CN106092044A - building level measuring method - Google Patents

building level measuring method Download PDF

Info

Publication number
CN106092044A
CN106092044A CN201610617931.5A CN201610617931A CN106092044A CN 106092044 A CN106092044 A CN 106092044A CN 201610617931 A CN201610617931 A CN 201610617931A CN 106092044 A CN106092044 A CN 106092044A
Authority
CN
China
Prior art keywords
testing
point
level gauge
elevation
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610617931.5A
Other languages
Chinese (zh)
Other versions
CN106092044B (en
Inventor
顾建忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610617931.5A priority Critical patent/CN106092044B/en
Publication of CN106092044A publication Critical patent/CN106092044A/en
Application granted granted Critical
Publication of CN106092044B publication Critical patent/CN106092044B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C5/00Measuring height; Measuring distances transverse to line of sight; Levelling between separated points; Surveyors' levels

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to a kind of building level measuring method, for building being carried out the testing of bench mark, comprise the following steps: 1. select pilot measurement point, determine the testing elevation of bench mark and execute point position, determining the position of survey station point according to the position of pilot measurement point and testing point;2. set up level gauge at survey station point, place scale at pilot measurement point, and determine this scale answer testing height, described in answer testing be highly the difference of elevation that the testing elevation of bench mark deducts pilot measurement point;3. answering testing position highly on the scale at the height adjustment of level gauge to alignment pilot measurement point, making the testing of level gauge highly become known elevation, this known elevation is the testing elevation of bench mark;4. horizontally rotate the testing point of level gauge horizontal aligument building known to step 3 camber, by the testing point of the elevation testing of bench mark to building.The present invention measures that process is simple, it is high to measure precision.

Description

Building level measuring method
Technical field
The present invention relates to a kind of building level measuring method.
Background technology
Traditional building measurement of higher degree method, is that (absolute elevation coordinate and building are corresponding for the pilot measurement point that provided by regional planning agency The relation of elevation) determine building elevation, and use closed circuit, repeat circuit, round circuit to check its measurement result.Pass Unified test metering method typically uses following steps: testing person set up level gauge chi people scale put to pilot measurement point (assume to be set to ± 0.000) testing person reads reader on scale and calculates level gauge height and be converted into the building elevation wanting testing (generally+1.00M).
The method is cumbersome, precision is not enough, because of its instrument height with testing point the most in the same horizontal line, so can not be timely Process error during discovery instrumental error and construction survey (includes chi people's centering error, dotted line time error, instrument itself Error etc.), and this error is not found.In traditional method: 1, do not know height of instrument because of testing person.2、 Height of instrument is not the most integer.3, checking that constructure ground, stay in place form testing person can not directly read the error amount of template. 4, the most also want each point to keep a record, go back to office and carry out conversion error value.
Summary of the invention
The technical problem to be solved is to provide a kind of measures that process is simple, measure the building level that precision is high Measuring method.
The technical scheme is that a kind of building level measuring method, for building Thing carries out the testing of bench mark, comprises the following steps:
Step (1): select pilot measurement point, determines the testing elevation of bench mark and executes point position, according to pilot measurement point and testing The position of point determines the position of survey station point;
Step (2): survey station point set up level gauge, pilot measurement point place scale, and determine this scale answer testing height, The difference of the described elevation answering the testing testing elevation highly for bench mark to deduct pilot measurement point;
Step (3): answering testing position highly on the scale at the height adjustment of level gauge to alignment pilot measurement point, make water The testing of quasi-instrument highly becomes known elevation, and this known elevation is the testing elevation of bench mark;
Step (4): horizontally rotate the testing point of level gauge horizontal aligument building known to step (3) camber, by water Elevation testing on schedule is to the testing point of building.
As preferably, described building has multiple testing point, and arranges multiple survey station point, is being transformed to by level gauge During each survey station point, level gauge remains the same testing elevation of alignment at the height of each survey station point, and this testing elevation is The testing elevation of bench mark.
As preferably, in step (3), use and place scale at each testing point, and in rotating detection process, read level gauge The rod reading being directed at the mode recorded are to determine the level height of each testing point;
Or the mode using the position being directed at by level gauge at each testing point in rotating detection process to be marked determines The level height of each testing point.
As preferably, in step (3), the position being directed at each testing point by level gauge in rotating detection process is marked Note, and mark is connected by the way of playing horizontal line by each testing point of testing two-by-two, form the level of building Line.
As preferably, this measuring method also includes each testing point, levelling line are carried out inspection and checked, and comprises the following steps:
Step A: when testing person converts survey station point in rotating detection process, height of leveling instrument alignment levelling line;
Step B: slowly rotate level gauge, as level gauge crosshair overlaps with the levelling line of building, represents measurement result Correctly, can directly find when rotating level gauge if any error.
As preferably, this measuring method is additionally included in inspection and the correction during measurement to level gauge, including following step Rapid:
Step a: take any two air line distance testing point not less than 40m, this level gauge with level gauge on building The isosceles triangle with this level gauge as summit is constituted with above-mentioned two testing point line in same level;
Step b: the testing elevation that testing elevation is bench mark of described level gauge alignment, by the crosshair pair of this level gauge Two testing points choosing in quasi-step a are also marked in the position that each testing point is directed at by the crosshair of this level gauge;
Step c: the position converting described level gauge makes two the testing points chosen in itself and step a in same level Line form right angle triangle, this right angled triangle with the line of two described testing points as hypotenuse, this right angled triangle The length of a wherein right-angle side be not more than 3m;
Step d: adjust described level gauge so that it is the testing elevation that testing elevation is bench mark of alignment, by this level The mark of two testing points described in step c observed by instrument, and the mark such as two testing points is still located on sustained height, i.e. Show that level gauge is working properly, coincidence measurement precision, otherwise, it is necessary to can use after level gauge is corrected.
As preferably, the reading direction of the scale at pilot measurement point and at testing point is held in vertical.
The invention has the beneficial effects as follows: 1, tradition height of leveling instrument the unknown is become known.2, decrease pilot measurement elevation and The conversion process of testing elevation.3, survey station point instrument height is real with building needs elevation in the same horizontal line, has reached to measure again Core settles at one go.4, after conversion instrumented site, it is similarly aligned with+1.00M point on building can find that this accuracy of instrument is by mistake in time Difference.5, the method as in short supply in Field Force people can complete the level gauge more more accurate than two people and accurately measure.6, utilize This method can also allow on-the-spot testing person that instrumental error can be found in time can to control oneself in 10 minutes and instrument is adjusted to allow In the range of, make testing compliant requirement.7, this method is used: in constructing at building structure, check that form height, ground are high Can a reading error value during degree error.8, as when certain building, building is B1, two floor testing personnel often+-numerical computations The reverse phenomenon causing basis to backbreak or again to excavate for the second time is the most common in construction, by this method: such as basement-8m, execute Survey person moves on to the integer of-6.5m datum mark, and then, instrument is to quasi-6.5m.If datum mark is set as integer, instrument every time It is directed at known elevation, makes a fault when thus being avoided that calculating, just can complete without computer just mental arithmetic.
Accompanying drawing explanation
Fig. 1 is the instrumentation plan of embodiments of the invention 1;
Fig. 2 is the instrumentation plan of floor template platform in embodiments of the invention 2;
Detailed description of the invention
Being described principle and the feature of the present invention below in conjunction with accompanying drawing, example is served only for explaining the present invention, and Non-for limiting the scope of the present invention.
Embodiment 1
As it is shown in figure 1, use the method for the present invention that building carries out the testing of bench mark, comprise the following steps:
Step (1): select pilot measurement point 2, determines the testing elevation of bench mark and executes point position, according to pilot measurement point 2 with execute The position of measuring point determines the position of survey station point.
Step (2): set up level gauge 1 at survey station point, places scale at pilot measurement point 2, and determine this scale answer testing high Degree, described in answer testing be highly the difference of elevation that the testing elevation of bench mark deducts pilot measurement point;If as it is shown in figure 1, pilot measurement point 2 Height be ± 0.00m, the testing elevation of bench mark is set as+1.00m, described in answer testing the most then for+1.00m.
Step (3): answering testing position highly on the scale at the height adjustment of level gauge 1 to alignment pilot measurement point 2, make The testing of level gauge 1 highly becomes known elevation, and this known elevation is the testing elevation of bench mark;
Step (4): horizontally rotate the testing point of level gauge 1 horizontal aligument building known to step (3) camber, by water Elevation testing on schedule is marked to the testing point of building, the position being directed at by level gauge 1 at testing point.
Building the most all determines there is multiple testing point, and determines there is multiple survey according to the position of pilot measurement point and testing point Website, during level gauge 1 is transformed to each survey station point, at the height of each survey station point, level gauge 1 remains that alignment is same One testing elevation, this testing elevation is the testing elevation of bench mark.The level gauge 1 side in the elevation procedure (2) of each survey station point Method is adjusted, and cannot be directed at the survey station point of pilot measurement point at some, and the level gauge 1 at this then can be by being directed at executing of testing The mark of measuring point is adjusted to testing height.
In rotating detection process, after the position being directed at each testing point by level gauge 1 is marked, each testing to testing Mark is connected by the way of playing horizontal line by point two-by-two, forms the levelling line of building.
The measuring method of the present invention also includes each testing point, levelling line are carried out inspection and checked, and comprises the following steps:
Step A: when testing person converts survey station point in rotating detection process, height of leveling instrument alignment levelling line;
Step B: slowly rotate level gauge, as level gauge crosshair overlaps with the levelling line of building, represents measurement result Correctly, can directly find when rotating level gauge if any error.
The measuring method of the present invention is additionally included in inspection and the correction during measurement to level gauge, comprises the following steps:
Step a: take any two air line distance testing point not less than 40m, the present embodiment with level gauge 1 on building In, as it is shown in figure 1, be positioned at the leftmost side and the testing point that two air line distances are 40m of the rightmost side on paper, in being positioned on paper Between level gauge 1 constitute the isosceles three with this level gauge 1 as summit with above-mentioned two testing point line in same level Dihedral;
Step b: the testing elevation that testing elevation is bench mark of described level gauge 1 alignment, by the crosshair of this level gauge 1 Two testing points choosing in alignment procedures a are also marked in the position that each testing point is directed at by the crosshair of this level gauge 1, As it is shown in figure 1, form labelling point A3 and labelling point B4 respectively;
Step c: as it is shown in figure 1, convert rightmost position on described level gauge 1 to paper so that it is with labelling point A3 and Labelling point B4 line form right angle triangle in same level, a wherein right-angle side of this right angled triangle is labelling The line of some A3 and the line of labelling point B4, level gauge 1 described in a length of Fig. 1 of another right-angle side and labelling point B4, its A length of 3m;
Step d: adjust described level gauge 1 so that it is the testing elevation that testing elevation is bench mark of alignment, by this level Labelling point A3 and labelling point B4 observed by instrument 1, as labelling point A3 and labelling point B4 is still located on sustained height, i.e. shows level gauge 1 Working properly, coincidence measurement precision, otherwise, it is necessary to can use after level gauge 1 is corrected.
Grasp level gauge after this method take less than every 1 year, half a year be corrected to detection department, oneself periodically or not Regularly carry out the correction work of instrument, make measurement more precisely, more relieved.
Embodiment 2
In floor template platform construction, need the error amount of beam, platform template to be checked, as beyond code requirement Will later process construct before be adjusted in specification allowed band.Assume that the elevation of pilot measurement point is for ± 0.00m, it is assumed that this platform The thickness of the concrete that will construct is 0.12m, uses the measuring method of the present invention to measure, comprises the following steps:
(1). selecting pilot measurement point, pilot measurement point height is ± 0.00m, determines that the elevation of floor bench mark is+1.4m (this floor After construction, the elevation of floor template upper surface should be+0.00m), determine the position of testing point, in Fig. 2, rectangle frame represents floor mould Plate platform, the round dot in rectangle frame is point (the i.e. testing point) position that each is to be checked, determines the position of survey station point, Fig. 2's It it is one of them erection point (i.e. survey station point) of level gauge in the middle of in rectangle frame.
(2). set up level gauge at survey station point, place scale, at pilot measurement point and at testing point at pilot measurement point and each testing point The reading direction of scale be held in vertical.Determine this scale answers testing highly for+1.4m.
(3) .+1.4m the reading on the scale at the height adjustment of level gauge 1 to alignment pilot measurement point 2, a floor is to the greatest extent Amount uses a survey station point, and as really moved level gauge to other survey station points, the alidade of level gauge is all directed at pilot measurement point+1.4m Reading.
(4). horizontally rotate the scale at level gauge horizontal aligument each testing point, read scale high scale numerical value.Such as reading Be 1.52m, i.e. formwork elevation measuring is correct;If reading is 1.525m, i.e. the low 5mm of form height.
Cross above-mentioned measuring method measurement data mark on the plane graph of this floor template platform, can be to this floor mould The levelness of plate platform correctly judges, exceedes design for error and code requirement is readjusted.
Measuring according to above-mentioned measuring method, the data of record are few, and computational methods are quickly and easily, decrease complexity Conversion process, the error amount of template or flooring can be directly read, very convenient and practical, as long as testing personnel are through in short-term Between exercise, grope, gaining the essentials just can free and relaxed complete.
In sum, use the measuring method of the present invention to measure, have the advantage that
1, tradition leveling measuring instrument height the unknown is become known.Because it is during measuring, sighting of level gauge Portion is directly directed at, through quickly adjusting, the elevation wanted.(i.e. the testing elevation of building bench mark)
2, the conversion process of pilot measurement elevation and testing elevation is decreased.Such as: I want testing on certain building+ The pilot measurement point that the bench mark of 1.00m, Party A or regional planning agency are given is assumed to be building elevation-0.5m, and chi people is vertically put scale Put on pilot measurement point, the 1.5m scale on the alidade alignment scale of level gauge, rotate instrument and align should survey on certain building Point is level point or the horizontal line of+1.00.When eliminating traditional measurement, pilot measurement elevation adds scale height and subtracts the bench mark of testing Elevation.Sometimes, testing personnel often because of mistake in computation or reverse+with-relation cause the consequence done over again.
3, elevation should be surveyed in the same horizontal line because this method survey station point level gauge is high with building, reach to measure and checked Settle at one go.
4, behind conversion level gauge position, it is similarly aligned with+1.00M point on building can find this accuracy of instrument error in time.
5, as in short supply in Field Force, by the measuring method of the present invention, the measurement of building can be completed by a people, It is more accurate than the two of traditional method people measure.Because this method height of level gauge when measuring is all known, if, I will architectural will the horizontal line of one+1.00m of bullet, I exists with stainless rule or the acrylic glass ruler nail of a 300mm length On wall, level gauge alidade sees that the point on chi seeks to the+1.00m of testing.+ the 1.00m of all of testing point is put and is connected The horizontal line formed just elevation with level gauge is on same horizontal line.You can find the horizontal line that you measure at any time Error amount.(two people of tradition measure the actual error value that can not find during measuring, and do not reach this measurement essence Degree.(error essentially consists in by scale people, and chi heeling error, dotted line time error, yardstick portion accounts for thing error, testing person sometimes Reading time error etc..Utilize this method that on-the-spot testing person can also be allowed to find instrumental error in time, can control oneself on-the-spot 10 In minute, instrument is adjusted in allowed band, makes testing compliant requirement.
6, this method is used: as can be once read when checking form height, ground level error in building structure construction Go out error amount.
7, as when certain building, building is B1, two floor testing personnel often+-numerical computations is reverse causes basis to backbreak or the The phenomenon that secondary excavates again is the most common in construction, by the measuring method of the present invention: such as basement-8m, testing person is level The elevation of point moves on to the integer of-6.5m, and then, level gauge is to quasi-6.5m.If the elevation of bench mark is set as integer every time, Level gauge is directed at known elevation, makes a fault when thus being avoided that calculating, just can complete without computer just mental arithmetic.
The foregoing is only presently preferred embodiments of the present invention, not in order to limit the present invention, all spirit in the present invention and Within principle, any modification, equivalent substitution and improvement etc. made, should be included within the scope of the present invention.

Claims (7)

1. a building level measuring method, it is characterised in that for building being carried out the testing of bench mark, including following step Rapid:
Step (1): select pilot measurement point, determines the testing elevation of bench mark and executes point position, according to pilot measurement point and testing point Position determines the position of survey station point;
Step (2): survey station point set up level gauge, pilot measurement point place scale, and determine this scale answer testing height, described Testing is answered highly to deduct the difference of elevation of pilot measurement point for the testing elevation of bench mark;
Step (3): answering testing position highly on the scale at the height adjustment of level gauge to alignment pilot measurement point, make level gauge Testing highly become known elevation, this known elevation is the testing elevation of bench mark;
Step (4): horizontally rotate the testing point of level gauge horizontal aligument building known to step (3) camber, by bench mark Elevation testing to the testing point of building.
Building level measuring method the most according to claim 1, it is characterised in that described building has multiple testing Point, and multiple survey station point is set, during level gauge transforms to each survey station point, level gauge is at the height of each survey station point Remaining the same testing elevation of alignment, this testing elevation is the testing elevation of bench mark.
Building level measuring method the most according to claim 1 and 2, it is characterised in that in step (3), uses respectively Testing point places scale, and reads the rod reading of level gauge alignment the mode that records in rotating detection process to determine each testing The level height of point;
Or the mode using the position being directed at by level gauge at each testing point in rotating detection process to be marked determines respectively to be executed The level height of measuring point.
Building level measuring method the most according to claim 2, it is characterised in that in step (3), in rotating detection process The position being directed at each testing point by level gauge is marked, and will mark by the way of playing horizontal line to each testing point of testing Connect two-by-two at note, form the levelling line of building.
Building level measuring method the most according to claim 4, it is characterised in that this measuring method also includes each testing Point, levelling line carry out inspection and check, and comprise the following steps:
Step A: when testing person converts survey station point in rotating detection process, height of leveling instrument alignment levelling line;
Step B: slowly rotate level gauge, as level gauge crosshair overlaps with the levelling line of building, represents that measurement result is correct, Can directly find when rotating level gauge if any error.
Building level measuring method the most according to claim 4, it is characterised in that this measuring method is additionally included in be measured Inspection and correction to level gauge in journey, comprises the following steps:
Step a: taking any two air line distance testing point not less than 40m with level gauge on building, this level gauge is with upper State two testing points line in same level and constitute the isosceles triangle with this level gauge as summit;
Step b: the testing elevation that testing elevation is bench mark of described level gauge alignment, is directed at step by the crosshair of this level gauge Two testing points choosing in rapid a are also marked in the position that each testing point is directed at by the crosshair of this level gauge;
Step c: the position converting described level gauge makes two the testing points chosen in itself and step a company in same level Line form right angle triangle, this right angled triangle with the line of two described testing points as hypotenuse, its of this right angled triangle In the length of a right-angle side be not more than 3m;
Step d: adjust described level gauge so that it is the testing elevation that testing elevation is bench mark of alignment, is seen by this level gauge Examining the mark of two described in step c testing point, the mark such as two testing points is still located on sustained height, i.e. shows Level gauge is working properly, coincidence measurement precision, otherwise, it is necessary to can use after level gauge is corrected.
Building level measuring method the most according to claim 3, it is characterised in that the scale at pilot measurement point and at testing point Reading direction be held in vertical.
CN201610617931.5A 2016-07-29 2016-07-29 Building level measurement method Active CN106092044B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610617931.5A CN106092044B (en) 2016-07-29 2016-07-29 Building level measurement method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610617931.5A CN106092044B (en) 2016-07-29 2016-07-29 Building level measurement method

Publications (2)

Publication Number Publication Date
CN106092044A true CN106092044A (en) 2016-11-09
CN106092044B CN106092044B (en) 2018-09-25

Family

ID=57478868

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610617931.5A Active CN106092044B (en) 2016-07-29 2016-07-29 Building level measurement method

Country Status (1)

Country Link
CN (1) CN106092044B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108931231A (en) * 2017-05-27 2018-12-04 中国二十冶集团有限公司 The observation method of high-precision rolling mill foundation settlement
CN111536997A (en) * 2020-05-20 2020-08-14 中建七局第一建筑有限公司 Self-checking and correcting method for level

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103759705A (en) * 2014-01-30 2014-04-30 刘雁春 Three-point closed laying measurement method for composite water level
CN105444733A (en) * 2016-01-09 2016-03-30 长安大学 Measuring scale and measuring method for automatically-centralized level gauge
CN105466366A (en) * 2015-11-26 2016-04-06 中国建筑股份有限公司 High-rise frame-tube structure vertical absolute deformation and differential deformation monitoring device and method
CN105674952A (en) * 2016-01-08 2016-06-15 武汉市市政建设集团有限公司 Building settlement measurement device and method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103759705A (en) * 2014-01-30 2014-04-30 刘雁春 Three-point closed laying measurement method for composite water level
CN105466366A (en) * 2015-11-26 2016-04-06 中国建筑股份有限公司 High-rise frame-tube structure vertical absolute deformation and differential deformation monitoring device and method
CN105674952A (en) * 2016-01-08 2016-06-15 武汉市市政建设集团有限公司 Building settlement measurement device and method
CN105444733A (en) * 2016-01-09 2016-03-30 长安大学 Measuring scale and measuring method for automatically-centralized level gauge

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108931231A (en) * 2017-05-27 2018-12-04 中国二十冶集团有限公司 The observation method of high-precision rolling mill foundation settlement
CN111536997A (en) * 2020-05-20 2020-08-14 中建七局第一建筑有限公司 Self-checking and correcting method for level
CN111536997B (en) * 2020-05-20 2023-06-02 中建七局第一建筑有限公司 Self-checking correction method for level

Also Published As

Publication number Publication date
CN106092044B (en) 2018-09-25

Similar Documents

Publication Publication Date Title
CN104631419B (en) The method of monitoring foundation ditch top horizontal movement
CN111197979A (en) Building detection method and device based on point cloud data analysis
CN103486998A (en) Autocollimator indication error calibration device and calibration method
CN103499340A (en) Measurement device and measurement method for vertical great-height difference height transmission
CN102230311A (en) Precision detection system and method applicable to slab ballastless track plate
CN105180763A (en) Concrete structure steel bar protection layer thickness detection environment calibrating device and operation method
CN210154486U (en) Height difference measuring device
CN111521148B (en) Method for rapidly measuring plane coordinates of reference points on tower column
CN106092044A (en) building level measuring method
CN201094015Y (en) Total station instrument of automatic target recognizing and collimating
CN105300210B (en) A kind of polymeter
CN219869658U (en) Template straightness detector that hangs down
CN108827232B (en) Device and method for quickly measuring arching value of large-span structure
CN201508176U (en) Angulometer type spirit level
CN203479292U (en) Autocollimator indication error calibrating device
CN104316027B (en) Composite level own-side height determination method
CN108532984B (en) High-precision mounting method for supporting jig frame
CN201110853Y (en) Non-contact type rock soil shrinkage test apparatus
CN107764235B (en) Elevation vertical transmission measurement method for high-rise building construction
CN110231055B (en) Calibration method for plummet and zenith instrument
CN205748238U (en) A kind of architectural engineering detection rule for verticality assay device
CN211121079U (en) Detection equipment for detecting distance between prefabricated parts
CN111121656B (en) Detection equipment and method for detecting prefabricated part spacing
CN211147651U (en) Device for measuring inclination of building
CN207991553U (en) A kind of measuring device in gate recess installation process

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant