CN104674625A - Underway structure and construction method thereof - Google Patents

Underway structure and construction method thereof Download PDF

Info

Publication number
CN104674625A
CN104674625A CN201510129667.6A CN201510129667A CN104674625A CN 104674625 A CN104674625 A CN 104674625A CN 201510129667 A CN201510129667 A CN 201510129667A CN 104674625 A CN104674625 A CN 104674625A
Authority
CN
China
Prior art keywords
steel pipe
underpasses
prefabricated
transverse slat
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510129667.6A
Other languages
Chinese (zh)
Inventor
易辉
张长青
刘孝辉
杨洋
吴娇媚
王毅力
杜欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Merchants Chongqing Communications Research and Design Institute Co Ltd
Original Assignee
China Merchants Chongqing Communications Research and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Merchants Chongqing Communications Research and Design Institute Co Ltd filed Critical China Merchants Chongqing Communications Research and Design Institute Co Ltd
Priority to CN201510129667.6A priority Critical patent/CN104674625A/en
Publication of CN104674625A publication Critical patent/CN104674625A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C1/00Design or layout of roads, e.g. for noise abatement, for gas absorption
    • E01C1/04Road crossings on different levels; Interconnections between roads on different levels
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/14Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings

Abstract

The invention discloses an underway structure, which comprises a prefabricated concrete base, a prefabricated steel pipe, a carriageway plate, a pit backfill and an upper pavement, wherein the prefabricated concrete base is located in a pit; the prefabricated steel pipe is located on the base; the carriageway plate is located in the prefabricated steel pipe; the upper pavement is arranged on the upper surface of the pit backfill. The underway structure is suitable for an open cut method for the underway; the base and the steel pipe can be prefabricated in advance before the pit is complete; the base and the steel pipe can be directly mounted after the pit is finished; a cast-in-situ member is not needed; the construction cycle is greatly shortened; and the traffic impact on pedestrian and vehicles on the pavement is reduced. Meanwhile, the invention further discloses a construction method employing the structure. The method is good on construction safety and short in construction cycle.

Description

Underpasses structure and construction method
Technical field
The present invention relates to a kind of underpasses structure and construction method.
Background technology
Box structure and U groove structure are secretly buried in underpasses many employings in city, are monolithic reinforced concrete structure, adopt constructure scheme to have cut and cover method, shallow burial hidden digging etc.
Shortcoming: (1) site concrete long construction period; (2) cut and cover method needs close traffic, greatly affects road traffic in construction period; Adverse effect is caused to the trip of the people; (3) shallow burial hidden digging, difficulty of construction is large, has risk road surface occurring and collapses.
Summary of the invention
In view of this, the technical problem to be solved in the present invention is to provide a kind of underpasses structure, and this structure is applicable to cut and cover method, the low and short construction period of difficulty of construction.
Corresponding to it, another technical problem that will solve of the present invention is the method that application said structure carries out underpasses construction.
With regard to underpasses structure, comprise the precast concrete base being positioned at foundation ditch, the prefabricated steel pipe be positioned on base, the carriageway plate being positioned at prefabricated steel pipe, pit backfill and be positioned at the road surface, upper strata of pit backfill upper surface.
Further, described precast concrete base has deep-slotted chip breaker, described prefabricated steel pipe is positioned at deep-slotted chip breaker.
Further, described carriageway plate comprises the riser of transverse slat and transverse slat bottom, and the two ends, left and right of described transverse slat are connected with pre-manufactured steel tube passage, and the bottom of described riser is connected with the bottom of pre-manufactured steel tube passage.
Further, in described prefabricated steel pipe, between two ends, transverse slat left and right and riser, be provided with arc-like rows water pipe, the top of described arc-like rows water pipe is communicated with transverse slat.
These underpasses structure is applicable to the cut and cover method of underpasses, just can first precast base and steel pipe before foundation ditch is complete, direct mounting seat and steel pipe after foundation ditch completes, without the need to cast in situs component, substantially reduce construction period, the pedestrian in minimizing road pavement and the traffic impact of vehicle.
With regard to underpasses construction method, comprise the steps: S1) precast concrete base and steel pipe;
S2) after excavation pit sclerosis ground;
S3) concrete bed is installed, prefabricated steel pipe is installed immediately as underpass primary structure thing, then build carriageway plate and backfill foundation ditch in pipe, finally pour into a mould road surface, upper strata.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the invention will be further described.
Fig. 1 is structural representation of the present invention.
Detailed description of the invention
As shown in Figure 1: the underpasses structure of the present embodiment, the precast concrete base 1 being positioned at foundation ditch, the prefabricated steel pipe 2 be positioned on base, the carriageway plate 3 being positioned at prefabricated steel pipe, pit backfill layer 4 is comprised and the road surface, upper strata 5 that is positioned on pit backfill layer.Concrete bed 1 and prefabricated steel pipe 2 are prefabricated component, can before underpasses construction or the foundation ditch of underpasses complete before make complete, during construction, adopt cut and cover method, after the foundation pit construction of underpasses completes, directly concrete bed 1 and steel pipe 2 are installed, without the need to as existing cut and cover method, cast in situs component after foundation ditch completes, provides the speed of application of cut and cover tunneling, decreases the adverse effect caused the trip of the people.
Concrete, precast concrete base 1 has deep-slotted chip breaker 11, and prefabricated steel pipe 2 is positioned at deep-slotted chip breaker 11, and supported by deep-slotted chip breaker 11 pairs of steel pipes 12, support effect is good.
As the further improvement of technique scheme, described carriageway plate 3 comprises transverse slat 31 and is positioned at the riser 32 of transverse slat bottom, the two ends, left and right of described transverse slat 31 are connected with pre-manufactured steel tube passage, the bottom of described riser 32 is connected with the bottom of prefabricated steel pipe, transverse slat 31 to form two leg-of-mutton supports between riser 32 and corresponding steel pipe 2, structural strength is high, more stable to the support of transverse slat 31 to driving.
As the further improvement of technique scheme, in described prefabricated steel pipe 2, between transverse slat about 31 two ends and riser 32, be provided with arc-like rows water pipe 33, the top of described arc-like rows water pipe 33 is communicated with transverse slat 31.Arc-like rows water pipe 33 is established according to steel pipe 2 inwall, the place that certain arc-like rows water pipe 33 is communicated with transverse slat 31 must be the minimum point on transverse slat 31, water on such transverse slat 31 is clapped to steel pipe 2 and between riser 32 through arc-like rows water pipe 33, milder for water can drain into bottom steel pipe 2 by arc-like rows water pipe 33, avoid causing greater impact to riser 32, and then affect the structural stability of riser 32.
Adopt the underpasses construction method of said structure, comprise the steps:
S1) precast concrete base 1 and steel pipe 2;
S2) excavation pit, sclerosis ground;
S3) first concrete bed 1 is installed, with being arranged on by pre-manufactured steel pipe 2 on base 1 using as underpass primary structure thing, then building carriageway plate and backfill foundation ditch in pipe, finally pouring into a mould road surface, upper strata 5.
This construction method is cut and cover method, and advantage and the safety with cut and cover method are good, difficulty of construction is low, there will not be the risk that road surface in hidden construction process caves in, and also overcomes long shortcoming of existing cut and cover tunneling cycle simultaneously, improves efficiency of construction.
What finally illustrate is, above embodiment is only in order to illustrate technical scheme of the present invention and unrestricted, although with reference to preferred embodiment to invention has been detailed description, those of ordinary skill in the art is to be understood that, can modify to technical scheme of the present invention or equivalent replacement, and not departing from aim and the scope of technical solution of the present invention, it all should be encompassed in the middle of right of the present invention.

Claims (5)

1. a underpasses structure, is characterized in that: the road surface, upper strata (5) comprising the precast concrete base (1) being positioned at foundation ditch, the prefabricated steel pipe (2) be positioned on base, the carriageway plate (3) being positioned at prefabricated steel pipe, pit backfill layer (4) and be positioned on pit backfill layer.
2. underpasses structure according to claim 1, is characterized in that: described precast concrete base (1) has deep-slotted chip breaker (11), and described prefabricated steel pipe (2) is positioned at deep-slotted chip breaker (11).
3. underpasses structure according to claim 2, it is characterized in that: described carriageway plate (3) comprises transverse slat (31) and is positioned at the riser (32) of transverse slat bottom, the two ends, left and right of described transverse slat (31) and prefabricated fastener for connection, the bottom of described riser (32) is connected with the bottom of prefabricated steel pipe.
4. underpasses structure according to claim 3, it is characterized in that: in described prefabricated steel pipe (2), be positioned between transverse slat (31) two ends, left and right and riser (32) and be provided with arc-like rows water pipe (33), the top of described arc-like rows water pipe (33) is communicated with transverse slat (31).
5. a underpasses construction method, is characterized in that: comprise the steps:
S1) precast concrete base (1) and steel pipe (2);
S2) excavation pit, sclerosis ground;
Concrete bed (1) S3) is first installed, with being arranged on by pre-manufactured steel pipe (2) on base (1) using as underpass primary structure thing, then building carriageway plate and backfill foundation ditch in pipe, finally pouring into a mould road surface, upper strata (5).
CN201510129667.6A 2015-03-24 2015-03-24 Underway structure and construction method thereof Pending CN104674625A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510129667.6A CN104674625A (en) 2015-03-24 2015-03-24 Underway structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510129667.6A CN104674625A (en) 2015-03-24 2015-03-24 Underway structure and construction method thereof

Publications (1)

Publication Number Publication Date
CN104674625A true CN104674625A (en) 2015-06-03

Family

ID=53310172

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510129667.6A Pending CN104674625A (en) 2015-03-24 2015-03-24 Underway structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN104674625A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105673035A (en) * 2016-01-25 2016-06-15 济南轨道交通集团有限公司 Prefabricated shield node tunnel under condition of shield intersection and small spacing and construction method
CN107386320A (en) * 2017-03-17 2017-11-24 中国华冶科工集团有限公司 Pass through the construction method of the underground pipe gallery of buried concrete waterpipe

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1470741A (en) * 2003-03-04 2004-01-28 上海市隧道工程轨道交通设计研究院 Single-pipe circular tunnel two-layer structure
CN1626738A (en) * 2003-12-09 2005-06-15 邝伟强 Full prefabricated packaged type tunnel as far as zero earth backing
CN1807837A (en) * 2005-12-27 2006-07-26 上海市隧道工程轨道交通设计研究院 Double-layer structured round tunnel with deformation control device
CN200940265Y (en) * 2006-08-17 2007-08-29 龙文忠 Casing type under-ground pass-way
KR20100040197A (en) * 2008-10-09 2010-04-19 주식회사 한국종합기술 Underground steel pipe structure and constructing method thereof
CN203021884U (en) * 2012-12-18 2013-06-26 中交公路规划设计院有限公司 Internal double-layer prefabricated carriageway structure of shield tunnel
CN103912011A (en) * 2014-04-04 2014-07-09 北京城建设计发展集团股份有限公司 Open excavation prefabricated underground structure
CN204509922U (en) * 2015-03-24 2015-07-29 招商局重庆交通科研设计院有限公司 Underpasses structure

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1470741A (en) * 2003-03-04 2004-01-28 上海市隧道工程轨道交通设计研究院 Single-pipe circular tunnel two-layer structure
CN1626738A (en) * 2003-12-09 2005-06-15 邝伟强 Full prefabricated packaged type tunnel as far as zero earth backing
CN1807837A (en) * 2005-12-27 2006-07-26 上海市隧道工程轨道交通设计研究院 Double-layer structured round tunnel with deformation control device
CN200940265Y (en) * 2006-08-17 2007-08-29 龙文忠 Casing type under-ground pass-way
KR20100040197A (en) * 2008-10-09 2010-04-19 주식회사 한국종합기술 Underground steel pipe structure and constructing method thereof
CN203021884U (en) * 2012-12-18 2013-06-26 中交公路规划设计院有限公司 Internal double-layer prefabricated carriageway structure of shield tunnel
CN103912011A (en) * 2014-04-04 2014-07-09 北京城建设计发展集团股份有限公司 Open excavation prefabricated underground structure
CN204509922U (en) * 2015-03-24 2015-07-29 招商局重庆交通科研设计院有限公司 Underpasses structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105673035A (en) * 2016-01-25 2016-06-15 济南轨道交通集团有限公司 Prefabricated shield node tunnel under condition of shield intersection and small spacing and construction method
CN105673035B (en) * 2016-01-25 2017-11-17 济南轨道交通集团有限公司 Shield crosses and the prefabricated tunnel of shield node and construction method during small spacing
CN107386320A (en) * 2017-03-17 2017-11-24 中国华冶科工集团有限公司 Pass through the construction method of the underground pipe gallery of buried concrete waterpipe

Similar Documents

Publication Publication Date Title
CN107558494B (en) Underground station structure for rail transit and construction method thereof
CN106854873B (en) Engineering method of prefabricated spliced open caisson type parking garage and parking garage
CN102182325B (en) Storey adding method for existing building basement with frame structure and independent foundation
CN104878776B (en) A kind of underground shallow layer automatic parking garage the library structure
CN112982481B (en) Structure construction method for crossing subway intersection node on pipe gallery
CN113668588B (en) Efficient backfill construction method for large-scale assembled steel plate box factory building foundation
CN105089670B (en) Construction method for enlarging and excavating subway station on basis of parallel interval shield tunnel
CN108035379B (en) Comprehensive pipe gallery and construction method thereof
CN111188355B (en) Super-gravity type anchorage shallow-buried foundation and construction method
CN103485791A (en) Construction method for in-situ maintenance or extension of road tunnel
CN106012851A (en) Synchronous construction method of steel box girder and concrete pier studs
CN204509922U (en) Underpasses structure
CN112343654B (en) Maintainable drainage system for extremely water-rich stratum tunnel and tunnel
CN114457850A (en) Construction method of anti-floating system for crossing existing subway intersection section on open trench tunnel
CN104775439A (en) Foundation pit support and water stop integrated structure and construction method thereof
CN104674625A (en) Underway structure and construction method thereof
CN102116036B (en) Method for constructing underground large building by combining top-down construction method technology with sequence construction method technology
CN204282399U (en) A kind of subway space enclosing structure
CN104131566A (en) Method for constructing basement foundation pit without horizontal braces
CN107574836B (en) Construction structure and construction method for crossing urban road underground passage
CN107326932A (en) A kind of accurate half reversed construction method of underground garage
CN105986578A (en) Ejecting pipe construction method of roadside tubular underground garage
CN110117959B (en) Construction method for foundation pit support near river
CN111877383A (en) Prefabricated underground structure based on open caisson method and construction method
CN105986830B (en) The tunneling method of construction of roadside strip underground garage

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150603

RJ01 Rejection of invention patent application after publication