CN108589747A - EPS light road banks are widened in conjunction with plant biological bag protective slope structure and construction method - Google Patents

EPS light road banks are widened in conjunction with plant biological bag protective slope structure and construction method Download PDF

Info

Publication number
CN108589747A
CN108589747A CN201810582158.2A CN201810582158A CN108589747A CN 108589747 A CN108589747 A CN 108589747A CN 201810582158 A CN201810582158 A CN 201810582158A CN 108589747 A CN108589747 A CN 108589747A
Authority
CN
China
Prior art keywords
layer
eps
widened
lightweights
reinforcing bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810582158.2A
Other languages
Chinese (zh)
Inventor
朱凯
李栋樑
陈小林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Longhuang Municipal Engineering Co., Ltd.
Original Assignee
Hangzhou Ang Chuang Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Ang Chuang Technology Co Ltd filed Critical Hangzhou Ang Chuang Technology Co Ltd
Priority to CN201810582158.2A priority Critical patent/CN108589747A/en
Publication of CN108589747A publication Critical patent/CN108589747A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/76Anchorings for bulkheads or sections thereof in as much as specially adapted therefor

Abstract

The present invention relates to a kind of EPS light road banks to widen in conjunction with plant biological bag protective slope structure and construction method, it includes the Widening Embankment being made of EPS light blocks and the plant biological bag bank protection that is made of the soil engineering bag that bankets, EPS light blocks are by connecting reinforcing bar interconnection and being connect with the anchor pole of former embankment, if one of armoured concrete slab is arranged at interval of dried layer EPS light blocks, the outside of Widening Embankment is equipped with m esh-hanging sprayed concrete layer, m esh-hanging sprayed concrete layer pre-sets embedded ribs, when the soil engineering bag that bankets is constructed, embedded ribs are inserted into the soil engineering bag that bankets, the neighbouring soil engineering bag that bankets is connected by three-dimensional water discharge coupling button.The present invention improves construction site order and construction efficiency, significantly reduces the additional stress and sedimentation and deformation of soft stratum, reduces basement process expense, is that a kind of construction efficiency is high, embankment widens that effect is good, the strong embankment of environmental suitability widens the structure with bank protection.

Description

EPS light road banks are widened in conjunction with plant biological bag protective slope structure and construction method
Technical field
The invention belongs to embankment Widening Technique fields more particularly to EPS light road banks to widen in conjunction with plant biological bag protective slope structure And construction method, it is suitable for embankment Widening Construction on soft layer.
Background technology
In the Widening Construction of the enterprising walking along the street dike of soft layer, conventional method be to soft layer carry out piling prepressing, vacuum, Composite pile foundation changes and the processing such as fills out, and to improve the foundation bearing capacity of soft layer and reduce settling amount, another method is using light Matter embankment meets bearing capacity and settling amount requirement to reduce the loading of soft foundation, EPS (polyethylene) light road bank Typical Representative as this method is widely used in Practical Project, and obtains preferable technical economic benefit.EPS lightweights road Dike still has following problem in actual application:First, it is dramatically different due to former embankment and EPS light road bank materials, It is easy to generate obvious relative settlement in interface;The slope protection of second, EPS embankment, conventional method are used and are banketed Protection, this causes slope surface loading to be significantly greater than EPS embankments, so as to cause the uneven of sedimentation.
The difficulties encountered in Practical Project for existing EPS light road banks Widening Technique, it is necessary to which exploitation is a kind of Construction efficiency is high, embankment widens that effect is good, and the strong embankment of environmental suitability widens protective slope structure, this reality invention is exactly such Made of being developed under background, preferable economic and social benefits will be generated in construction.
Invention content
It is an object of the invention to be directed to foundation bearing capacity deficiency in the construction of EPS light road bank Widening Techniques, sedimentation is very much not Uniformly, the big disadvantage of slope surface load, it is proposed that EPS light road banks are widened in conjunction with plant biological bag protective slope structure, and propose EPS lightweights Embankment widens the construction method in conjunction with plant biological bag protective slope structure.
For the attainment of one's purpose, technical solution provided by the invention is:
A kind of EPS light road banks of the present invention are widened in conjunction with plant biological bag protective slope structure, including former embankment, former embankment side Face is equipped with excavation face, and excavation face is in step-like, and several anchor poles being evenly arranged, the surrounding of every anchor pole are equipped at each step It is equipped with anchor bolt grouting body, further includes Widening Embankment and plant biological bag bank protection.
Reinforcing bar is connected if the Widening Embankment includes dried layer, connection reinforcing bar is corresponding with anchor pole or so and is connected with each other, on Under widen layer equipped with EPS lightweights between adjacent connection reinforcing bar, EPS lightweights widen layer by several EPS light blocks arranged side by side Composition, EPS light blocks and upper and lower connection bar connecting, if widening layer at interval of dried layer EPS lightweights and top layer EPS lightweights are opened up The top of wide layer is equipped with armoured concrete slab.
The plant biological bag bank protection includes m esh-hanging sprayed concrete layer and the soil engineering bag that bankets, and m esh-hanging sprayed concrete layer is located at EPS lightweights widen the outside of layer, and the soil engineering bag that bankets is stacked on the outside of m esh-hanging sprayed concrete layer with mutually staggering, and neighbouring fills out It is connected by three-dimensional water discharge coupling button between native soil engineering bag.
Preferably, the EPS lightweights of bottom widen the lower section of layer and are equipped with graded soil hardcore, set in graded soil hardcore There are TGXG, TGXG being connected with U-shaped connecting plate close to former embankment one end, TGXG passes through mutually matched fixation Bolt and location nut are connect with the side plate of U-shaped connecting plate, and the bottom plate of U-shaped connecting plate and the end of anchor pole connect, TGXG It is being in hook solid close to one end of plant biological bag bank protection.
Preferably, the top surface that bottom EPS lightweights widen the bottom surface of layer and top layer EPS lightweights widen layer passes through single head connector With corresponding connection bar connecting, remaining neighbouring EPS lightweight widens the opposite one side of layer and passes through double-headed connector and two Connection bar connecting between person.
Preferably, the single head connector includes a reinforcing bar fixes sleeve and one piece of connecting plate, and the double end connects Fitting includes a reinforcing bar fixes sleeve and about two pieces corresponding connecting plates, and connecting plate is equipped with several connecting holes.
Preferably, the anchor pole is connected with reinforcing bar is connect by double end threaded sleeve, and double end threaded sleeve includes Two connection rings, the internal diameters of two connection rings with the diameter of anchor pole and connect the diameter matches of reinforcing bar respectively.
Preferably, vertical cement mortar joint filling, two layers neighbouring of EPS are equipped between the adjacent EPS light blocks in left and right Lightweight is equipped with interlayer cement sand bed between widening layer.
Preferably, the m esh-hanging sprayed concrete layer is internally provided with bar-mat reinforcement, and reinforcing bar net surface interval is welded with pre-buried Muscle, embedded ribs insertion are banketed in soil engineering bag.
Preferably, the three-dimensional water discharge coupling is buckled equipped with osculum and fixed point, and osculum joins through three-dimensional water discharge Knot upper and lower surface, and fixed point is located at the upper and lower surface of three-dimensional water discharge coupling button, and fixed point is inserted into upper and lower banket in soil engineering bag.
A kind of EPS light road banks widen the construction method in conjunction with plant biological bag protective slope structure, include the following steps:
(1) former side slope of embankment excavates stepped, drills and is implanted into anchor pole, slip casting forms anchor bolt grouting body;
(2) the anchor pole revealed section installation U-shaped connecting plate and TGXG of bottom, is laid with graded soil hardcore;
(3) bottom EPS lightweights widen layer construction, are fixedly connected with reinforcing bar, and single head connector, single head are installed on connection reinforcing bar Fixing bolt, making interlayer cement sand bed are installed in the connection hole of connector, and fixing bolt exposes interlayer cement sand bed table Face is laid with the EPS light blocks of bottom on interlayer cement sand bed, and the fixing bolt for being exposed to interlayer cement mortar layer surface is inserted into EPS light blocks pour vertical cement mortar joint filling;
(4) middle layer EPS lightweights widen layer construction, and installation middle layer connects reinforcing bar, and installs double end on connection reinforcing bar Connector, the connecting plate of double-headed connector lower part is widened layer with lower layer EPS lightweights by fixing bolt and is connect, in double-headed connector Fixing bolt is set on the connecting plate at top, using the identical mode making interlayer cement sand bed of step 3, is laid with EPS lightweights Block and pour vertical cement mortar joint filling;
(5) one layer of EPS lightweight of often constructing widens layer, judges whether to need bank protection and is laid with armoured concrete slab, if only needing Bank protection is wanted, step 6.1 is carried out, if only needing to be laid with armoured concrete slab, carries out step 6.2, if desired bank protection and laying reinforcing bar Concrete slab carries out step 6.1 and 6.2 successively, if all not needing, repeats step 4;
(6.1) EPS lightweights, which are widened, is laid with bar-mat reinforcement on the outside of layer, and embedded ribs are welded on bar-mat reinforcement, gunite concrete shape At m esh-hanging sprayed concrete layer, embedded ribs expose m esh-hanging sprayed concrete layer, are successively laid with banket soil engineering bag and three-dimensional water discharge connection It knots, the soil engineering bag that bankets near m esh-hanging sprayed concrete layer is connect by embedded ribs with m esh-hanging sprayed concrete layer;
(6.2) one layer of armoured concrete slab of cast in situs;
(7) it uses the identical method of step 3 to complete top layer EPS lightweights and widens layer construction, and layer is widened in top layer EPS lightweights On pour one layer of armoured concrete slab;
(8) top subgrade construction, including pour and widen filler, widen base, protection body and widen road surface.
Preferably, in the step 5, when EPS lightweights are widened, layer has constructed 4~5 layers or EPS lightweights widen the peace of layer When dress height reaches 2m, pouring reinforcement concrete plate is needed.
Using technical solution provided by the invention, compared with prior art, have the advantages that:
1, the present invention replaces normal sands hardcore using EPS light blocks, significantly reduces the additional stress of soft stratum and sinks Drop deformation, reduces basement process expense, and EPS light block making speed is fast, significantly improves construction efficiency, shortens the construction period, and reduces Labor intensity.
2, setting connection reinforcing bar between EPS light blocks, connection reinforcing bar are connect with anchor bar body, improve the connection between new and old embankment Intensity reduces the relative settlement between interface, while the armoured concrete slab for connecting reinforcing bar and certain altitude setting can be improved and widen The overall stability of embankment.
3, the slope surface of Widening Embankment uses m esh-hanging sprayed concrete to protect EPS light blocks, and grinding tooth can be prevented dynamic Destruction of the object to EPS light blocks, improves its durability.
4, slope surface of the invention is using the soil engineering bag that bankets, the soil engineering bag that bankets up and down, the left and right fissure of displacement be laid with, and using connection Reinforcing bar is connect with the bar-mat reinforcement on gunite concrete, while the soil engineering bag that bankets has similar reinforced action, significantly improves side slope Stability mixes grass-seed, shrub and arbor seed by planting the raw-soil in the soil engineering bag that bankets, and the later stage is convenient for forming ecological afforestation side slope.
Description of the drawings
Fig. 1 is that EPS light road banks of the present invention widen the schematic diagram in conjunction with plant biological bag protective slope structure;
Fig. 2 is that attached EPS light road banks shown in FIG. 1 widen 1-1 connection details in conjunction with plant biological bag protective slope structure;
Fig. 3 is U-shaped connecting plate schematic three dimensional views;
Fig. 4 is the A-A sectional views of attached U-shaped connecting plate shown in Fig. 3;
Fig. 5 is double end threaded sleeve schematic three dimensional views;
Fig. 6 is that attached EPS light road banks shown in FIG. 1 widen 2-2 connection details in conjunction with plant biological bag protective slope structure;
Fig. 7 is the structural schematic diagram of EPS light blocks;
Fig. 8 is the structural schematic diagram of single head connector;
Fig. 9 is the B-B sectional views of attached single head connector shown in Fig. 8;
Figure 10 is the structural schematic diagram of double-headed connector;
Figure 11 is the C-C sectional views of attached double-headed connector shown in Fig. 10;
Figure 12 is EPS light blocks and double-headed connector or single head connector connection diagram;
Figure 13 is bar-mat reinforcement structural schematic diagram;
Figure 14 is that attached EPS light road banks shown in FIG. 1 are widened in conjunction with plant biological bag protective slope structure 3-3 connection details;
Figure 15 is the structural schematic diagram of three-dimensional water discharge coupling button.
It illustrates:1-EPS light blocks, 2- original embankments, 3- excavation faces, 4- graded soil hardcores, 5- TGXG, 6- Sand-gravel cushion, 7- pitched works, the gutters 8-, 9- anchor poles, 10- armoured concrete slabs, 11- interlayer cement sand beds, 12- linked networks Shotcrete layer, 13- banket soil engineering bag, the vertical cement mortar joint fillings of 14-, 15- originals road surface, 16- former base layers, and 17- widens road Face, 18- widen base, and 19- widens filler, 20- protection bodies, 21-U shape connecting plates, 22- double end threaded sleeves, 23- reinforcing bars Net, 24- embedded ribs, 25- three-dimensional water discharge coupling buttons, 26- osculums, 27- fix point, and 28- single head connectors, 29- reinforcing bars are fixed Sleeve, 30- connecting holes, 31- anchor pole through holes, 32- TGXG mounting holes, 33- fixing bolts, 34- location nuts, 35- anchors Gu injecting cement paste, 36- plants the raw-soil, 37- connection reinforcing bars, 38- connecting holes, 39- double-headed connectors, 40- connecting plates.
Specific implementation mode
To further appreciate that present disclosure, the present invention is described in detail in conjunction with the embodiments, and following embodiment is used for Illustrate the present invention, but is not limited to the scope of the present invention.
In conjunction with shown in attached drawing 1, the purpose of the invention is to be widened to former road surface 15, the lower section on the original road surface is equipped with Former base layer 16 and former embankment 2.It is in former embankment that a kind of EPS light road banks of the present invention, which are widened in conjunction with plant biological bag protective slope structure, 2 sides are equipped with excavation face 3, and excavation face 3 is in step-like, drill at each step and equipped with several uniform and horizontally disposed anchor pole 9, a diameter of 32mm of anchor pole 9, anchor pole 9 stretch out the length of 10~15mm of step, reinforcing bar 37, every anchor are fixedly connected with for the later stage The surrounding slip casting of bar 9 forms anchor bolt grouting body 35, and Widening Embankment and plant biological bag bank protection is arranged in the side that former embankment 2 is widened.
In conjunction with shown in attached Fig. 1 and 2, the bottom setting graded soil hardcore 4 of the Widening Embankment, grading earth and stone material pad TGXG 5 is equipped in layer 4, TGXG 5 curves U-shaped and is connected with U-shaped connecting plate 21 close to 2 one end of former embankment, and U-shaped connects The structure of fishplate bar 21 as shown in figures 3 and 4, is respectively provided with a TGXG mounting hole 32, TGXG is solid on two side plate The aperture for determining hole 32 is 8mm, sets that there are one anchor pole through holes 31 on bottom plate, and the aperture of anchor pole through hole 31 is 32mm, Tu Gongge Grid 5 are connect by the way that in TGXG mounting hole 32 and mutually matched fixing bolt 33 and location nut 34 is arranged with U-shaped The side plate of plate 21 connects, and anchor pole 9 passes through the grid hole of anchor pole through hole 31 and TGXG 5 and fixed with location nut, into And anchor pole 9, U-shaped connecting plate 21 and TGXG 5 is made to be connected with each other, one end of the close plant biological bag bank protection of TGXG 5 is in curved It is hook-shaped, it is used for the earth and stone material of anti-package graded soil hardcore 4.4 top of graded soil hardcore is equipped with sand-gravel cushion 6, outside Build pitched work 7 by laying bricks or stones, the outside of pitched work 7 is equipped with gutter 8, for draining.
Again in conjunction with shown in attached drawing 1, reinforcing bar 37 is connected if the Widening Embankment includes dried layer, connection reinforcing bar 37 passes through double end Threaded sleeve 22 is connect with anchor pole 9, and the structure of the double end threaded sleeve 22 is as shown in Fig. 5 comprising two companies Connect ring, the internal diameters of two connection rings is respectively 32mm and 8mm, just with anchor pole 9 and connect the diameter matches of reinforcing bar 37 respectively.Such as Shown in attached drawing 6, the smaller connection ring of 22 internal diameter of double end threaded sleeve is sleeved on connection reinforcing bar 37, anchor pole 9 is then aligned with, and The larger connection ring of 22 internal diameter of double end threaded sleeve is sleeved on anchor pole 9, you can realize the company of connection reinforcing bar 37 and anchor pole 9 It connects.Layer is widened equipped with EPS lightweights between neighbouring connection reinforcing bar, EPS lightweights widen layer by several EPS arranged side by side Light block 1 forms, and the structure of EPS light blocks 1 is as shown in Fig. 7, and the upper and lower surface of EPS light blocks 1 is equipped with connecting hole 38, bottom The connection reinforcing bar 37 of underrun single head connector 28 and the lower section of the EPS light blocks 1 of layer and top layer connects, remaining phase up and down The opposite one side of adjacent EPS light blocks 1 is then connected by double-headed connector 39 and connection reinforcing bar 37 between the two.Single head connects The structure of part 28 as shown in figs. 8 and 9, including a reinforcing bar fixes sleeve 29 and one piece of connecting plate 40;Double-headed connector 39 Structure is as shown in attached drawing 10 and attached drawing 11, including a reinforcing bar fixes sleeve 29 and about two pieces corresponding connecting plates 40.Single head The connecting plate 40 of connector 28 and double-headed connector 39 is equipped with several connecting holes 30.As shown in Fig. 12, the company of connecting plate 40 The connecting hole 38 for connecing hole and EPS light blocks 1 is mutual corresponding, by single head connector 28 or the steel of double-headed connector 39 when connection Muscle fixes sleeve 29 is sleeved on connection reinforcing bar 37, then with the fixing bolt fixed connecting plate 40 for being sequentially inserted into connecting hole 30,38 With EPS light blocks 1, the connection of EPS light blocks 1 and connection reinforcing bar 37 is realized.It is equipped with and hangs down between the adjacent EPS light blocks 1 in left and right Straight cement mortar joint filling 14, two layers neighbouring of EPS lightweight are equipped with interlayer cement sand bed 11 between widening layer.For another example attached drawing Shown in 1, if widening layer at interval of 4~5 layers of EPS lightweights or when EPS lightweights widen layer continuously construction is more than 2m, cast in situs one Layer armoured concrete slab 10 is also equipped with armoured concrete slab 10 above it after the completion of top layer EPS lightweights widen layer construction.
As shown in Fig. 1, the plant biological bag bank protection includes m esh-hanging sprayed concrete layer 12 and the soil engineering bag 13 that bankets, linked network Shotcrete layer 12 is located at the outside that EPS lightweights widen layer, is internally provided with bar-mat reinforcement 23, as shown in Fig. 13, bar-mat reinforcement 23 weld two A8 reinforcing bars as embedded ribs 24, such as 14 institute of attached drawing towards the surface of the side for the soil engineering bag 13 that bankets at interval of 40cm Show, what the outside of m esh-hanging sprayed concrete layer 12 interlocked is stacked with the soil engineering bag 13 that bankets, wherein embedded ribs 24 are inserted into most inner side one Layer bankets in soil engineering bag 13, and then makes banket soil engineering bag 13 and the interconnection of m esh-hanging sprayed concrete layer 12.Neighbouring fills out It being connected by three-dimensional water discharge coupling button 25 between native soil engineering bag 13, the structure of three-dimensional water discharge coupling button 25 is as shown in Fig. 15, Equipped with osculum 25 and fixed point 27, osculum 26 runs through 25 upper and lower surface of three-dimensional water discharge coupling button, and fixed point 27 is located at three-dimensional The upper and lower surface of water discharge coupling button 25,27 insertion of fixed point is upper and lower to banket in soil engineering bag 13, bankets for connecting upper layer and lower layer Soil engineering bag 13 is equipped in the soil engineering bag 13 that each bankets and plants the raw-soil 36, is used for planting plants.
It after the completion of Widening Embankment and plant biological bag slope protection construction, is filled on Widening Embankment and widens filler 19, widening filler It is poured on 19 and widens base 18, widened base 18 and connect with former base layer 16 in entirety, poured above widening subgrade and widen road surface 17, it widens road surface 17 and is linked to be entirety with former road surface 15, widening base 18 and widening 17 outside of road surface and pour protection body 20 prevents from opening up Wide base 18 comes down with road surface 17 is widened.
Above-mentioned EPS light road banks are widened the construction method in conjunction with plant biological bag protective slope structure and are included the following steps:
Step 1,2 Slope Treatment of former embankment is reinforced:The vegetation in 2 side slope of former embankment and protective slope structure are removed, according to The geometric dimension and making mode of EPS light blocks 1,10 thickness of armoured concrete slab and installation position etc. cut open 2 side slope of former embankment It is cut into the excavation face 3 of the step shape of certain altitude and width, manual amendment is simultaneously tamped, on the vertical plane of step, corresponding EPS 1 horizontal inter-layer position of light block is implanted into anchor pole 9, and slip casting forms anchor bolt grouting body 35 using drill hole of drilling machine, flattens earth's surface, and The gutter 8 of 0.8~1.0m depths is excavated on the outside.
Step 2, TGXG 5 is fixed, graded soil hardcore 4 is laid with:9 revealed section of anchor pole passes through U-shaped connecting plate 21 5 grid hole of anchor pole through hole 31 and TGXG is used in combination location nut 34 to fix, patch U-shaped connecting plate 21 in 5 one end of TGXG It fixes, the earth and stone material in 5 other end anti-package graded soil hardcore 4 of TGXG, after the completion of graded soil hardcore 4, builds by laying bricks or stones Pitched work 7.
Step 3, bottom EPS lightweights widen layer construction, and exposed anchor pole 9 is passed through double end threaded sleeve with reinforcing bar 37 is connect 22 integrated connections are inserted into the reinforcing bar fixes sleeve 29 of single head connector 28 in connection reinforcing bar 37 after the completion of connection, according to reality 1 making of EPS light blocks fixes position of the single head connector 28 on connection reinforcing bar 37 apart from size with location nut, has positioned Cheng Hou, the connecting hole 30 that connecting plate 40 is inserted into fixing bolt are fixed, and 11 making of intermediary water silt particle pulp layer is carried out after installation is complete, Since fixing bolt is longer, fixing bolt reserves 2cm linkage sections when interlayer 11 making of cement sand bed, 1 bottom of EPS light blocks The connecting hole 38 in portion, which is put into fixing bolt and reserves 2cm linkage sections, to be disposed, and vertical cement mortar joint filling 14 between pour.
Step 4, middle layer EPS lightweights widen layer construction, and installation middle layer connects reinforcing bar 37, and pacifies on connection reinforcing bar 37 Filling double-headed connector 39, the connecting plate 30 of 39 lower part of double-headed connector is widened layer with lower layer EPS lightweights by fixing bolt and is connect, Fixing bolt is set on the connecting plate 30 at 39 top of double-headed connector, using the identical mode making interlayer cement bonded sand of step 3 Pulp layer 11 is laid with EPS light blocks 1 and pours vertical cement mortar joint filling 14.
Step 5, one layer of EPS lightweight of often constructing widens layer, the 4 layers of EPS lightweights that see whether continuously to have constructed widen layer or Whether the EPS lightweights continuously constructed widen layer height more than 2m, judge whether to need pouring reinforcement concrete plate 10, and root with this Judge whether to need bank protection according to actual conditions, if only needing bank protection, carries out step 6.1, if only needing to be laid with armoured concrete slab, Step 6.2 is carried out, if desired bank protection and laying armoured concrete slab, carry out step 6.1 and 6.2 successively, if all not needing, repeat Step 4.
Step 6.1, m esh-hanging sprayed concrete layer 12 is constructed, and EPS lightweights, which are widened, is laid with bar-mat reinforcement 23 on the outside of layer, and in reinforcing bar Embedded ribs 24 are connected on net 23, embedded ribs 24 are connect by the way of binding or welding with bar-mat reinforcement 23, and gunite concrete is formed M esh-hanging sprayed concrete layer 12, embedded ribs 24 expose m esh-hanging sprayed concrete layer 12, are successively laid with banket soil engineering bag 13 and three-dimensional Water discharge coupling button 25, the soil engineering bag 13 that bankets near m esh-hanging sprayed concrete layer 12 spray coagulation by embedded ribs 24 and linked network Soil layer 12 connects.
Step 6.2, when EPS lightweights widen 4 layers of layer installation or mounting height reaches 2m, one layer of reinforced concrete of cast in situs Native plate 10.
Step 7, anchor pole 9 is connected using the identical method of step 3 and connect reinforcing bar 37, single head connector 28 solid Positioning is set and is connected reinforcing bar 37 and is connected and fixed, and fixedly connected hole 30 and EPS light blocks 1 is inserted into fixing bolt, after installation is complete Carry out 11 making of interlayer cement sand bed, one layer of armoured concrete slab 10 of cast in situs.
Step 8, top subgrade construction, including pour and widen filler 19, widen base 18, protection body 20 and widen road surface 17。
It is described the invention in detail above in association with embodiment, but the content is only the preferable implementation of the present invention Example should not be construed as limiting the practical range of the present invention.It is all according to all the changes and improvements made by the present patent application range Deng within the patent covering scope that should all still fall within the present invention.

Claims (10)

1. a kind of EPS light road banks are widened in conjunction with plant biological bag protective slope structure, including former embankment, former embankment side is equipped with excavation face, Excavation face is in step-like, and several anchor poles being evenly arranged are equipped at each step, and the surrounding of every anchor pole is equipped with anchoring note Slurry, it is characterised in that:It further includes Widening Embankment and plant biological bag bank protection;
Reinforcing bar is connected if the Widening Embankment includes dried layer, connection reinforcing bar is corresponding with anchor pole or so and is connected with each other, up and down phase Layer is widened equipped with EPS lightweights between adjacent connection reinforcing bar, EPS lightweights are widened layer and are made of several EPS light blocks arranged side by side, EPS light blocks and upper and lower connection bar connecting, if widening layer at interval of dried layer EPS lightweights and top layer EPS lightweights widen layer Top be equipped with armoured concrete slab;
The plant biological bag bank protection includes m esh-hanging sprayed concrete layer and the soil engineering bag that bankets, and m esh-hanging sprayed concrete layer is located at EPS Lightweight widens the outside of layer, and the soil engineering bag that bankets is stacked on the outside of m esh-hanging sprayed concrete layer with mutually staggering, and neighbouring bankets It is connected by three-dimensional water discharge coupling button between soil engineering bag.
2. EPS light road banks according to claim 1 are widened in conjunction with plant biological bag protective slope structure, it is characterised in that:Bottom The lower section that EPS lightweights widen layer is equipped with graded soil hardcore, is equipped with TGXG in graded soil hardcore, TGXG exists It is connected with U-shaped connecting plate close to original embankment one end, TGXG is connected by mutually matched fixing bolt and location nut with U-shaped The side plate of fishplate bar connects, and the bottom plate of U-shaped connecting plate and the end of anchor pole connect, and TGXG is close to one end of plant biological bag bank protection In hook solid.
3. EPS light road banks according to claim 1 are widened in conjunction with plant biological bag protective slope structure, it is characterised in that:Bottom EPS Lightweight widens the bottom surface of layer and top layer EPS lightweights widen the top surface of layer by single head connector and corresponding connection bar connecting, Remaining neighbouring EPS lightweight widens the opposite one side of layer and passes through double-headed connector and connection bar connecting between the two.
4. EPS light road banks according to claim 3 are widened in conjunction with plant biological bag protective slope structure, it is characterised in that:Described Single head connector includes a reinforcing bar fixes sleeve and one piece of connecting plate, and the double-headed connector includes a reinforcing bar fixing sleeve Cylinder and about two pieces corresponding connecting plates, connecting plate are equipped with several connecting holes.
5. EPS light road banks according to claim 1 are widened in conjunction with plant biological bag protective slope structure, it is characterised in that:Described Anchor pole is connected with reinforcing bar is connect by double end threaded sleeve, and double end threaded sleeve includes two connection rings, two connection rings Internal diameter with the diameter of anchor pole and connect the diameter matches of reinforcing bar respectively.
6. EPS light road banks according to claim 1 are widened in conjunction with plant biological bag protective slope structure, it is characterised in that:Left and right phase Vertical cement mortar joint filling is equipped between adjacent EPS light blocks, two layers neighbouring of EPS lightweight is equipped with interlayer between widening layer Cement sand bed.
7. EPS light road banks according to claim 1 are widened in conjunction with plant biological bag protective slope structure, it is characterised in that:Described M esh-hanging sprayed concrete layer is internally provided with bar-mat reinforcement, and reinforcing bar net surface interval is welded with embedded ribs, and embedded ribs are inserted into the geotechnique that bankets In bag.
8. EPS light road banks according to claim 1 are widened in conjunction with plant biological bag protective slope structure, it is characterised in that:Described Three-dimensional water discharge coupling is buckled equipped with osculum and fixed point, and osculum buckles lower surface through three-dimensional water discharge coupling, and fixed point is set In the upper and lower surface of three-dimensional water discharge coupling button, fixed point is inserted into upper and lower banket in soil engineering bag.
9. a kind of EPS light road banks described in claim 1 widen the construction method in conjunction with plant biological bag protective slope structure, feature exists In including the following steps:
(1) former side slope of embankment excavates stepped, drills and is implanted into anchor pole, slip casting forms anchor bolt grouting body;
(2) the anchor pole revealed section installation U-shaped connecting plate and TGXG of bottom, is laid with graded soil hardcore;
(3) bottom EPS lightweights widen layer construction, are fixedly connected with reinforcing bar, and single head connector, single head connection are installed on connection reinforcing bar Fixing bolt, making interlayer cement sand bed are installed in the connection hole of part, and fixing bolt exposes interlayer cement mortar layer surface, layer Between the EPS light blocks of bottom are laid on cement sand bed, being exposed to the fixing bolt of interlayer cement mortar layer surface, to be inserted into EPS light Mass pours vertical cement mortar joint filling;
(4) middle layer EPS lightweights widen layer construction, and installation middle layer connects reinforcing bar, and the installation double end connection on connection reinforcing bar Part, the connecting plate of double-headed connector lower part is widened layer with lower layer EPS lightweights by fixing bolt and is connect, at the top of double-headed connector Connecting plate on fixing bolt is set, using the identical mode making interlayer cement sand bed of step 3, be laid with EPS light blocks and Pour vertical cement mortar joint filling;
(5) one layer of EPS lightweight of often constructing widens layer, judges whether to need bank protection and is laid with armoured concrete slab, if only needing to protect Slope carries out step 6.1, if only needing to be laid with armoured concrete slab, carries out step 6.2, if desired bank protection and laying reinforced concrete Native plate carries out step 6.1 and 6.2 successively, if all not needing, repeats step 4;
(6.1) EPS lightweights, which are widened, is laid with bar-mat reinforcement on the outside of layer, and embedded ribs are welded on bar-mat reinforcement, and gunite concrete, which is formed, to be hung Net shotcrete layer, embedded ribs expose m esh-hanging sprayed concrete layer, are successively laid with banket soil engineering bag and three-dimensional water discharge coupling button, The soil engineering bag that bankets near m esh-hanging sprayed concrete layer is connect by embedded ribs with m esh-hanging sprayed concrete layer;
(6.2) one layer of armoured concrete slab of cast in situs;
(7) it uses the identical method of step 3 to complete top layer EPS lightweights and widens layer construction, and widen in top layer EPS lightweights and poured on layer Build one layer of armoured concrete slab;
(8) top subgrade construction, including pour and widen filler, widen base, protection body and widen road surface.
10. EPS light road banks according to claim 9 widen the construction method in conjunction with plant biological bag protective slope structure, feature It is:In the step 5, when EPS lightweights are widened, layer has constructed 4~5 layers or EPS lightweights are widened the mounting height of layer and reached When 2m, pouring reinforcement concrete plate is needed.
CN201810582158.2A 2018-06-07 2018-06-07 EPS light road banks are widened in conjunction with plant biological bag protective slope structure and construction method Pending CN108589747A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810582158.2A CN108589747A (en) 2018-06-07 2018-06-07 EPS light road banks are widened in conjunction with plant biological bag protective slope structure and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810582158.2A CN108589747A (en) 2018-06-07 2018-06-07 EPS light road banks are widened in conjunction with plant biological bag protective slope structure and construction method

Publications (1)

Publication Number Publication Date
CN108589747A true CN108589747A (en) 2018-09-28

Family

ID=63627793

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810582158.2A Pending CN108589747A (en) 2018-06-07 2018-06-07 EPS light road banks are widened in conjunction with plant biological bag protective slope structure and construction method

Country Status (1)

Country Link
CN (1) CN108589747A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109487802A (en) * 2018-10-26 2019-03-19 中铁二院成都勘察设计研究院有限责任公司 A kind of wide processing method of roadbed side
CN113373949A (en) * 2021-05-20 2021-09-10 上海工程技术大学 Protective structure for expansive soil slope and construction method
CN113818300A (en) * 2021-09-24 2021-12-21 中煤科工重庆设计研究院(集团)有限公司 Sponge urban ecological roadbed structure based on original road and construction method thereof

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000144747A (en) * 1998-11-16 2000-05-26 Dow Kakoh Kk Structure and execution method of lightweight banking
JP2005232858A (en) * 2004-02-20 2005-09-02 Free Kogyo Kk Road widening method and method of preventing stone from falling
CN203393530U (en) * 2013-08-08 2014-01-15 江苏翔森建设工程有限公司 Anti-floating lightweight high-fill embankment structure
CN103628378A (en) * 2013-11-12 2014-03-12 江苏省镇江市路桥工程总公司 Waterside road broadened embankment structure and construction method thereof
CN204059125U (en) * 2014-08-26 2014-12-31 德州市公路工程总公司 One suspended wall height barricade embankment near water section Widening Embankment structure
CN104278608A (en) * 2013-07-05 2015-01-14 杭州华水市政工程有限公司 Novel highway embankment widened structure and construction method
CN104928996A (en) * 2015-06-24 2015-09-23 中铁第四勘察设计院集团有限公司 Light soil side wide roadbed structure for railway
CN204959774U (en) * 2015-07-15 2016-01-13 杭州江润科技有限公司 Ecological brick flexible protection structure of immerseable embankment high slope interlocking formula
CN106988178A (en) * 2017-04-14 2017-07-28 华中科技大学 A kind of subgrade in soft soil zone widened structure and its construction method
CN107254817A (en) * 2017-06-16 2017-10-17 江苏省镇江市路桥工程总公司 Splice the construction method of widened structure based on assembled template new and old roadbed light soil
CN206887972U (en) * 2017-07-07 2018-01-16 江苏省镇江市路桥工程总公司 The reinforced ecological slope protection structure of roadbed three-dimensional water discharge
CN208293589U (en) * 2018-06-07 2018-12-28 杭州昂创科技有限公司 A kind of EPS light road bank is widened in conjunction with plant biological bag protective slope structure

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000144747A (en) * 1998-11-16 2000-05-26 Dow Kakoh Kk Structure and execution method of lightweight banking
JP2005232858A (en) * 2004-02-20 2005-09-02 Free Kogyo Kk Road widening method and method of preventing stone from falling
CN104278608A (en) * 2013-07-05 2015-01-14 杭州华水市政工程有限公司 Novel highway embankment widened structure and construction method
CN203393530U (en) * 2013-08-08 2014-01-15 江苏翔森建设工程有限公司 Anti-floating lightweight high-fill embankment structure
CN103628378A (en) * 2013-11-12 2014-03-12 江苏省镇江市路桥工程总公司 Waterside road broadened embankment structure and construction method thereof
CN204059125U (en) * 2014-08-26 2014-12-31 德州市公路工程总公司 One suspended wall height barricade embankment near water section Widening Embankment structure
CN104928996A (en) * 2015-06-24 2015-09-23 中铁第四勘察设计院集团有限公司 Light soil side wide roadbed structure for railway
CN204959774U (en) * 2015-07-15 2016-01-13 杭州江润科技有限公司 Ecological brick flexible protection structure of immerseable embankment high slope interlocking formula
CN106988178A (en) * 2017-04-14 2017-07-28 华中科技大学 A kind of subgrade in soft soil zone widened structure and its construction method
CN107254817A (en) * 2017-06-16 2017-10-17 江苏省镇江市路桥工程总公司 Splice the construction method of widened structure based on assembled template new and old roadbed light soil
CN206887972U (en) * 2017-07-07 2018-01-16 江苏省镇江市路桥工程总公司 The reinforced ecological slope protection structure of roadbed three-dimensional water discharge
CN208293589U (en) * 2018-06-07 2018-12-28 杭州昂创科技有限公司 A kind of EPS light road bank is widened in conjunction with plant biological bag protective slope structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109487802A (en) * 2018-10-26 2019-03-19 中铁二院成都勘察设计研究院有限责任公司 A kind of wide processing method of roadbed side
CN113373949A (en) * 2021-05-20 2021-09-10 上海工程技术大学 Protective structure for expansive soil slope and construction method
CN113373949B (en) * 2021-05-20 2022-07-22 上海工程技术大学 Protective structure for expansive soil slope and construction method
CN113818300A (en) * 2021-09-24 2021-12-21 中煤科工重庆设计研究院(集团)有限公司 Sponge urban ecological roadbed structure based on original road and construction method thereof

Similar Documents

Publication Publication Date Title
CN106013191B (en) Environment-friendly type grass planting Concrete Highway protective slope structure and construction method
CN204059124U (en) A kind of sand drain strong rammer grouting behind shaft or drift lining foundation reinforcing structure
CN106759473B (en) The constructing structure and its construction method of underground pipe gallery and road
CN109736346B (en) Steel anchor pipe reinforced weathered rock stratum reinforced weighing type retaining wall structure and construction method
CN205999903U (en) Environment-friendly type grass planting Concrete Highway protective slope structure
CN108560349A (en) The high embankment retaining structure in soft clay area
CN109538246A (en) Ledge method tunneling subway station arch springing ruggedized construction and construction method
CN106677154A (en) Collapsible loess foundation rubble frame structure reinforcement system and reinforcement method
CN106320120A (en) Construction process for pile slab type non-soil roadbed highway
CN107190602A (en) A kind of river degradation section pile formula foam concrete light road bank structure and construction method
CN107254817A (en) Splice the construction method of widened structure based on assembled template new and old roadbed light soil
CN201027311Y (en) Water discharge type anchor stock frame beam for reinforcing side slope
CN108589747A (en) EPS light road banks are widened in conjunction with plant biological bag protective slope structure and construction method
CN104358196B (en) Highway open to traffic Embankment Subsidence disposes the construction method of structure
CN209039896U (en) The soft soil roadbed three-dimensional reinforced structure of convolution is knitted in a kind of stake-
CN107938456A (en) Fill out river road construction method
CN106869151A (en) A kind of bridge construction method of deep foundation ditch
CN109838240A (en) Cross the river tunnel ledge cover and cut construction method
CN110004991A (en) Underground structure anti-floating system and construction method based on raised type tangs plate
CN109594442A (en) Garden path construction technology
CN104480956B (en) A kind of minor diameter mold-bagged concrete pile composite foundation
CN208604438U (en) The high embankment retaining structure in soft clay area
CN103334450B (en) Construction method of pile precast slab retaining wall with drainage ditch
CN106012971A (en) Vegetation concrete protection slope and construction method thereof
CN212077981U (en) Combined slope supporting structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190520

Address after: 350800 Fujian Province Fuzhou City Fuqing City Shizhu Street Fuping Street Home for the Elderly

Applicant after: Fujian Longhuang Municipal Engineering Co., Ltd.

Address before: 310000 Wanda Commercial Center, Gongshu District, Hangzhou City, Zhejiang Province, 4 buildings, 3 units 1409

Applicant before: Hangzhou ang Chuang Technology Co., Ltd.