CN106120649B - A kind of sill may roadbed bank protection fast reinforcing - Google Patents

A kind of sill may roadbed bank protection fast reinforcing Download PDF

Info

Publication number
CN106120649B
CN106120649B CN201610709190.3A CN201610709190A CN106120649B CN 106120649 B CN106120649 B CN 106120649B CN 201610709190 A CN201610709190 A CN 201610709190A CN 106120649 B CN106120649 B CN 106120649B
Authority
CN
China
Prior art keywords
bank protection
matrix
sill
rivet
link
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610709190.3A
Other languages
Chinese (zh)
Other versions
CN106120649A (en
Inventor
姜明
姜涞
姜维
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei three and pipe pile Co., Ltd.
Original Assignee
Hubei Three And Pipe Pile Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Three And Pipe Pile Co Ltd filed Critical Hubei Three And Pipe Pile Co Ltd
Priority to CN201610709190.3A priority Critical patent/CN106120649B/en
Publication of CN106120649A publication Critical patent/CN106120649A/en
Application granted granted Critical
Publication of CN106120649B publication Critical patent/CN106120649B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • E02B3/14Preformed blocks or slabs for forming essentially continuous surfaces; Arrangements thereof

Abstract

The present invention provides a kind of sill may roadbed bank protection fast reinforcing,Its structure is to reinforce matrix by bank protection,Double nails link part,Four nails link part and rivet composition,Wherein,It is rectangle that bank protection, which reinforces matrix,,The four corners of bank protection reinforcing matrix, which are provided with, links part jack,It is provided centrally with rivet jack,Double nails link part and four nails link part and are made of panel and pin,Pin is vertically set on panel,The diameter of pin and aligned gaps reinforce the matrix adjacent diameter for linking part jack and gap with bank protection and match on panel,Double nails link part and four nails link pin on part and reinforce the upper surface of matrix from bank protection and are inserted into link and two pieces or four pieces of bank protections are reinforced matrixs in part jack link together,The centre that rivet then reinforces matrix upper surface from bank protection passes through rivet jack to be inserted into composition solidification bank protection in the soil of sill may roadbed,It can guarantee that bank protection reinforces matrix and do not started by water punching or stormy waves and caused dam break,Make entire continental rise sill may as indestructible by concrete prefabricated net or stone material cylinder mould cover,Primary investment is century-old to be benefited.

Description

A kind of sill may roadbed bank protection fast reinforcing
Technical field
The present invention relates to hydraulic engineering or technical field of road construction, specifically a kind of sill may roadbed bank protection quickly adds It is fixedly mounted with and sets.
Background technology
The sill may roadbed bank protection of the prior art is mostly built into stone, and existing deficiency is that firmness is insufficient in use, The punching of stormy waves water or mud-rock flow are encountered, damage of caving in is easy, it is often more important that although stone can gather materials on the spot, specification Disunity, engineering take and take a lot of work, and the hole between stone is easy to be burrowed by mouse, is easy to form piping in flood season, has potential Dam break burst transportation work style danger, the solution not had also at present.
Invention content
The object of the present invention is to provide a kind of sill may roadbed bank protection fast reinforcings.
The purpose of the present invention is what is realized in the following manner, a kind of sill may roadbed bank protection fast reinforcing, including bank protection Reinforce matrix, double nails link part, four nails link part and rivet, wherein it is rectangle that bank protection, which reinforces matrix, and bank protection reinforces the four of matrix A corner, which is provided with, links part jack, is provided centrally with rivet jack, double nails link part and four nails to link part be by panel and pin Nail composition, pin is vertically set on panel, the diameter of pin and the aligned gaps hook adjacent with bank protection reinforcing matrix on panel Even the diameter of part jack and gap match, and double nails link part and four nails link the upper surface that pin on part reinforces matrix from bank protection Insertion links in part jack and links together two pieces or four pieces of bank protections reinforcing matrixs, and rivet then reinforces matrix upper surface from bank protection Centre pass through rivet jack be inserted into sill may roadbed soil in composition solidification bank protection;
Application method is as follows:
1)Using the bank protection for preventing from being made rectangle middle with hole that concrete prefabricated method or stone material are cut reinforce matrix, It links part and rivet is spare;
2)Now sill may roadbed bank protection is flattened and is compacted, it is spare to overlay rubble fine sand if it is sill may;
3)Accurate diced into sections is laid with bank protection by diced into sections and reinforces matrix, sill may roadbed bank protection is made to reinforce base by bank protection Block completely covers;
4)Every four pieces adjacent bank protections reinforcing matrix corners link part with one four nail and are fixed together;
5)Every two pieces of bank protections reinforcing matrix of sill may roadbed bank protection edge links part with double nails and is fixed together;
6)First be directed at rivet jack with drill rod and prick out deep hole to sill may roadbed bank protection, then with mallet by rivet throw into deep hole it It is middle that bank protection reinforcing matrix is secured firmly on sill may roadbed bank protection;
The prefabricated bank protection bracing means of the sill may roadbed, it is by reinforced concrete that bank protection, which reinforces matrix, links part and rivet, It is prefabricated into or is made using rock slice, slitting and drilling batch production.
The beneficial effects of the invention are as follows:Using advanced processing of stone technology and concrete prefabricated technology, standardization is made Bank protection reinforce matrix, link part and rivet, when construction, can be with rapid construction, due to the use of linking part and reinforcing rivet, shield Slope reinforces between matrix and bank protection reinforcing matrix and fits together perfectly, and the chance to burrow will not be left to mouse, mutual by linking part Link, it is therefore prevented that bank protection reinforce matrix displacement and the fissure of displacement, due to each bank protection reinforce matrix have rivet be fixed on soil it In, it more can guarantee that bank protection is reinforced matrix and do not started by water punching or stormy waves and dam break caused to burst slope, make entire continental rise sill may as mixed Solidifying native prefabricated net or stone material cylinder mould cover are indestructible, and primary investment is century-old to be benefited.
Description of the drawings
Fig. 1 is the overall structure diagram of the prefabricated bank protection bracing means of sill may roadbed;
Fig. 2 is the section structure diagram of the prefabricated bank protection bracing means of sill may roadbed;
Fig. 3 is the overlooking structure diagram that four nails link part;
Fig. 4 is that four nails link part main structure diagram;
Fig. 5 is the overlooking structure diagram that double nails link part
Fig. 6 is the main structure diagram that double nails link part;
Fig. 7 is the overlooking structure diagram that bank protection reinforces matrix.
Reference sign:The bank protection reinforcing nail of matrix 1, four links part 2, double nails link part 3, link part jack 4, rivet is inserted Hole 5, pin 6, rivet 7.
Specific implementation mode
A kind of sill may roadbed bank protection fast reinforcing of the present invention is described in detail below with reference to Figure of description.
A kind of sill may roadbed bank protection fast reinforcing, including bank protection reinforces matrix 1, double nails link the nail of part 3, four and link part 2 and rivet 7, wherein it is rectangle that bank protection, which reinforces matrix 1, and the four corners that bank protection reinforces matrix 1 are provided with and link part jack 4, in The heart is provided with rivet jack 5, and double nails link the nail of part 3 and four and link part 2 to be made of panel and pin 6, and pin 6 is vertically set on On panel, on panel the diameter of pin 6 and aligned gaps and bank protection reinforce the adjacent diameter for linking part jack 4 of matrix 1 and Gap matches, and double nails, which link part 3 and four, to be followed closely to link pin 6 on part 2 and reinforce the upper surface of matrix 1 from bank protection and be inserted into and link part and insert Two pieces or four pieces of bank protections are reinforced matrix 1 in hole 4 to link together, the centre that rivet 7 then reinforces 1 upper surface of matrix from bank protection is worn It crosses rivet jack 5 and is inserted into composition solidification bank protection in the soil of sill may roadbed;
Embodiment
Application method is as follows:
1)Be made using the method that concrete prefabricated method or stone material are cut rectangle middle with hole bank protection reinforce matrix, It links part and rivet is spare;
2)Now sill may roadbed bank protection is flattened and is compacted, it is spare to overlay rubble fine sand if it is sill may;
3)Accurate diced into sections is laid with bank protection by diced into sections and reinforces matrix, sill may roadbed bank protection is made to reinforce base by bank protection Block completely covers;
4)Every four pieces adjacent bank protections reinforcing matrix corners link part with one four nail and are fixed together;
5)Every two pieces of bank protections reinforcing matrix of sill may roadbed bank protection edge links part with double nails and is fixed together;
6)First be directed at rivet jack with drill rod and prick out deep hole to sill may roadbed bank protection, then with mallet by rivet throw into deep hole it It is middle that bank protection reinforcing matrix is secured firmly on sill may roadbed bank protection;
The prefabricated bank protection bracing means of the sill may roadbed, it is by reinforced concrete that bank protection, which reinforces matrix, links part and rivet, It is prefabricated into or is made using rock slice, slitting and drilling batch production.
For those of ordinary skill in the art to which the present invention belongs, without departing from the inventive concept of the premise, Its architectural form cans be flexible and changeable, and only makes several simple deduction or replace, all shall be regarded as belonging to the present invention by being carried The scope of patent protection that claims of friendship determine.
It is the known technology of those skilled in the art in addition to the technical characteristic described in specification.

Claims (1)

1. a kind of sill may roadbed bank protection fast reinforcing, which is characterized in that reinforce matrix including bank protection, double nails link part, four Nail link part and rivet, wherein bank protection reinforce matrix be rectangle, bank protection reinforce matrix four corners be provided with link part insert Hole is provided centrally with rivet jack, and double nails link part and four nails link part and are made of panel and pin, and pin is vertically set on On panel, the diameter of pin and aligned gaps and the bank protection diameter for linking part jack and gap phase that reinforce matrix adjacent on panel It coincide, double nails link the pin that part and four nails link on part and linked two in part jack from the upper surface insertion of bank protection reinforcing matrix Block or four pieces of bank protections are reinforced matrix and are linked together, and the centre that rivet then reinforces matrix upper surface from bank protection is inserted across rivet jack Enter in the soil of sill may roadbed composition solidification bank protection, bank protection reinforces matrix, link part and rivet be by precast reinforced concrete at or It is made of using rock slice, slitting and drilling batch production;
Application method is as follows:
1)The bank protection that rectangle middle with hole is made using the method that concrete prefabricated method or stone material are cut is reinforced matrix, linked Part and rivet are spare;
2)Now sill may roadbed bank protection is flattened and is compacted, it is spare to overlay rubble fine sand if it is sill may;
3)Accurate diced into sections is laid with bank protection by diced into sections and reinforces matrix, keeps sill may roadbed bank protection complete by bank protection reinforcing matrix Whole covering;
4)Every four pieces adjacent bank protections reinforcing matrix corners link part with one four nail and are fixed together;
5)Every two pieces of bank protections reinforcing matrix of sill may roadbed bank protection edge links part with double nails and is fixed together;
6)First be directed at rivet jack with drill rod and prick out deep hole to sill may roadbed bank protection, then with mallet by rivet throw deep hole among will Bank protection is reinforced matrix and is secured firmly on sill may roadbed bank protection.
CN201610709190.3A 2016-08-24 2016-08-24 A kind of sill may roadbed bank protection fast reinforcing Active CN106120649B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610709190.3A CN106120649B (en) 2016-08-24 2016-08-24 A kind of sill may roadbed bank protection fast reinforcing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610709190.3A CN106120649B (en) 2016-08-24 2016-08-24 A kind of sill may roadbed bank protection fast reinforcing

Publications (2)

Publication Number Publication Date
CN106120649A CN106120649A (en) 2016-11-16
CN106120649B true CN106120649B (en) 2018-08-07

Family

ID=57274222

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610709190.3A Active CN106120649B (en) 2016-08-24 2016-08-24 A kind of sill may roadbed bank protection fast reinforcing

Country Status (1)

Country Link
CN (1) CN106120649B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1540108A (en) * 2003-10-31 2004-10-27 三峡大学 Method and equipment for protecting and greening side slope
CN101117796A (en) * 2007-09-03 2008-02-06 程卫国 Inter-embedding type slope protection block and construction method therefor
CN103774617A (en) * 2013-12-06 2014-05-07 浙江水利水电学院 Mutually-embedded type slope protection building block and construction method thereof
CN204282299U (en) * 2014-11-12 2015-04-22 黄肖峰 A kind of modularization water conservancy slope protection net
CN204435317U (en) * 2015-02-01 2015-07-01 刘进强 A kind of cross protective slope structure

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002129572A (en) * 2000-10-27 2002-05-09 Heisei Engineering:Kk Slope coating material and slope coating method using the same

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1540108A (en) * 2003-10-31 2004-10-27 三峡大学 Method and equipment for protecting and greening side slope
CN101117796A (en) * 2007-09-03 2008-02-06 程卫国 Inter-embedding type slope protection block and construction method therefor
CN103774617A (en) * 2013-12-06 2014-05-07 浙江水利水电学院 Mutually-embedded type slope protection building block and construction method thereof
CN204282299U (en) * 2014-11-12 2015-04-22 黄肖峰 A kind of modularization water conservancy slope protection net
CN204435317U (en) * 2015-02-01 2015-07-01 刘进强 A kind of cross protective slope structure

Also Published As

Publication number Publication date
CN106120649A (en) 2016-11-16

Similar Documents

Publication Publication Date Title
CN102733827B (en) Tunnel arch exchanging construction method and construction structure in tunnel arch exchanging construction
CN105862887B (en) A kind of ion type rareearth mine ecological slope protection structure
CN104074199B (en) Underwater bearing platform construction method
CN106958208A (en) A kind of novel reinforced method of double curvature arched bridge
CN204253054U (en) Mountain tunnel stake arch cap excavation method comprehensive support structure
CN101446088B (en) Construction method for pole and tower foundation in Gobi Desert gravelly soil area
CN103938512B (en) The inverted construction method of existing highway is worn under a kind of newly-built road
CN104294769B (en) A kind of piling and the construction method increasing the built bridge abutment structure of platform cap composite reinforcement
CN205742175U (en) A kind of steel construction protection wall of bored pile
CN108265735A (en) High latitude High Temperature Permafrost area highway raft plate-pile composite foundation and process for constructing
CN108374674B (en) Six pilot tunnels, 12 step Underground Space Excavation method for protecting support
CN204551491U (en) A kind of side slope protection greening structure
CN207333947U (en) A kind of oil-gas pipeline protective device
CN212272234U (en) High-strength combined template for open groove section of large-section inclined shaft
CN106120649B (en) A kind of sill may roadbed bank protection fast reinforcing
CN206127984U (en) Quick reinforcing apparatus of river dam road bed bank protection
CN204418229U (en) Poured band of outer wall of basement concrete draw-in groove
CN202673305U (en) Construction structure for use in tunnel arch changing construction
CN201362853Y (en) Inclined grid concrete casting ecological slope protection template
CN203905045U (en) Moving foundation of hoisting machine
CN206127989U (en) Quick reinforcing construction module of river dam road bed bank protection
CN107964975A (en) The PBL shear connectors connection structure and its construction method of steel pipe composite pile and cushion cap
CN204530357U (en) Cliff side slope plank road
CN106120654A (en) A kind of sill may roadbed bank protection rapid reinforcement construction module
CN209293069U (en) Soft base Self-sinking type underground space structure construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20180628

Address after: 436000 Linjiang Township, Huarong District, Ezhou, Hubei

Applicant after: Hubei three and pipe pile Co., Ltd.

Address before: 273500 Room 501, office building 499 Hengfeng Road, Central Electrical and Mechanical Industrial Park, Zoucheng downtown, Jining, Shandong

Applicant before: ZOUCHENG ZHONGDA INTELLECTUAL PROPERTY ADVISORY SERVICES CO., LTD.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant