CN106088588B - A kind of cast-in-situ stair closes the construction of formwork erecting structure and its reverse irrigation concrete - Google Patents
A kind of cast-in-situ stair closes the construction of formwork erecting structure and its reverse irrigation concrete Download PDFInfo
- Publication number
- CN106088588B CN106088588B CN201610633919.3A CN201610633919A CN106088588B CN 106088588 B CN106088588 B CN 106088588B CN 201610633919 A CN201610633919 A CN 201610633919A CN 106088588 B CN106088588 B CN 106088588B
- Authority
- CN
- China
- Prior art keywords
- bench
- bed die
- outer side
- side board
- plate bed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G13/00—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
- E04G13/06—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for stairs, steps, cornices, balconies, or other parts corbelled out of the wall
- E04G13/062—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for stairs, steps, cornices, balconies, or other parts corbelled out of the wall for stairs or steps
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The invention proposes a kind of cast-in-situ stair closing formwork erecting structure and its constructions of reverse irrigation concrete, its step includes: that bench plate bed die is laid with, and terraced beam, the installation of platform board template, support frame are set up, the binding of stair reinforcing bar, lay split heads, outer side board is installed, the installation level of marking time, vertical formwork install angle steel, bench bolster is reinforced, bench Side shuttering is reinforced, concreting, maintenance, and bed die, outer side board remove turnover.The beneficial effect is that: stair step upper surface utilizes form for seal, effectively prevent concrete excessive, saves material;It is carried out when placing concrete from bench bottom to top, the vibration compacting when pouring.
Description
Technical field
The present invention relates to floor slab construction field, particularly relates to a kind of cast-in-situ stair closing formwork erecting structure and its flow backward concrete
Construction.
Background technique
In cast-in-situ stair work progress, usually bench is marked time and is separated with template, top surface hollow out of marking time, concrete is from hollow out
Face is poured, and work progress has the following problems:
The concreting of stair bench cannot be carried out continuously, time-consuming work consuming.Since stair step absolute altitude is different, concrete is poured
Build it is appropriate to the occasion carried out from bench lower to upper part, when pouring top concrete, if concrete flowability is big, lower part concrete can be by
It is acted on to top concrete gravity power and overflows template, therefore bench need to be poured close to secondary when initial set when concrete;
Concrete final set front stairs can not be used as vertical transport channel.Before bench concrete final set, stepped on if people steps down in
It walks in step, easily leaves footprints on marking time, influence concrete impression quality.
Vulnerable to damage after bench molding, finished product protection need to be carried out.Since stair are people, material passway, traffic volume is big, ladder
Duan Chengpin is highly prone to destroy, and needs to be surrounded with template during routine use and mark time, carries out finished product protection to it.
Summary of the invention
The present invention to solve problems of the prior art, proposes that a kind of cast-in-situ stair closes formwork erecting structure and its reverse irrigation
The construction of concrete.
The technical scheme of the present invention is realized as follows:
A kind of cast-in-situ stair closing formwork erecting structure, composition includes: bench plate bed die, platform board, outer side board, waist slab bottom
Mould is tiltedly mounted between the platform board of descending stair beam, and several upright bars are equipped under bench plate bed die, is arranged two in upright bar upper end
Horizontal support frame is arranged in road brace in the middle part of upright bar, and the upright bar lower end is fixed on the waist slab of lower layer, bench plate bed die
Bottom is equipped with time stupefied, and waist slab reinforcing bar is banded in bench plate bed die, ladder is installed between bench plate bed die and platform board
Beam steel is banded with platform board reinforcing bar on platform board, installs outer side board in bench plate bed die two sides, installs between outer side board
It marks time and horizontal shuttering and marks time vertical formwork, angle steel is installed at the external corner of mark time horizontal shuttering and vertical formwork of marking time,
The fixed lumps of wood is disposed at the inner corner trim of mark time horizontal shuttering and vertical formwork of marking time, split bolt is by bench plate bed die and marks time
Horizontal shuttering, vertical formwork of marking time are strained and fixed, and install double steel pipe on the outside of outer side board, are equipped between double steel pipe to drawing spiral shell
Bolt.
Outer side board include: it is stupefied under stupefied and outer side board in outer side board, outer side board is by stupefied fixation under side board stupefied and outer in outer side board
In bench plate bed die;Upright bar upper end is equipped with jacking, and it is stupefied that master is equipped on jacking.
The step of a kind of cast-in-situ stair closing formwork erecting structure flows backward the construction of concrete, the construction method include:
A. bench plate bed die is laid with, and terraced beam, the installation of platform board template, support frame are set up,
1) bench plate bed die uses 1830 × 915 × 18mm glued board, and support frame uses A48.3 × 3.6mm steel pipe;
2) support frame should be arranged two rows of along parallel bench plate bed die direction, and upright bar spacing h is not more than 900mm, and is arranged two
Road brace draws logical upright bar;
3) stupefied using 50 × 100mm flitch work time along bench plate bed die length direction in bench plate bed die bottom, secondary stupefied
Away from no more than 250mm;Decided using 100 × 100mm flitch stupefied in jacking top;
B. stair reinforcing bar is bound, and waist slab reinforcing bar is bound in bench plate bed die, and platform board reinforcing bar is bound on platform board,
Terraced beam steel is installed between bench plate bed die and platform board;
C. split heads is laid, split heads should all be arranged in waist slab gluten and bottom muscle, and gluten preferably uses finished product steel bar horse-shaped bench, plastics horse
Stool etc.;Bottom muscle preferably uses concrete pad split heads, and split heads spacing is not preferably greater than 1000mm;
D., outer side board is installed, outer side board is installed in bench plate bed die two sides, it is stupefied firm solid under stupefied and outer side board in outer side board
It is fixed;
E. the installation level of marking time, vertical formwork, pop up the control of mark time horizontal shuttering, vertical formwork of marking time in outer side board
Line installs mark time horizontal shuttering, vertical formwork of marking time according to control line;
F., angle steel is installed, 50 × 3 angle steel, angle steel are installed at the external corner that horizontal shuttering of marking time, vertical formwork of marking time join
With mark time horizontal shuttering and vertical formwork junction of marking time holds out against and contacts, mark time horizontal shuttering and vertical formwork handover of marking time
The fixed lumps of wood is mounted at inner corner trim;
G. bench bolster is reinforced, and bench bolster is marked time every 3 bench plate bed die and will be stepped on split bolt
Step horizontal shuttering, vertical formwork of marking time are strained and fixed;
H. bench plate bed die Side shuttering is reinforced, using the double steel pipe of A48.3 × 3.6 every 3 use of marking time on the outside of outer side board
Outer side board is strained and fixed by split bolt;
I. concreting, maintenance, concrete flows backward from bench bottom to top to be poured, the plate vibrator when pouring
Vibration compacting observes gas vent situation, until bench concreting is closely knit;
J. bench plate bed die, outer side board remove turnover, and bench plate bed die, outer side board should be in concrete strengths up to tearing open after 75%
It removes, application of force is not excessive in demolishing process;
K. after dismounting, if it is desired, retaining mark time horizontal shuttering and vertical formwork of marking time, as finished product protection measure.
Before step a, needs to make template in advance, should conscientiously be familiar with construction drawing before template construct, it is ensured that processing dimension
Accurately;For make closing bench template surface answer it is smooth, smooth, the peeling for the constructional appearance Forming Quality that must not have an impact,
The defects of deformation, reserves two diameter 20mm circular holes on every step bench horizontal shuttering in advance.The beneficial effects of the present invention are:
1. stair tread formwork close, bench concrete can continuous placing, one-pass molding, stair step upper surface utilize mould
Plate closing, effectively prevent concrete excessive, saves material;It is carried out when placing concrete from bench bottom to top, when pouring
Vibration compacting;
2. vertical transport channel is unrestricted, concreting is forward and backward, stair can be used as vertical transport and lead in the process
Road;
3. template of marking time can be used for bench finished product protection, and can repeatedly be used in turn, after the completion of concreting, mould of marking time
Plate can be used as later period finished product protection measure, and recyclable recycling.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with
It obtains other drawings based on these drawings.
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the partial enlarged view of A of the present invention;
Fig. 3 is bench plate bed die laying structure schematic diagram of the invention;
Fig. 4 is the structural schematic diagram that stair reinforcing bar of the invention is bound;
Fig. 5 is the structural schematic diagram of the outer side board of the present invention and upper and lower stupefied installation;
Fig. 6 is the structural schematic diagram of the present invention level of marking time, vertical formwork installation;
Fig. 7 is the structural schematic diagram of angle steel of the present invention installation;
Fig. 8 is the structural schematic diagram that template system of the present invention is reinforced.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, those of ordinary skill in the art are obtained every other under that premise of not paying creative labor
Embodiment shall fall within the protection scope of the present invention.
A kind of cast-in-situ stair closing formwork erecting structure, composition includes: bench plate bed die 1, platform board 8, outer side board 14, bench
Plate bed die 1 is tiltedly mounted between the platform board 8 of descending stair beam, several upright bars 4 is equipped under bench plate bed die 1, in upright bar 4
End setting twice brace 3, is arranged horizontal support frame 2 in the middle part of upright bar 4, and 4 lower end of upright bar is fixed on the waist slab 1 of lower layer,
1 bottom of bench plate bed die is equipped with secondary stupefied 5, and waist slab reinforcing bar 9 is banded in bench plate bed die 1, in bench plate bed die 1 and puts down
Terraced beam steel 10 is installed between platen 8, platform board reinforcing bar 11 is banded on platform board 8, is installed in 1 two sides of bench plate bed die
Outer side board 14, installation, which is marked time, between outer side board 14 horizontal shuttering 15 and marks time vertical formwork 16, mark time horizontal shuttering 15 with
It marks time and angle steel 17 is installed at the external corner of vertical formwork 16, pacify at the inner corner trim in mark time horizontal shuttering 15 and vertical formwork 16 of marking time
The fixed lumps of wood 18 is set, bench plate bed die 1 and mark time horizontal shuttering 15, vertical formwork 16 of marking time are strained and fixed by split bolt 19,
Double steel pipe 20 is installed on the outside of outer side board 14, split bolt 19 is equipped between double steel pipe 20.
Outer side board 14 include: in outer side board stupefied 12 and outer side board under stupefied 13, outer side board 14 is by outer side board stupefied 12 and outer side
Stupefied 13 are fixed in bench plate bed die 1 under plate;4 upper end of upright bar is equipped with jacking 7, and main stupefied 6 are equipped on jacking 7.
The step of a kind of cast-in-situ stair closing formwork erecting structure and its construction for flowing backward concrete, the construction method, wraps
It includes:
A. bench plate bed die 1 is laid with, and terraced beam, the installation of platform board template, support frame are set up,
1) bench plate bed die 1 uses 1830 × 915 × 18mm glued board, and support frame 2 uses A48.3 × 3.6mm steel pipe;
2) support frame 2 should be arranged two rows of along parallel 1 direction of bench plate bed die, and 4 spacing h of upright bar is not more than 900mm, and is arranged
Twice brace 3 draws logical upright bar 4;
3) make secondary stupefied 5, secondary stupefied 5 using 50 × 100mm flitch along bench plate bed die length direction in 1 bottom of bench plate bed die
Spacing is not more than 250mm;Stupefied 6 are decided using 100 × 100mm flitch in 7 top of jacking;
B. stair reinforcing bar is bound, and waist slab reinforcing bar 9 is bound in bench plate bed die 1, and platform slab is bound on platform board 8
Muscle 11 installs terraced beam steel 10 between bench plate bed die 1 and platform board 8;
C. split heads is laid, split heads should all be arranged in waist slab gluten and bottom muscle, and gluten preferably uses finished product steel bar horse-shaped bench, plastics horse
Stool etc.;Bottom muscle preferably uses concrete pad split heads, and split heads spacing is not preferably greater than 1000mm;
D., outer side board 14 is installed, in the outer side board 14 of 1 two sides of bench plate bed die installation, outer side board stupefied 12 and outer side board under it is stupefied
13 firm fixations;
E. the installation level of marking time, vertical formwork, pop up mark time horizontal shuttering 15, vertical formwork 16 of marking time in outer side board 14
Control line, mark time horizontal shuttering 15, vertical formwork 16 of marking time according to control line installation;
F., angle steel is installed, 50 × 3 angle steel are installed at the external corner that horizontal shuttering 15 of marking time, vertical formwork 16 of marking time join
17, angle steel 17 with mark time horizontal shuttering 15 and 16 junction of vertical formwork of marking time holds out against and contacts, mark time and horizontal shuttering 15 and mark time
The fixed lumps of wood 18 is mounted at the inner corner trim that vertical formwork 16 joins;
G. bench bolster is reinforced, bench bolster mark time bench plate bed die every 3 with split bolt 19 and
Mark time horizontal shuttering 15, vertical formwork 16 of marking time is strained and fixed;
H. bench Side shuttering reinforce, bench Side shuttering using the double steel pipe of A48.3 × 3.6 20 mark time every 3 with pair
Bolt 19 is drawn, outer side board 14 is strained and fixed;
I. concreting, maintenance, concrete flows backward from bench bottom to top to be poured, the plate vibrator when pouring
Vibration compacting observes gas vent situation, until bench concreting is closely knit;
J. bench plate bed die, outer side board remove turnover, and bench plate bed die, outer side board should be in concrete strengths up to tearing open after 75%
It removes, application of force is not excessive in demolishing process;
K. after dismounting, if it is desired, retaining the horizontal and vertical template of bench, as finished product protection measure.
Before step a, needs to make template in advance, should conscientiously be familiar with construction drawing before template construct, it is ensured that processing dimension
Accurately;For make closing bench template surface answer it is smooth, smooth, the peeling for the constructional appearance Forming Quality that must not have an impact,
The defects of deformation, reserves two diameter 20mm circular holes on every step bench horizontal shuttering in advance.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention
Within mind and principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.
Claims (4)
1. a kind of cast-in-situ stair closes formwork erecting structure, composition includes: bench plate bed die (1), platform board (8), outer side board (14),
It is characterized by: bench plate bed die (1) is tiltedly mounted between the platform board (8) of descending stair beam, bench plate bed die is installed under (1)
There are several upright bars (4), twice brace (3) are set in upright bar (4) upper end, the horizontal support frame (2) of setting in the middle part of upright bar (4),
Upright bar (4) lower end is fixed on the waist slab of lower layer, and bench plate bed die (1) bottom is equipped with time stupefied (5), at waist slab bottom
It is banded with waist slab reinforcing bar (9) on mould (1), terraced beam steel (10) is installed between bench plate bed die (1) and platform board (8),
It is banded with platform board reinforcing bar (11) on platform board (8), outer side board (14) is installed in bench plate bed die (1) two sides, in outer side board
(14) mark time horizontal shuttering (15) and vertical formwork of marking time (16) are installed, in horizontal shuttering of marking time (15) and vertical mould of marking time between
Angle steel (17) are installed at the external corner of plate (16), placement is solid at the inner corner trim of horizontal shuttering of marking time (15) and vertical formwork (16) of marking time
Determine the lumps of wood (18), split bolt (19) tenses bench plate bed die (1) and horizontal shuttering of marking time (15), vertical formwork of marking time (16)
It is fixed, double steel pipe (20) are installed on the outside of outer side board (14), are equipped with split bolt (19) between double steel pipe (20).
2. a kind of cast-in-situ stair according to claim 1 closes formwork erecting structure, it is characterised in that: outer side board (14) includes:
In outer side board under stupefied (12) and outer side board stupefied (13), outer side board (14) is fixed by (13) stupefied under (12) stupefied in outer side board and outer side board
On bench plate bed die (1);Upright bar (4) upper end is equipped with jacking (7), is equipped on jacking (7) main stupefied (6).
3. the construction that a kind of cast-in-situ stair closing formwork erecting structure flows backward concrete, it is characterised in that: the step of the construction method
Suddenly include:
A. bench plate bed die (1) is laid with, and terraced beam, the installation of platform board template, support frame are set up,
1) bench plate bed die (1) uses 1830 × 915 × 18mm glued board, and support frame (2) uses A48.3 × 3.6mm steel pipe;
2) support frame (2) should be arranged two rows of along parallel bench plate bed die (1) direction, and upright bar (4) spacing h is not more than 900mm, and sets
It sets twice brace (3) and draws logical upright bar (4);
3) made time stupefied (5) along bench plate bed die length direction using 50 × 100mm flitch in bench plate bed die (1) bottom, it is secondary stupefied
(5) spacing is not more than 250mm;Jacking (7) top stupefied (6) are decided using 100 × 100mm flitch;
B. stair reinforcing bar is bound, and is bound waist slab reinforcing bar (9) on bench plate bed die (1), is bound platform board on platform board (8)
Reinforcing bar (11) installs terraced beam steel (10) between bench plate bed die (1) and platform board (8);
C. split heads is laid, split heads should all be arranged in waist slab gluten and bottom muscle, and gluten preferably uses finished product steel bar horse-shaped bench, Madeng ' made up of plastic;
Bottom muscle preferably uses concrete pad split heads, and split heads spacing is not preferably greater than 1000mm;
D., outer side board (14) is installed, outer side board (14), stupefied (12) and outer side board in outer side board are installed in bench plate bed die (1) two sides
Under stupefied (13) firm fixation;
E. the installation level of marking time, vertical formwork, pop up mark time horizontal shuttering (15), vertical formwork of marking time on outer side board (14)
(16) control line installs mark time horizontal shuttering (15), vertical formwork of marking time (16) according to control line;
F., angle steel is installed, 50 × 3 angle steel are installed at the external corner that horizontal shuttering of marking time (15), vertical formwork of marking time (16) join
(17), angle steel (17) holds out against and contacts with horizontal shuttering of marking time (15) and vertical formwork of marking time (16) junction, horizontal shuttering of marking time
(15) and at the inner corner trim of vertical formwork of marking time (16) handover the fixed lumps of wood (18) are mounted with;
G. bench bolster is reinforced, and bench bolster is marked time every 3 bench plate bed die and will be stepped on split bolt (19)
Step horizontal shuttering (15), vertical formwork of marking time (16) are strained and fixed;
H. bench plate bed die Side shuttering is reinforced, using the double steel pipe of A48.3 × 3.6 (20) every 3 use of marking time on the outside of outer side board
Outer side board (14) is strained and fixed by split bolt (19);
I. concreting, maintenance, concrete flows backward from bench bottom to top to be poured, and is vibrated when pouring with plate vibrator
It is closely knit, gas vent situation is observed, until bench concreting is closely knit;
J. bench plate bed die, outer side board remove turnover, and bench plate bed die, outer side board should be torn open in concrete strength up to removing after 75%
Except application of force is not excessive in the process;
K. after dismounting, if it is desired, retaining mark time horizontal shuttering and vertical formwork of marking time, as finished product protection measure.
4. the construction that cast-in-situ stair closing formwork erecting structure according to claim 3 flows backward concrete, it is characterised in that:
Before step a, needs to make template in advance, should conscientiously be familiar with construction drawing before template construct, it is ensured that processing dimension is accurate;For
The template surface of production closing bench answers smooth, smooth, peeling, the deformation defect of the constructional appearance Forming Quality that must not have an impact,
Two diameter 20mm circular holes are reserved on every step bench horizontal shuttering in advance.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610633919.3A CN106088588B (en) | 2016-08-05 | 2016-08-05 | A kind of cast-in-situ stair closes the construction of formwork erecting structure and its reverse irrigation concrete |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610633919.3A CN106088588B (en) | 2016-08-05 | 2016-08-05 | A kind of cast-in-situ stair closes the construction of formwork erecting structure and its reverse irrigation concrete |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106088588A CN106088588A (en) | 2016-11-09 |
CN106088588B true CN106088588B (en) | 2019-04-19 |
Family
ID=57454949
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610633919.3A Active CN106088588B (en) | 2016-08-05 | 2016-08-05 | A kind of cast-in-situ stair closes the construction of formwork erecting structure and its reverse irrigation concrete |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106088588B (en) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108798045A (en) * | 2017-04-27 | 2018-11-13 | 五冶集团上海有限公司 | A kind of temporary stairways pedal installation method for reinforced concrete stairs construction |
CN107288340A (en) * | 2017-07-20 | 2017-10-24 | 北京城建远东建设投资集团有限公司 | The hanging board device and construction method of a kind of control cast-in-situ stair bench plate thickness |
CN107401279A (en) * | 2017-09-19 | 2017-11-28 | 中联世纪建设集团有限公司 | Disposable one-piece casting staircase wall ladder combined steel formwork installation construction method |
CN108035548A (en) * | 2017-11-24 | 2018-05-15 | 常州第建筑集团有限公司 | The closed template construction method of cast-in-place concrete stair |
CN109457960B (en) * | 2018-11-20 | 2024-03-22 | 中铁十六局集团城市建设发展有限公司 | Adjustable universal mold for integrally assembling cast-in-situ stair steps |
CN111173273A (en) * | 2019-12-31 | 2020-05-19 | 中航建筑工程有限公司 | Closed stair formwork structure and construction method thereof |
CN112982974A (en) * | 2021-03-15 | 2021-06-18 | 山西三建集团有限公司 | Cast-in-place concrete stair template system that modularization was assembled |
CN113914617A (en) * | 2021-11-26 | 2022-01-11 | 上海宝冶集团有限公司 | Cast-in-place concrete beam plate type stair totally-enclosed formwork reinforcing method |
CN114033173B (en) * | 2021-12-15 | 2023-01-17 | 山东长泰建设集团工程有限公司 | Cast-in-place stair steel-wood composite formwork based on BIM technology |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN205857711U (en) * | 2016-08-05 | 2017-01-04 | 中国建筑第七工程局有限公司 | A kind of cast-in-situ stair closes formwork erecting structure |
Family Cites Families (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2532175Y (en) * | 2002-03-19 | 2003-01-22 | 高杰 | Combined steel form for in site pouring concrete stairway |
CN201722927U (en) * | 2010-07-23 | 2011-01-26 | 中国建筑第二工程局有限公司 | Drawable slat type stair template |
CN202055526U (en) * | 2011-04-27 | 2011-11-30 | 中国葛洲坝集团股份有限公司 | Set-shaped steel formwork for cast-in-situ concrete steps |
CN102733600A (en) * | 2012-07-04 | 2012-10-17 | 江苏省华建建设股份有限公司 | Totally-enclosed stair template components |
CN202787974U (en) * | 2012-09-24 | 2013-03-13 | 中国建筑第八工程局有限公司 | Closed framework structure used for stair construction |
CN102864925A (en) * | 2012-09-29 | 2013-01-09 | 朱宏宇 | Stair mould base, stair and method for building stair mould base and stair |
CN203475828U (en) * | 2013-09-18 | 2014-03-12 | 五矿二十三冶建设集团有限公司 | Totally closed stair formwork for cast-in-situ stair construction |
CN103669865A (en) * | 2013-12-20 | 2014-03-26 | 广东省第四建筑工程公司 | Stair construction method through shaped supports |
CN104120880A (en) * | 2014-06-30 | 2014-10-29 | 中国建筑第二工程局有限公司 | Shaping tool type stair template system and construction method thereof |
CN105804395B (en) * | 2016-03-18 | 2018-01-16 | 杭州江润科技有限公司 | Stair continuously poured in one molding construction method based on monoblock type typified form |
CN105971276B (en) * | 2016-06-23 | 2018-01-16 | 杭州江润科技有限公司 | Integral aluminum formwork stair one-step continuous pouring forming structure and construction method |
-
2016
- 2016-08-05 CN CN201610633919.3A patent/CN106088588B/en active Active
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN205857711U (en) * | 2016-08-05 | 2017-01-04 | 中国建筑第七工程局有限公司 | A kind of cast-in-situ stair closes formwork erecting structure |
Also Published As
Publication number | Publication date |
---|---|
CN106088588A (en) | 2016-11-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106088588B (en) | A kind of cast-in-situ stair closes the construction of formwork erecting structure and its reverse irrigation concrete | |
CN106677069B (en) | A kind of construction method of bridge pier integral formwork support one-shot forming structure | |
CN105804395B (en) | Stair continuously poured in one molding construction method based on monoblock type typified form | |
CN104594500B (en) | Integrated slab column formwork structure system and construction method | |
CN108638324A (en) | A kind of construction method of prefabricated case beam | |
CN102121310A (en) | Double column constructional template for large-section ultrahigh steel reinforced clear water concrete and construction method thereof | |
CN206784913U (en) | A kind of two-part superimposed sheet seam hangs die worker's tool | |
CN104878924A (en) | Stair step concrete pouring-molded template and stair cast-in-situ construction method | |
CN106939663A (en) | A kind of concrete hollow double-storied floor and its construction method | |
CN205857711U (en) | A kind of cast-in-situ stair closes formwork erecting structure | |
CN205364148U (en) | PC track beam mold | |
CN206015861U (en) | The cast-in-place core body of light block wall | |
CN104164951B (en) | Stair rest platform and construction method thereof | |
CN205894681U (en) | Closed staircase template | |
CN109137977A (en) | A kind of subway rail construction method that road and middle plate are poured simultaneously against the wind | |
CN208267342U (en) | High-altitude overhanging concrete structure formwork scaffold | |
CN110080299A (en) | A kind of shallow embedding mountain tunnel open-cut engineering method | |
CN207048309U (en) | A kind of top plate Quick Release support system | |
CN102733600A (en) | Totally-enclosed stair template components | |
CN108729456B (en) | Integrative concrete slope protection pouring mold and pouring construction method thereof | |
CN104895582B (en) | A kind of integral mold plate concrete constructions method of double track tunnel ditch cable trench | |
CN209976016U (en) | Combined steel formwork keel support with steel bar protection layer support | |
CN105544832B (en) | Shell roof and construction method thereof | |
CN206553938U (en) | Bridge pier integral formwork support one-shot forming structure | |
CN206873731U (en) | A kind of concrete hollow double-storied floor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |