CN105986578A - Ejecting pipe construction method of roadside tubular underground garage - Google Patents

Ejecting pipe construction method of roadside tubular underground garage Download PDF

Info

Publication number
CN105986578A
CN105986578A CN201510084351.XA CN201510084351A CN105986578A CN 105986578 A CN105986578 A CN 105986578A CN 201510084351 A CN201510084351 A CN 201510084351A CN 105986578 A CN105986578 A CN 105986578A
Authority
CN
China
Prior art keywords
push pipe
pipe
prefabricated
underground garage
district
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510084351.XA
Other languages
Chinese (zh)
Inventor
涓ュ钩
严平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Nanlian Base Foundation Engineering Co Ltd
Original Assignee
Hangzhou Nanlian Base Foundation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Nanlian Base Foundation Engineering Co Ltd filed Critical Hangzhou Nanlian Base Foundation Engineering Co Ltd
Priority to CN201510084351.XA priority Critical patent/CN105986578A/en
Publication of CN105986578A publication Critical patent/CN105986578A/en
Pending legal-status Critical Current

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention discloses an ejecting pipe construction method of a roadside tubular underground garage. The tubular underground garage includes a vehicle access port and a tubular parking area formed by an ejecting pipe; and the method comprises the following main construction steps: a first section of prefabricated pipe is lifted in from an access port of an ejecting pipe departing area, and is in place on an ejecting pipe guide base; a jack transverse ejecting pipe is started to enable the prefabricated pipe to enter a protective cylinder of the ejecting pipe departing area; humans and machinery start to transversely excavate in the prefabricated pipe; excavated soil is lifted out to the ground for carrying away by a cart from the access port of the ejecting pipe departing area; the first section of prefabricated pipe is pushed through ejecting while excavating; a second section of prefabricated pipe is lifted in to connect with the first section of prefabricated pipe; and the sections are pushed one by one until the ejecting pipe is received in a terminal area. The method constructs the underground garage through manual operation or small mechanical excavation by using a jack to eject the prefabricated pipe, and has the advantages of low construction cost and fewer limitations from a construction site compared with construction by large machinery.

Description

The push pipe method of construction of roadside tube-shaped Underground Garage
Technical field
The present invention relates to the method for construction of underground garage in construction, particularly relate to a kind of roadside tubulose The push pipe method of construction of underground garage.
Background technology
With fast development social in recent years, people's income is continuously increased, and is improved by buying automobile The family of living standard quality also gets more and more.According to incompletely statistics, ended for the end of the year 2014, the whole nation The vehicle guaranteeding organic quantity having reaches 2.64 hundred million, wherein 1.54 hundred million, automobile.
But a large amount of uses of automobile, also bring series of problems to society, such as: environmental pollution, Traffic jam, difficulty etc. of stopping.Owing to urban land area is certain, population is concentrated in a large number, particularly Urban central zone, the automobile of traveling generally requires and takes a significant amount of time searching parking stall, and city is native Ground area is limited, and land values are high, and the soil for building parking stall is very limited, on ground, city There is again great danger on face overhead construction parking stall, therefore by the exploitation underground space, increases city The quantity of vehicle parking space, becomes people and solves a kind of feasible method of city parking difficulty.
Content of the invention
The invention provides the push pipe method of construction of a kind of roadside tube-shaped Underground Garage, solve in city Garage is less, the problem of difficulty of stopping, and reduces again the construction cost of underground garage simultaneously, improves Economic benefit.
The push pipe method of construction of a kind of roadside tube-shaped Underground Garage, described tube-shaped Underground Garage includes car Gateway and the tubulose being formed by push pipe are parked district.
Main construction procedure is as follows:
1), the edge tube-shaped vehicle in and out port at Underground Garage two ends sets and goes along with sb. to guard him piling wall for one week;
Set multiple rows of mixing pile or rotary churning pile at the park intersection in district of vehicle in and out port and tubulose, formed Cement-soil gravity type retaining wall, is used as vehicle in and out port and tubulose and parks the excavating at intersection for the district;
Described vehicle in and out port has two, and one is push pipe zone of departure, and another is that push pipe receives eventually Point district;
2), construct the top capping beam in the tube-shaped vehicle in and out port region at Underground Garage two ends, open downwards Dig and park at district's pipe end face absolute altitude to tubulose, pour the gate area waling fine strain of millet of one week;Waling fine strain of millet is put down The rectangular closed in face, makes to play this layer of supporting role;
3), the vehicle in and out port region at tube-shaped Underground Garage two ends continues to be excavated to downwards tubulose and park At the following absolute altitude in district pipe bottom surface, pour the base plate in vehicle in and out port region;
Push pipe geomery is made in setting-out on the cement-soil gravity type retaining wall of described push pipe zone of departure, Use hand digging shaping, formwork, lay reinforcing bar, pour the casing that concrete makes formation push pipe zone of departure;
Making prefabricated push pipe guide seats in push pipe zone of departure base surface, described prefabricated push pipe is led simultaneously Consistent with casing inner surface to base, it is just fixed that the prefabricated pipe fitting that makes lifting get off is placed in guide seats Position, can carry out push pipe operation at once;
4), the metope of going along with sb. to guard him in push pipe zone of departure installs fixing push pipe jack pedestal frame, this pedestal Frame is distributed required multiple stage jack accordingly by prefabricated pipe fitting peripheral shape and absolute altitude, and described is very heavy Top is equipped with the hydraulic control system that synchronization rises, and simultaneously according to jack jacking lift, is equipped with and can stretch The push pipe rod member of contracting;
5), jacking construction is carried out;By first segment prefabricated pipe fitting, from push pipe zone of departure gateway, lifting enters, It is made to put in place in push pipe guide seats;Starting the horizontal push pipe of jack makes prefabricated pipe fitting entrance push pipe go out Send out in the casing in district;
People and machinery start laterally to excavate in prefabricated pipe fitting, will dig out soil body go-cart from push pipe District gateway hangs out to be transported to ground, such limit excavation limit pushing tow, advances first segment prefabricated pipe fitting;
Hang in second section prefabricated pipe fitting, pushing tow its be connected with first segment prefabricated pipe fitting;Connect down strict Measurement control guiding measure under tunnel again, transport the soil body, jacking advance, such one joint joint pushing tow until Push pipe receives terminal district;
Receiving terminal district at push pipe, the pushing tow process according to prefabricated pipe fitting, at cement-soil gravity type retaining wall On excavate a corresponding receiver hole by push pipe shape, absolute altitude, for push pipe receive prepare;
6), construct from bottom to top push pipe zone of departure and push pipe receives the bottom plate surface layer in terminal district, surrounding Wallboard and push pipe zone of departure and push pipe receive terminal district and are connected with the waterproof of surrounding metope, make vehicle go out Entrance forms totally-enclosed with tube-shaped Underground Garage, to guarantee to resist the seepage flow of underground water.
Step 1) in the piling wall of going along with sb. to guard him that sets use self-developing cement mixing or churning to loosen soil to be formed Soil cement curtain, implants the I-shaped stake of prefabricated reinforced concrete or hollow water chestnut while constructing soil cement curtain Shape stake, soil cement forms enclosure wall after condensing.
Setting when going along with sb. to guard him piling wall of push pipe zone of departure, counter-force when need to consider to bear jack push pipe is made With;It is considered as jacking construction planar dimension demand, it is also contemplated that the hanging and excavate the soil body of prefabricated pipe fitting Lifting outward transport.
Push pipe connects formation by more piece prefabricated pipe fitting, and it is in the convex-concave groove of junction that prefabricated pipe fitting connects Pressurization is injected flexible fast lime set shape waterproofing unction and uses multiple spot rigid solder or bolt to connect, or welding It is connected mixing application with bolt, make formation overall.
In step 3) in pour the base plate in vehicle in and out port region, if tube-shaped Underground Garage is multilayer row Row, be made up of many push pipes, then should pour herein plane close waling beam, connect down by step 3), 4), 5) construction completes this layer of push pipe, and after construction finishes, the vehicle in and out port from two ends continues excavation downwards, Repeat the above steps, until tube-shaped last layer of base plate of Underground Garage.
This method of construction uses factorial praluction Prefabricated reinforced concrete pipe fitting, and transport, to scene, passes through vehicle Gateway lifts to underground, and by the limit driving limit pipe-jacking technology of underground, segmentation jacking forms roadside pipe Shape underground garage.Prefabricated pipe fitting is changeable, and little can only moor row's vehicle, and big can be sharp in pipe It is separated into multi-layer multi-row with steel construction to park line;Prefabricated pipe fitting is generally circular, it is possible to be rectangle;In advance Tubulation part can be merogenesis integral manufacturing or convenient transportation often saves piecemeal and makes, and transport is to now It is spliced into entirety after Chang.
Roadside tube-shaped Underground Garage can be the small-sized push pipe of the single vehicle of pool being arranged by multiple rows of multilayer Formed, it is possible to use the single formation of large-scale push pipe.
Beneficial effects of the present invention:
1st, there is many pipelines, circuit in urban road and neighboring area, if using normal excavation to build The resident living of periphery, business activity can be caused suitable impact by the mode of making, and use this construction side Method can avoid construction to cause damage pipeline below road, decreases economic loss;
2nd, excavate downwards at the vehicle in and out port except tube-shaped Underground Garage two ends for this method of construction When affect periphery traffic, other construction activities are all carried out below road, do not affect top personnel activity, Therefore less on periphery impact during the technical program construction;
3rd, owing to this method of construction is excavated by artificial or small-sized machine, use jack jacking simultaneously Prefabricated pipe fitting builds underground garage, relative to using big machinery construction, has that construction cost is low, executes The restricted less advantage in ground, workshop, also has workable, construction safety, quick, and quality is easy In control, can reduce tearing down and reconstructing of the impact on traffic and underground utilities, comprehensive benefit is notable, has weight Engineer applied is wanted to be worth and development prospect.
Brief description
Fig. 1 is the floor map that the present invention implements tube-shaped Underground Garage in row 1;
Fig. 2 is that in the embodiment of the present invention 1, tube-shaped Underground Garage sets the generalized section going along with sb. to guard him piling wall;
Fig. 3 is the generalized section of waling beam at vehicle in and out port in the embodiment of the present invention 1;
Fig. 4 is the generalized section of base plate at vehicle in and out port in the embodiment of the present invention 1;
Fig. 5 is the generalized section of push pipe zone of departure pushing tow prefabricated pipe fitting in the embodiment of the present invention 1;
Fig. 6 is the generalized section that in the embodiment of the present invention 1, tube-shaped Underground Garage completes.
Detailed description of the invention
Embodiment 1
As shown in figures 1 to 6, as a example by the tube-shaped Underground Garage of the roadside of single push pipe, introduce what it was built Construction order and way main points.
The push pipe method of construction of a kind of roadside tube-shaped Underground Garage, tube-shaped Underground Garage includes that vehicle comes in and goes out Mouthful 1 and the tubulose that formed by push pipe park district 2.
Main construction procedure is as follows:
1), the edge tube-shaped vehicle in and out port at Underground Garage two ends sets and goes along with sb. to guard him piling wall for 1 one weeks;Fender post Wall uses cement mixing or churning to loosen soil and forms soil cement curtain, while constructing soil cement curtain Implanting the I-shaped stake of prefabricated reinforced concrete or open diamonds stake, soil cement forms enclosure wall after condensing.
Set multiple rows of mixing pile or rotary churning pile at the park intersection in district of vehicle in and out port and tubulose, formed Cement-soil gravity type retaining wall 3, is used as vehicle in and out port and tubulose and parks the excavating at intersection for the district;
Vehicle in and out port has two, and one is push pipe zone of departure 4, and another is that push pipe receives terminal district 5;The enclosure wall of push pipe zone of departure 4 is thicker, produces when needing to bear jack pushing tow prefabricated pipe fitting Counter-force effect.
2), construct the top capping beam 6 in the tube-shaped vehicle in and out port region at Underground Garage two ends, downwards It is excavated to tubulose and parks at district's pipe end face absolute altitude, pour the gate area waling fine strain of millet 7 of one week;Waling The rectangular closed of fine strain of millet plane, makes to play this layer of supporting role;
3), vehicle in and out port 1 region at tube-shaped Underground Garage two ends continues to be excavated to downwards tubulose pool At the following absolute altitude in car district pipe bottom surface, pour the base plate 8 in vehicle in and out port region;
Push pipe geomery is made in setting-out on the cement-soil gravity type retaining wall 3 of push pipe zone of departure 4, adopts With hand digging shaping, formwork, lay reinforcing bar, pour the casing 9 that concrete makes formation push pipe zone of departure;
Make prefabricated push pipe guide seats 10 in push pipe zone of departure base plate 8 face, prefabricated push pipe guides simultaneously Base is consistent with casing 9 inner surface, and the prefabricated pipe fitting 11 making lifting get off just is placed in guide seats Position, push pipe operation can be carried out at once;
4), the metope of going along with sb. to guard him in push pipe zone of departure installs fixing push pipe jack pedestal frame 12, this Mounting 12 is distributed required multiple stage jack 13 accordingly by prefabricated pipe fitting peripheral shape and absolute altitude, and thousand Jin top is equipped with the hydraulic control system that synchronization rises, and simultaneously according to jack jacking lift, being equipped with can Flexible push pipe rod member 14;
5), jacking construction is carried out;First segment prefabricated pipe fitting is lifted from push pipe zone of departure 4 gateway into Enter so that it is put in place in push pipe guide seats 10;Starting the horizontal push pipe of jack makes prefabricated pipe fitting 11 Enter in the casing 9 of push pipe zone of departure;
People and machinery start laterally to excavate in prefabricated pipe fitting, will dig out soil body go-cart from push pipe District gateway hangs out to be transported to ground, such limit excavation limit pushing tow, advances first segment prefabricated pipe fitting;
Hang in second section prefabricated pipe fitting, pushing tow its be connected with first segment prefabricated pipe fitting;Connect down strict Measurement control guiding measure under tunnel again, transport the soil body, jacking advance, such one joint joint pushing tow until Push pipe receives terminal district;
Push pipe 17 connects formation by more piece prefabricated pipe fitting 11, and it is convex in junction that prefabricated pipe fitting connects Pressurization in groove is injected flexible fast lime set shape waterproofing unction and uses multiple spot rigid solder or bolt to connect, Or welding is connected mixing application with bolt, make formation overall.
Receiving terminal district at push pipe, the pushing tow process according to prefabricated pipe fitting 11, at Cement-soil Gravity Excavate a corresponding receiver hole by push pipe shape, absolute altitude on barricade, receive for push pipe and prepare;
6), construction push pipe zone of departure and push pipe receive bottom plate surface layer the 15th, the surrounding in terminal district from bottom to top Wallboard 16 and push pipe zone of departure and push pipe receive terminal district and be connected with the waterproof of surrounding metope, make Vehicle in and out port forms totally-enclosed with tube-shaped Underground Garage, to guarantee to resist the seepage flow of underground water.

Claims (3)

1. a push pipe method of construction for roadside tube-shaped Underground Garage, described tube-shaped Underground Garage bag Include vehicle in and out port (1) and the tubulose being formed by push pipe parked district (2), it is characterised in that:
Main construction procedure is as follows:
1), the edge tube-shaped vehicle in and out port at Underground Garage two ends sets and goes along with sb. to guard him piling wall for one week;
Set multiple rows of mixing pile or rotation is disputed stake at the park intersection in district of vehicle in and out port and tubulose, formed Cement-soil gravity type retaining wall (3), is used as vehicle in and out port and the tubulose district that parks and encloses at the excavation of intersection Protect;
Described vehicle in and out port has two, and one is push pipe zone of departure (4), and another is that push pipe connects Receive terminal district (5);
2), construct the top capping beam (6) in the tube-shaped vehicle in and out port region at Underground Garage two ends, to Under be excavated to tubulose and park at district's pipe end face absolute altitude, pour the gate area waling fine strain of millet (7) of one week; The rectangular closed of waling fine strain of millet plane, makes to play this layer of supporting role;
3), the vehicle in and out port region at tube-shaped Underground Garage two ends continues to be excavated to downwards tubulose and park At the following absolute altitude in district pipe bottom surface, pour the base plate (8) in vehicle in and out port region;
Push pipe is made in the upper setting-out of cement-soil gravity type retaining wall (3) in described push pipe zone of departure (4) Geomery, uses hand digging shaping, formwork, lays reinforcing bar, pours concrete and make formation push pipe set out The casing (9) in district;
Making prefabricated push pipe guide seats (10) in push pipe zone of departure base surface, described is prefabricated simultaneously Push pipe guide seats is consistent with casing inner surface, and the prefabricated pipe fitting (11) making lifting get off is placed on guiding Just position on base, push pipe operation can be carried out at once;
4), the metope of going along with sb. to guard him in push pipe zone of departure installs fixing push pipe jack pedestal frame (12), This pedestal frame is distributed required multiple stage jack (13) accordingly by prefabricated pipe fitting peripheral shape and absolute altitude, Described jack is equipped with the hydraulic control system that synchronization rises, simultaneously according to jack jacking lift, It is equipped with telescopic push pipe rod member (14);
5), jacking construction is carried out;First segment prefabricated pipe fitting is hung from push pipe zone of departure (4) gateway It feed into so that it is put in place in push pipe guide seats;Starting the horizontal push pipe of jack makes prefabricated pipe fitting enter Enter in the casing of push pipe zone of departure;
People and machinery start laterally to excavate in prefabricated pipe fitting, will dig out soil body go-cart from push pipe District gateway hangs out to be transported to ground, such limit excavation limit pushing tow, advances first segment prefabricated pipe fitting;
Hang in second section prefabricated pipe fitting, pushing tow its be connected with first segment prefabricated pipe fitting;Connect down strict Measurement control guiding measure under tunnel again, transport the soil body, jacking advance, such one joint joint pushing tow until Push pipe receives terminal district;
Receiving terminal district at push pipe, the pushing tow process according to prefabricated pipe fitting, at cement-soil gravity type retaining wall On excavate a corresponding receiver hole by push pipe shape, absolute altitude, for push pipe receive prepare;
6), construct from bottom to top push pipe zone of departure and push pipe receive the bottom plate surface layer (15) in terminal district, The wallboard (16) of surrounding and push pipe zone of departure and push pipe receive the waterproof company in terminal district and surrounding metope Connect, make vehicle in and out port be formed totally-enclosed with tube-shaped Underground Garage, to guarantee to resist the seepage flow of underground water.
2. the push pipe method of construction of roadside according to claim 1 tube-shaped Underground Garage, it is special Levy and be: described push pipe (17) connects formation by more piece prefabricated pipe fitting (11), and described is pre- Tubulation part integral manufacturing, or piecemeal making, scene is spliced into entirety.
3. the push pipe method of construction of roadside according to claim 1 tube-shaped Underground Garage, it is special Levy and be: it is that pressurization is injected flexible fast in the convex-concave groove of junction that described prefabricated pipe fitting (11) connects Lime set shape waterproofing unction simultaneously uses multiple spot rigid solder or bolt to connect, or welding is connected mixing with bolt Application, makes formation overall.
CN201510084351.XA 2015-02-13 2015-02-13 Ejecting pipe construction method of roadside tubular underground garage Pending CN105986578A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510084351.XA CN105986578A (en) 2015-02-13 2015-02-13 Ejecting pipe construction method of roadside tubular underground garage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510084351.XA CN105986578A (en) 2015-02-13 2015-02-13 Ejecting pipe construction method of roadside tubular underground garage

Publications (1)

Publication Number Publication Date
CN105986578A true CN105986578A (en) 2016-10-05

Family

ID=57038961

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510084351.XA Pending CN105986578A (en) 2015-02-13 2015-02-13 Ejecting pipe construction method of roadside tubular underground garage

Country Status (1)

Country Link
CN (1) CN105986578A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106436720B (en) * 2016-11-15 2018-04-10 河南省水利勘测设计研究有限公司 The construction method of jacking construction small size deep foundation pit supporting structure
CN108086292A (en) * 2017-11-30 2018-05-29 中国二十冶集团有限公司 The control method of jacking construction after Reinforcement with Cement-mixed Piles
CN109972725A (en) * 2019-03-06 2019-07-05 张四海 A method of constructing underground automatic garage structures
CN110080578A (en) * 2019-05-27 2019-08-02 北京中岩智泊科技有限公司 Tunnel type stereo garage and its construction method under a kind of road
CN115523345A (en) * 2022-07-22 2022-12-27 临沂市政集团有限公司 Man-machine top-to-top trenchless buried pipe construction method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102277965A (en) * 2011-05-06 2011-12-14 杭州岩土工程有限公司 Method for building underground garage through non-surface excavation on open space
CN102733413A (en) * 2012-06-18 2012-10-17 河海大学 Method for controlling subsidence of operating subway tunnel
CN203977941U (en) * 2014-07-11 2014-12-03 杭州南联地基基础工程有限公司 Push pipe formula strip underground garage

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102277965A (en) * 2011-05-06 2011-12-14 杭州岩土工程有限公司 Method for building underground garage through non-surface excavation on open space
CN102733413A (en) * 2012-06-18 2012-10-17 河海大学 Method for controlling subsidence of operating subway tunnel
CN203977941U (en) * 2014-07-11 2014-12-03 杭州南联地基基础工程有限公司 Push pipe formula strip underground garage

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
宋杰等: "矩形顶管法在城市轨道交通中的应用与设计方法", 《城市轨道交通研究》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106436720B (en) * 2016-11-15 2018-04-10 河南省水利勘测设计研究有限公司 The construction method of jacking construction small size deep foundation pit supporting structure
CN108086292A (en) * 2017-11-30 2018-05-29 中国二十冶集团有限公司 The control method of jacking construction after Reinforcement with Cement-mixed Piles
CN109972725A (en) * 2019-03-06 2019-07-05 张四海 A method of constructing underground automatic garage structures
CN109972725B (en) * 2019-03-06 2020-10-09 张四海 Method for constructing underground automatic garage structure
CN110080578A (en) * 2019-05-27 2019-08-02 北京中岩智泊科技有限公司 Tunnel type stereo garage and its construction method under a kind of road
CN115523345A (en) * 2022-07-22 2022-12-27 临沂市政集团有限公司 Man-machine top-to-top trenchless buried pipe construction method

Similar Documents

Publication Publication Date Title
CN104674846B (en) A kind of construction method utilizing precast construction lid to dig subway station
CN111851509A (en) Temporary channel construction method based on deep foundation pit inner support structure
CN101215834A (en) Construction Method of Outrigger Type Diaphragm Wall
CN112983493B (en) Reinforcing structure for shield to closely penetrate large-section bridge and culvert downwards and construction method
CN106013052A (en) Steel sheet pile and open caisson combined underground garage and construction method thereof
CN205875209U (en) Temporary road surface system supports with concrete and closes subway station half range bedding structure of establishing
CN101725149A (en) Construction method of long open-cut tunnel
CN105736001A (en) Construction method for building subway station through precast parts
CN108915698A (en) A kind of complex condition large diameter pipe curtain construction method
CN112012763B (en) Construction method of double-layer primary support multi-arch tunnel structure
CN101793023A (en) Foundation pit construction method
CN107090851A (en) The inverted side-wall construction method of downtown area open cut groove
CN102116036B (en) Method for constructing underground large-scale buildings on roads by combining top-down construction method and skip warehouse method technology
CN115341910A (en) A tunnel construction method with complex geological conditions under expressway and tunnel
CN107794945B (en) Movable assembly type template mounting and dismounting operation system and construction method thereof
CN104131566B (en) A kind of basement is without the construction method of horizontal support foundation ditch
CN206635599U (en) A kind of road surface for caving in road, which is speedily carried out rescue work, fixes device
CN112177042A (en) Rail transit station construction method without affecting ground traffic
CN212270962U (en) An integrated structure of foundation pit support and construction road
CN113322731B (en) Construction method of foam concrete landscape restoration system
CN210636440U (en) Annular deep foundation pit excavation construction structure
CN105986830B (en) The tunneling method of construction of roadside strip underground garage
CN210766861U (en) Pile foundation underpinning structure of portal-type building under narrow space
CN207469303U (en) A kind of removable assembled template peace tears operating system open
CN107023016A (en) Two walls unification foundation pit system is worn under a kind of road and its along the practice

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20161005

WD01 Invention patent application deemed withdrawn after publication