CN104195911B CN201410425892.XA CN201410425892A CN104195911B CN 104195911 B CN104195911 B CN 104195911B CN 201410425892 A CN201410425892 A CN 201410425892A CN 104195911 B CN104195911 B CN 104195911B
Authority
CN
China
Prior art keywords
construction
pile
plate
reinforcing
embankment
Prior art date
Application number
CN201410425892.XA
Other languages
Chinese (zh)
Other versions
CN104195911A (en
Inventor
张晓波
秦建
矫良田
王宗明
朱小金
Original Assignee
德州市公路工程总公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 德州市公路工程总公司 filed Critical 德州市公路工程总公司
Priority to CN201410425892.XA priority Critical patent/CN104195911B/en
Publication of CN104195911A publication Critical patent/CN104195911A/en
Application granted granted Critical
Publication of CN104195911B publication Critical patent/CN104195911B/en

Links

Classifications

    • Y02A30/68

Abstract

The present invention relates to the one section Widening Embankment structure of suspended wall height barricade embankment near water, be mainly made up of former pavement structure, lateral connection steel reinforcement cage, grouting and reinforcing body, new pupil portion pavement structure, skewed horizontal load, mortar rubble masonry pavement, Reinforced Concrete Continuous Plate, pile for prestressed pipe; Pile for prestressed pipe top is provided with Reinforced Concrete Continuous Plate and skewed horizontal load, and described skewed horizontal load one end is connected with pile for prestressed pipe top, and the other end is connected with former cantilever retaining wall panel; At the bottom of former cantilever retaining wall base plate and Reinforced Concrete Continuous Plate, grouting and reinforcing body is being set; It is provided with lateral connection steel reinforcement cage between former cantilever retaining wall panel and new Widening Embankment; Waterproof layer is laid on Reinforced Concrete Continuous Plate and grouting and reinforcing body top, it builds light road bank and new pupil portion pavement structure successively, is provided with bank protection waterproof layer and mortar rubble masonry pavement outside new pupil portion pavement structure side slope. The present invention efficiently solves former cantilever barricade cannot remove the difficult problem carrying out Widening Construction.

Description

The one section Widening Embankment structure of suspended wall height barricade embankment near water and construction method

Technical field

The present invention relates to a kind of Widening Embankment structure, particularly to the one section Widening Embankment structure of suspended wall height barricade embankment near water and construction method. Belong to highway engineering field, it is adaptable to old road reconstruction and extension project, be particularly well-suited to suspended wall height barricade embankment widening project near water.

Background technology

In recent years, along with developing rapidly of China's economy, the volume of traffic cumulative year after year of road, underestimate owing to early stage builds the road swift and violent growth the to traffic, the road that some operation amounts are big has presented the situation that the volume of traffic is saturated so that transportation is severely impacted. For meeting the requirement of growing traffic and social development, it is inevitable that existing road widening has been become.

It is the engineering that suspended wall height barricade embankment section is widened for old road dike, normally it is open to traffic in situation, carry out the Widening Construction of embankment, owing to the stability and normal safe for ensureing old road dike is open to traffic, when widening, suspended wall reinforcement height barricade cannot once or all be removed, therefore cannot carry out the old and new's road dyke combination construction by step excavation traditionally. Owing to the stability, uniformity of new-old concrete bond, intensity are different with compaction rate in widening of subgrade engineering, new-old concrete bond can produce different sedimentations, thus can cause road surface, along seam, longitudinal crack occurs, the problem mainly solved in roadbed widening processing procedure should be handle the ground of coupling section of the new and old road position well, strengthens the bond strength of new-old concrete bond.

The Settlement Consolidation being typically due to old road roadbed is basicly stable, and the new subgrade settlement time is short, and new-old concrete bond junction will produce differential settlement, thus producing longitudinal crack. The differential settlement of new-old concrete bond causes that cement concrete slab produces disconnected plate under load action, and asphalt concrete pavement produces reflection crack, driving quality is brought very big impact, strengthens cost of transportation, even entail dangers to traffic safety.Although more existing measures that can be used for solving Widened roads area differentiation settlement issues in engineering, the combination application of various measures is for controlling embankment later stage differential deformation, strengthen the globality at new and old road embankment loading position to have positive effect, but existing measure is big for embankment height, difference settlement control requires that high section is difficult to be suitable for.

Existing one highway widening embankment structure (ZL:201310561704.1) near water, is formed by the combination reinforced structure of outside water proof maintaining pile and inner side at present. Though this structure can improve the globality widening highway subgrade under suitable engineering specifications, but the training works of former road surface structare layer is relatively big, during oblique grouting and reinforcing body construction, there is certain risk, be unsuitable for suspended wall height barricade embankment widening project near water.

In sum, although the method for more existing punishment soft soil roadbed settlement abnormal problems in subgrade engineering, each treatment measures, method achieve good consolidation effect under suitable engineering specifications, but working procedure is complex loaded down with trivial details mostly, some sections still there will be, in the later stage, the problem that sedimentation is abnormal.

Given this, for effectively controlling the relative settlement of the old and new's embankment impact on road structure after road widening, reduce the differential settlement between new-old concrete bond, need the compatible deformation inventing a kind of the old and new's of enhancing embankment and stability at present badly, prevent extraneous water body from penetrating into, improving the height barricade embankment section Widening Embankment structure of suspended wall near water and the construction method of new Widening Embankment anti-floating ability.

Summary of the invention

It is an object of the invention to provide the compatible deformation of a kind of the old and new's of enhancing embankment and stability, prevent extraneous water body from penetrating into, improving the height barricade embankment section Widening Embankment structure of suspended wall near water and the construction method of new Widening Embankment anti-floating ability.

In order to realize above-mentioned technical purpose, present invention employs techniques below scheme:

The one section Widening Embankment structure of suspended wall height barricade embankment near water, it is characterized in that, be mainly made up of former pavement structure, lateral connection steel reinforcement cage, grouting and reinforcing body, new pupil portion pavement structure, skewed horizontal load, mortar rubble masonry pavement, Reinforced Concrete Continuous Plate, pile for prestressed pipe; Pile for prestressed pipe top is provided with Reinforced Concrete Continuous Plate and skewed horizontal load, and described skewed horizontal load one end is connected with pile for prestressed pipe top, and the other end is connected with former cantilever retaining wall panel; At the bottom of former cantilever retaining wall base plate and Reinforced Concrete Continuous Plate, grouting and reinforcing body is being set; It is provided with lateral connection steel reinforcement cage between former cantilever retaining wall panel and new Widening Embankment; Waterproof layer is laid on Reinforced Concrete Continuous Plate and grouting and reinforcing body top, it builds light road bank and new pupil portion pavement structure successively, is provided with bank protection waterproof layer and mortar rubble masonry pavement outside new pupil portion pavement structure side slope.

Arranging Anti-floating reinforcing steel bar in described pile for prestressed pipe, Anti-floating reinforcing steel bar one end is connected with the steel plate pile top of pile for prestressed pipe, and one end is connected with pile for prestressed pipe upper head plate, and upper head plate diameter is bigger compared with pile for prestressed pipe external diameter.

Described pile for prestressed pipe top arranges Reinforced Concrete Continuous Plate, and Reinforced Concrete Continuous Plate surface configuration connects reinforcing bar.

The upper head plate of described pile for prestressed pipe is placed in Reinforced Concrete Continuous Plate, and upper head plate top is provided with end plate connection reinforcing bar.

Described grouting and reinforcing body is that high-pressure slip-casting forms between cantilever height barricade and continuous-reinforced slab.

Described skewed horizontal load is reinforced concrete support or bracing members, and skewed horizontal load is provided with anti-floating tension rib.

Described cantilever retaining wall panel is provided with square or quincunx hole of drawing, and there is expanded hole bottom, and lateral connection steel reinforcement cage is implanted and drawn in hole, and one end is stretched in new Widening Embankment, and the other end stretches in former dike, and adopts concrete casting to close.

Present invention also offers the construction method of a kind of height barricade embankment section Widening Embankment structure of suspended wall near water, including following construction procedure:

Prepare before step one, construction: clearing up former side slope of embankment, organizing construction's equipment is marched into the arena, and arranges cofferdam and carries out treatment of soft foundation;

Step 2, prestressing pipe pile construction: arrange stake position according to designing requirement, in pile for prestressed pipe steel plate pile top, Anti-floating reinforcing steel bar is set, and carry out prestressing pipe pile construction, to Anti-floating reinforcing steel bar Shi Hanzhang, and adopting ground tackle to be fixed on pile for prestressed pipe upper head plate, pile for prestressed pipe upper head plate reserves end plate connection reinforcing bar;

Step 3, skewed horizontal load are constructed: carry out skewed horizontal load construction on pile for prestressed pipe and former cantilever retaining wall panel;

Step 4, armored concrete connecting plate is set: at the downward hand excavation 200mm��500mm of design attitude, installing template, assembling reinforcement carries out armored concrete connecting plate construction;

Step 5, grouting and reinforcing body construction: between cantilever retaining wall base plate and Reinforced Concrete Continuous Plate, carry out high-pressure slip-casting form grouting and reinforcing body, grouting and reinforcing body top mark is high high with armored concrete connecting plate top mark consistent;

Step 6, laying waterproof layer: water layer of setting up defences on grouting and reinforcing body and armored concrete connecting plate upper berth;

Step 7, lateral connection steel reinforcement cage are constructed: on cantilever retaining wall panel according to square or quincunx uniformly draw hole after, bottom arranges expanded hole, implants lateral connection steel reinforcement cage, and adopt concrete casting to close behind clear hole;

Step 8, light road bank construct: set up enclose template build cellular concrete formed light road bank;

Step 9, outer slope construction: side slope carries out bank protection construction of waterproof layer outside;

Step 10, road surface structare layer are constructed: manual demolition former suspended wall retaining wall panel and skewed horizontal load exceed former embankment design level section, former pavement structure is renovated into stepped ramp type, carries out pupil portion pavement structure construction after laying high-strength degree GSZ.

Step 11, subsequent construction: according to subsequent construction such as designing requirement slope construction guardrail, gutter, side slope protection face and afforestation vegetations.

The invention have the characteristics that and beneficial effect:

(1) between cantilever retaining wall base plate and Reinforced Concrete Continuous Plate, carry out high-pressure slip-casting form grouting and reinforcing body, the combination of grouting and reinforcing body and Reinforced Concrete Continuous Plate uses the bonding strength that both can strengthen the old and new's embankment bottom, prevent cantilever retaining wall wall base plate and Reinforced Concrete Continuous Plate joining place generation differential deformation, also can improve the bearing capacity of embankment.

(2) Anti-floating reinforcing steel bar is set in pile for prestressed pipe, after having set pile for prestressed pipe, carrying out Anti-floating reinforcing steel bar Shi Hanzhang, Anti-floating reinforcing steel bar arranges, with pile for prestressed pipe upper head plate, combining of Reinforced Concrete Continuous Plate, the anti-floating problem that can effectively solve light road bank.

(3) waterproof layer that grouting and reinforcing body, Reinforced Concrete Continuous Plate and outer side slope are arranged can cut off, extend the path of extraneous water body infiltration embankment from many levels, it is prevented that embankment immersion destroys.

(4) stability of the compatible deformation that effective guarantee the old and new's embankment is set of lateral connection steel reinforcement cage and new embankment.

(5) former road surface structare layer is excavated into small stair shape, adopt the GSZ of high intensity to process thereon, strengthen the bond strength of new and old roadbed, it is prevented that reflection cracking in a pavement.

(6) anti-floating tension rib is set on skewed horizontal load, enhances the switching performance of skewed horizontal load and light road bank, also function to anti-floating effect.

The present invention efficiently solves former cantilever retaining wall cannot remove the difficult problem carrying out Widening Construction, normally can be open to traffic in situation at original path, carry out the Widening Construction of embankment, not only can strengthen the compatible deformation of the old and new's embankment and stability, but also prevent extraneous water body from penetrating into, improving the anti-floating ability of new Widening Embankment.

Accompanying drawing explanation

Fig. 1 is the structural representation of the present invention section Widening Embankment structure of suspended wall height barricade embankment near water;

In figure: the former pavement structure of 1-, 2-expanded hole, 3-lateral connection steel reinforcement cage, 4-concrete, the former cantilever retaining wall panel of 5-, the former cantilever retaining wall base plate of 6-, 7-grouting and reinforcing body, the new pupil portion pavement structure of 8-, 9-bank protection waterproof layer, 10-skewed horizontal load, 11-mortar rubble masonry pavement, 12-connects reinforcing bar, 13-waterproof layer, 14-Reinforced Concrete Continuous Plate, 15-pile for prestressed pipe upper head plate, 16-end plate connection reinforcing bar, 17-pile for prestressed pipe, 18-Anti-floating reinforcing steel bar, the original soil body of 19-, 20-steel plate pile top, part removed by 21-suspended wall retaining wall panel, 22-anti-floating tension rib.

Specific embodiment

The design and construction technology requirement of pile for prestressed pipe in present embodiment, reinforcing bar binding, Plate Welding construction technical requirement, the present embodiment such as concrete design and construction requirement is not repeated, is specifically described the embodiment that the present invention relates to structure.

Fig. 1 is the structural representation of the present invention section Widening Embankment structure of suspended wall height barricade embankment near water.

With reference to the height barricade embankment section Widening Embankment structure of suspended wall near water shown in Fig. 1, mainly it is made up of former pavement structure 1, lateral connection steel reinforcement cage 3, grouting and reinforcing body 7, new pupil portion pavement structure 8, skewed horizontal load 10, mortar rubble masonry pavement 11, Reinforced Concrete Continuous Plate 14, pile for prestressed pipe 17, the original soil body 19.

Pile for prestressed pipe 17 top is provided with Reinforced Concrete Continuous Plate 14 and skewed horizontal load 10, skewed horizontal load 10 one end is connected with pile for prestressed pipe 17 top, the other end is connected with former cantilever retaining wall panel 5, skewed horizontal load 10 is provided with anti-floating tension rib 22, the HRB335 reinforcing bar that anti-floating tension rib 22 adopts diameter to be 20mm, steel strength grade is Q345; At former cantilever retaining wall base plate 6 and Reinforced Concrete Continuous Plate 14 end, grouting and reinforcing body 7 is set; It is provided with lateral connection steel reinforcement cage 3 between former cantilever retaining wall panel 5 and new Widening Embankment; Waterproof layer 13 is laid on Reinforced Concrete Continuous Plate 14 and grouting and reinforcing body 7 top, it builds light road bank and new pupil portion pavement structure 8 successively, is provided with bank protection waterproof layer 9 and mortar rubble masonry pavement 11 outside new pupil portion pavement structure side slope.

First clearing up former side slope of embankment, organizing construction's equipment is marched into the arena, and arranges cofferdam and is drawn water by water pump, clears up new pupil portion bottom of river channel pasture and water, mud, and mechanical equivalent of light excavation, after projected depth, adopts Static pressure pile driver to set pile for prestressed pipe 17. Pile for prestressed pipe 17 adopts the prestressed high-strength concrete pile of external diameter 600mm, wall thickness 110mm, length 12000mm, steel plate pile top 20 adopts cross-shaped steel plate pile tip, steel plate pile top 20 arranges Anti-floating reinforcing steel bar 18, Anti-floating reinforcing steel bar 18 bottom and steel plate pile top 20 are welded to connect, top is connected by ground tackle through supporting plate, wadding weft variation with after pile for prestressed pipe upper head plate 15 Shi Hanzhang, the HRB335 reinforcing bar that Anti-floating reinforcing steel bar adopts diameter to be 30mm, steel strength grade is Q345. Pile for prestressed pipe 17 top arranges pile for prestressed pipe upper head plate 15, and pile for prestressed pipe upper head plate 15 is rounded, and external diameter is 1000mm.Pile for prestressed pipe upper head plate 15 surface configuration has end plate connection reinforcing bar 16. The spiral that end plate connection reinforcing bar 16 adopts steel strength grade to be Q345.

After pile for prestressed pipe 17 has set, carrying out the construction of skewed horizontal load 10, skewed horizontal load 10 one end is connected with pile for prestressed pipe 17 top, and the other end is connected with former cantilever high gear shingle nail 5; Skewed horizontal load 10 can be reinforced concrete support or bracing members. At the downward hand excavation 200mm��500mm of design attitude, install template, assembling reinforcement carries out armored concrete connecting plate 14 and constructs, Reinforced Concrete Continuous Plate 14 reserves 500mm-1000mm from cantilever retaining wall base plate 6, Reinforced Concrete Continuous Plate 14 surface configuration connects reinforcing bar 12, connects reinforcing bar 12 and stretches out Reinforced Concrete Continuous Plate 14 top 300mm��500mm. Reinforced Concrete Continuous Plate 14 strength grade of concrete is C30, connects the spiral that reinforcing bar 12 adopts strength grade to be Q345.

According to designing requirement, the reserved part between cantilever retaining wall base plate 6 and Reinforced Concrete Continuous Plate 14 carries out high-pressure slip-casting and carries out grouting and reinforcing body 7, and grouting and reinforcing body 7 absolute altitude is consistent with armored concrete connecting plate 14 absolute altitude.

On former cantilever retaining wall panel 5 according to square or quincunx uniformly draw hole after, there is expanded hole 2 bottom, implants lateral connection steel reinforcement cage 3, and adopt concrete 4 to recharge closing behind clear hole. The diameter of lateral connection steel reinforcement cage 3 is 500mm, arranges the longitudinal screw reinforcing bar of 12 �� 16mm, strength grade Q345, and tie hoop adopts �� 8mm, strength grade to be the plain steel-bar of HPB300. The strength grade of concrete of concrete 4 is C30.

Laying waterproof layer 13 in Reinforced Concrete Continuous Plate 14 and grouting and reinforcing body 7 top, waterproof layer adopts needle punched non-woven fabrics and PE film composite non woven geotextiles, and specification is 300g/m2, design parameter requires referring to table 1; The lap of splice between adjacent geotextiles is not less than 200mm.

Table 1 waterproof geotextiles design parameter table

Mass area ratio deviation Thickness Amplitude error Ultimate strength Elongation at break CBR bursting strength Effective aperture Tearing brute force 7% ��2.4 mm -0.5% ��9.5 kN/m 25��100% ��1.5kN 0.07��0.2mm ��0.24 kN

After Construction for waterproofing treatment completes, setting up and enclose template and build light road bank, light road bank can adopt cellular concrete, EPS light filler or flyash filler.

Side slope does bank protection waterproof layer 9 and mortar rubble masonry pavement 11 outside, remove former suspended wall retaining wall panel and skewed horizontal load exceedes former embankment design level section, and former pavement structure 1 is renovated into stepped ramp type, the vertical height of step and transverse width are 400mm, and step surface sets the leaning angle of 3%. Pupil portion pavement construction is carried out after laying high-strength degree GSZ.

The main construction procedure of the section Widening Embankment structure of suspended wall height barricade embankment near water is as follows:

Prepare before step one, construction: clearing up former side slope of embankment, organizing construction's equipment is marched into the arena, and arranges cofferdam and carries out treatment of soft foundation;

Step 2, pile for prestressed pipe 17 are constructed: arrange stake position according to designing requirement, in pile for prestressed pipe steel plate pile top 20, Anti-floating reinforcing steel bar 18 is set, and carry out pile for prestressed pipe 17 and construct, to Anti-floating reinforcing steel bar 18 Shi Hanzhang, and adopting ground tackle to be fixed on pile for prestressed pipe upper head plate 15, pile for prestressed pipe upper head plate 15 reserves end plate connection reinforcing bar 16;

Step 3, skewed horizontal load 10 are constructed: carry out skewed horizontal load 10 on pile for prestressed pipe 17 and former cantilever retaining wall panel 5 and construct;

Step 4, armored concrete connecting plate 14 is set: at the downward hand excavation 200mm��500mm of design attitude, installing template, assembling reinforcement carries out armored concrete connecting plate 14 and constructs;

Step 5, grouting and reinforcing body 7 are constructed: according to designing requirement, carry out high-pressure slip-casting and form grouting and reinforcing body 7 between cantilever retaining wall base plate 6 and Reinforced Concrete Continuous Plate 14, and grouting and reinforcing body 7 top mark is high high with armored concrete connecting plate top mark consistent;

Step 6, laying waterproof layer 13: water layer 13 of setting up defences on grouting and reinforcing body 7 and armored concrete connecting plate 14 upper berth;

Step 7, lateral connection steel reinforcement cage 3 are constructed: on former cantilever retaining wall panel 5 according to square or quincunx uniformly draw hole after, bottom arranges expanded hole 2, implants lateral connection steel reinforcement cage 3, and adopt concrete 4 to recharge closing behind clear hole;

Step 8, light road bank construct: set up enclose template build cellular concrete formed light road bank;

Step 9, outer slope construction: side slope carries out bank protection waterproof layer 9 and mortar rubble masonry pavement 11 is constructed outside;

Step 10, road surface structare layer are constructed: manual demolition former suspended wall retaining wall panel and skewed horizontal load exceed former embankment design level section, former pavement structure 1 is renovated into stepped ramp type, carries out pupil portion pavement structure 8 and construct after laying high-strength degree GSZ.

Step 11, subsequent construction: according to subsequent construction such as designing requirement slope construction guardrail, gutter, side slope protection face and afforestation vegetations.

Claims (7)

1. the construction method of the section Widening Embankment structure of suspended wall height barricade embankment near water, it is characterized in that, the described height barricade embankment section Widening Embankment structure of suspended wall near water is mainly made up of former pavement structure, lateral connection steel reinforcement cage, grouting and reinforcing body, new pupil portion pavement structure, skewed horizontal load, mortar rubble masonry pavement, Reinforced Concrete Continuous Plate, pile for prestressed pipe; Pile for prestressed pipe top is provided with Reinforced Concrete Continuous Plate and skewed horizontal load, and described skewed horizontal load one end is connected with pile for prestressed pipe top, and the other end is connected with former cantilever retaining wall panel; At the bottom of former cantilever retaining wall base plate and Reinforced Concrete Continuous Plate, grouting and reinforcing body is being set; It is provided with lateral connection steel reinforcement cage between former cantilever retaining wall panel and new Widening Embankment; Waterproof layer is laid on Reinforced Concrete Continuous Plate and grouting and reinforcing body top, it builds light road bank and new pupil portion pavement structure successively, is provided with bank protection waterproof layer and mortar rubble masonry pavement outside new pupil portion pavement structure side slope;
Described construction method includes following construction procedure:
Prepare before step one, construction: clearing up former side slope of embankment, organizing construction's equipment is marched into the arena, and arranges cofferdam and carries out treatment of soft foundation;
Step 2, prestressing pipe pile construction: arrange stake position according to designing requirement, in pile for prestressed pipe steel plate pile top, Anti-floating reinforcing steel bar is set, and carry out prestressing pipe pile construction, to Anti-floating reinforcing steel bar Shi Hanzhang, and adopting ground tackle to be fixed on pile for prestressed pipe upper head plate, pile for prestressed pipe upper head plate reserves end plate connection reinforcing bar;
Step 3, skewed horizontal load are constructed: carry out skewed horizontal load construction on pile for prestressed pipe and former cantilever retaining wall panel;
Step 4, armored concrete connecting plate is set: at the downward hand excavation 200mm��500mm of design attitude, installing template, assembling reinforcement carries out armored concrete connecting plate construction;
Step 5, grouting and reinforcing body construction: between cantilever retaining wall base plate and Reinforced Concrete Continuous Plate, carry out high-pressure slip-casting form grouting and reinforcing body, grouting and reinforcing body top mark is high high with armored concrete connecting plate top mark consistent;
Step 6, laying waterproof layer: water layer of setting up defences on grouting and reinforcing body and armored concrete connecting plate upper berth;
Step 7, lateral connection steel reinforcement cage are constructed: on cantilever retaining wall panel according to square or quincunx uniformly draw hole after, bottom arranges expanded hole, implants lateral connection steel reinforcement cage, and adopt concrete casting to close behind clear hole;
Step 8, light road bank construct: set up enclose template build cellular concrete formed light road bank;
Step 9, outer slope construction: side slope carries out bank protection construction of waterproof layer outside;
Step 10, road surface structare layer are constructed: manual demolition former suspended wall retaining wall panel and skewed horizontal load exceed former embankment design level section, former pavement structure is renovated into stepped ramp type, carries out pupil portion pavement structure construction after laying high-strength degree GSZ;
Step 11, subsequent construction: according to designing requirement slope construction guardrail, gutter, side slope protection face and afforestation vegetation subsequent construction.
2. construction method according to claim 1, it is characterized in that arranging Anti-floating reinforcing steel bar in described pile for prestressed pipe, Anti-floating reinforcing steel bar one end is connected with the steel plate pile top of pile for prestressed pipe, and one end is connected with pile for prestressed pipe upper head plate, and upper head plate diameter is bigger compared with pile for prestressed pipe external diameter.
3. construction method according to claim 1, it is characterised in that described pile for prestressed pipe top arranges Reinforced Concrete Continuous Plate, Reinforced Concrete Continuous Plate surface configuration connects reinforcing bar.
4. construction method according to claim 1, it is characterised in that the upper head plate of described pile for prestressed pipe is placed in Reinforced Concrete Continuous Plate, and upper head plate top is provided with end plate connection reinforcing bar.
5. construction method according to claim 1, it is characterised in that described grouting and reinforcing body is that high-pressure slip-casting forms between cantilever height barricade and continuous-reinforced slab.
6. construction method according to claim 1, it is characterised in that; Described skewed horizontal load is reinforced concrete support or bracing members, and skewed horizontal load is provided with anti-floating tension rib.
7. construction method according to claim 1, it is characterized in that being provided with on described cantilever retaining wall panel and square or quincunx draw hole, side end has expanded hole, lateral connection steel reinforcement cage is implanted and is drawn in hole, one end is stretched in new Widening Embankment, the other end stretches in former dike, and adopts concrete casting to close.
CN201410425892.XA 2014-08-26 2014-08-26 The one section Widening Embankment structure of suspended wall height barricade embankment near water and construction method CN104195911B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410425892.XA CN104195911B (en) 2014-08-26 2014-08-26 The one section Widening Embankment structure of suspended wall height barricade embankment near water and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410425892.XA CN104195911B (en) 2014-08-26 2014-08-26 The one section Widening Embankment structure of suspended wall height barricade embankment near water and construction method

Publications (2)

Publication Number Publication Date
CN104195911A CN104195911A (en) 2014-12-10
CN104195911B true CN104195911B (en) 2016-06-08

Family

ID=52081264

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410425892.XA CN104195911B (en) 2014-08-26 2014-08-26 The one section Widening Embankment structure of suspended wall height barricade embankment near water and construction method

Country Status (1)

Country Link
CN (1) CN104195911B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104894926B (en) * 2015-06-09 2017-12-26 中铁第一勘察设计院集团有限公司 Retaining structure and its construction method on the high embankment of existing railway
CN105937196B (en) * 2016-05-24 2017-12-22 安徽省交通建设股份有限公司 A kind of roadbed peg board formula spells wide structure and construction method
CN106592527A (en) * 2017-01-04 2017-04-26 成都佳美嘉科技有限公司 Side slope structure for water-conservancy capital construction
CN107366302B (en) * 2017-06-27 2019-02-05 华恒建设集团有限公司 A kind of construction technology of reinforced concrete retaining wall
CN109306707A (en) * 2018-11-13 2019-02-05 江西博慧工程技术服务有限公司 A kind of Widened roads structure and construction method
CN109252542A (en) * 2018-11-14 2019-01-22 山东大学 A kind of root pile lightweight barricade and its construction method for road widening

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1988009849A1 (en) * 1987-06-12 1988-12-15 Foundation Technology Pty. Ltd. Reinforcement for continuously-cast concrete walls
JPH08232277A (en) * 1995-02-23 1996-09-10 Masaharu Nagai Retaining wall structure
JP2001049678A (en) * 1999-08-06 2001-02-20 Tetsuya Matsunaga Slab structure for reinforcing retaining wall, and its construction
CN201144421Y (en) * 2007-12-21 2008-11-05 中铁二院工程集团有限责任公司 Antiskid supporting and retaining structure
CN202898930U (en) * 2012-10-15 2013-04-24 浙江鸿安建设有限公司 By-river reinforced roadbed structure
CN203383119U (en) * 2013-07-05 2014-01-08 杭州华水市政工程有限公司 Novel widening structure of highway embankment
CN103628378A (en) * 2013-11-12 2014-03-12 江苏省镇江市路桥工程总公司 Waterside road broadened embankment structure and construction method thereof
CN204059125U (en) * 2014-08-26 2014-12-31 德州市公路工程总公司 One suspended wall height barricade embankment near water section Widening Embankment structure

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1988009849A1 (en) * 1987-06-12 1988-12-15 Foundation Technology Pty. Ltd. Reinforcement for continuously-cast concrete walls
EP0393032A4 (en) * 1987-06-12 1991-05-08 Foundation Technology (Aust) Pty. Ltd. Reinforcement for continuously-cast concrete walls
JPH08232277A (en) * 1995-02-23 1996-09-10 Masaharu Nagai Retaining wall structure
JP2001049678A (en) * 1999-08-06 2001-02-20 Tetsuya Matsunaga Slab structure for reinforcing retaining wall, and its construction
CN201144421Y (en) * 2007-12-21 2008-11-05 中铁二院工程集团有限责任公司 Antiskid supporting and retaining structure
CN202898930U (en) * 2012-10-15 2013-04-24 浙江鸿安建设有限公司 By-river reinforced roadbed structure
CN203383119U (en) * 2013-07-05 2014-01-08 杭州华水市政工程有限公司 Novel widening structure of highway embankment
CN103628378A (en) * 2013-11-12 2014-03-12 江苏省镇江市路桥工程总公司 Waterside road broadened embankment structure and construction method thereof
CN204059125U (en) * 2014-08-26 2014-12-31 德州市公路工程总公司 One suspended wall height barricade embankment near water section Widening Embankment structure

Also Published As

Publication number Publication date
CN104195911A (en) 2014-12-10

Similar Documents

Publication Publication Date Title
CN103410167B (en) Three-dimensional reinforced rigid-soft composite ecological retaining wall and construction method
CN102518135B (en) Horizontal jet grouting soil anchor and castinplace pile Composite Foundation Pit supporting construction engineering method
CN102433876B (en) Multi-compartment casing composite pile and construction method thereof
KR100866162B1 (en) Chair-type self-supported earth retaining wall constructing method
CN203174453U (en) Light-mass embankment structure for managing bump at bridge head
CN203741868U (en) Reinforced concrete retaining wall structure with combined anchor wire
CN102926304B (en) Reinforcement method and reinforcement structure for treating railway soft soil roadbed settlement overweight before operation
CN104278608B (en) The constructional method of a kind of highway embankment widened structure
CN102619150A (en) Anchored roadbed widening method
CN103306289B (en) Foundation pit piled anchor dado concrete anchor cable top beam structure and construction method thereof
CN102966119B (en) Geogrid reinforced wall and construction method thereof
CN103883328B (en) The dark construction method of half lid half of high steep V-type coombe biased segment is worn under separate tunnel
CN103628378B (en) One is highway widening embankment structure and construction method near water
CN104533446B (en) Construction method and its structure that a kind of big cross section Support System in Soft Rock Tunnels bilayer pre- Geological disaster prevention of preliminary bracing occurs
CN103774514B (en) A kind of prefabricated tubular pile embankment structure and construction method thereof
CN101761068A (en) Box-raft pressure-bearing type foundation underpinning and construction reinforcing method for tunnel across pile foundation of bridge above river
CN105155558A (en) Combined retaining structure and construction method thereof
CN104131555B (en) A kind of outsourcing water penetration concrete reinforced pipe crushed stone grouting pile and construction method thereof
CN106499413B (en) A kind of Shallow-buried section tunnel stratum consolidation construction method
CN104389320B (en) Construction method of pile foundation anchor rope prestress high retaining wall
CN104264688B (en) Manually digging hole non-uniform pile support construction process
CN204000901U (en) The vertical high slope prestressing anchor support of a kind of massif device
CN203320549U (en) Reinforced gabion retaining wall of high slope in airport engineering
CN104452809A (en) Ultra-shallow buried tunnel cover-excavation construction method
CN105804119A (en) Underground corridor structure with dual-purpose pile foundations and construction method of underground corridor structure

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Zhang Xiaobo

Inventor after: Qin Jian

Inventor after: Jiao Liangtian

Inventor after: Wang Zongming

Inventor after: Zhu Xiaojin

Inventor before: Sun Xiaobo

Inventor before: Qin Jian

Inventor before: Jiao Liangtian

Inventor before: Wang Zongming

Inventor before: Zhu Xiaojin

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: SUN XIAOBO QIN JIAN JIAO LIANGTIAN WANG ZONGMING ZHU XIAOJIN TO: ZHANG XIAOBO QIN JIAN JIAO LIANGTIAN WANG ZONGMING ZHU XIAOJIN

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160608

Termination date: 20170826