CN204509922U - Underpasses structure - Google Patents
Underpasses structure Download PDFInfo
- Publication number
- CN204509922U CN204509922U CN201520167056.6U CN201520167056U CN204509922U CN 204509922 U CN204509922 U CN 204509922U CN 201520167056 U CN201520167056 U CN 201520167056U CN 204509922 U CN204509922 U CN 204509922U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- underpasses
- transverse slat
- prefabricated steel
- foundation ditch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model discloses a kind of underpasses structure, comprise the precast concrete base being positioned at foundation ditch, the prefabricated steel pipe be positioned on base, the carriageway plate being positioned at prefabricated steel pipe, pit backfill and be positioned at the road surface, upper strata of pit backfill upper surface.These underpasses structure is applicable to the cut and cover method of underpasses, just can first precast base and steel pipe before foundation ditch is complete, direct mounting seat and steel pipe after foundation ditch completes, without the need to cast in situs component, substantially reduce construction period, the pedestrian in minimizing road pavement and the traffic impact of vehicle.
Description
Technical field
The utility model relates to a kind of underpasses structure.
Background technology
Box structure and U groove structure are secretly buried in underpasses many employings in city, are monolithic reinforced concrete structure, adopt constructure scheme to have cut and cover method, shallow burial hidden digging etc.
Shortcoming: (1) site concrete long construction period; (2) cut and cover method needs close traffic, greatly affects road traffic in construction period; Adverse effect is caused to the trip of the people; (3) shallow burial hidden digging, difficulty of construction is large, has risk road surface occurring and collapses.
Utility model content
In view of this, the technical problems to be solved in the utility model is to provide a kind of underpasses structure, and this structure is applicable to cut and cover method, the low and short construction period of difficulty of construction.
Corresponding to it, another technical problem that will solve of the utility model is the method that application said structure carries out underpasses construction.
With regard to underpasses structure, comprise the precast concrete base being positioned at foundation ditch, the prefabricated steel pipe be positioned on base, the carriageway plate being positioned at prefabricated steel pipe, pit backfill and be positioned at the road surface, upper strata of pit backfill upper surface.
Further, described precast concrete base has deep-slotted chip breaker, described prefabricated steel pipe is positioned at deep-slotted chip breaker.
Further, described carriageway plate comprises the riser of transverse slat and transverse slat bottom, and the two ends, left and right of described transverse slat are connected with pre-manufactured steel tube passage, and the bottom of described riser is connected with the bottom of pre-manufactured steel tube passage.
Further, in described prefabricated steel pipe, between two ends, transverse slat left and right and riser, be provided with arc-like rows water pipe, the top of described arc-like rows water pipe is communicated with transverse slat.
These underpasses structure is applicable to the cut and cover method of underpasses, just can first precast base and steel pipe before foundation ditch is complete, direct mounting seat and steel pipe after foundation ditch completes, without the need to cast in situs component, substantially reduce construction period, the pedestrian in minimizing road pavement and the traffic impact of vehicle.
With regard to underpasses construction method, comprise the steps: S1) precast concrete base and steel pipe;
S2) after excavation pit sclerosis ground;
S3) concrete bed is installed, prefabricated steel pipe is installed immediately as underpass primary structure thing, then build carriageway plate and backfill foundation ditch in pipe, finally pour into a mould road surface, upper strata.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is further described.
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
As shown in Figure 1: the underpasses structure of the present embodiment, the precast concrete base 1 being positioned at foundation ditch, the prefabricated steel pipe 2 be positioned on base, the carriageway plate 3 being positioned at prefabricated steel pipe, pit backfill layer 4 is comprised and the road surface, upper strata 5 that is positioned on pit backfill layer.Concrete bed 1 and prefabricated steel pipe 2 are prefabricated component, can before underpasses construction or the foundation ditch of underpasses complete before make complete, during construction, adopt cut and cover method, after the foundation pit construction of underpasses completes, directly concrete bed 1 and steel pipe 2 are installed, without the need to as existing cut and cover method, cast in situs component after foundation ditch completes, provides the speed of application of cut and cover tunneling, decreases the adverse effect caused the trip of the people.
Concrete, precast concrete base 1 has deep-slotted chip breaker 11, and prefabricated steel pipe 2 is positioned at deep-slotted chip breaker 11, and supported by deep-slotted chip breaker 11 pairs of steel pipes 12, support effect is good.
As the further improvement of technique scheme, described carriageway plate 3 comprises transverse slat 31 and is positioned at the riser 32 of transverse slat bottom, the two ends, left and right of described transverse slat 31 are connected with pre-manufactured steel tube passage, the bottom of described riser 32 is connected with the bottom of prefabricated steel pipe, transverse slat 31 to form two leg-of-mutton supports between riser 32 and corresponding steel pipe 2, structural strength is high, more stable to the support of transverse slat 31 to driving.
As the further improvement of technique scheme, in described prefabricated steel pipe 2, between transverse slat about 31 two ends and riser 32, be provided with arc-like rows water pipe 33, the top of described arc-like rows water pipe 33 is communicated with transverse slat 31.Arc-like rows water pipe 33 is established according to steel pipe 2 inwall, the place that certain arc-like rows water pipe 33 is communicated with transverse slat 31 must be the minimum point on transverse slat 31, water on such transverse slat 31 is clapped to steel pipe 2 and between riser 32 through arc-like rows water pipe 33, milder for water can drain into bottom steel pipe 2 by arc-like rows water pipe 33, avoid causing greater impact to riser 32, and then affect the structural stability of riser 32.
Adopt the underpasses construction method of said structure, comprise the steps:
S1) precast concrete base 1 and steel pipe 2;
S2) excavation pit, sclerosis ground;
S3) first concrete bed 1 is installed, with being arranged on by pre-manufactured steel pipe 2 on base 1 using as underpass primary structure thing, then building carriageway plate and backfill foundation ditch in pipe, finally pouring into a mould road surface, upper strata 5.
This construction method is cut and cover method, and advantage and the safety with cut and cover method are good, difficulty of construction is low, there will not be the risk that road surface in hidden construction process caves in, and also overcomes long shortcoming of existing cut and cover tunneling cycle simultaneously, improves efficiency of construction.
What finally illustrate is, above embodiment is only in order to illustrate the technical solution of the utility model and unrestricted, although be described in detail the utility model with reference to preferred embodiment, those of ordinary skill in the art is to be understood that, can modify to the technical solution of the utility model or equivalent replacement, and not departing from aim and the scope of technical solutions of the utility model, it all should be encompassed in the middle of right of the present utility model.
Claims (4)
1. a underpasses structure, is characterized in that: the road surface, upper strata (5) comprising the precast concrete base (1) being positioned at foundation ditch, the prefabricated steel pipe (2) be positioned on base, the carriageway plate (3) being positioned at prefabricated steel pipe, pit backfill layer (4) and be positioned on pit backfill layer.
2. underpasses structure according to claim 1, is characterized in that: described precast concrete base (1) has deep-slotted chip breaker (11), and described prefabricated steel pipe (2) is positioned at deep-slotted chip breaker (11).
3. underpasses structure according to claim 2, it is characterized in that: described carriageway plate (3) comprises transverse slat (31) and is positioned at the riser (32) of transverse slat bottom, the two ends, left and right of described transverse slat (31) and prefabricated fastener for connection, the bottom of described riser (32) is connected with the bottom of prefabricated steel pipe.
4. underpasses structure according to claim 3, it is characterized in that: in described prefabricated steel pipe (2), be positioned between transverse slat (31) two ends, left and right and riser (32) and be provided with arc-like rows water pipe (33), the top of described arc-like rows water pipe (33) is communicated with transverse slat (31).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520167056.6U CN204509922U (en) | 2015-03-24 | 2015-03-24 | Underpasses structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520167056.6U CN204509922U (en) | 2015-03-24 | 2015-03-24 | Underpasses structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204509922U true CN204509922U (en) | 2015-07-29 |
Family
ID=53707916
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520167056.6U Expired - Fee Related CN204509922U (en) | 2015-03-24 | 2015-03-24 | Underpasses structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204509922U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104674625A (en) * | 2015-03-24 | 2015-06-03 | 招商局重庆交通科研设计院有限公司 | Underway structure and construction method thereof |
CN108386219A (en) * | 2018-04-18 | 2018-08-10 | 招商局重庆交通科研设计院有限公司 | A kind of support system and operating method of tunnel support structure |
-
2015
- 2015-03-24 CN CN201520167056.6U patent/CN204509922U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104674625A (en) * | 2015-03-24 | 2015-06-03 | 招商局重庆交通科研设计院有限公司 | Underway structure and construction method thereof |
CN108386219A (en) * | 2018-04-18 | 2018-08-10 | 招商局重庆交通科研设计院有限公司 | A kind of support system and operating method of tunnel support structure |
CN108386219B (en) * | 2018-04-18 | 2023-08-11 | 招商局重庆交通科研设计院有限公司 | Supporting system of tunnel supporting structure and operation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106968712B (en) | Tunnel bottom drainage structure of water-rich stratum and construction method thereof | |
CN106854873B (en) | Engineering method of prefabricated spliced open caisson type parking garage and parking garage | |
CN107558494B (en) | Underground station structure for rail transit and construction method thereof | |
CN106120501B (en) | Existing barricade section roadbed spells width and increases structure and construction method | |
CN108487252A (en) | A kind of deep foundation pit open cutting is suitable to make construction method | |
CN107794942B (en) | Construction method of underpass riverbed comprehensive pipe gallery structure | |
CN103953351B (en) | Enlarging construction method is dug under existing tunnel in the case of a kind of uninterrupted traffic | |
CN105089670B (en) | Construction method for enlarging and excavating subway station on basis of parallel interval shield tunnel | |
CN112982481B (en) | Structure construction method for crossing subway intersection node on pipe gallery | |
CN104652444A (en) | Construction method for overall reverse operation of ultra-large type deep foundation pit center island type alternative earth excavation | |
CN206752667U (en) | A kind of basement barrier wall structure | |
CN105586985A (en) | Construction method of subway envelop enclosure structure and subway envelop enclosure structure | |
CN204509922U (en) | Underpasses structure | |
CN104674625A (en) | Underway structure and construction method thereof | |
CN104131566A (en) | Method for constructing basement foundation pit without horizontal braces | |
CN105756100B (en) | Basement post-pouring zone system and preparation method thereof | |
CN204282399U (en) | A kind of subway space enclosing structure | |
CN112343654B (en) | Maintainable drainage system for extremely water-rich stratum tunnel and tunnel | |
CN102116036B (en) | Method for constructing underground large building by combining top-down construction method technology with sequence construction method technology | |
CN110117959B (en) | Construction method for foundation pit support near river | |
CN107326932A (en) | A kind of accurate half reversed construction method of underground garage | |
CN110939139B (en) | Pile plate wall structure based on rigid contact of post-pile special-shaped retaining wall and construction method thereof | |
CN105986578A (en) | Ejecting pipe construction method of roadside tubular underground garage | |
CN105625184A (en) | Subway station building method using bridge and station combined building mode | |
CN105986830B (en) | The tunneling method of construction of roadside strip underground garage |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150729 Termination date: 20180324 |
|
CF01 | Termination of patent right due to non-payment of annual fee |