CN106120654A - A kind of sill may roadbed bank protection rapid reinforcement construction module - Google Patents

A kind of sill may roadbed bank protection rapid reinforcement construction module Download PDF

Info

Publication number
CN106120654A
CN106120654A CN201610709301.0A CN201610709301A CN106120654A CN 106120654 A CN106120654 A CN 106120654A CN 201610709301 A CN201610709301 A CN 201610709301A CN 106120654 A CN106120654 A CN 106120654A
Authority
CN
China
Prior art keywords
bank protection
module
reinforced
sill
riveting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610709301.0A
Other languages
Chinese (zh)
Inventor
姜明
姜涞
姜维
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zoucheng Zhongda Intellectual Property Advisory Services Co Ltd
Original Assignee
Zoucheng Zhongda Intellectual Property Advisory Services Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zoucheng Zhongda Intellectual Property Advisory Services Co Ltd filed Critical Zoucheng Zhongda Intellectual Property Advisory Services Co Ltd
Priority to CN201610709301.0A priority Critical patent/CN106120654A/en
Publication of CN106120654A publication Critical patent/CN106120654A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • E02B3/14Preformed blocks or slabs for forming essentially continuous surfaces; Arrangements thereof

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The present invention provides a kind of sill may roadbed bank protection rapid reinforcement construction module, its structure is to be reinforced module by bank protection, riveting stubs and double dovetail link block composition, wherein, module reinforced by bank protection is rectangle, bank protection is reinforced four edge of module and is provided with dovetail groove, it is provided centrally with riveting stubs jack, double dovetail link blocks are wing tips, the dovetail groove that each dovetail reinforces module edge with bank protection matches, double dovetail link blocks are embedded in bank protection and reinforce in the double dovetail grooves formed after module is alignd with two limits of adjacent bank protection reinforcing module, riveting stubs is reinforced the middle riveting stubs jack of module upper surface through composition solidification bank protection in the earth insert sill may roadbed from bank protection;Can guarantee that bank protection is reinforced module and do not rushed by water or stormy waves starts and causes dam break to burst slope, make whole continental rise sill may as indestructible by concrete prefabricated net or stone material cylinder mould cover, once investment a century is benefited.

Description

A kind of sill may roadbed bank protection rapid reinforcement construction module
Technical field
The present invention relates to packing technique field, specifically a kind of sill may roadbed bank protection rapid reinforcement construction module.
Background technology
Mostly the sill may roadbed bank protection of prior art is to be built into stone, and the deficiency in use existed is, firmness is not enough, Run into the punching of stormy waves water or mud-rock flow, damage of easily caving in, it is often more important that although stone can be gathered materials on the spot, but specification Disunity, engineering time-consumingly takes a lot of work, and the hole between stone is easily burrowed by mouse, easily forms piping in flood season, has potential Dam break burst transportation work style danger, the solution the most also not had.
Summary of the invention
It is an object of the invention to provide a kind of sill may roadbed bank protection rapid reinforcement construction module.
It is an object of the invention to realize in the following manner, a kind of sill may roadbed bank protection rapid reinforcement construction module, including Bank protection reinforces module, riveting stubs and double dovetail link block, and wherein, module reinforced by bank protection is rectangle, and module reinforced by bank protection Four edge are provided with dovetail groove, are provided centrally with riveting stubs jack, and double dovetail link blocks are wing tips, Mei Geyan The dovetail groove that tail reinforces module edge with bank protection matches, and double dovetail link blocks are embedded in bank protection and reinforce module and adjacent bank protection In the double dovetail grooves formed after reinforcing two limit alignment of module, riveting stubs reinforces the middle riveting of module upper surface from bank protection Through composition solidification bank protection in the earth insert sill may roadbed in stubs jack.
Using method is as follows:
1) existing by standby for the smooth compacting of arrangement of sill may roadbed bank protection;
2) accurate diced into sections, lays bank protection by diced into sections and reinforces module, makes sill may roadbed bank protection be reinforced module by bank protection complete Whole covering;
3) double dovetail link blocks are embedded in bank protection and reinforce the relative double dovetails formed in limit of module and adjacent bank protection reinforcing module Among groove difficult to understand, make mutually to link part between bank protection reinforcing module with adjacent bank protection reinforcing module and be fixed together;
4) first prick out deep hole with drill rod alignment riveting stubs jack to sill may roadbed bank protection, then with mallet, riveting stubs is thrown into deeply Among hole, bank protection is reinforced module and is secured firmly on sill may roadbed bank protection;
5) all gaps bank protection being reinforced module with fine sand or cement are filled with, and module edge cement reinforced by all bank protections Covering modified by mortar makes it not reveal earth.
Sill may roadbed bank protection rapid reinforcement the most according to claim 1 construction module, it is characterised in that bank protection adds Solid model block, double dovetail link block are to be become or use rock section, cutting and boring by precast reinforced concrete with riveting stubs Batch production is made.
The invention has the beneficial effects as follows: utilize advanced processing of stone technology and concrete prefabricated technology, make standardization Bank protection reinforce module, link part and rivet, can be with rapid construction during construction, owing to employing connector and reinforcing riveting stake mould Block, module reinforced by bank protection and bank protection is reinforced and fitted together perfectly between module, will not leave the chance burrowed to mouse, pass through connector Mutually linking, it is therefore prevented that displacement and the fissure of displacement of module reinforced by bank protection, reinforcing module due to each bank protection has riveting stubs to fix Among earth, more can guarantee that bank protection is reinforced module and do not rushed by water or stormy waves starts and causes dam break to burst slope, make whole continental rise sill may As indestructible by concrete prefabricated net or stone material cylinder mould cover, once investment a century is benefited.
Accompanying drawing explanation
Fig. 1 is the structural representation after module construction reinforced by bank protection.
Fig. 2 is the structural representation that module reinforced by single bank protection.
Fig. 3 is the structural representation of double dovetail link block.
Fig. 4 is the structural representation of riveting stubs;
Description of reference numerals: bank protection reinforces module 1, double dovetail link block 2, dovetail groove 3, riveting stubs jack 4, riveting stake mould Block 5.
Detailed description of the invention
With reference to Figure of description, a kind of sill may roadbed bank protection rapid reinforcement of the present invention is constructed module work in detail below Explanation.
A kind of sill may roadbed bank protection rapid reinforcement construction module, reinforces module 1, riveting stubs 5 and double dovetail including bank protection Link block 2, wherein, module 1 reinforced by bank protection is rectangle, and bank protection is reinforced four edge of module 1 and is provided with dovetail groove 3, center Being provided with riveting stubs jack 4, double dovetail link blocks 2 are in wing tips, and each dovetail reinforces module edge with bank protection Dovetail groove 3 matches, and double dovetail link blocks 2 are embedded in bank protection reinforcing module and align with two limits of adjacent bank protection reinforcing module In double dovetail grooves of rear formation, riveting stubs 5 is reinforced the middle riveting stubs jack 4 of module 1 upper surface from bank protection and is passed Insert composition solidification bank protection in the earth of sill may roadbed.
Embodiment
Construction method is as follows:
1) existing by standby for the smooth compacting of arrangement of sill may roadbed bank protection;
2) accurate diced into sections, lays bank protection by diced into sections and reinforces module, makes sill may roadbed bank protection be reinforced module by bank protection complete Whole covering;
3) double dovetail link blocks are embedded in bank protection and reinforce the relative double dovetails formed in limit of module and adjacent bank protection reinforcing module Among groove difficult to understand, make mutually to link part between bank protection reinforcing module with adjacent bank protection reinforcing module and be fixed together;
4) first prick out deep hole with drill rod alignment riveting stubs jack to sill may roadbed bank protection, then with mallet, riveting stubs is thrown into deeply Among hole, bank protection is reinforced module and is secured firmly on sill may roadbed bank protection;
5) all gaps bank protection being reinforced module with fine sand or cement are filled with, and module edge cement reinforced by all bank protections Covering modified by mortar makes it not reveal earth.
Described sill may roadbed bank protection rapid reinforcement construction module, bank protection reinforces module, double dovetail link block and riveting stake Module is become by precast reinforced concrete or uses rock section, cutting and boring batch production to make.
For general technical staff of the technical field of the invention, without departing from the inventive concept of the premise, Its framework form can be flexible and changeable, simply makes some simple deduction or replace, all should be considered as belonging to the present invention by being carried The scope of patent protection that the claims handed over determine.
In addition to the technical characteristic described in description, it is the known technology of those skilled in the art.

Claims (2)

1. a sill may roadbed bank protection rapid reinforcement construction module, it is characterised in that include that bank protection reinforces module, riveting stubs With double dovetail link blocks, wherein, module reinforced by bank protection is rectangle, and bank protection is reinforced four edge of module and is provided with dovetail groove, Being provided centrally with riveting stubs jack, double dovetail link blocks are wing tips, and each dovetail reinforces module edge with bank protection Dovetail groove match, double dovetail link blocks are embedded in bank protection and reinforce two limits of module and adjacent bank protection reinforcing module and align In double dovetail grooves of rear formation, riveting stubs is reinforced the middle riveting stubs jack of module upper surface through inserting from bank protection Composition solidification bank protection in the earth of sill may roadbed;
Using method is as follows:
1) existing by standby for the smooth compacting of arrangement of sill may roadbed bank protection;
2) accurate diced into sections, lays bank protection by diced into sections and reinforces module, makes sill may roadbed bank protection be reinforced module by bank protection complete Whole covering;
3) double dovetail link blocks are embedded in bank protection and reinforce the relative double dovetails formed in limit of module and adjacent bank protection reinforcing module Among groove difficult to understand, make mutually to link part between bank protection reinforcing module with adjacent bank protection reinforcing module and be fixed together;
4) first prick out deep hole with drill rod alignment riveting stubs jack to sill may roadbed bank protection, then with mallet, riveting stubs is thrown into deeply Among hole, bank protection is reinforced module and is secured firmly on sill may roadbed bank protection;
5) all gaps bank protection being reinforced module with fine sand or cement are filled with, and module edge cement reinforced by all bank protections Covering modified by mortar makes it not reveal earth.
Sill may roadbed bank protection rapid reinforcement the most according to claim 1 construction module, it is characterised in that bank protection adds solid model Block, double dovetail link block are to be become or use rock section, cutting and boring factory by precast reinforced concrete with riveting stubs Change is made.
CN201610709301.0A 2016-08-24 2016-08-24 A kind of sill may roadbed bank protection rapid reinforcement construction module Pending CN106120654A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610709301.0A CN106120654A (en) 2016-08-24 2016-08-24 A kind of sill may roadbed bank protection rapid reinforcement construction module

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610709301.0A CN106120654A (en) 2016-08-24 2016-08-24 A kind of sill may roadbed bank protection rapid reinforcement construction module

Publications (1)

Publication Number Publication Date
CN106120654A true CN106120654A (en) 2016-11-16

Family

ID=57274210

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610709301.0A Pending CN106120654A (en) 2016-08-24 2016-08-24 A kind of sill may roadbed bank protection rapid reinforcement construction module

Country Status (1)

Country Link
CN (1) CN106120654A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106738311A (en) * 2016-12-12 2017-05-31 山东兴润园林建设有限公司 A kind of garden layout special-purpose backing material brick and its manufacture method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002129572A (en) * 2000-10-27 2002-05-09 Heisei Engineering:Kk Slope coating material and slope coating method using the same
CN1514900A (en) * 2002-02-08 2004-07-21 � 姜 Plant growth type bank protecting building block capable of advertizing
CN101117796A (en) * 2007-09-03 2008-02-06 程卫国 Inter-embedding type slope protection block and construction method therefor
CN201400896Y (en) * 2009-04-21 2010-02-10 吴运华 Ecological interlocked pitching building block
CN202969340U (en) * 2012-12-13 2013-06-05 北京育青富源生态科技有限公司 Ecological interlocking building block

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002129572A (en) * 2000-10-27 2002-05-09 Heisei Engineering:Kk Slope coating material and slope coating method using the same
CN1514900A (en) * 2002-02-08 2004-07-21 � 姜 Plant growth type bank protecting building block capable of advertizing
CN101117796A (en) * 2007-09-03 2008-02-06 程卫国 Inter-embedding type slope protection block and construction method therefor
CN201400896Y (en) * 2009-04-21 2010-02-10 吴运华 Ecological interlocked pitching building block
CN202969340U (en) * 2012-12-13 2013-06-05 北京育青富源生态科技有限公司 Ecological interlocking building block

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106738311A (en) * 2016-12-12 2017-05-31 山东兴润园林建设有限公司 A kind of garden layout special-purpose backing material brick and its manufacture method

Similar Documents

Publication Publication Date Title
CN102733827B (en) Tunnel arch exchanging construction method and construction structure in tunnel arch exchanging construction
CN105887806A (en) Assembled type underground diaphragm wall and construction method thereof
CN104389610B (en) A kind of ultrashort step construction method of traversing operation freeway tunnel
CN102518453A (en) Quick tunnel-entrance construction method for bias-pressure shallow-buried or single-pressure tilting arenaceous loess tunnels
CN201089893Y (en) Foundation pit circle shield prefabricated driven pile
CN104074199A (en) Underwater bearing platform construction method
CN104294769B (en) A kind of piling and the construction method increasing the built bridge abutment structure of platform cap composite reinforcement
CN107542115A (en) Underground project waterproof structure and its construction method
CN110700841B (en) Double-side-wall guide pit type excavation method for tunnel excavation
CN209195427U (en) The open cut tunnel for passing through half Packing character solution cavity adds the tunnel bottom stake hardened structure of raft
CN108797653A (en) A kind of construction method carrying out structural anti-buoyancy using deep foundation pit fender post
CN108265969A (en) Plastic building template for ground beam and bearing platform engineering and mounting method thereof
CN107489106A (en) A kind of rocky bed subaqueous bearing platform construction method
CN202132053U (en) VI-level surrounding-rock double track tunnel lining support structure
CN106120654A (en) A kind of sill may roadbed bank protection rapid reinforcement construction module
CN105002891B (en) A kind of cast-in-situ bored pile exempts from inter-pile soil excavation construction method
CN204097889U (en) A kind of piling and the built bridge abutment structure of increase platform cap composite reinforcement
CN207960680U (en) A kind of lock wall for underground coal mine waterproof
CN103883336B (en) A kind of adjustable gob side entry retaining body of wall of first initiatively relief pressure supporting and construction method thereof
CN206127989U (en) Quick reinforcing construction module of river dam road bed bank protection
CN104500076A (en) Super-large-section and long-span cave-in bulk solid tunnel excavation method
CN204199298U (en) A kind of formwork system being applicable to large-scale deep trouth hole sty bed course
CN207776228U (en) A kind of building-block structure suitable for loam wall external corner
CN106120649B (en) A kind of sill may roadbed bank protection fast reinforcing
CN207109611U (en) A kind of prefabricated just beam buttress

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161116