CN106120649A - A kind of sill may roadbed bank protection fast reinforcing - Google Patents
A kind of sill may roadbed bank protection fast reinforcing Download PDFInfo
- Publication number
- CN106120649A CN106120649A CN201610709190.3A CN201610709190A CN106120649A CN 106120649 A CN106120649 A CN 106120649A CN 201610709190 A CN201610709190 A CN 201610709190A CN 106120649 A CN106120649 A CN 106120649A
- Authority
- CN
- China
- Prior art keywords
- bank protection
- matrix
- sill
- reinforced
- rivet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/12—Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/12—Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
- E02B3/14—Preformed blocks or slabs for forming essentially continuous surfaces; Arrangements thereof
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
Abstract
nullThe present invention provides a kind of sill may roadbed bank protection fast reinforcing,Its structure is to be reinforced matrix by bank protection、Double nails link part、Four nails link part and rivet composition,Wherein,Matrix reinforced by bank protection is rectangle,Four corners of bank protection reinforcing matrix are provided with and link part jack,It is provided centrally with rivet jack,Double nails link part and four nails link part and are made up of panel and pin,Pin is vertically set on panel,On panel, the diameter of pin and aligned gaps reinforce the adjacent diameter linking part jack of matrix with bank protection and gap matches,The pin that double nails link part and four nails link on part is reinforced the upper surface of matrix from bank protection and is inserted to link part jack two pieces or four pieces of bank protections are reinforced matrixs and linked together,Rivet then reinforces the centre of matrix upper surface through composition solidification bank protection the earth of rivet jack insertion sill may roadbed from bank protection,Can guarantee that bank protection reinforcing matrix is not rushed by water or stormy waves starts and causes dam break,Make whole continental rise sill may as indestructible by concrete prefabricated net or stone material cylinder mould cover,Once investment a century is benefited.
Description
Technical field
The present invention relates to hydraulic engineering or technical field of road construction, specifically a kind of sill may roadbed bank protection quickly adds
It is fixedly mounted with and puts.
Background technology
Mostly the sill may roadbed bank protection of prior art is to be built into stone, and the deficiency in use existed is, firmness is not enough,
Run into the punching of stormy waves water or mud-rock flow, damage of easily caving in, it is often more important that although stone can be gathered materials on the spot, but specification
Disunity, engineering time-consumingly takes a lot of work, and the hole between stone is easily burrowed by mouse, easily forms piping in flood season, has potential
Dam break burst transportation work style danger, the solution the most also not had.
Summary of the invention
It is an object of the invention to provide a kind of sill may roadbed bank protection fast reinforcing.
It is an object of the invention to realize in the following manner, a kind of sill may roadbed bank protection fast reinforcing, including bank protection
Reinforce matrix, double nail links part, four nails link part and rivet, and wherein, matrix reinforced by bank protection is rectangle, and the four of matrix reinforced by bank protection
Individual corner is provided with and links part jack, is provided centrally with rivet jack, double nails link part and four nails to link part be by panel and pin
Nail composition, pin is vertically set on panel, and on panel, diameter and the aligned gaps of pin reinforce, with bank protection, the hook that matrix is adjacent
Even diameter and the gap of part jack matches, and double nails link part and four nails link pin on part and reinforce the upper surface of matrix from bank protection
Insertion links in part jack and two pieces or four pieces of bank protections is reinforced matrix and linked together, and rivet then reinforces matrix upper surface from bank protection
Centre through rivet jack insert sill may roadbed earth in composition solidification bank protection;
Using method is as follows:
1) bank protection preventing from making rectangle middle with hole using concrete prefabricated method or stone material cutting is reinforced matrix, is linked
Part and rivet are standby;
2) existing by the leveling compacting of sill may roadbed bank protection, if sill may overlay rubble fine sand is standby;
3) accurate diced into sections, lays bank protection by diced into sections and reinforces matrix, makes sill may roadbed bank protection be reinforced matrix by bank protection complete
Whole covering;
4) every four pieces of adjacent bank protections are reinforced matrix corner and are followed closely with one four and link part and be fixed together;
5) every two pieces of bank protections of sill may roadbed bank protection edge are reinforced matrix and are linked part be fixed together with double nail;
6) first prick out deep hole with drill rod alignment rivet jack to sill may roadbed bank protection, then thrown into by rivet with mallet will among deep hole
Bank protection is reinforced matrix and is secured firmly on sill may roadbed bank protection;
Described sill may roadbed prefabricated bank protection bracing means, bank protection is reinforced matrix, is linked part and rivet is by precast reinforced concrete
Become or use rock section, cutting and boring batch production to make.
The invention has the beneficial effects as follows: utilize advanced processing of stone technology and concrete prefabricated technology, make standardization
Bank protection reinforce matrix, link part and rivet, part can be linked owing to employing and reinforce rivet, protecting with rapid construction during construction
Slope reinforces matrix and bank protection is reinforced and fitted together perfectly between matrix, will not leave the chance burrowed to mouse, mutual by linking part
Link, it is therefore prevented that bank protection reinforces the displacement of matrix and the fissure of displacement, due to each bank protection reinforce matrix have rivet be fixed on earth it
In, more can guarantee that bank protection is reinforced matrix and do not rushed by water or stormy waves starts and causes dam break to burst slope, make whole continental rise sill may as mixed
Solidifying native prefabricated net or stone material cylinder mould cover are indestructible, and once investment a century is benefited.
Accompanying drawing explanation
Fig. 1 is the overall structure schematic diagram of sill may roadbed prefabricated bank protection bracing means;
Fig. 2 is the section structure schematic diagram of sill may roadbed prefabricated bank protection bracing means;
Fig. 3 is the plan structure schematic diagram that four nails link part;
Fig. 4 is that four nails link part main TV structure schematic diagram;
Fig. 5 is the plan structure schematic diagram that double nail links part
Fig. 6 is the main TV structure schematic diagram that double nail links part;
Fig. 7 is the plan structure schematic diagram that matrix reinforced by bank protection.
Description of reference numerals: bank protection reinforcing matrix 1, four nail links part 2, double nail links part 3, link part jack 4, rivet is inserted
Hole 5, pin 6, rivet 7.
Detailed description of the invention
With reference to Figure of description, a kind of sill may roadbed bank protection fast reinforcing of the present invention is described in detail below.
A kind of sill may roadbed bank protection fast reinforcing, links part 3, four nail link part including bank protection reinforcing matrix 1, double nail
2 and rivet 7, wherein, matrix 1 reinforced by bank protection be rectangle, and four corners of bank protection reinforcing matrix 1 are provided with and link part jack 4, in
The heart is provided with rivet jack 5, and double nails link part 3 and four nails link part 2 and are made up of panel and pin 6, and pin 6 is vertically set on
On panel, on panel the diameter of pin 6 and aligned gaps reinforce with bank protection the adjacent diameter linking part jack 4 of matrix 1 and
Gap matches, and the pin 6 that double nails link part 3 and four nails link on part 2 is reinforced the upper surface of matrix 1 from bank protection and inserted and link part and insert
In hole 4, two pieces or four pieces of bank protections being reinforced matrix 1 and linked together, the centre that rivet 7 then reinforces matrix 1 upper surface from bank protection is worn
Cross rivet jack 5 and insert composition solidification bank protection in the earth of sill may roadbed.
Embodiment
Using method is as follows:
1) bank protection preventing from making rectangle middle with hole using concrete prefabricated method or stone material cutting is reinforced matrix, is linked
Part and rivet are standby;
2) existing by the leveling compacting of sill may roadbed bank protection, if sill may overlay rubble fine sand is standby;
3) accurate diced into sections, lays bank protection by diced into sections and reinforces matrix, makes sill may roadbed bank protection be reinforced matrix by bank protection complete
Whole covering;
4) every four pieces of adjacent bank protections are reinforced matrix corner and are followed closely with one four and link part and be fixed together;
5) every two pieces of bank protections of sill may roadbed bank protection edge are reinforced matrix and are linked part be fixed together with double nail;
6) first prick out deep hole with drill rod alignment rivet jack to sill may roadbed bank protection, then thrown into by rivet with mallet will among deep hole
Bank protection is reinforced matrix and is secured firmly on sill may roadbed bank protection;
Described sill may roadbed prefabricated bank protection bracing means, bank protection is reinforced matrix, is linked part and rivet is by precast reinforced concrete
Become or use rock section, cutting and boring batch production to make.
For general technical staff of the technical field of the invention, without departing from the inventive concept of the premise,
Its framework form can be flexible and changeable, simply makes some simple deduction or replace, all should be considered as belonging to the present invention by being carried
The scope of patent protection that the claims handed over determine.
In addition to the technical characteristic described in description, it is the known technology of those skilled in the art.
Claims (2)
1. a sill may roadbed bank protection fast reinforcing, it is characterised in that include bank protection reinforce matrix, double nail link part, four
Nail links part and rivet, and wherein, matrix reinforced by bank protection is rectangle, and bank protection is reinforced four corners of matrix and is provided with and links part and insert
Hole, is provided centrally with rivet jack, and double nails link part and four nails link part and are made up of panel and pin, and pin is vertically set on
On panel, on panel, diameter and the aligned gaps of pin reinforce the adjacent diameter linking part jack of matrix and gap phase with bank protection
Coincideing, the pin that double nails link part and four nails link on part is reinforced the upper surface of matrix from bank protection and is inserted and link two part jack
Block or four pieces of bank protections are reinforced matrix and are linked together, and rivet is then reinforced the centre of matrix upper surface and inserted through rivet jack from bank protection
Enter composition solidification bank protection in the earth of sill may roadbed;
Using method is as follows:
1) bank protection preventing from making rectangle middle with hole using concrete prefabricated method or stone material cutting is reinforced matrix, is linked
Part and rivet are standby;
2) existing by the leveling compacting of sill may roadbed bank protection, if sill may overlay rubble fine sand is standby;
3) accurate diced into sections, lays bank protection by diced into sections and reinforces matrix, makes sill may roadbed bank protection be reinforced matrix by bank protection complete
Whole covering;
4) every four pieces of adjacent bank protections are reinforced matrix corner and are followed closely with one four and link part and be fixed together;
5) every two pieces of bank protections of sill may roadbed bank protection edge are reinforced matrix and are linked part be fixed together with double nail;
6) first prick out deep hole with drill rod alignment rivet jack to sill may roadbed bank protection, then thrown into by rivet with mallet will among deep hole
Bank protection is reinforced matrix and is secured firmly on sill may roadbed bank protection.
Sill may roadbed bank protection fast reinforcing the most according to claim 1, it is characterised in that bank protection reinforces matrix, hook
Even part and rivet are become by precast reinforced concrete or use rock to cut into slices, cutting and boring batch production are made.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610709190.3A CN106120649B (en) | 2016-08-24 | 2016-08-24 | A kind of sill may roadbed bank protection fast reinforcing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610709190.3A CN106120649B (en) | 2016-08-24 | 2016-08-24 | A kind of sill may roadbed bank protection fast reinforcing |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106120649A true CN106120649A (en) | 2016-11-16 |
CN106120649B CN106120649B (en) | 2018-08-07 |
Family
ID=57274222
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610709190.3A Active CN106120649B (en) | 2016-08-24 | 2016-08-24 | A kind of sill may roadbed bank protection fast reinforcing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106120649B (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002129572A (en) * | 2000-10-27 | 2002-05-09 | Heisei Engineering:Kk | Slope coating material and slope coating method using the same |
CN1540108A (en) * | 2003-10-31 | 2004-10-27 | 三峡大学 | Method and equipment for protecting and greening side slope |
CN101117796A (en) * | 2007-09-03 | 2008-02-06 | 程卫国 | Inter-embedding type slope protection block and construction method therefor |
CN103774617A (en) * | 2013-12-06 | 2014-05-07 | 浙江水利水电学院 | Mutually-embedded type slope protection building block and construction method thereof |
CN204282299U (en) * | 2014-11-12 | 2015-04-22 | 黄肖峰 | A kind of modularization water conservancy slope protection net |
CN204435317U (en) * | 2015-02-01 | 2015-07-01 | 刘进强 | A kind of cross protective slope structure |
-
2016
- 2016-08-24 CN CN201610709190.3A patent/CN106120649B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002129572A (en) * | 2000-10-27 | 2002-05-09 | Heisei Engineering:Kk | Slope coating material and slope coating method using the same |
CN1540108A (en) * | 2003-10-31 | 2004-10-27 | 三峡大学 | Method and equipment for protecting and greening side slope |
CN101117796A (en) * | 2007-09-03 | 2008-02-06 | 程卫国 | Inter-embedding type slope protection block and construction method therefor |
CN103774617A (en) * | 2013-12-06 | 2014-05-07 | 浙江水利水电学院 | Mutually-embedded type slope protection building block and construction method thereof |
CN204282299U (en) * | 2014-11-12 | 2015-04-22 | 黄肖峰 | A kind of modularization water conservancy slope protection net |
CN204435317U (en) * | 2015-02-01 | 2015-07-01 | 刘进强 | A kind of cross protective slope structure |
Also Published As
Publication number | Publication date |
---|---|
CN106120649B (en) | 2018-08-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102733827B (en) | Tunnel arch exchanging construction method and construction structure in tunnel arch exchanging construction | |
CN104074199B (en) | Underwater bearing platform construction method | |
CN106958208A (en) | A kind of novel reinforced method of double curvature arched bridge | |
CN206768834U (en) | A kind of deep basal pit combined support structure | |
CN102061923B (en) | Tunnel construction method capable of protecting existing building | |
CN104294769B (en) | A kind of piling and the construction method increasing the built bridge abutment structure of platform cap composite reinforcement | |
CN101446088A (en) | Construction method for pole and tower foundation in Gobi Desert gravelly soil area | |
CN108265735A (en) | High latitude High Temperature Permafrost area highway raft plate-pile composite foundation and process for constructing | |
CN104295301B (en) | The construction method in a kind of shallow buried covered excavation cracked rock mass subway tunnel crosspoint | |
CN107355008A (en) | A kind of prefabricated attachment structure and method of newly-increased steel core concrete column and existing structure | |
CN204551491U (en) | A kind of side slope protection greening structure | |
CN108374674B (en) | Six pilot tunnels, 12 step Underground Space Excavation method for protecting support | |
CN103590599A (en) | Self-compaction mode locking device and using method | |
CN105821887A (en) | Installing method for stand column pile constructed in pebble bed | |
CN204097889U (en) | A kind of piling and the built bridge abutment structure of increase platform cap composite reinforcement | |
CN207919491U (en) | A kind of bank slope ecological safeguard structure | |
CN106120649B (en) | A kind of sill may roadbed bank protection fast reinforcing | |
CN207812482U (en) | A kind of stone masonry vertical retaining wall structure ecological reconstruction structure | |
CN206127984U (en) | Quick reinforcing apparatus of river dam road bed bank protection | |
CN110241817A (en) | A kind of impaired after-construction method of the friction pile stake holes of emergency repair engineering | |
CN202673305U (en) | Construction structure for use in tunnel arch changing construction | |
CN106120654A (en) | A kind of sill may roadbed bank protection rapid reinforcement construction module | |
CN205502020U (en) | Sloping underground structure is put to stagnant water | |
CN104631474B (en) | A kind of side slope protection greening structure | |
CN107119726B (en) | Equipment, method is stayed in a kind of post-cast strip |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20180628 Address after: 436000 Linjiang Township, Huarong District, Ezhou, Hubei Applicant after: Hubei three and pipe pile Co., Ltd. Address before: 273500 Room 501, office building 499 Hengfeng Road, Central Electrical and Mechanical Industrial Park, Zoucheng downtown, Jining, Shandong Applicant before: ZOUCHENG ZHONGDA INTELLECTUAL PROPERTY ADVISORY SERVICES CO., LTD. |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |