CN105544460B CN201511003711.5A CN201511003711A CN105544460B CN 105544460 B CN105544460 B CN 105544460B CN 201511003711 A CN201511003711 A CN 201511003711A CN 105544460 B CN105544460 B CN 105544460B
Authority
CN
China
Prior art keywords
concrete
construction
cast
slope
place
Prior art date
Application number
CN201511003711.5A
Other languages
Chinese (zh)
Other versions
CN105544460A (en
Inventor
吴金兴
吴晓斌
吴晓峰
Original Assignee
深圳市福田建安建设集团有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 深圳市福田建安建设集团有限公司 filed Critical 深圳市福田建安建设集团有限公司
Priority to CN201511003711.5A priority Critical patent/CN105544460B/en
Publication of CN105544460A publication Critical patent/CN105544460A/en
Application granted granted Critical
Publication of CN105544460B publication Critical patent/CN105544460B/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor

Abstract

The present invention relates to a kind of cast-in-place plant growing type eco-concrete slope protection construction method, mainly including step:Preparation of construction, concrete river bottom protection cast-in-place construction, the construction of slabstone concrete guard wall, lattice stalk cast-in-place construction, anti-impact biology blanket, water balcony construction are installed, the construction of pervious concrete slope wall, concrete for plant growth are poured in assembling frame lattice beam, sash beam, is installed to plant raw coiled material, casting concrete and protect and is pushed up.Protective slope structure speed of application involved in the present invention is fast, while bank protection face comprehensive ecology from top to bottom.

Description

Cast-in-place plant growing type eco-concrete slope protection construction method
Technical field
The present invention relates to a kind of cast-in-place plant growing type eco-concrete protective slope structure construction method.Belong to ground and foundation engineering Field, it is adaptable to which greening requires slope protection works near water that is high, need to taking into account amphibious ecology.
Background technology
River waterway revetment engineering is to protect river bank to attack and wash away taken engineering and arrange from current, stormy waves Apply.The bank protection structure in usual river course mainly has reinforced earth bank protection structure, grouts or placed rockfill bank protection structure, cast-in-place concrete weight Power retaining wall bank protection structure and precast concrete block bank protection structure etc., these bank protection structures are meeting bank protection Functional Requirement Meanwhile, the mass exchange completely cut off between soil and water body destroys the original ecosystem in river loke shore area, causes two packing spaces Property decline, land bank and aquatic animals and plants lose and perch space, and self-purification of water function reduction even completely loses, and what is left is one The gallery of rule grey.
In view of this, possess porous plant-growing type eco-concrete to be increasingly being applied in the protective slope structure of river lake. Plant-growing type eco-concrete bank protection have high intensity, macroporosity, Stability Analysis of Structures, freeze proof melt type it is good, it is effective suppression mound stream The performance characteristics of mistake, adapt to the raw mode of many plantations again, and afforestation coverage rate reaches more than 95%, improves the ecological environment and landscape, can Long duration ecological revetment is realized, however, the conventional greening engineering method supporting with plant-growing type eco-concrete bank protection is such as:Seed Method and turf laying method are disseminated, overburden layer anti-erosion is generally there is(Rainfall, fluctuation of water table, current scour)Ability is weak, nutrition Basic unit's fertilizer conservation and poor water retention property, plant drought and freezing tolerance is low, late maintaining high cost, plant come into force fruit climate factor influence It is big to wait not enough.
Therefore, a kind of efficiency of construction of invention is needed badly at present high, while bank protection face comprehensive ecology from top to bottom, and economic skill The cast-in-place plant growing type eco-concrete protective slope structure that art benefit is protruded.The present invention is by plant-growing type eco-concrete bulkhead tech and fills Note type is planted raw coiled material greening engineering method and is engaged, and has evaded the deficiency of traditional bank and conventional greening engineering method, while pre- using inverted T-shaped Assembled sash girder construction processed, improves domatic efficiency of construction, and ecological anti-in the pervious concrete barricade interlocking-type of side installation near water Block is rushed, amphibious ecology is taken into account, with preferable economic technology benefit.
The content of the invention
It is high it is an object of the invention to provide a kind of efficiency of construction, while bank protection face comprehensive ecology from top to bottom, and warp The cast-in-place plant growing type eco-concrete slope protection construction method that Ji technical benefits is protruded.
To realize above-mentioned technical purpose, present invention employs following technical scheme:
A kind of cast-in-place plant growing type eco-concrete slope protection construction method, it is characterised in that the cast-in-place plant growing type eco is mixed Solidifying soil bank protection mainly includes prefabricated assembled sash beam, plants raw coiled material, pervious concrete slope wall, anti-impact biology blanket, permeable mixed Solidifying soil barricade and ecological erosion control block;Bamboo reinforcement and prestress anchorage cable are provided with prefabricated assembled sash beam, its end is provided with company Connect and be disposed with from bottom to top in anchor pole, sash beam enclosed space bed course, concrete for plant growth and the raw coiled material of plant;In sash beam shield Bottom of slope portion is provided with pervious concrete slope wall, prefabricated assembled sash beam by its internal longitudinal prestressing anchor cable with it is permeable Concrete revetment joist anchor is solidly connected;It is domatic using cast-in-place lattice stalk under water, anti-impact biology blanket, lattice stalk bank protection face bottom are provided with lattice stalk Portion is provided with pervious concrete barricade;The pervious concrete barricade wall back of the body backfills air bubble mix light-textured soil, and side is provided with ecology near water Erosion control block;
The construction method of the cast-in-place plant growing type eco-concrete bank protection, it is characterised in that key step is as follows:
1)Preparation of construction:Construction area is marked according to construction drawing, cofferdam construction is carried out, and removes the mud of basic unit and miscellaneous Matter;
2)Concrete river bottom protection cast-in-place construction:Concrete river bottom protection bottom first pours bed course, then according to drawing supporting module, its In pre-buried feed pipe, Reperfu- sion concrete, finally top install concrete precast block;
3)Slabstone concrete guard wall is constructed:Pervious concrete barricade is built by laying bricks or stones using pervious concrete, and in pervious concrete Side installs ecological erosion control block perpendicular to metope pre-embedded connecting screw rod, on screw rod to barricade near water, using vertical screw rod by ecological erosion control Block connection is integral, while excavating the ground earthen backfill air bubble mix light-textured soil of certain area after wall;
4)Lattice obstruct cast-in-place construction:Domatic below ordinary water level is repaired, according to design specification in domatic formwork, colligation Vertically and horizontally reinforcing bar, pours lattice stalk;
5)Anti-impact biology blanket is installed:After the completion of lattice stalk maintenance, first in the interior laying bed course of lattice stalk, then anti-impact is installed on bed course Biological blanket;
6)Water balcony is constructed:At side slope ordinary water level, by domatic leveling, install permeable after laying certain thickness bed course Property concrete precast block is used as water balcony;
7)Pervious concrete slope wall is constructed:Pervious concrete slope wall uses prefabricated or cast-in-place structural, prefabricated permeable mixed Solidifying soil slope wall is squeezed into using plant equipment block-by-block, and cast-in-place structural first passes through rig pore-forming, irrigates permeable mixed after laying steel reinforcement cage Solidifying earth forming;
8)Assembling frame lattice beam:More than ordinary water level domatic is repaired, block-by-block overlap joint installs prefabricated assembled sash beam, And connect integral by horizontal bamboo reinforcement and longitudinal bamboo reinforcement, and the prestressed anchor cable in horizontal bamboo reinforcement and longitudinal bamboo reinforcement, its The prestress anchorage cable bottom of middle longitudinal bamboo reinforcement anchors with pervious concrete slope wall;
9)Concrete for plant growth is poured in sash beam:After sash beam installation, bed course is laid, then plant is poured in sash beam Growing concrete;
10)Install and plant raw coiled material:Installed on concrete for plant growth and plant raw coiled material, planted raw coiled material and consolidated with sash beam by holdfast It is fixed;
11)Casting concrete shield top:After the completion of above-mentioned construction, the foundation soil of certain depth is excavated on slope top, pour coagulation Soil is used as shield roof construction.
Further, prefabricated assembled sash beam is provided with overlap joint block in end, and connection bolthole is reserved in overlap joint block, Top is provided with holdfast hole;Spaced set has concrete penetrating via to prefabricated assembled sash beam along its length;Prefabricated dress With bamboo reinforcement preformed hole is additionally provided with formula sash beam, bamboo reinforcement is set in hole, prestress anchorage cable is provided with bamboo reinforcement.
Described plant life coiled material is anchored in prefabricated assembled sash back portion using holdfast.
Described pervious concrete slope wall top is provided with inclining anchor cable passage, and side is provided with anchor end plate near water.
Described anti-impact biology blanket is connected with cast-in-place lattice stalk using holdfast, is planted on anti-impact biology blanket and is implanted with hygrophyte.
Described pervious concrete barricade is in inverted T-shaped structure, and it is equidistantly embedded with erosion control block perpendicular to metope in side near water Connecting screw rod.
Described ecological erosion control block is interlocking structure, and ecological erosion control block is connected with pervious concrete barricade by pre embedded bolt Connect, be internally provided with discrete material filling hole and planting hole, ecological erosion control block surface is provided with the raw groove of plant, between ecological erosion control block Connect integral using vertical connecting screw rod.
The characteristics of present invention has following and beneficial effect:
(1)Plant-growing type eco-concrete bulkhead tech and pouring type are planted raw coiled material greening engineering method and are engaged by the present invention, are advised The deficiency of traditional bank and conventional greening engineering method is kept away, while shore protection security and stability is met, has ensured that root system of plant is more easy to In penetrating porous concrete structure and penetrating the domatic soil body, so as to construct many natural type ecological riverways, reach embankment, environment, Ecological, landscape and the harmony of the mankind.
(2)The prefabricated assembled sash girder construction of inverted T-shaped more than side slope ordinary water level is used in the present invention, and by bamboo reinforcement and interior Put prestress anchorage cable connection integral, while slope stability is ensured, greatly speed up the speed of application of side slope protection treatment, Shorten the construction period, with preferable economic technology benefit.
(3)Pervious concrete barricade is set in the present invention at water balcony, further strengthens the overall stability of side slope, together When due to using pervious concrete, effectively protect constituent and ecologic structure in former foundation soil.
(4)In pervious concrete barricade, interlocking-type ecology erosion control block is installed in side to the present invention near water, and erosion control block inside is set plants Raw hole, while set that raw groove is planted on its surface, for aquatic organism provides reliably existence, breeding space, environmental protection.
Brief description of the drawings
Fig. 1 is cast-in-place plant growing type eco-concrete protective slope structure schematic diagram of the present invention;
Fig. 2 is cast-in-place plant growing type eco-concrete protective slope structure of the present invention along slope aspect profile;
Fig. 3 be in the present invention prefabricated assembled bamboo reinforcement without sand sash beam assembly pre-structure schematic diagram;
Fig. 4 be in the present invention prefabricated assembled bamboo reinforcement without structural representation after the assembly of sand sash beam;
Fig. 5 is ecological erosion control block structure schematic diagram in the present invention.
Fig. 6 is construction process figure of the present invention.
In figure:1- side slopes, 2- concrete bears down on one, the prefabricated assembled sash beams of 3-, 4- slope green plants, 5- holdfasts, 6- Plant raw coiled material, 7- concrete for plant growth, 8- bed courses, 9- prestress anchorage cables, 10- anchor end plates, 11- pervious concrete slope walls, 12- Permeable concrete prefabricated section, 13- hygrophytes, 14- anti-impacts biology blanket, 15- lattice stalk, 16- air bubble mix light-textured soils, 17- is saturating Water coagulation soil barricade, 18- ecology erosion control blocks, 19- underwater plants, 20- waters, 21- concrete precast blocks, 22- concrete river bottom protection, 23- feed pipes, 24- sashes beam connection anchor pole, 25- holdfasts hole, 26- transverse direction bamboo reinforcement preformed holes, 27- sashes beam connection anchor pole is reserved Hole, 28- sash beam concrete penetrating vias, 29- longitudinal directions bamboo reinforcement preformed hole, left plate in the middle of 30- sash beams connection end, 31- frames Lattice beam connection end top plate, 32- sash beams connection end lower plywood, 33- sash beams connection end intermediate right side plate, 34- discrete materials Filling hole, the vertical erosion control block connection anchor poles of 35-, 36- plants raw groove, the built-in planting hole of 37- erosion control blocks, 38- pre embedded bolts.
Specific embodiment
The precasting process requirement of assembled sash beam, ecological erosion control block etc. in present embodiment, prestressed anchor cable stretching is applied Work technical requirements, the construction process requirement of concreting, slope plants species etc. are repeated no more, emphasis illustrate the present invention relates to Cast-in-place plant growing type eco-concrete protective slope structure construction implementation method.
Fig. 1 is cast-in-place plant growing type eco-concrete protective slope structure schematic diagram of the present invention, and Fig. 2 is cast-in-place vegetation type life of the invention State concrete revetment structure along slope aspect profile, Fig. 3 be in the present invention prefabricated assembled bamboo reinforcement without sand sash beam assembly pre-structure Schematic diagram, Fig. 4 be in the present invention prefabricated assembled bamboo reinforcement without structural representation after the assembly of sand sash beam, Fig. 5 is raw in the present invention State erosion control block structure schematic diagram.Fig. 6 is construction process figure of the present invention.
Shown in reference picture 1-5, cast-in-place plant growing type eco-concrete protective slope structure of the present invention, mainly by prefabricated assembled sash Beam 3, the raw coiled material 6 of plant, pervious concrete slope wall 11, anti-impact biology blanket 14, pervious concrete barricade 17 and ecological erosion control block 18 Deng composition.
Before cast-in-place plant growing type eco-concrete slope protection construction, cofferdam is carried out using steel sheet pile in construction area, after drawing water The mud and impurity of basic unit are removed, is required according to design drawing, first pour the thick Base with Sand Gravel Cushion of 100mm in bottom, then installed Assembling reinforcement and the concrete feed pipe 23 of internal diameter 500mm is pre-installed in template, wherein template, Reperfu- sion strength grade is C35's Commerical ready-mixed concrete, forms concrete river bottom protection 22, finally in the sand bedding course of the top of concrete river bottom protection 22 laying 5mm, and installs coagulation Native prefabricated section 21.
Underwater concrete barricade is built by laying bricks or stones using pervious concrete, the height of pervious concrete barricade 17 is 1200mm, when building by laying bricks or stones In barricade, side is perpendicular to the uniform pre-buried a diameter of 10mm of metope near water, and the pre embedded bolt 38 of 500mm long, pervious concrete barricade is foster After the completion of shield, ecological erosion control block 18 is installed on pre embedded bolt 38, ecological erosion control block 18, using concrete prefabricated, is interlocking-type knot Structure, the area on surface 40% digs into the raw groove 36 of plant, and rubble is filled in discrete material filling hole 34 during installation, and enhancing structure is steady It is qualitative, and the related water plant of plantation in the built-in planting hole 37 of erosion control block, will finally by vertical erosion control block connection anchor pole 35 Ecological erosion control block 18 connects integral.
The foundation soil of certain area is excavated after pervious concrete barricade 17, is backfilled using air bubble mix light-textured soil 16, to subtract Soil pressure after light wall.
After the completion of pervious concrete barricade 17 is constructed, domatic below ordinary water level is repaired, existed according to design specification Domatic formwork, colligation vertically and horizontally reinforcing bar, it is C35 concretings lattice stalk 15 to use strength grade, after the completion of the maintenance of lattice stalk 15, first The laying 50mm thick sand-gravel cushion in lattice stalk 15, then anti-impact biology blanket 14 is installed on sand-gravel cushion, on anti-impact biology blanket 14 Plantation hygrophyte 13.
At side slope ordinary water level, permeable concrete is installed by domatic leveling, after laying 100mm thick Base with Sand Gravel Cushion prefabricated Block 12 is used as water balcony.Pervious concrete slope wall 11 uses precast construction, is highly 2000mm, prefabricated pervious concrete shield Slope wall 11 is squeezed into using plant equipment block-by-block.
Then, more than ordinary water level domatic is repaired, block-by-block overlap joint installs prefabricated assembled sash beam 3, prefabricated dress It is inverted T-shaped structure with formula sash beam 3, overall high 150mm, wherein base a height of 50mm prefabricated using pervious concrete are wide Reserve the sash beam concrete penetrating via 28 of a diameter of 60mm in 150mm, top;Adjacent 4 pieces of prefabricated assembled sashes during installation Beam 3 connects anchor pole 24 and fixes by sash beam, and bamboo reinforcement is vertically and horizontally respectively mounted in preformed hole, and a diameter of 12mm is installed in bamboo reinforcement Prestress anchorage cable 9, and longitudinal prestressing anchor cable bottom is anchored with the anchor end plate 10 on pervious concrete slope wall 11.
After the installation of prefabricated assembled sash beam 3, the thick bed courses 8 of 50mm are laid, then plant life is poured in sash beam and mixed Solidifying soil 7.Raw coiled material 6 is completely sodded on concrete for plant growth 7, raw coiled material 6 is planted and is fixed with sash beam by holdfast.Raw coiled material 6 is planted to spread If after finishing, during water, seed, special organic matter goods, materials and equipments and special development basic material sequentially added into mixing plant, through filling After dividing stirring, it is injected into plant life coiled material 6 by the special machinery force feed that injects, completes pouring type plant life coiled material 6 and construct.
After the completion of above-mentioned construction, the foundation soil of certain depth is excavated on slope top, casting concrete forms concrete and bears down on one 2, As shield roof construction.
As shown in fig. 6, the construction key step of cast-in-place plant growing type eco-concrete bank protection is as follows:
1)Preparation of construction:Construction area is marked according to construction drawing, cofferdam construction is carried out, and removes the mud of basic unit and miscellaneous Matter.
2)Concrete river bottom protection cast-in-place construction:Concrete river bottom protection bottom first pours the thick Base with Sand Gravel Cushion of 100mm, then according to figure Paper supporting module, wherein the feed pipe of pre-buried internal diameter 500mm, Reperfu- sion C35 concrete, finally install concrete prefabricated at top Block.
3)Slabstone concrete guard wall is constructed:Pervious concrete barricade is built by laying bricks or stones using pervious concrete, and in pervious concrete Side installs ecological erosion control block perpendicular to metope pre-embedded connecting screw rod, on screw rod to barricade near water, and using vertical screw rod that ecology is anti- Block connection is rushed integral, while excavating the ground earthen backfill air bubble mix light-textured soil of certain area after wall.
4)Lattice obstruct cast-in-place construction:Domatic below ordinary water level is repaired, according to design specification in domatic formwork, colligation Vertically and horizontally reinforcing bar, pours lattice stalk.
5)Anti-impact biology blanket is installed:After the completion of lattice stalk maintenance, first in the bed course that the interior laying 50mm of lattice stalk is thick, then on bed course Anti-impact biology blanket is installed.
6)Water balcony is constructed:At side slope ordinary water level, domatic leveling is installed after laying 100mm thick Base with Sand Gravel Cushion Permeable concrete prefabricated section is used as water balcony.
7)Pervious concrete slope wall is constructed:Pervious concrete slope wall can use prefabricated or cast-in-place structural, prefabricated permeable Concrete revetment wall can be squeezed into using plant equipment block-by-block, and cast-in-place structural first passes through rig pore-forming, and perfusion is saturating after laying steel reinforcement cage Water coagulation earth forming.
8)Assembling frame lattice beam:More than ordinary water level domatic is repaired, block-by-block overlap joint installs prefabricated assembled sash beam, And connect integral by horizontal bamboo reinforcement and longitudinal bamboo reinforcement, and the prestress anchorage cable of a diameter of 12mm is installed in bamboo reinforcement, wherein The prestress anchorage cable bottom of longitudinal bamboo reinforcement anchors with pervious concrete slope wall.
9)Concrete for plant growth is poured in sash beam:After sash beam installation, laying 50mm thick bed course, then in sash beam Inside pour concrete for plant growth.
10)Install and plant raw coiled material:Installed on concrete for plant growth and plant raw coiled material, planted raw coiled material and consolidated with sash beam by holdfast It is fixed.
11)Casting concrete shield top:After the completion of above-mentioned construction, the foundation soil of certain depth is excavated on slope top, pour coagulation Soil is used as shield roof construction.

Claims (7)

1. a kind of cast-in-place plant growing type eco-concrete slope protection construction method, it is characterised in that the cast-in-place plant growing type eco coagulation Native bank protection mainly includes prefabricated assembled sash beam, plants raw coiled material, pervious concrete slope wall, anti-impact biology blanket, permeable coagulation Native barricade and ecological erosion control block;Bamboo reinforcement and prestress anchorage cable are provided with prefabricated assembled sash beam, its end is provided with connection Bed course, concrete for plant growth are disposed with anchor pole, sash beam enclosed space from bottom to top and raw coiled material is planted;In frame gird type slope protection Bottom is provided with pervious concrete slope wall, and prefabricated assembled sash beam is mixed with permeable by its internal longitudinal prestressing anchor cable Solidifying soil slope wall anchor connection;It is domatic using cast-in-place lattice stalk under water, anti-impact biology blanket, lattice stalk shield face toe are provided with lattice stalk It is provided with pervious concrete barricade;The pervious concrete barricade wall back of the body backfills air bubble mix light-textured soil, and side is provided with ecological anti-near water Rush block;
The construction method of the cast-in-place plant growing type eco-concrete bank protection, it is characterised in that key step is as follows:
1)Preparation of construction:Construction area is marked according to construction drawing, cofferdam construction is carried out, and remove the mud and impurity of basic unit;
2)Concrete river bottom protection cast-in-place construction:Concrete river bottom protection bottom first pours bed course, then according to drawing supporting module, wherein in advance Feed pipe is buried, Reperfu- sion concrete finally installs concrete precast block at top;
3)Slabstone concrete guard wall is constructed:Pervious concrete barricade is built by laying bricks or stones using pervious concrete, and in pervious concrete barricade Side installs ecological erosion control block perpendicular to metope pre-embedded connecting screw rod, on screw rod near water, is connected ecological erosion control block using vertical screw rod Entirety is connected into, while excavating the ground earthen backfill air bubble mix light-textured soil of certain area after wall;
4)Lattice obstruct cast-in-place construction:Domatic below ordinary water level is repaired, according to design specification in domatic formwork, colligation in length and breadth To reinforcing bar, lattice stalk is poured;
5)Anti-impact biology blanket is installed:After the completion of lattice stalk maintenance, the first laying bed course in lattice stalk, then anti-impact biology is installed on bed course Blanket;
6)Water balcony is constructed:At side slope ordinary water level, by domatic leveling, installation water penetration is mixed after laying certain thickness bed course Solidifying soil prefabricated section is used as water balcony;
7)Pervious concrete slope wall is constructed:Pervious concrete slope wall uses prefabricated or cast-in-place structural, prefabricated pervious concrete Slope wall is squeezed into using plant equipment block-by-block, and cast-in-place structural first passes through rig pore-forming, and pervious concrete is irrigated after laying steel reinforcement cage Shaping;
8)Assembling frame lattice beam:More than ordinary water level domatic is repaired, block-by-block overlap joint installs prefabricated assembled sash beam, and leads to Cross horizontal bamboo reinforcement and longitudinal bamboo reinforcement connection is integral, and the prestressed anchor cable in horizontal bamboo reinforcement and longitudinal bamboo reinforcement, wherein vertical Anchored to the prestress anchorage cable bottom and pervious concrete slope wall of bamboo reinforcement;
9)Concrete for plant growth is poured in sash beam:After sash beam installation, bed course is laid, then plant life is poured in sash beam and mixed Solidifying soil;
10)Install and plant raw coiled material:Installed on concrete for plant growth and plant raw coiled material, planted raw coiled material and fixed with sash beam by holdfast;
11)Casting concrete shield top:After the completion of above-mentioned construction, the foundation soil of certain depth is excavated on slope top, casting concrete is made It is shield roof construction.
2. cast-in-place plant growing type eco-concrete slope protection construction method according to claim 1, it is characterised in that described is pre- Assembled sash beam processed is provided with overlap joint block in end, and connection bolthole is reserved in overlap joint block, and top is provided with holdfast hole;In advance Spaced set has concrete penetrating via to assembled sash beam processed along its length;It is additionally provided with prefabricated assembled sash beam Bamboo reinforcement preformed hole, sets bamboo reinforcement in hole, prestress anchorage cable is provided with bamboo reinforcement.
3. cast-in-place plant growing type eco-concrete slope protection construction method according to claim 1, it is characterised in that described plant Raw coiled material is anchored in prefabricated assembled sash back portion using holdfast.
4. cast-in-place plant growing type eco-concrete slope protection construction method according to claim 1, it is characterised in that described is saturating Water coagulation soil slope wall top is provided with inclining anchor cable passage, and side is provided with anchor end plate near water.
5. cast-in-place plant growing type eco-concrete slope protection construction method according to claim 1, it is characterised in that described is anti- The biological blanket of punching is connected with cast-in-place lattice stalk using holdfast, is planted on anti-impact biology blanket and is implanted with hygrophyte.
6. cast-in-place plant growing type eco-concrete slope protection construction method according to claim 1, it is characterised in that described is saturating Water coagulation soil barricade is in inverted T-shaped structure, and it is equidistantly embedded with erosion control block connecting screw rod perpendicular to metope in side near water.
7. cast-in-place plant growing type eco-concrete slope protection construction method according to claim 1, it is characterised in that described life State erosion control block is interlocking structure, and ecological erosion control block is connected by pre embedded bolt with pervious concrete barricade, is internally provided with scattered Body material fills hole and planting hole, and ecological erosion control block surface is provided with the raw groove of plant, using vertical connection spiral shell between ecological erosion control block Bar connection is integral.
CN201511003711.5A 2015-12-29 2015-12-29 Cast-in-place plant growing type eco-concrete slope protection construction method CN105544460B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201511003711.5A CN105544460B (en) 2015-12-29 2015-12-29 Cast-in-place plant growing type eco-concrete slope protection construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201511003711.5A CN105544460B (en) 2015-12-29 2015-12-29 Cast-in-place plant growing type eco-concrete slope protection construction method

Publications (2)

Publication Number Publication Date
CN105544460A CN105544460A (en) 2016-05-04
CN105544460B true CN105544460B (en) 2017-05-31

Family

ID=55823987

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201511003711.5A CN105544460B (en) 2015-12-29 2015-12-29 Cast-in-place plant growing type eco-concrete slope protection construction method

Country Status (1)

Country Link
CN (1) CN105544460B (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106368223A (en) * 2016-05-25 2017-02-01 路域生态工程有限公司 Rainstorm washing and water logging resisting side slope and revetment protection method and application
CN106869143A (en) * 2016-12-23 2017-06-20 扬州大学 For environmental combination bank protection and the construction method of the punishment of road runoff pollution
CN106759104B (en) * 2016-12-29 2019-03-08 浙江大学城市学院 Ecological slope protection structure and construction method
CN106930234A (en) * 2017-03-21 2017-07-07 水利部交通运输部国家能源局南京水利科学研究院 A kind of High-cold regions earth and rockfill dam protective slope structure and its construction method
CN107524116B (en) * 2017-08-24 2021-01-01 宁波市产城生态建设集团有限公司 Ecological method for hard revetment of river channel
CN108385607A (en) * 2018-02-01 2018-08-10 浙江水利水电学院 A kind of construction method of ecological riverway embankment
CN108487191B (en) * 2018-04-27 2020-10-20 河南创辉水利水电工程有限公司 Method for carrying out double protection on river slope
CN108330914B (en) * 2018-04-27 2021-03-23 张新泉 Double-layer protection device for embankment slope of mountain river
CN108848729A (en) * 2018-06-06 2018-11-23 中国冶集团有限公司 Soil slope shore protection facade greening system and preparation method thereof
CN109168384A (en) * 2018-07-31 2019-01-11 浙江普天园林建筑发展有限公司 It is a kind of to carry out arid and semi-arid lands's prevention and control of soil erosion method using ornamental plant
CN109235365A (en) * 2018-10-29 2019-01-18 中水电第十工程局(郑州)有限公司 A kind of self-locking ecological revetment brick construction method
CN109837913A (en) * 2019-02-21 2019-06-04 中国林业科学研究院森林生态环境与保护研究所 A kind of restoration methods of the earthquake-stricken area Chuan Xi slopes soil and vegetation

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000096586A (en) * 1998-09-24 2000-04-04 Takeshige Shimonohara Hollow block for hiding opening and laying method therefor
CN101949144A (en) * 2010-09-29 2011-01-19 无锡申湖织造有限公司 Ecological grass planting mold bag
CN203755241U (en) * 2014-02-17 2014-08-06 广州市市政工程设计研究院 Small fishing port and riverway revetment structure
CN204023586U (en) * 2014-08-11 2014-12-17 重庆威卡科技有限公司 A kind of ecological revetment system

Also Published As

Publication number Publication date
CN105544460A (en) 2016-05-04

Similar Documents

Publication Publication Date Title
CN102518135B (en) Horizontal jet grouting soil anchor and castinplace pile Composite Foundation Pit supporting construction engineering method
CN1837511B (en) Double-rowed cofferdam and method for manufacturing the same
CN101298782B (en) Method and system for basement engineering water proof and water drain
CN105421485B (en) Construction method of high-fill prefabricated cast-in-situ combined pile slab wall protection structure
CN204059124U (en) A kind of sand drain strong rammer grouting behind shaft or drift lining foundation reinforcing structure
CN103410159B (en) Expansive soil cut slope support structure and construction method thereof
CN105862887B (en) A kind of ion type rareearth mine ecological slope protection structure
CN103590425A (en) Peaty soft soil stratum subway station construction technology
CN203603105U (en) Wall plate type ecological retaining wall bank protection structure
CN101451355B (en) Water retention method of back fill course
CN102071697A (en) Hard reinforced concrete revetment slope biological repairing method
CN102383413B (en) Method for constructing strengthened saturated-flow plastic silt soft soil foundation
CN202559376U (en) Near-river municipal administration road structure below viaduct bridge
CN104131575B (en) A kind of karst height grows the leak stopping water discharge method of the stratum dam foundation
CN103741714A (en) Construction method for full cover-excavation reverse method of underground engineering
CN106638634A (en) Road rock slope vine ecological protection structure and construction method
CN105350561B (en) A kind of miniature well foundation of assembled for soft clay area power transmission tower
CN105672348A (en) Construction method for cropping bridge pile foundation at sandy gravel stratum of abyssal region
CN202718138U (en) Self-locking type ecological retaining wall structure
CN103122641A (en) Slope reinforced structure and reinforcing method thereof
CN103437321B (en) Cast-in-place anti-filter restoring vegetation concrete ecological revetment system and construction method thereof
CN204000901U (en) The vertical high slope prestressing anchor support of a kind of massif device
CN101649608B (en) Ecological slope protection structure
CN104818711A (en) Anti-liquefaction three-dimensional drainage rigid pile and construction method thereof
CN203403426U (en) Supporting structure of expensive earth road cutting side slope

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant