CN103628378A - Waterside road broadened embankment structure and construction method thereof - Google Patents

Waterside road broadened embankment structure and construction method thereof Download PDF

Info

Publication number
CN103628378A
CN103628378A CN201310561704.1A CN201310561704A CN103628378A CN 103628378 A CN103628378 A CN 103628378A CN 201310561704 A CN201310561704 A CN 201310561704A CN 103628378 A CN103628378 A CN 103628378A
Authority
CN
China
Prior art keywords
embankment
water
side slope
former
new
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310561704.1A
Other languages
Chinese (zh)
Other versions
CN103628378B (en
Inventor
管鹤楼
赵秀娟
刘林
戴超明
李红卫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Zhenjiang Road and Bridge Engineering Co., Ltd.
Original Assignee
Jiangsu Zhenjiang Road & Bridge Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Zhenjiang Road & Bridge Engineering Corp filed Critical Jiangsu Zhenjiang Road & Bridge Engineering Corp
Priority to CN201310561704.1A priority Critical patent/CN103628378B/en
Publication of CN103628378A publication Critical patent/CN103628378A/en
Application granted granted Critical
Publication of CN103628378B publication Critical patent/CN103628378B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Abstract

The invention relates to a waterside road broadened embankment structure, which is characterized in that the waterside side of a new embankment is provided with a waterproof maintenance pile, and the outer side of the maintenance pile is provided with a dumping stone weights body; the lower part of the new embankment is a solidified soil layer, the upper part of the new embankment is a lightweight filler layer, and the contact part of the solidified soil layer and the lightweight filler layer is provided with a horizontal reinforced body and a vertical reinforced body; a grouting strengthened body is arranged in an original embankment, and the front end of the grouting strengthened body is a reinforced connecting section; and the side slopes on the top surface and outer side of the new embankment and the two sides of the maintenance pile are respectively provided with a waterproof later, and the bottom of the dumping stone weights body is provided with an impervious blanket. According to the invention, the connection strength and integrity of the new and original embankments can be enhanced, an outside water body is prevented from permeating in the embankments from multiple beddings, and the anti-uplift performance of the embankment can be improved, therefore, the embankment structure has good technical and economic benefits. The invention also provides a construction method of the broadened embankment structure.

Description

A kind of Widening Embankment structure of highway near water and construction method
Technical field
The present invention relates to a kind of highway embankment and widen structure, particularly a kind of Widening Embankment structure of highway near water and construction method, can strengthen new former embankment intensity and globality, prevent that extraneous water body from infiltrating, improving embankment stability.Belong to highway engineering field, be applicable to old road reconstruction and extension project, be specially adapted near water the one-sided or bilateral embankment widening project of highway.
Background technology
In recent years, along with developing rapidly of China's economy, traffic volume of highway cumulative year after year, the traffic volume of some highways has approached saturation flow, and to this, for meeting growing transport need and social development needs, highway reconstruction and expansion project is more and more.Though these projects have higher Technological Economy value to improving category of roads and improving road network structure, due to the settlement difference of embankment He Xin road, old road embankment, cause new former embankment junction to be prone to the qualitative problems of construction such as pavement cracking, local subsidence.In addition, for original path, for along the river, for riverine road, can run into unavoidably one-sided or bilateral problem near water, its mechanical characteristic is more complicated, also there will be the engineering problems such as seepage failure, embankment floating if deal with improperly.
For strengthen new-old pavement combination, effectively control the differential settlement amount of new and old roadbed, at present existing more processing method, common are and adopt new former embankment junction step excavation, lays Application of geosynthetics-reinforced layer, adopts the engineering measures such as light filler railway embankment using.Wherein, step excavation within the scope of the embankment fill material of step excavation Shi Jiu road, new former embankment junction, this method construction is simple, can strengthen to a certain extent the bonding strength of new former embankment junction; It is to lay the materials such as geo-grid, reinforced mesh within the scope of new embankment fill material that Application of geosynthetics-reinforced bed course, reinforced soil embankment are set, with globality and the intensity of reinforcer; It is to adopt light filler as embankment fill material that light road bank fills, and this method can alleviate the weight of new railway embankment using to a great extent, reduces newly to fill out the subsidiary stress of embankment to former embankment basis.
Although said method can play very good renovating effect in the lower section of groundwater table, but in section near water, but be difficult to resolve certainly the seepage failure problem of embankment fill material and the infiltration problem of extraneous water body, cause embankment soil erosion, along with the bottom soil body is loose, vacancy, even if there is reinforcement material, still keep embankment integrality, even if similar lightweight cellular concrete etc. has the filler that integral body is filled effect, also can ftracture, and because of the certain floating of the higher generation of water level near water.
In sum, day by day ripe for the measure that solves old road widened section relative settlement problem in engineering, and form the combined construction method of various measures, and play and avoid new former embankment binding site to occur the problem of relative settlement and cracking at suitable engineering specifications.Yet existing measure rarely has and relates to old road embankment supporting capacity and improve, control the design that causes old roadbed sedimentation again (distortion) because of inclined load increase; Even if highway enlarging time has the related measure of the conservation of soil and water near water, but the On The Floating likely occurring for embankment and whole antiseepage ask that body often do not considered by emphasis, have certain hidden dangers in project.
Given this, differential settlement for the old and new's embankment after minimizing road widening, successfully manage section soil erosion near water and On The Floating, improve the globality widen highway subgrade, urgently invent a kind of intensity and globality that strengthens new former embankment at present, prevent that extraneous water body from infiltrating, improving the Widening Embankment structure of highway near water and the construction method of embankment stability.
Summary of the invention
The object of the present invention is to provide a kind of intensity and globality that can simultaneously strengthen new former embankment, and can effectively stop outside water body to infiltrate, improve the novel Widening Embankment structure of highway near water and the construction method of embankment stability and non-deformability.
In order to realize above-mentioned technical purpose, the present invention has adopted following technical scheme:
A highway Widening Embankment structure, is characterized in that being provided with water proof maintaining pile in the side near water of new embankment near water, and the outside of maintaining pile is provided with jackstone ballast body; The bottom of new embankment is for solidifying soil layer, and top is light filler layer, at curing soil layer and light filler layer contact position, is provided with transversal reinforcement body and vertical reinforced body; In former embankment, be provided with grouting and reinforcing body, grouting and reinforcing body front end is reinforcement linkage section; End face, outside side slope and maintaining pile both sides at new embankment arrange water barrier, in jackstone ballast body bottom, are provided with impervious blanket.
Described maintaining pile is near water the precast rc slab stake with ribbing with water isolating.
After the interior silt of curing soil layer effluent bed, rubble and former side slope of embankment regulation spoir mix cement and curing compound, compacting is filled and is formed, and solidifies in soil layer and is implanted with in advance vertical reinforced body, and end face is laid transversal reinforcement body.
Described vertical reinforced body can adopt indented bars or hard high strength reinforcement mesh sheet, and transversal reinforcement body can adopt geo-grid, high strength reinforcement mesh sheet or geotextile, between transversal reinforcement body and vertical reinforced body, adopts colligation to be connected or is welded to connect.
Light filler layer can be adopted as air bubble mix light-textured soil, foam beads mix light-textured soil or EPS particle light soil, is equipped with transversal reinforcement body in light filler layer.
Described grouting and reinforcing body, for tiltedly to draw hole from former side slope of embankment, forms in the slip casting of former embankment inner high voltage, and its bottom is provided with pressure and expands termination.
Described reinforcement linkage section is grouting and reinforcing body leading portion implanted reinforced bar cage and adopts pea gravel concreten to recharge to form.
Described impervious blanket adopts good pea gravel concreten, anti-seepage geomembrane or the splash guard of anti-permeability performance, and impervious blanket is closely connected with the water barrier in maintaining pile outside.
A construction method for highway Widening Embankment structure near water, is characterized in that comprising the following steps:
1) before construction, prepare: clear up former side slope of embankment, organizing construction's equipment is marched into the arena, and cofferdam is set and carries out artificial rainmaking;
2) set water proof maintaining pile: in embankment outside, set water proof maintaining pile, water proof maintaining pile should be inserted to steady soil;
3) lay water barrier: inner side and outer surface at water proof maintaining pile are laid water barrier;
4) Seepage: impervious blanket is laid in the outside at water proof maintaining pile, and impervious blanket is closely connected with the water barrier in maintaining pile outside;
5) grouting and reinforcing body construction: from former roadbed side slope along the oblique hole of drawing to even interval in length and breadth, to drawing bottom, hole, carry out reaming processing, duct inner high voltage slip casting, at duct leading portion, implant reinforcing body reinforcing bar, recharge again pea gravel concreten, after fixed, former side slope of embankment is trimmed to step-like, exposed portions serve reinforcement section;
6) curing soil layer is set: bottom, the former river course of part pasture and water, mud are widened in cleaning, suitably digs after dark and solidify on the spot the riverbed soil body, and the spoir producing in work progress early stage is solidified and is backfilled to former embankment bed course end face absolute altitude, vertical reinforced body is set in solidified earth;
7) jackstone ballast body construction:, the top of impervious blanket arranges jackstone, form jackstone ballast body in the outside of maintaining pile, should prevent during construction that jackstone ballast body from damaging impervious blanket;
8) light filler is filled: until curing soil layer, reach after design strength, the light filler that paves of layering thereon, when each light filler is filled to former side slope of embankment step surface absolute altitude, lays transversal reinforcement body thereon;
9) side slope is repaired: after light filler has been filled, side slope outside new embankment is trimmed to design grade;
10) water barrier is laid: end face, outside side slope outside at new embankment are laid water barrier, and the two ends of outside side slope lateral septal water layer are connected closely with new embankment end face water barrier, maintaining pile medial septal water layer respectively;
11) follow-up construction: widen the follow-up constructions such as part road structure, gutter, side slope protection face and afforestation vegetation according to designing requirement construction.
the present invention has following feature and beneficial effect:
(1) at new former embankment joining place, grouting and reinforcing body is set and both can strengthens the bonding strength of new former embankment, prevent new former embankment joining place generation differential deformation, also can improve the stress performance of new former embankment, improve the supporting capacity of embankment.
(2) new embankment bottom adopts solidified earth to fill globality and the intensity that not only can improve embankment fill material, and can reduce and abandon earth volume, realizes twice laid, and forms abundant underlayer, and self-stable ability is stronger; New embankment top adopts light filler to fill, and takes full advantage of that light filler is lightweight, intensity is high, the advantage of good endurance, and can effectively reduce the subsidiary stress value of foundation soil, reduces the deformation of sedimentation of roadbed.
(3) outside embankment, the setting of maintaining pile can be played water proof simultaneously, strengthens stability, reduce river course and invade space consuming effect; The effect that the jackstone ballast body of its arranged outside can play and prevent seepage failure, strengthen stability.
(4) water barrier of embankment end face, side slope outside, the setting of maintaining pile both sides, and the setting of impervious blanket can cut off from many levels, extend the path that extraneous water body infiltrates embankment, guarantees that the moisture content of embankment meets design requirement, and prevents seepage failure.
In a word; feature of the present invention is both can improve globality and the intensity of the old and new's roadbed; can improve again near joint portion and the physical and mechanical property of new embankment; also can effectively prevent embankment generation seepage failure, thereby realized multi-angle, prevent the object of highway Widening Embankment disease, saving construction costs, protection of the environment near water.
Accompanying drawing explanation
Fig. 1 is a kind of highway near water of the present invention Widening Embankment structure section schematic diagram;
In figure: the former road structure of 1-, the former embankment of 2-, 3-reinforcement linkage section, 4-widen part road structure, 5-light filler layer, 6-transversal reinforcement body, 7-gutter, 8-leveling layer, 9-water barrier, 10-bank protection face, 11-vertical reinforced body, the curing soil layer of 12-, 13-water proof maintaining pile, 14-jackstone ballast body, 15-river course, 16-riverbed, 17-roadbed bed course, 18-grouting and reinforcing body, 19-impervious blanket, the former embankment soil matrix of 20-.
Specific embodiment
The side slope of embankment bench excavation construction of present embodiment Zhong Jiu road, maintaining pile construction technical requirement, the design and construction technical requirements of grouting serous fluid, light filler, pea gravel concreten, the laying construction technical requirements of reinforcing body reinforcing bar binding, transversal reinforcement body, in the present embodiment such as design and construction technical requirements of roadbed side slope protection, road structure, be not repeated, emphasis is set forth the embodiment that the present invention relates to structure.
Fig. 1 is a kind of highway near water of the present invention Widening Embankment structure section schematic diagram.Shown in Fig. 1, a kind of Widening Embankment of highway near water structure is mainly comprised of light filler layer 5, transversal reinforcement body 6, water barrier 9, vertical reinforced body 11, curing soil layer 12, water proof maintaining pile 13, jackstone ballast body 14, grouting and reinforcing body 18, impervious blanket 19.
The total length of grouting and reinforcing body 18 is 5000mm, adopt small-sized drill from former embankment 2 side slopes along 45 ° of inclination angles to embankment inner hole, pass roadbed bed course 17 to former embankment soil matrix 20, channel diameter 150mm, the diameter that bottom expands termination is 400mm, and horizontal, the vertical interval in duct is respectively 3000mm and 1500mm; The bottom of grouting and reinforcing body 18 is provided with and expands termination, the reinforcement linkage section 3 of 2000mm is established on top, reinforcing body is reinforcing cage, it is the indented bars that 12mm, strength grade are Q345 that main muscle adopts diameter, reinforcement linkage section 3 adopts pea gravel concreten backfills, until grouting and reinforcing body 18 and reinforcement linkage section 3 reach design strength more than 80% after, former embankment 2 side slope fillers are trimmed to step-like, vertical height and the transverse width of step are 1000mm, establish 3% leaning angle on step surface.In conjunction with artificial soil digging, interior reinforcement linkage section 3 parts of former embankment 2 are exposed to the soil body.
Part river course 15 bottom pasture and water, mud are widened in cleaning, dig after dark 2000mm, solidify on the spot 16 soil body 500mm left and right, original riverbed, and the spoir producing in work progress early stage and riverbed are dug out to the soil body solidify and be backfilled to former embankment bed course 17 end face absolute altitudes, at the interior pre-tree planter of curing soil layer 12, to reinforcing body 11, and lay transversal reinforcement body 6 at end face.
Vertical reinforced body 11 adopts long 2000mm diameter 16mmHRB345 indented bars, wherein stretches into and solidifies soil layer 12 segment length 800mm, uniformly-spaced arranges in length and breadth with 500mm.
Light filler layer 5 adopts EPS particle light soil, its foam: soil is 55:45, and dry density is no more than 1.1 * 103kg/m3, and unconfined compression strength is not less than 280 kPa; Light filler layer 5 filled height exceed former road structure 1 bottom surface 200mm.In light filler layer 5 paving process, at each step excavation plane place, all lay transversal reinforcement body 6, horizontal elongated laying in Widening Embankment, and should carry out pre-stretch-draw, minimum step place transversal reinforcement body 6 is connected with 11 colligations of vertical reinforced body, and construction technical requirement should meet the requirement of current specifications; Transversal reinforcement body 6 adopts earth grille, and the properties of geo-grid and construction technical requirement should meet the requirement of current specifications.
Table 1 transversal reinforcement body 6 design parameter tables
Mass area ratio deviation Thickness Amplitude error Ultimate strength Elongation at break Tearing brute force
7% ≥2.4mm -0.5% ≥9.5? KN/m 25~100% ≥0.24 KN
Water barrier 9 adopts composite geo-membrane.The lap length of water barrier 9 is not less than 200mm.The design parameter of water barrier 9 is referring to table 2.
Table 2 water barrier 9 parameter lists
Sequence number Project Design objective
1 Weight per unit area g/m 2 >=600(thickness >=2.7mm)
2 Thickness (with normal pressure relation) mm ≥2.7
3 Resistance to hydrostatic pressure power Mpa ≥0.6
4 Vertical transmission coefficient cm/s <1×10 -11
Water proof maintaining pile 13 adopts the good precast rc slab stake with ribbing of water isolating, and design maintenance stake 13 end face absolute altitudes exceed ordinary water level 1200mm, and adjacent sheet pile joining place is established watertight rubber bar.
Jackstone ballast body 14 adopts volume to be not less than 200cm 3long-pending the forming of piece clitter, piling up is highly 1000mm, along the transverse width on top, riverbed, is 1500mm, piece stone outer wrapping reinforcing cage, the plain steel-bar colligation that reinforcing cage employing diameter is 6mm forms.
Impervious blanket 19 material therefors are identical with water barrier 9, and paste and be connected with the water barrier 9 in water proof maintaining pile 13 outsides; Impervious blanket 19 is 3000mm along the transverse width on top, riverbed.
Highway Widening Embankment structure near water, main construction course is as follows:
1) before construction, prepare: clear up former embankment 2 side slopes, organizing construction's equipment is marched into the arena, and cofferdam is set and carries out artificial rainmaking;
2) set water proof maintaining pile: according to embankment, widen situation, set water proof maintaining pile 13 in embankment outside, water proof maintaining pile 13 should be inserted to and in steady soil, be not less than 1000mm;
3) lay water barrier: inner side and outer surface at maintaining pile are laid water barrier 9;
4) Seepage: impervious blanket 19 is laid in the outside at water proof maintaining pile 13, and impervious blanket 19 is closely connected with the water barrier 9 in maintaining pile 13 outsides;
5) grouting and reinforcing body construction: from former embankment 2 side slopes along the oblique hole of drawing to even interval in length and breadth, to drawing bottom, hole, carry out reaming processing, duct inner high voltage slip casting, at duct leading portion implanted reinforced bar cage, recharge again pea gravel concreten, after fixed, former side slope of embankment is trimmed to step-like, exposed portions serve reinforcement linkage section 3;
6) solidify soil layer construction: bottom, the former river course of part pasture and water, mud are widened in cleaning, suitably dig after dark and solidify on the spot riverbed 16 soil bodys, and the spoir producing in work progress early stage is solidified and is backfilled to former embankment bed course 17 end face absolute altitudes, form and solidify soil layer 12;
7) jackstone ballast body construction: in the outside of water proof maintaining pile 13, the top jackstone of impervious blanket 19, form jackstone ballast body 14, should prevent during construction that jackstone ballast body 14 from damaging impervious blankets 19;
8) light filler layer 5 fills: until curing soil layer 12, reach after design strength, the light filler that paves of layering thereon, when each light filler is filled to former side slope of embankment step surface absolute altitude, should lay transversal reinforcement body 6 thereon, light filler should be connected with reinforcement linkage section 3;
9) side slope is repaired: after light filler layer 5 has filled, side slope outside new embankment is trimmed to design grade;
10) water barrier is laid: in new embankment end face, outside side slope outside, lay water barrier 9, and the two ends of side slope side water barrier are connected closely with new embankment end face water barrier, water proof maintaining pile 13 medial septal water layers respectively;
11) follow-up construction: widen the follow-up constructions such as part road structure 4, gutter 7, side slope protection face 10 and afforestation vegetation according to designing requirement construction.

Claims (9)

1. a highway Widening Embankment structure near water, is characterized in that being provided with water proof maintaining pile in the side near water of new embankment, and the outside of maintaining pile is provided with jackstone ballast body; The bottom of new embankment is for solidifying soil layer, and top is light filler layer, at curing soil layer and light filler layer contact position, is provided with transversal reinforcement body and vertical reinforced body; In former embankment, be provided with grouting and reinforcing body, grouting and reinforcing body front end is reinforcement linkage section; End face, outside side slope and maintaining pile both sides at new embankment arrange water barrier, in jackstone ballast body bottom, are provided with impervious blanket.
2. the Widening Embankment of highway near water structure according to claim 1, described in it is characterized in that, maintaining pile is the precast rc slab stake with ribbing with water isolating near water.
3. the Widening Embankment of highway near water structure according to claim 1, it is characterized in that after silt in described curing soil layer effluent bed, rubble and former side slope of embankment regulation spoir mix cement and curing compound that compacting is filled forms, solidify in soil layer and be implanted with in advance vertical reinforced body, end face is laid transversal reinforcement body.
4. the Widening Embankment of highway near water structure according to claim 1, it is characterized in that described vertical reinforced body can adopt indented bars or hard high strength reinforcement mesh sheet, transversal reinforcement body can adopt geo-grid, high strength reinforcement mesh sheet or geotextile, between transversal reinforcement body and vertical reinforced body, adopts colligation to be connected or is welded to connect.
5. the Widening Embankment of highway near water structure according to claim 1, is characterized in that described light filler layer can be adopted as air bubble mix light-textured soil, foam beads mix light-textured soil or EPS particle light soil, is equipped with transversal reinforcement body in light filler layer.
6. the Widening Embankment of highway near water structure according to claim 1, is characterized in that described grouting and reinforcing body, for tiltedly to draw hole from former side slope of embankment, forms in the slip casting of former embankment inner high voltage, and its bottom is provided with pressure and expands termination.
7. the Widening Embankment of highway near water structure according to claim 1, is characterized in that described reinforcement linkage section is grouting and reinforcing body leading portion implanted reinforced bar cage and adopts pea gravel concreten to recharge to form.
8. the Widening Embankment of highway near water structure according to claim 1, is characterized in that described impervious blanket adopts good pea gravel concreten, anti-seepage geomembrane or the splash guard of anti-permeability performance, and impervious blanket is closely connected with the water barrier in maintaining pile outside.
9. the construction method of the Widening Embankment of the highway near water structure described in claim 1 ~ 8, is characterized in that comprising the following steps:
1) before construction, prepare: clear up former side slope of embankment, organizing construction's equipment is marched into the arena, and cofferdam is set and carries out artificial rainmaking;
2) set water proof maintaining pile: in embankment outside, set water proof maintaining pile, water proof maintaining pile should be inserted to steady soil;
3) lay water barrier: inner side and outer surface at water proof maintaining pile are laid water barrier;
4) Seepage: impervious blanket is laid in the outside at water proof maintaining pile, and impervious blanket is closely connected with the water barrier in maintaining pile outside;
5) grouting and reinforcing body construction: from former roadbed side slope along in length and breadth to even interval to the oblique hole of drawing, to drawing bottom, hole, carry out reaming processing, duct inner high voltage slip casting, at duct leading portion, implant reinforcing body reinforcing bar, recharge again pea gravel concreten, after fixed, former side slope of embankment is trimmed to step-like, exposed portions serve reinforcement section;
6) curing soil layer is set: bottom, the former river course of part pasture and water, mud are widened in cleaning, suitably digs after dark and solidify on the spot the riverbed soil body, and the spoir producing in work progress early stage is solidified and is backfilled to former embankment bed course end face absolute altitude, vertical reinforced body is set in solidified earth;
7) jackstone ballast body construction:, the top of impervious blanket arranges jackstone, form jackstone ballast body in the outside of maintaining pile, should prevent during construction that jackstone ballast body from damaging impervious blanket;
8) light filler is filled: until curing soil layer, reach after design strength, the light filler that paves of layering thereon, when each light filler is filled to former side slope of embankment step surface absolute altitude, lays transversal reinforcement body thereon;
9) side slope is repaired: after light filler has been filled, side slope outside new embankment is trimmed to design grade;
10) water barrier is laid: end face, outside side slope outside at new embankment are laid water barrier, and the two ends of outside side slope lateral septal water layer are connected closely with new embankment end face water barrier, maintaining pile medial septal water layer respectively;
11) follow-up construction: widen the follow-up constructions such as part road structure, gutter, side slope protection face and afforestation vegetation according to designing requirement construction.
CN201310561704.1A 2013-11-12 2013-11-12 One is highway widening embankment structure and construction method near water Active CN103628378B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310561704.1A CN103628378B (en) 2013-11-12 2013-11-12 One is highway widening embankment structure and construction method near water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310561704.1A CN103628378B (en) 2013-11-12 2013-11-12 One is highway widening embankment structure and construction method near water

Publications (2)

Publication Number Publication Date
CN103628378A true CN103628378A (en) 2014-03-12
CN103628378B CN103628378B (en) 2015-09-09

Family

ID=50209808

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310561704.1A Active CN103628378B (en) 2013-11-12 2013-11-12 One is highway widening embankment structure and construction method near water

Country Status (1)

Country Link
CN (1) CN103628378B (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104195911A (en) * 2014-08-26 2014-12-10 德州市公路工程总公司 Widened embankment structure with beside-water cliff high retaining wall fill section and construction method of widened embankment structure
CN104264680A (en) * 2014-10-01 2015-01-07 西安科技大学 Foundation treatment method of collapsible loess slope cut-and-fill joint part
CN104818658A (en) * 2015-05-13 2015-08-05 山西省交通科学研究院 Road widening system and road widening method for collapsible yellow earth foundation layer
CN104928996A (en) * 2015-06-24 2015-09-23 中铁第四勘察设计院集团有限公司 Light soil side wide roadbed structure for railway
CN105926406A (en) * 2016-04-29 2016-09-07 中交公局第工程有限公司 Splicing method and structure for new and old roads in reconstruction and extension of pavement
CN106120501A (en) * 2016-08-10 2016-11-16 浙江大学城市学院 Existing barricade section roadbed is spelled width and is increased structure and construction method
CN106835877A (en) * 2017-01-20 2017-06-13 杭州江润科技有限公司 The construction method of roadbed widening structure
CN106894386A (en) * 2017-04-14 2017-06-27 上海勘测设计研究院有限公司 Construction system and construction method for reinforcing river course revetment
CN107938457A (en) * 2017-12-25 2018-04-20 浙江大学城市学院 A kind of neighbouring the express highway roadbed of existing Subway Facilities fills out river structure and construction method
CN108166347A (en) * 2018-02-10 2018-06-15 山东省交通规划设计院 A kind of widened structure and construction method applied to mountain highway barricade section
CN108589747A (en) * 2018-06-07 2018-09-28 杭州昂创科技有限公司 EPS light road banks are widened in conjunction with plant biological bag protective slope structure and construction method
CN108824418A (en) * 2018-06-13 2018-11-16 中国市政工程中南设计研究总院有限公司 The road construction method in pool is passed through based on the whole roadbed for the technology that is cured in situ
CN109162161A (en) * 2018-10-25 2019-01-08 江西博慧工程技术服务有限公司 A kind of road structure and its construction method of Ground included structures
CN109306707A (en) * 2018-11-13 2019-02-05 江西博慧工程技术服务有限公司 A kind of Widened roads structure and construction method
CN110725162A (en) * 2019-10-22 2020-01-24 中铁十局集团第八工程有限公司 Roadbed device for rail transit and manufacturing method
CN111218870A (en) * 2019-11-22 2020-06-02 中国一冶集团有限公司 New and old roadbed splicing structure for road widening and construction method thereof
CN114657851A (en) * 2022-04-01 2022-06-24 中交路桥华东工程有限公司 Roadbed disposal method for river pond area crossing

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11280040A (en) * 1998-03-30 1999-10-12 Kankyo Kogaku Kk Civil engineering structure, unit for civil engineering structure, and construction method for civil engineering structure
JP3653083B2 (en) * 2003-01-23 2005-05-25 株式会社ダイヤコンサルタント Road construction method
CN102409589A (en) * 2011-08-23 2012-04-11 河南省交通规划勘察设计院有限责任公司 Construction method for joining new and old pavements in road widening project
CN102493303A (en) * 2011-12-16 2012-06-13 何晓英 Road bed embedding and broadening method
CN102619150A (en) * 2012-04-26 2012-08-01 石家庄铁道大学 Anchored roadbed widening method
CN202559376U (en) * 2012-04-28 2012-11-28 浙江润业建设有限公司 Near-river municipal administration road structure below viaduct bridge
CN203212971U (en) * 2013-04-19 2013-09-25 中交第一公路勘察设计研究院有限公司 Thermal probe insulation board type expressway subgrade widening structure on soil-containing ice layer segment
CN203639772U (en) * 2013-11-12 2014-06-11 江苏省镇江市路桥工程总公司 Widening embankment structure of water road

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11280040A (en) * 1998-03-30 1999-10-12 Kankyo Kogaku Kk Civil engineering structure, unit for civil engineering structure, and construction method for civil engineering structure
JP3653083B2 (en) * 2003-01-23 2005-05-25 株式会社ダイヤコンサルタント Road construction method
CN102409589A (en) * 2011-08-23 2012-04-11 河南省交通规划勘察设计院有限责任公司 Construction method for joining new and old pavements in road widening project
CN102493303A (en) * 2011-12-16 2012-06-13 何晓英 Road bed embedding and broadening method
CN102619150A (en) * 2012-04-26 2012-08-01 石家庄铁道大学 Anchored roadbed widening method
CN202559376U (en) * 2012-04-28 2012-11-28 浙江润业建设有限公司 Near-river municipal administration road structure below viaduct bridge
CN203212971U (en) * 2013-04-19 2013-09-25 中交第一公路勘察设计研究院有限公司 Thermal probe insulation board type expressway subgrade widening structure on soil-containing ice layer segment
CN203639772U (en) * 2013-11-12 2014-06-11 江苏省镇江市路桥工程总公司 Widening embankment structure of water road

Cited By (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104195911B (en) * 2014-08-26 2016-06-08 德州市公路工程总公司 The one section Widening Embankment structure of suspended wall height barricade embankment near water and construction method
CN104195911A (en) * 2014-08-26 2014-12-10 德州市公路工程总公司 Widened embankment structure with beside-water cliff high retaining wall fill section and construction method of widened embankment structure
CN104264680A (en) * 2014-10-01 2015-01-07 西安科技大学 Foundation treatment method of collapsible loess slope cut-and-fill joint part
CN104264680B (en) * 2014-10-01 2016-04-27 西安科技大学 The method for processing foundation of Tian Wa joint portion, a kind of collapsible loess slope
CN104818658A (en) * 2015-05-13 2015-08-05 山西省交通科学研究院 Road widening system and road widening method for collapsible yellow earth foundation layer
CN104928996B (en) * 2015-06-24 2016-09-21 中铁第四勘察设计院集团有限公司 Railway light soil side broad way based structures
CN104928996A (en) * 2015-06-24 2015-09-23 中铁第四勘察设计院集团有限公司 Light soil side wide roadbed structure for railway
CN105926406A (en) * 2016-04-29 2016-09-07 中交公局第工程有限公司 Splicing method and structure for new and old roads in reconstruction and extension of pavement
CN105926406B (en) * 2016-04-29 2018-11-02 中交一公局第一工程有限公司 A kind of joining method and structure on old road new in reorganization and expansion pavement construction
CN106120501A (en) * 2016-08-10 2016-11-16 浙江大学城市学院 Existing barricade section roadbed is spelled width and is increased structure and construction method
CN106835877A (en) * 2017-01-20 2017-06-13 杭州江润科技有限公司 The construction method of roadbed widening structure
CN106835877B (en) * 2017-01-20 2019-01-22 西安市市政建设(集团)有限公司 The construction method of roadbed widening structure
CN106894386A (en) * 2017-04-14 2017-06-27 上海勘测设计研究院有限公司 Construction system and construction method for reinforcing river course revetment
CN107938457A (en) * 2017-12-25 2018-04-20 浙江大学城市学院 A kind of neighbouring the express highway roadbed of existing Subway Facilities fills out river structure and construction method
CN107938457B (en) * 2017-12-25 2023-05-09 浙江大学城市学院 Highway roadbed river filling structure adjacent to existing subway facilities and construction method
CN108166347A (en) * 2018-02-10 2018-06-15 山东省交通规划设计院 A kind of widened structure and construction method applied to mountain highway barricade section
CN108166347B (en) * 2018-02-10 2023-08-25 山东省交通规划设计院 Widening structure applied to mountain highway retaining wall section and construction method
CN108589747A (en) * 2018-06-07 2018-09-28 杭州昂创科技有限公司 EPS light road banks are widened in conjunction with plant biological bag protective slope structure and construction method
CN108824418A (en) * 2018-06-13 2018-11-16 中国市政工程中南设计研究总院有限公司 The road construction method in pool is passed through based on the whole roadbed for the technology that is cured in situ
CN109162161A (en) * 2018-10-25 2019-01-08 江西博慧工程技术服务有限公司 A kind of road structure and its construction method of Ground included structures
CN109162161B (en) * 2018-10-25 2020-07-14 江西博慧工程技术服务有限公司 Road structure containing structural object road section and construction method thereof
CN109306707A (en) * 2018-11-13 2019-02-05 江西博慧工程技术服务有限公司 A kind of Widened roads structure and construction method
CN110725162A (en) * 2019-10-22 2020-01-24 中铁十局集团第八工程有限公司 Roadbed device for rail transit and manufacturing method
CN111218870A (en) * 2019-11-22 2020-06-02 中国一冶集团有限公司 New and old roadbed splicing structure for road widening and construction method thereof
CN114657851A (en) * 2022-04-01 2022-06-24 中交路桥华东工程有限公司 Roadbed disposal method for river pond area crossing

Also Published As

Publication number Publication date
CN103628378B (en) 2015-09-09

Similar Documents

Publication Publication Date Title
CN103628378B (en) One is highway widening embankment structure and construction method near water
CN103510441B (en) Three-dimensional-drainage roadbed structure for preventing water damage of road in cold region and construction method thereof
CN203383119U (en) Novel widening structure of highway embankment
CN103410167B (en) Three-dimensional reinforced rigid-soft composite ecological retaining wall and construction method
CN104264557B (en) One is partly filled out and is partly dug ecological road structure and construction method
CN104278608A (en) Novel highway embankment widened structure and construction method
CN103334357B (en) Viaduct road embankment structure with lower pile foundation bearing platform extending in roadbed, and construction method
CN109056786A (en) Face upward inclined road shoulder wall water drainage behind the wall system and construction method
CN103835203B (en) The construction method of jacking light road bank structure after a kind of deep soft foundation
CN109750571B (en) Road collapse emergency and permanent retaining integrated structure and construction method
CN203498721U (en) Three-dimensional drainage roadbed structure preventing damage by water of road in cold region
CN103790151B (en) Plugging structure and construction method after a kind of soft soil roadbed draining precompressed
CN106676993B (en) Reinforced broken stone frame structure roadbed reinforcing system and reinforcing method thereof
CN204097823U (en) One is partly filled out and is partly dug ecological road structure
CN107859062A (en) The earth-filling method of underground pipe gallery
CN203334154U (en) Embankment structure for preventing bearing platform of pile foundation from stretching in roadbed under viaduct
CN112681043B (en) Roadbed splicing widening structure and construction method
CN212405094U (en) High water content clay fill foundation drainage system
CN113106799A (en) Roadbed structure of road and bridge engineering and construction method thereof
CN206245155U (en) A kind of firm road structure of embankment
CN111809470A (en) Structure and method for preventing cracks of road base layer and road subbase layer
CN111827152A (en) Internal drainage structure of edge-covered roadbed and implementation method thereof
CN203639772U (en) Widening embankment structure of water road
CN112575638B (en) Roadbed reinforcing structure adopting steel reinforcement cage bamboo shoot piles and construction process of roadbed reinforcing structure
CN203741814U (en) Blocking structure used after soft soil roadbed drainage prepressing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 212011 No. 300 Guantangqiao Road, Runzhou District, Zhenjiang City, Jiangsu Province

Patentee after: Jiangsu Zhenjiang Road and Bridge Engineering Co., Ltd.

Address before: 212000 No. 69 Nanshan Road, Runzhou District, Zhenjiang City, Jiangsu Province

Patentee before: Jiangsu Zhenjiang Road & Bridge Engineering Corporation