CN106120501A CN201610655959.8A CN201610655959A CN106120501A CN 106120501 A CN106120501 A CN 106120501A CN 201610655959 A CN201610655959 A CN 201610655959A CN 106120501 A CN106120501 A CN 106120501A
Authority
CN
China
Prior art keywords
bars
concrete slab
poured concrete
former
precoated plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610655959.8A
Other languages
Chinese (zh)
Other versions
CN106120501B (en
Inventor
王新泉
崔允亮
张世民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University City College ZUCC
Original Assignee
Zhejiang University City College ZUCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University City College ZUCC filed Critical Zhejiang University City College ZUCC
Priority to CN201610655959.8A priority Critical patent/CN106120501B/en
Publication of CN106120501A publication Critical patent/CN106120501A/en
Application granted granted Critical
Publication of CN106120501B publication Critical patent/CN106120501B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Architecture (AREA)
  • Road Paving Structures (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The present invention relates to a kind of existing barricade section roadbed spelling width and increase structure and construction method, former side slope of embankment excavation is formed step-like, cast-in-situ bored pile and column are set outside original barricade, original barricade and column pour Bars In Poured Concrete Slab and L-type precoated plate is set outside Bars In Poured Concrete Slab as pouring the template of cellular concrete, described Bars In Poured Concrete Slab returning with cellular concrete notch cuttype and builds.Construction speed and the construction quality of wide structure spelled by the structure that the present invention relates to and the construction method guaranteed roadbed of energy, alleviates embankment and conducts oneself with dignity, ensure that the economy of construction, safety, simplification working procedure, economizes the land resource, has preferable economic technology benefit.

Description

Existing barricade section roadbed is spelled width and is increased structure and construction method
Technical field
The present invention relates to a kind of existing barricade section roadbed spelling money and increase structure, particularly relate to existing barricade section roadbed spelling width and add The construction method of high structure.
Technical background
Along with economic development, rural economy was continuous progressive in recent years, and improving constantly of people's living standard makes People are more and more higher to the requirement of quality of life.Road belongs to one of basic facilities of people's go off daily, in order to Guarantee that people go on a journey is the most comfortable convenient.When many built roads are built, social economy's level, technical merit and construction are managed The restriction read, has quite a few the most not adapt to the volume of traffic and increases and the requirement of social development.Reorganization and expansion to existing road Just become the another solution outside newly-built road, road construction occupies increasingly consequence.Changing expansion It is frequently encountered roadbed in building and spells wide problem.
Roadbed uses the wide technology of spelling to be directly connected to the normal pass of whole subgrade settlement and road, from conventional Engineering Projects Understand, if new-old concrete bond spelling width position processes the bad differential settlement phenomenon that easilys lead to and occurs, and then produce longitudinal splitting Seam, to such an extent as to cause lot of unstable factor for transportation.Therefore to widen section lay time, new-old concrete bond to be strengthened The combination at position, the most just can increase the shear resistance of binding site so that the differential settlement that new-old concrete bond occurs obtains With stable, in order to avoid new subgrade settlement is corrupted to old road base.Roadbed needs to remove the gear of former roadbed bank protection in spelling wide work progress simultaneously Wall, this measure is likely to result in landslide, needs again new roadbed to be put slope after roadbed pile driving construction completes simultaneously, occupies a large amount of Land resource.Being left intact under the bed course of new and old roadbed stage disk bottom, single bed course is likely to result in pad in the past The sliding of layer.
In consideration of it, for new and old roadbed settlement issues, roadbed such as occupies cultivated land at the construction Difficulties, needs invention one at present badly and executes Work speed is fast, and construction quality is good, and the existing barricade section roadbed economized the land resource is spelled width and increased construction method.
Summary of the invention
It is an object of the invention to provide a kind of existing barricade section roadbed spelling width and increase structure and construction method.
For achieving the above object, present invention employs techniques below scheme:
A kind of existing barricade section roadbed is spelled width and is increased structure, mainly includes that cast-in-situ bored pile, column, Bars In Poured Concrete Slab, L-type are prefabricated Plate, cellular concrete, reinforced mesh, former barricade, former embankment, step etc., it is characterised in that cast-in-situ bored pile top arranges column Platform, column platform pours column;Arranging Bars In Poured Concrete Slab on former barricade and column, Bars In Poured Concrete Slab outer rim arranges non-slipping block;L-type precoated plate sets Put to coordinate to support on Bars In Poured Concrete Slab and form stepped slope structure;Pour cellular concrete on Bars In Poured Concrete Slab and bar-mat reinforcement is successively set Sheet.
One layer of upper berth, top layer, ground sand-gravel cushion around described cast-in-situ bored pile, sand-gravel cushion arranges rhone.
Described drain pipe one end is arranged in sand stone layer and arranges filter screen.
Described column top arranges bearing.
Reserved hole slot and bar-shaped trough on described Bars In Poured Concrete Slab.
Described L-type precoated plate is with draw-in groove, and adjacent L-type precoated plate joggle is together.
It is step that described former side slope of embankment is rested and reorganized, and every layer of step is provided with one layer of reinforcing bar with pouring of cellular concrete Mesh sheet.
Described L-type precoated plate surface covers backfill soil and afforests.
Described existing barricade section roadbed is spelled width and is increased the construction method of structure, it is characterised in that comprise the following steps:
1) former side slope of embankment is rested and reorganized: former barricade is motionless, step excavation on former side slope of embankment;
2) lower support structure construction: after bored concrete pile intensity hole to be drilled reaches design requirement, on every cast-in-situ bored pile top Portion installs template and pours pylon, then backfills sand-gravel cushion and arranges rhone, sets up falsework and spread on sand-gravel cushion If end template, shored by regulation and be adjusted to end template specify position, finally carry out Bars In Poured Concrete Slab and pour;
3) L-type precoated plate is installed: the most successively installing L-type precoated plate, neighbouring L-type precoated plate joggle is one Rising, bottom arranges support, and precoated plate is installed by the superiors, backfills one after all precoated plates install on the step formed Divide backfill soil;
4) cellular concrete pours: first between step bottommost and Bars In Poured Concrete Slab backfill one layer of sand-gravel cushion, then by Layer carries out cellular concrete and pours and successively lay reinforced mesh, after cellular concrete intensity reaches design requirement, carries out new Road surface, guardrail and gutter construction, finally cover backfill soil at new side slope of embankment upper surface and plant green plants.
The present invention has following feature and a beneficial effect:
(1) hole drilling bored concrete pile and pylon construction, and pouring reinforcement concrete plate on pylon are drawn outside roadbed side slope, existing Water and on plate, pour cellular concrete, then earth-covering greening, this form of construction work economy environmental protection again.
(2) template that L-type precoated plate joggle pours as cellular concrete together, can prevent as side slope step again Protect.
(3) old road dike is strengthened linking together by reinforced mesh with new embankment.
(4) existing road is widened, it is not necessary to remove old barricade, old barricade is spelled as roadbed wide structure one Point.
Accompanying drawing explanation
Fig. 1 is that the present invention existing barricade section roadbed spelling width increases structural representation;
Fig. 2 to Fig. 7 is construction technology of the present invention each stage schematic diagram successively.
In figure: in figure: 1. cast-in-situ bored pile;2. column;3. sand-gravel cushion;The most former barricade;5. rhone;6. gutter; 7. drain pipe;8. clip;9. filter screen;10. sand stone layer;11. Bars In Poured Concrete Slabs;12.L type precoated plate;13. draw-in grooves;14. hole slots;Article 15., Shape groove;16. precoated plates;17. non-slipping blocks;18. cellular concretes;19. backfill soil;20. former embankments;21. steps;22. former roadsides Slope line;23. reinforced mesh;24. former road surfaces;25. column platforms;26. falseworks;27. shore;28. brackets;29. chocks;30. End template;31. bearings;32. new road surfaces;33. baffle plates;34. above-ground routes.
Detailed description of the invention
These enforcements such as present embodiment construction process for bored pile, concreting technique are not stated tired, emphasis Illustrate that the present invention relates to existing barricade section roadbed spells the wide embodiment increasing structure and construction method.
Fig. 1 is that the present invention existing barricade section roadbed spelling width increases structural representation;Shown in reference Fig. 1, cast-in-situ bored pile 1, Column 2, Bars In Poured Concrete Slab 11, L-type precoated plate 12, cellular concrete 18, reinforced mesh 23, former barricade 4, former embankment 20, step 21 etc., It is characterized in that, cast-in-situ bored pile 1 top arranges column platform 25, and column platform 25 pours column 2;Set on former barricade 4 and column 2 Putting Bars In Poured Concrete Slab 11, Bars In Poured Concrete Slab 11 outer rim arranges non-slipping block 17;L-type precoated plate 12 is arranged on Bars In Poured Concrete Slab 11 cooperation and supports 35 formation Stepped slope structure;Pour cellular concrete 18 on Bars In Poured Concrete Slab 11 and reinforced mesh 23 is successively set.
Former width of roadway is 10m, needs to widen 4m;Domatic clear list processing is carried out according to 50cm to former at the old and new's road dyke combination After, cut slope according still further to 1:1-1:25.Depth of fill is 5m, and wall height is 3m;Side slope step dimension bottom-up for 100cm × 100cm, slopes inwardly 2% at the bottom of step;Cast-in-situ bored pile, cast-in-situ bored pile diameter it is respectively provided with at 2m, 4m outside former barricade For 500mm, a length of 8000mm, 200mm above ground level, longitudinally adjacent spacing is 5m;The a diameter of 400mm of important actor, highly 2700mm;In-situ deposited prefabricated plate thickness is 300mm;L-type precoated plate thickness is 100mm, card well width 95mm, degree of depth 150mm.
With reference to shown in Fig. 2 to Fig. 7, the invention mainly comprises following construction procedure:
(1) former side slope of embankment is rested and reorganized: former barricade 4 is motionless, step excavation 21 on former side slope of embankment;
(2) lower support structure construction: after bored concrete pile 1 intensity hole to be drilled reaches design requirement, at every cast-in-situ bored pile 1 Top installs template and pours pylon 25, then backfills sand-gravel cushion 3 and arranges rhone 5, setting up template and prop up on sand-gravel cushion 3 Frame 26 also lays end template 30, shores 27 by regulation and is adjusted to end template 30 specify position, finally carries out Bars In Poured Concrete Slab 11 and water Build;
(3) L-type precoated plate is installed: the most successively install L-type precoated plate 12, neighbouring L-type precoated plate 12 joggle Together, bottom arranges support 35, and precoated plate 16 is installed by the superiors, after all precoated plates install on the step formed Backfill part backfill soil 19;
(4) cellular concrete pours: first backfill one layer of sand-gravel cushion 3 between step 21 bottommost and Bars In Poured Concrete Slab 11, The most successively carrying out cellular concrete 18 pour and successively lay reinforced mesh 23, band cellular concrete 18 intensity reaches design and wants After asking, carry out new road surface 32, guardrail 33 and gutter 6 and construct, finally cover backfill soil 19 at new side slope of embankment upper surface and plant Plant green plants.

Claims (9)

1. existing barricade section roadbed spell width increase a structure, mainly include cast-in-situ bored pile (1), column (2), drain pipe (7), Bars In Poured Concrete Slab (11), L-type precoated plate (12), cellular concrete (18), reinforced mesh (23), former barricade (4), former embankment (20), platform Rank (21) etc., it is characterised in that cast-in-situ bored pile (1) top arranges column platform (25), and column platform (25) pours column (2); Arranging Bars In Poured Concrete Slab (11) on former barricade (4) and column (2), Bars In Poured Concrete Slab (11) outer rim arranges non-slipping block (17);L-type precoated plate (12) It is arranged on Bars In Poured Concrete Slab (11) and coordinates support (35) to form stepped slope structure;Bars In Poured Concrete Slab pours cellular concrete on (11) (18) reinforced mesh (23) and is successively set.
Existing barricade section roadbed the most according to claim 1 is spelled width and is increased structure, it is characterised in that described drill-pouring Stake (1) one layer of upper berth, top layer, ground sand-gravel cushion (3) around, sand-gravel cushion (3) arranges rhone (5).
Existing barricade section roadbed the most according to claim 1 is spelled width and is increased structure, it is characterised in that described drain pipe (7) One end is arranged in sand stone layer (10) and arranges filter screen (9).
Existing barricade section roadbed the most according to claim 1 is spelled width and is increased structure, it is characterised in that described column (2) top Portion arranges bearing (31).
Existing barricade section roadbed the most according to claim 1 is spelled width and is increased structure, it is characterised in that described Bars In Poured Concrete Slab (11) upper reserved hole slot (14) and bar-shaped trough (15).
Existing barricade section roadbed the most according to claim 1 is spelled width and is increased structure, it is characterised in that described L-type precoated plate (12) with draw-in groove (13), adjacent L-type precoated plate (12) joggle is together.
Existing barricade section roadbed the most according to claim 1 is spelled width and is increased structure, it is characterised in that described former embankment (20) side slope is rested and reorganized is step (21), and every layer of step is provided with one layer of reinforced mesh with pouring of cellular concrete (18) (23)。
Existing barricade section roadbed the most according to claim 1 is spelled width and is increased structure, it is characterised in that described L-type precoated plate (12) surface covers backfill soil (19) and afforests.
9. existing barricade section roadbed described in claim 1-8 is spelled width and is increased the construction method of structure, it is characterised in that include with Lower step:
1) former side slope of embankment is rested and reorganized: former barricade (4) is motionless, step excavation (21) on former side slope of embankment;
2) lower support structure construction: after bored concrete pile hole to be drilled (1) intensity reaches design requirement, in every cast-in-situ bored pile (1) Top installs template and pours pylon (25), then backfills sand-gravel cushion (3) and arranges rhone (5), taking on sand-gravel cushion (3) If falsework (26) also lays end template (30), shore (27) by regulation and be adjusted to end template (30) specify position, After carry out Bars In Poured Concrete Slab (11) and pour;
3) L-type precoated plate is installed: the most successively installing L-type precoated plate (12), neighbouring L-type precoated plate (12) joggle exists Together, bottom arranges support (35), and precoated plate (16) is installed by the superiors, in formation after all precoated plates (16) install Backfill part backfill soil (19) on step;
4) cellular concrete 18 pours: first backfill one layer of sand-gravel cushion between step (21) bottommost and Bars In Poured Concrete Slab (11) (3), the most successively carry out cellular concrete (18) and pour and successively lay reinforced mesh (23), treat cellular concrete (18) intensity After reaching design requirement, carry out new road surface (32), guardrail (33) and gutter (6) construction, finally at new side slope of embankment upper surface Cover backfill soil (19) and plant green plants.
CN201610655959.8A 2016-08-10 2016-08-10 Existing barricade section roadbed spells width and increases structure and construction method Active CN106120501B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610655959.8A CN106120501B (en) 2016-08-10 2016-08-10 Existing barricade section roadbed spells width and increases structure and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610655959.8A CN106120501B (en) 2016-08-10 2016-08-10 Existing barricade section roadbed spells width and increases structure and construction method

Publications (2)

Publication Number Publication Date
CN106120501A true CN106120501A (en) 2016-11-16
CN106120501B CN106120501B (en) 2018-01-09

Family

ID=57258749

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610655959.8A Active CN106120501B (en) 2016-08-10 2016-08-10 Existing barricade section roadbed spells width and increases structure and construction method

Country Status (1)

Country Link
CN (1) CN106120501B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106835877A (en) * 2017-01-20 2017-06-13 杭州江润科技有限公司 The construction method of roadbed widening structure
CN107386031A (en) * 2017-09-04 2017-11-24 崔宇鹏 The processing method of Expressway Extension Project joint portion
CN107447778A (en) * 2017-09-19 2017-12-08 中冶沈勘工程技术有限公司 The heightening and consolidation structure and method of a kind of in-service reinforced concrete retaining wall
CN107653833A (en) * 2017-09-29 2018-02-02 中冶华天工程技术有限公司 Box ecoscape barricade
CN107747261A (en) * 2017-11-18 2018-03-02 固远晨通科技发展有限公司 A kind of new Soft Clay seasonal frozen soil region highway subgrade structure and construction method
CN108166347A (en) * 2018-02-10 2018-06-15 山东省交通规划设计院 A kind of widened structure and construction method applied to mountain highway barricade section
CN108656831A (en) * 2018-05-10 2018-10-16 杭州江润科技有限公司 Combined type skeleton piling and layout of stones moulds mountain and construction method
CN109306707A (en) * 2018-11-13 2019-02-05 江西博慧工程技术服务有限公司 A kind of Widened roads structure and construction method
CN109853624A (en) * 2019-03-29 2019-06-07 山东省交通规划设计院 A kind of enlarging construction method for existing highway rectangle culvert
CN113201986A (en) * 2021-04-07 2021-08-03 安徽省交通规划设计研究总院股份有限公司 Roadbed spliced wide portal type retaining wall structure and construction method
CN113215995A (en) * 2021-05-11 2021-08-06 广州市市政工程设计研究总院有限公司 Method for constructing bridge road in narrow space
WO2023213117A1 (en) * 2022-05-05 2023-11-09 中交路桥建设有限公司 Widening structure and construction method for existing subgrade embankment wall section near river

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101003975A (en) * 2007-02-06 2007-07-25 程卫国 Retaining wall in lightweight, and construction method
CN101105034A (en) * 2007-07-24 2008-01-16 江西省公路管理局 Ecological protection method for sand-filling road foundation hollow block
WO2008131480A1 (en) * 2007-04-26 2008-11-06 Paul Camilleri Method of constructing building slabs and pavements and storing water
CN103628378A (en) * 2013-11-12 2014-03-12 江苏省镇江市路桥工程总公司 Waterside road broadened embankment structure and construction method thereof
CN104372765A (en) * 2014-11-21 2015-02-25 浙江省水利水电勘测设计院 Frame column type frame bank protection structure for city watercourse and construction method of bank protection structure
CN204940333U (en) * 2015-09-13 2016-01-06 吴帆 From embedded infiltration greening block and ecological retaining wall
CN205934629U (en) * 2016-08-10 2017-02-08 浙江大学城市学院 Wide structure of increasing is pieced together to existing barricade section road bed

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101003975A (en) * 2007-02-06 2007-07-25 程卫国 Retaining wall in lightweight, and construction method
WO2008131480A1 (en) * 2007-04-26 2008-11-06 Paul Camilleri Method of constructing building slabs and pavements and storing water
CN101105034A (en) * 2007-07-24 2008-01-16 江西省公路管理局 Ecological protection method for sand-filling road foundation hollow block
CN103628378A (en) * 2013-11-12 2014-03-12 江苏省镇江市路桥工程总公司 Waterside road broadened embankment structure and construction method thereof
CN104372765A (en) * 2014-11-21 2015-02-25 浙江省水利水电勘测设计院 Frame column type frame bank protection structure for city watercourse and construction method of bank protection structure
CN204940333U (en) * 2015-09-13 2016-01-06 吴帆 From embedded infiltration greening block and ecological retaining wall
CN205934629U (en) * 2016-08-10 2017-02-08 浙江大学城市学院 Wide structure of increasing is pieced together to existing barricade section road bed

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
吴晓峰等: "《悬臂式挡土墙段道路路基拓宽方案设计》", 《城市道桥与防洪》 *

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106835877B (en) * 2017-01-20 2019-01-22 西安市市政建设(集团)有限公司 The construction method of roadbed widening structure
CN106835877A (en) * 2017-01-20 2017-06-13 杭州江润科技有限公司 The construction method of roadbed widening structure
CN107386031A (en) * 2017-09-04 2017-11-24 崔宇鹏 The processing method of Expressway Extension Project joint portion
CN107447778A (en) * 2017-09-19 2017-12-08 中冶沈勘工程技术有限公司 The heightening and consolidation structure and method of a kind of in-service reinforced concrete retaining wall
CN107653833A (en) * 2017-09-29 2018-02-02 中冶华天工程技术有限公司 Box ecoscape barricade
CN107747261A (en) * 2017-11-18 2018-03-02 固远晨通科技发展有限公司 A kind of new Soft Clay seasonal frozen soil region highway subgrade structure and construction method
CN108166347B (en) * 2018-02-10 2023-08-25 山东省交通规划设计院 Widening structure applied to mountain highway retaining wall section and construction method
CN108166347A (en) * 2018-02-10 2018-06-15 山东省交通规划设计院 A kind of widened structure and construction method applied to mountain highway barricade section
CN108656831A (en) * 2018-05-10 2018-10-16 杭州江润科技有限公司 Combined type skeleton piling and layout of stones moulds mountain and construction method
CN109306707A (en) * 2018-11-13 2019-02-05 江西博慧工程技术服务有限公司 A kind of Widened roads structure and construction method
CN109853624B (en) * 2019-03-29 2021-09-14 山东省交通规划设计院集团有限公司 Extension construction method for existing highway rectangular culvert
CN109853624A (en) * 2019-03-29 2019-06-07 山东省交通规划设计院 A kind of enlarging construction method for existing highway rectangle culvert
CN113201986A (en) * 2021-04-07 2021-08-03 安徽省交通规划设计研究总院股份有限公司 Roadbed spliced wide portal type retaining wall structure and construction method
CN113201986B (en) * 2021-04-07 2022-12-02 安徽省交通规划设计研究总院股份有限公司 Roadbed spliced wide portal retaining wall structure and construction method
CN113215995A (en) * 2021-05-11 2021-08-06 广州市市政工程设计研究总院有限公司 Method for constructing bridge road in narrow space
CN113215995B (en) * 2021-05-11 2022-06-10 广州市市政工程设计研究总院有限公司 Method for constructing bridge road in narrow space
WO2023213117A1 (en) * 2022-05-05 2023-11-09 中交路桥建设有限公司 Widening structure and construction method for existing subgrade embankment wall section near river

Also Published As

Publication number Publication date
CN106120501B (en) 2018-01-09

Similar Documents

Publication Publication Date Title
CN106120501B (en) Existing barricade section roadbed spells width and increases structure and construction method
CN205934629U (en) Wide structure of increasing is pieced together to existing barricade section road bed
CN108797249A (en) The construction method of soft soil roadbed high roadbed steep slope road section Foam lightweight soil
CN107386317A (en) Foam concrete lightweight barricade and construction method are excavated after a kind of first precompressed of deep ultra-soft soil
CN109750571A (en) A kind of road landslide emergency and permanent supporting and retaining system integral structure and construction method
CN104120736A (en) Construction method of reinforced concrete retaining wall
CN205778879U (en) Super-large-section tunnel drilling and blasting method enlarging constructing structure in situ
CN202627166U (en) Novel water-discharging ecological zone for town road
KR20200024519A (en) Solar panel installing structure using linear site
CN210797316U (en) Box culvert construction structure on soft foundation
CN209443368U (en) The overhead anti-ponding structure in bridge floor edge
CN109577183A (en) The anti-ponding structure in overhead bridge floor edge and construction
CN214573096U (en) Pavement paving structure with high water permeability
CN205502070U (en) A dual -purpose underground gallery structure
CN212427186U (en) Slide-resistant plate retaining wall for slope protection
CN211815447U (en) Maintenance structure that sinks is damaged to road surface of crossing pipeline department bituminous paving
CN204509922U (en) Underpasses structure
CN204753289U (en) System is widened to road on settlement by soaking loess foundation layer
CN211144529U (en) Rich water loess tunnel precipitation construction structures
CN109372013B (en) Comprehensive pipe gallery on soft foundation filled with EPS (expandable polystyrene) mixed soil and construction method
CN210104468U (en) Water-permeable prefabricated assembled concrete road
RU2453650C1 (en) Complex for construction of motor road on piles
CN106906829A (en) A kind of horizontal soil body reinforcement means of subway open-cut foundation ditch
CN107858886B (en) Viaduct foundation peripheral ground road and construction method thereof
CN206916773U (en) Foam concrete lightweight barricade is excavated after the first precompressed of deep ultra-soft soil

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant