that a kind of simple in construction, cost is relatively low, security performance is high, constructing operation efficiently Prevent method for protecting support and device that mud stone comes down, to overcome the deficiencies in the prior art.
The technical scheme is that and be achieved in that:
A kind of method for protecting support preventing mud stone from coming down of the present invention is that design excavation line is located at outside distance building on the top of slope by the method Locate beyond abutment wall 2M;From top to bottom putting slope, slope ratio by design requirement during construction to excavate, every 1.5m of excavation downwards suspends excavation, This layer is carried out interim suspension roof support, and in the body of slope, squeezes into drain pipe carry out drainage sunk well;To limit excavation limit supporting under successively With draining until reaching at the bottom of slope;Then excavating foundation trench at the bottom of slope, foundation trench outer wall is concreting body, utilizes excavation to get off in foundation trench Mud stone material be filled with compacting;On foundation trench, use the mode constructing concrete cavity of placement layer by layer afterwards, and use mud stone Material is filled in compacting in cavity, until top, slope;Finally anchor pole and drain pipe are fixed outside concrete cavity.
In preceding method, downward-sloping about 15 degree of described anchor pole is squeezed in the body of slope, uses determinant arrangement mode, anchor pole Anyhow it is 1.5m to spacing;Anchor pole anchors in using full bonding mode and slope;When carrying out interim suspension roof support, anchor pole exposes length Degree is it is ensured that anchor pole can run through concrete cavity, and guarantees that anchor pole is reliably fixed.
In preceding method, described drain pipe is inclined upwardly and squeezes in the body of slope, and drain pipe end in depth descends Shuifu County to collect as far as possible Position, drain pipe uses plum blossom-shaped arrangement mode, and between drain pipe, spacing is 2~3m;Drain pipe employing caliber is 100mmPVC draining floral tube, drain pipe protruded length is it is ensured that concrete cavity can be run through, and stretches out outside concrete cavity.
In preceding method, described drain pipe stretches out the lower section outside the concrete cavity at place and is provided with planting groove, in planting groove It is filled with to plough and plants soil, plough and plant plantation vine plant in soil.
In preceding method, described slope height is not more than 12m.
According to a kind of suspension device preventing mud stone from coming down of the present invention that said method is constituted, including side slope and side slope top The building in portion;Distance skin 2 meters, to be externally provided with design excavation line, is close to design excavation line and is provided with concrete cavity, It is provided with outside concrete cavity and runs through concrete cavity and stretch into anchor pole and drain pipe, the anchor pole downward-sloping 15 of shale layer in side slope Degree stretches into shale layer, and drain pipe is inclined upwardly and stretches into the subsoil water enrichment positions of shale layer;Foundation trench it is provided with bottom concrete cavity, Mud stone backfill soil it is filled with in foundation trench and concrete cavity;It is provided with planting groove below at concrete cavity outboard row pipe outlet, It is filled with in planting groove to plough and plants soil, plough kind in planting soil and be implanted with vine plant.
In aforementioned means, described side slope distance from top terrace absolute altitude is not more than 12M;Bottom described concrete cavity and foundation trench It is positioned at below terrace absolute altitude.
In aforementioned means, described anchor pole uses determinant arrangement mode, and anchor pole is 1.5m to spacing anyhow;Anchor pole and limit It is perfused with binding agent between shale layer in slope.
In aforementioned means, described drain pipe uses plum blossom-shaped arrangement mode, and the spacing between drain pipe is 2~3m;Row Water pipe uses caliber to be 100mmPVC draining floral tube.
Owing to have employed technique scheme, compared with prior art, the present invention utilizes excavation mud stone self to the present invention Strength characteristics, uses concrete cavity to carry out being wrapped to form a kind of reliable antiskid retaining wall of stress, with anchor pole, draining floral tube, kind Plant the integral structure of flute profile, have the spies such as simple in construction, cost is relatively low, reduce waste, security performance is high, constructing operation is quick Point, thus ensure the abundant safety of personnel in work progress, and building on the top of slope filling during construction and follow-up use Dividing safety, greening technique meets existing engineering ecology construction demand simultaneously, meets the requirement that national energy-saving reduces discharging.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present invention.
Figure is labeled as: 1-anchor pole, 2-drain pipe, 3-concrete cavity, 4-planting groove, 5-plough plant soil, 6-vine plant, 7-designs excavation line, 8-side slope, 9-building, 10-shale layer.
Detailed description of the invention
The present invention is described in further detail with embodiment below in conjunction with the accompanying drawings, but any not as to the present invention Limit.
A kind of method for protecting support preventing mud stone from coming down of the present invention, as shown in Figure 1: the method design excavation line is located at away from Locate beyond the outer abutment wall 2M of building on the top of slope;From top to bottom put slope, slope ratio by design requirement during construction to excavate, every excavation downwards 1.5m suspends excavation, and this layer carries out interim suspension roof support, and squeezes into drain pipe in the body of slope and carry out drainage sunk well;Under successively to Limit excavation limit supporting and draining are until reaching at the bottom of slope;Then excavating foundation trench at the bottom of slope, foundation trench outer wall is concreting body, in foundation trench The mud stone material excavated is utilized to be filled with compacting;The mode constructing concrete using placement layer by layer afterwards on foundation trench is empty Chamber, and be filled in cavity with mud stone material and tamp, until top, slope;Finally by solid outside anchor pole and drain pipe and concrete cavity Fixed.Downward-sloping about 15 degree of anchor pole is squeezed in the body of slope, uses determinant arrangement mode, and anchor pole is 1.5m to spacing anyhow; Anchor pole anchors in using full bonding mode and slope;When carrying out interim suspension roof support, anchor pole protruded length is it is ensured that anchor pole can pass through Wear concrete cavity, and guarantee that anchor pole is reliably fixed.Drain pipe is inclined upwardly and squeezes in the body of slope, and drain pipe end is the most in depth Lower water enrichment positions, drain pipe uses plum blossom-shaped arrangement mode, and between drain pipe, spacing is 2~3m;Drain pipe uses caliber For 100mmPVC draining floral tube, drain pipe protruded length is it is ensured that concrete cavity can be run through, and stretches out outside concrete cavity. Drain pipe stretches out the lower section outside the concrete cavity at place and is provided with planting groove, is filled with to plough and plants soil, plough to plant in soil and plant in planting groove Plant vine plant.Slope height is not more than 12m.
According to a kind of suspension device preventing mud stone from coming down of the present invention that said method is constituted, as it is shown in figure 1, this device Building 9 including side slope 8 and side slope top;Distance building 9 exterior wall 2 meters, to be externally provided with design excavation line 7, is close to design and is opened Dig line 7 and be provided with concrete cavity 3, be provided with outside concrete cavity 3 and run through concrete cavity 3 and stretch into shale layer 10 in side slope 8 Anchor pole 1 and drain pipe 2, downward-sloping 15 degree of anchor pole 1 stretches into shale layer 10, and drain pipe 2 is inclined upwardly and stretches into the ground of shale layer 10 Lower water enrichment positions;Mud stone backfill soil it is filled with in being provided with foundation trench 7, foundation trench 7 and concrete cavity 3 bottom concrete cavity 3;Mixed It is provided with planting groove 4 below solidifying soil cavity 3 outboard row water pipe 2 exit, is filled with in planting groove 4 to plough and plants soil 5, plough in planting soil 5 and plant It is implanted with vine plant 6.Side slope 8 distance from top terrace absolute altitude is not more than 12M;It is positioned in ground with foundation trench 7 bottom described concrete cavity 3 Below the absolute altitude of level ground.Anchor pole 1 uses determinant arrangement mode, anchor pole 1 to be anyhow 1.5m to spacing;Anchor pole 1 and the mud in side slope It is perfused with binding agent between rock stratum 10.Drain pipe 2 uses plum blossom-shaped arrangement mode, the spacing between drain pipe 2 to be 2~3m; Drain pipe 2 uses caliber to be 100mmPVC draining floral tube.
Embodiment
Side slope 8 height of this example is not more than 12m;Side slope top has been located building 9, building 9 outer abutment wall distance side slope 8 Design excavation line 7 not less than 2m;Side slope is put slope, slope ratio excavated by design requirement from top to bottom, and often excavation 1.5m height is carried out Anchor pole 1 supporting and slope body internal drainage thereof are administered, and complete to carry out next layer of 1.5m excavation after this layer processes again;Anchor pole 1 is by interim Protective treatment, uses the full Grouted bolt of system, and determinant arranges, and is anyhow 1.5m to spacing, and anchor pole inclination angle is 15 degree, anchor pole In the range of 1 exposed parts enters concrete cavity 3;Side slope body internal drainage is administered: built-in 100mmPVC draining floral tube 2, spacing Using 2~3m, plum blossom-shaped is arranged, water enrichment positions is in depth descended in end as far as possible, and outside extend out to outside concrete cavity 3;Treat whole After individual domatic provisional protection completes, excavating foundation trench, outer wall uses concreting, and the mud stone backfill soil of inner utilization excavation is carried out Fill, form ecological supporting architecture basics part, use and be divided into masonry wall body, carry out filling and the pressure of mud stone backfill soil simultaneously Real, eventually form a concrete cavity completed 3, the mud stone backfill soil of inner utilization excavation tamps;Outside concrete cavity 3 Arranging multistage planting groove 4 in side, put into plough and plant soil 5, draining floral tube 2 gos deep into planting groove 4 top, plants vine plant 6, and rattan class is planted Thing preferred oil MATENG.
It is more than a concrete exemplary applications of the present invention, it is also possible to have other embodiment, all employings equivalent to replace Change or the technical scheme of equivalent transformation formation, within being protection domain of the presently claimed invention.

Claims (9)

1. the method for protecting support preventing mud stone from coming down, it is characterised in that: design excavation line is located at top, distance slope and builds by the method Build and locate beyond outer abutment wall 2M;From top to bottom putting slope, slope ratio by design requirement during construction to excavate, every 1.5m of excavation downwards suspends Excavation, carries out interim suspension roof support to this layer, and squeezes into drain pipe in the body of slope and carry out drainage sunk well;To excavation limit, limit under successively Supporting and draining are until reaching at the bottom of slope;Then excavating foundation trench at the bottom of slope, foundation trench outer wall is concreting body, utilizes excavation in foundation trench The mud stone material got off is filled with compacting;On foundation trench, use the mode constructing concrete cavity of placement layer by layer afterwards, and use Mud stone material is filled in compacting in cavity, until top, slope;Finally anchor pole and drain pipe are fixed outside concrete cavity.
Method the most according to claim 1, it is characterised in that: downward-sloping about 15 degree of described anchor pole is squeezed in the body of slope, adopts Using determinant arrangement mode, anchor pole is 1.5m to spacing anyhow;Anchor pole anchors in using full bonding mode and slope;Carry out interim During suspension roof support, anchor pole protruded length is it is ensured that anchor pole can run through concrete cavity, and guarantees that anchor pole is reliably fixed.
Method the most according to claim 1, it is characterised in that: described drain pipe is inclined upwardly and squeezes in the body of slope, draining pipe end Portion in depth descends water enrichment positions as far as possible, and drain pipe uses plum blossom-shaped arrangement mode, and between drain pipe, spacing is 2~3m;Row Water pipe uses caliber to be 100mmPVC draining floral tube, and drain pipe protruded length is it is ensured that concrete cavity can be run through, and stretches out Outside concrete cavity.
Method the most according to claim 1, it is characterised in that: described drain pipe stretches out the lower section outside the concrete cavity at place It is provided with planting groove, is filled with in planting groove to plough and plants soil, plough and plant plantation vine plant in soil.
Method the most according to claim 1, it is characterised in that: described slope height is not more than 12m.
6. prevent the suspension device that mud stone comes down, including the building (9) at side slope (8) and side slope top;It is characterized in that: Distance building (9) exterior wall 2 meters, to be externally provided with design excavation line (7), is close to design excavation line (7) and is provided with concrete cavity (3), Concrete cavity (3) outside is provided with to be run through concrete cavity (3) and stretches into anchor pole (1) and the draining of side slope (8) interior shale layer (10) Pipe (2), downward-sloping 15 degree of anchor pole (1) stretches into shale layer (10), and drain pipe (2) is inclined upwardly and stretches into the underground of shale layer (10) Water enrichment positions;Concrete cavity (3) bottom is filled with mud stone in being provided with foundation trench (7), foundation trench (7) and concrete cavity (3) and returns Banket;It is provided with planting groove (4) below concrete cavity (3) outboard row water pipe (2) exit, is filled with in planting groove (4) to plough and plants Soil (5), ploughs kind in planting soil (5) and is implanted with vine plant (6).
Prevent the suspension device that mud stone comes down the most according to claim 6, it is characterised in that: described side slope (8) distance from top Terrace absolute altitude is not more than 12M;Described concrete cavity (3) bottom and foundation trench (7) are positioned at below terrace absolute altitude.
Prevent the suspension device that mud stone comes down the most according to claim 6, it is characterised in that: described anchor pole (1) uses ranks Formula arrangement mode, anchor pole (1) is 1.5m to spacing anyhow;It is perfused with viscous between shale layer (10) in anchor pole (1) and side slope Knot agent.
Prevent the suspension device that mud stone comes down the most according to claim 6, it is characterised in that: described drain pipe (2) uses prunus mume (sieb.) sieb.et zucc. Flower-shaped arrangement mode, the spacing between drain pipe (2) is 2~3m;Drain pipe (2) uses caliber to be 100mmPVC draining flower Pipe.
CN201610699637.3A 2016-08-23 2016-08-23 A kind of method for protecting support and device that prevent mud stone from coming down Active CN106120822B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610699637.3A CN106120822B (en) 2016-08-23 2016-08-23 A kind of method for protecting support and device that prevent mud stone from coming down

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610699637.3A CN106120822B (en) 2016-08-23 2016-08-23 A kind of method for protecting support and device that prevent mud stone from coming down

Publications (2)

Publication Number Publication Date
CN106120822A true CN106120822A (en) 2016-11-16
CN106120822B CN106120822B (en) 2018-08-14

Family

ID=57279436

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610699637.3A Active CN106120822B (en) 2016-08-23 2016-08-23 A kind of method for protecting support and device that prevent mud stone from coming down

Country Status (1)

Country Link
CN (1) CN106120822B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106818413A (en) * 2016-12-23 2017-06-13 西北农林科技大学 A kind of method of utilization slope underground water irrigated crop
CN107142923A (en) * 2017-05-25 2017-09-08 湖南科鑫电力设计有限公司 Drainpipe and the method that side slope downslide is handled using the drainpipe
CN107386310A (en) * 2017-08-15 2017-11-24 广东工业大学 A kind of building supporting construction and its implementation applied to slope terrain
CN115142442A (en) * 2022-07-20 2022-10-04 万宝矿产有限公司 Large-scale landslide treatment method for solution ditch side slope beside large-diameter pipeline
CN115142442B (en) * 2022-07-20 2024-04-30 万宝矿产有限公司 Large-scale landslide control method for side solution ditch side slope of large-diameter pipeline

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090098476A (en) * 2008-03-14 2009-09-17 이상덕 Soil nailing method and the ground reinforcement structure used soil nailing
CN201746843U (en) * 2010-08-02 2011-02-16 中国水电顾问集团华东勘测设计研究院 High slope supporting and road retaining wall integrated structure
JP2015094169A (en) * 2013-11-13 2015-05-18 共和ハーモテック株式会社 Earth retaining structure and formation method thereof
CN104762978A (en) * 2014-12-26 2015-07-08 浙江省电力设计院 Anchor rod gravity retaining wall for high slope support and manufacturing method
CN206143783U (en) * 2016-08-23 2017-05-03 中国电建集团贵阳勘测设计研究院有限公司 Prevent supporting device on mud stone landslide

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090098476A (en) * 2008-03-14 2009-09-17 이상덕 Soil nailing method and the ground reinforcement structure used soil nailing
CN201746843U (en) * 2010-08-02 2011-02-16 中国水电顾问集团华东勘测设计研究院 High slope supporting and road retaining wall integrated structure
JP2015094169A (en) * 2013-11-13 2015-05-18 共和ハーモテック株式会社 Earth retaining structure and formation method thereof
CN104762978A (en) * 2014-12-26 2015-07-08 浙江省电力设计院 Anchor rod gravity retaining wall for high slope support and manufacturing method
CN206143783U (en) * 2016-08-23 2017-05-03 中国电建集团贵阳勘测设计研究院有限公司 Prevent supporting device on mud stone landslide

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106818413A (en) * 2016-12-23 2017-06-13 西北农林科技大学 A kind of method of utilization slope underground water irrigated crop
CN107142923A (en) * 2017-05-25 2017-09-08 湖南科鑫电力设计有限公司 Drainpipe and the method that side slope downslide is handled using the drainpipe
CN107386310A (en) * 2017-08-15 2017-11-24 广东工业大学 A kind of building supporting construction and its implementation applied to slope terrain
CN115142442A (en) * 2022-07-20 2022-10-04 万宝矿产有限公司 Large-scale landslide treatment method for solution ditch side slope beside large-diameter pipeline
CN115142442B (en) * 2022-07-20 2024-04-30 万宝矿产有限公司 Large-scale landslide control method for side solution ditch side slope of large-diameter pipeline

Also Published As

Publication number Publication date
CN106120822B (en) 2018-08-14

Similar Documents

Publication Publication Date Title
CN105544460B (en) Cast-in-place plant growing type eco-concrete slope protection construction method
CN103774675B (en) Combined double-row-pile combined vertical prestress anchor rod supporting system and construction method thereof
CN104499479B (en) It is a kind of to pass through the dug pile construction method that sand gravel backfills layer
CN105672348A (en) Construction method for cropping bridge pile foundation at sandy gravel stratum of abyssal region
CN105862887A (en) Ecological slope protection structure for ion rare earth mine
CN106948340B (en) A kind of construction method of the Manual excavated pile structure of high polymer grouting protection
CN105239598A (en) Integral sinking construction method for well-type full-automatic stereo garage
CN102605793B (en) Moisture transfer and ecological management method for loess slope
CN110438999A (en) A kind of deep basal pit slope excavation construction method of rich groundwater
CN106640096A (en) Construction method for penetrating through tunnel of backfilling soil section and transition section
CN106703044A (en) Flow-plastic-shaped flushing and filling soil weak stratum sloping combination support method
CN110318410A (en) A kind of deep basal pit chance artesian water is prominent to gush decompression drought stress construction method
CN109594567A (en) A kind of shotcrete protection rock slope ecological safeguard structure arrangement and its method
CN106120822B (en) A kind of method for protecting support and device that prevent mud stone from coming down
CN110080169A (en) A kind of construction method reclaimed fields from the sea utilized based on basement
CN104878719A (en) Mutually-embedded reinforced ecological retaining wall construction method
CN108867673A (en) A kind of underwater prevention method in the foundation pit based on the curtain that draws water
CN210002425U (en) structure of seepage roadbed side slope drainage system
CN206204972U (en) A kind of prefabricated tubular pile as well-points dewatering
CN206143783U (en) Prevent supporting device on mud stone landslide
CN114134877A (en) Treatment method for mining ground cracks of shallow coal seam in hilly area of hilly landform
CN203729309U (en) Support system with combined double-row piles combined with vertical prestressed anchor bolts
CN212077981U (en) Combined slope supporting structure
CN208917850U (en) A kind of miniature steel pipe pile adds grid to spray anchor deep foundation ditch combination supporting scheme system
CN205296182U (en) A punishment device that is used for non - excavation formula excavation side slope hole groove disease

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Ou Yangzhangzhi

Inventor after: Zhang Kenan

Inventor after: Hu Yun

Inventor after: Duan Hao

Inventor after: Guo Ruchun

Inventor after: Li Xuan

Inventor after: Li Hui

Inventor before: Ou Yangzhangzhi

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180511

Address after: 550002 No. 128 North Section of Huaxi orchard, flower orchard, Nanming District, Guiyang, Guizhou

Applicant after: Guizhou Construction Engineering Group eighth Construction Engineering Co., Ltd.

Address before: 550025 Xingshan Lake District, Guiyang, Guizhou Province, No. 16

Applicant before: China Kweiyang survey and design research institute company limited of electricity Jian group

GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 550000 No. 1, floor 11, unit 1, building B, Taisheng international, No. 9, Airport Road, Shuanglong Airport Economic Zone, Guiyang City, Guizhou Province

Patentee after: Guizhou construction engineering eighth Construction Group Co.,Ltd.

Address before: 550002 No. 128 North Section of Huaxi orchard, flower orchard, Nanming District, Guiyang, Guizhou

Patentee before: NO.8 CONSTRUCTION ENGINEERING GROUP CO., LTD. OF GUIZHOU CONSTRUCTION AND ENGINEERING Group