CN106088146B - A kind of interim ground-connecting-wall Demolition Construction method - Google Patents

A kind of interim ground-connecting-wall Demolition Construction method Download PDF

Info

Publication number
CN106088146B
CN106088146B CN201610580185.7A CN201610580185A CN106088146B CN 106088146 B CN106088146 B CN 106088146B CN 201610580185 A CN201610580185 A CN 201610580185A CN 106088146 B CN106088146 B CN 106088146B
Authority
CN
China
Prior art keywords
wall
sole plate
interim ground
soil body
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610580185.7A
Other languages
Chinese (zh)
Other versions
CN106088146A (en
Inventor
于海申
裴鸿斌
亓立刚
苏亚武
刘鹏
柯子平
孙加齐
杨红岩
高辉
戚明浩
汤淼
王凯峰
肖大伟
杨晨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201610580185.7A priority Critical patent/CN106088146B/en
Publication of CN106088146A publication Critical patent/CN106088146A/en
Application granted granted Critical
Publication of CN106088146B publication Critical patent/CN106088146B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water

Abstract

The invention discloses a kind of interim ground-connecting-wall Demolition Construction methods, comprising steps of removing in the bottom soil body below interim ground-connecting-wall to sole plate bottom cushion;The bottom soil body is backfilled to sole plate bottom cushion;Fill up sole plate bottom cushion;Close sole plate.The present invention uses and removes interim ground-connecting-wall bottom to the bottom soil body below sole plate bottom cushion, and sole plate is reduced by backfill in the rigidity for the bottom structure for provisionally connecting wall displacement, to reduce sole plate because of bottom plate drawing crack caused by differential settlement, while guaranteeing basis and operation safety, it ensure that the integrality of sole plate, it is therefore prevented that underground water leakage.

Description

A kind of interim ground-connecting-wall Demolition Construction method
Technical field
The present invention relates to a kind of building field more particularly to a kind of interim ground-connecting-wall Demolition Construction methods.
Background technique
Coastal Soft Deep Foundation Pit has significant " tau-effect ", and exposure duration is longer, and foundation pit area is bigger, and foundation pit becomes Shape amount is bigger.Therefore the method for mostly using point storehouse to implement in construction reduces foundation pit area, wherein mostly use interim ground-connecting-wall into Row separates.When interim ground-connecting-wall two sides, main structure needs to remove interim ground-connecting-wall after going out foundation pit.However remove interim ground-connecting-wall It is scientific, reasonable that construction method needs, under the premise of guaranteeing deep pit monitor, it is ensured that the integrality of sole plate.Because provisionally connecting The vertical elevation that wall is removed directly determines the water penetration on basis, integrality.If interim ground-connecting-wall bottom is removed to sole plate Epithelium, then underground water can be leaked from the gap of interim ground-connecting-wall and two sides bottom plate.If interim ground-connecting-wall 21 is removed to basis Under 22 bed course 23 of bottom plate, sole plate 22 of then constructing again, as shown in Figure 1, because sole plate 22 is in interim ground-connecting-wall 21 Position is different from the rigidity of other positions sole plate bottom solum 24, therefore sole plate can be caused to draw because of differential settlement It splits, so as to cause underground water leakage.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of interim ground-connecting-wall Demolition Construction methods, can be effectively reduced Sole plate in the bottom rigidity for provisionally connecting wall displacement, thus reduce sole plate because caused by differential settlement bottom plate draw It splits.
In order to realize the above technical effect, the invention discloses a kind of interim ground-connecting-wall Demolition Construction methods, comprising steps of
It removes in the bottom soil body below interim ground-connecting-wall to sole plate bottom cushion;
The bottom soil body is backfilled to sole plate bottom cushion;
Fill up sole plate bottom cushion;
Close sole plate.
The interim ground-connecting-wall Demolition Construction method, which is further improved, to be, removes interim ground-connecting-wall to sole plate bottom Before in bottom soil body below portion's bed course, further includes: from top to bottom successively remove the interim ground-connecting-wall of each floor, and removing The interim ground-connecting-wall rear enclosed of each floor corresponds to the beam slab post-cast strip of floor.
The interim ground-connecting-wall Demolition Construction method, which is further improved, to be, the interim ground-connecting-wall is removed to basic bottom 200mm~400mm below plate bottom cushion, in the refill spaces for forming corresponding depth in the bottom soil body.
The interim ground-connecting-wall Demolition Construction method, which is further improved, to be, further includes before backfilling the bottom soil body Step: in waterproof layer is arranged in the refill spaces.
The interim ground-connecting-wall Demolition Construction method, which is further improved, to be, it is empty that the waterproof layer is completely laid on the backfill Between and extend to the upper surface of sole plate bottom cushion.
The interim ground-connecting-wall Demolition Construction method, which is further improved, to be, using consistent with the bottom soil body intensity The soil body backfill the refill spaces to the lower surface of sole plate bottom cushion.
The interim ground-connecting-wall Demolition Construction method, which is further improved, to be, when closing sole plate, is connect in closing Waterproof construction is set in seam.
The interim ground-connecting-wall Demolition Construction method, which is further improved, to be, the waterproof construction includes steel plate for sealing water And/or rubber water-proof item.
The interim ground-connecting-wall Demolition Construction method, which is further improved, to be, sole plate is base plate of foundation pit.
The present invention makes it have following the utility model has the advantages that by tearing interim ground-connecting-wall open due to using above technical scheme Except in the bottom soil body below sole plate bottom cushion, and sole plate is reduced in interim ground-connecting-wall position by backfill The rigidity for the bottom structure set is guaranteeing basis and is making to reduce sole plate because of bottom plate drawing crack caused by differential settlement While industry is safe, the integrality of sole plate ensure that, it is therefore prevented that underground water leakage.
Detailed description of the invention
Fig. 1 is conventional interim ground-connecting-wall bottom Demolition Construction figure.
Fig. 2 is the construction process figure of the interim ground-connecting-wall Demolition Construction method of the present invention.
Fig. 3~6 are interim ground-connecting-wall bottom Demolition Construction schematic diagram in the interim ground-connecting-wall Demolition Construction method of the present invention.
Fig. 7~14 are that interim ground-connecting-wall is removed to bottom base panel in the interim ground-connecting-wall Demolition Construction method of the present invention Construction schematic diagram.
Specific embodiment
With reference to the accompanying drawing and specific embodiment the present invention is described in further detail.
Firstly, a kind of interim ground-connecting-wall Demolition Construction method of the present invention mainly includes construction procedure refering to shown in Fig. 2~6:
S001: it removes in interim ground-connecting-wall 11 to the bottom soil body 14 of 12 bottom cushion of sole plate, 13 lower section, such as Fig. 3 institute Show;
S002: backfill bottom soil body to 12 bottom cushion 13 of sole plate, as shown in Figure 4;
S003: 12 bottom cushion 13 of sole plate is filled up, as shown in Figure 5;
S004: closing sole plate 12, as shown in Figure 6.
Wherein, the bottom of interim ground-connecting-wall 11 it is general it is dismountable to 12 bottom cushion of sole plate, 13 lower section about 200mm~ 400mm, preferably 300mm are (through multiple Check computations, it is contemplated that construction efficiency, engine request and economic benefit show the thickness Can reach preferable construction effect), at this point, in the refill spaces for forming corresponding depth in the bottom soil body 14 of 13 lower section of bed course 141。
In step S002: before backfill bottom soil body, further comprising the steps of: in the refill spaces 141 formed in bottom soil body 14 Interior setting waterproof layer (not showing waterproof layer in figure), the waterproof layer completely can be laid on refill spaces 141 and extend to sole plate 12 The upper surface of bottom cushion 13 prevents bed course 13 from leaking.
Backfill bottom soil body 14 refill spaces 141 when, generally use with the consistent soil body of 14 intensity of bottom soil body into Row backfill is simultaneously pragmatic, and backfills the soil body to the lower surface of 12 bottom cushion 13 of sole plate, to ensure the sole plate after backfilling Bottom structure rigidity it is consistent, prevent ground-connecting-wall remove after sole plate because bottom rigidity difference due to cause differential settlement, To cause sole plate drawing crack, the problem of underground water leaks.
In step S004: when closing sole plate 12, the closing between the sole plate newly constructed and original basis bottom plate Waterproof construction is set in seam, which may include steel plate for sealing water and/or rubber water-proof item, in the present embodiment, simultaneously Using steel plate for sealing water 121 and rubber water-proof item 122, it is separately positioned between the sole plate newly constructed and original basis bottom plate In closure seam, leaked to avoid underground water at closure seam, waterproof effect is preferable.
A kind of interim ground-connecting-wall Demolition Construction method of the present invention, which mainly passes through, removes interim ground-connecting-wall to sole plate bottom In bottom soil body below portion's bed course, and sole plate is reduced by backfill and is provisionally connecting the bottom structure of wall displacement Rigidity while guaranteeing basis and operation safety, is protected to reduce sole plate because of bottom plate drawing crack caused by differential settlement The integrality of sole plate is demonstrate,proved, it is therefore prevented that underground water leakage.
A kind of interim ground-connecting-wall Demolition Construction method of the present invention is constructed suitable for coastal Soft Deep Foundation Pit.At this point, basic Bottom plate is base plate of foundation pit, and it is bottom soil body below bed course that the bottom of base plate of foundation pit, which is equipped with bed course, and the bottom of interim ground-connecting-wall is goed deep into In bottom soil body, in interim ground-connecting-wall two sides, main structure needs to remove interim ground-connecting-wall after going out foundation pit, while repairing base plate of foundation pit With each floor beam slab.
Below with reference to interim ground-connecting-wall Demolition Construction method of the invention, the base of a base plate of foundation pit five floor of room located underground is enumerated The overall pulling down arrangement and method for construction for cheating interim ground-connecting-wall specifically includes following construction procedure in conjunction with shown in Fig. 7~14:
Step 1: removing one layer of basement (B1) interim ground-connecting-wall 11, as shown in Figure 7 and Figure 8;
Step 2: closing one level beam of basement, floor slab back casting band, then remove the interim ground-connecting-wall 11 of subcellar, As shown in Figure 9 and Figure 10;
Step 3: closing two level beam of basement, floor slab back casting band, then remove three layers of basement interim ground-connecting-wall 11, As is illustrated by figs. 11 and 12;
Step 4: closing basement tri-layer beam, floor slab back casting band, then remove four layers of basement interim ground-connecting-wall 11, As shown in Figure 13 and Figure 14;
Step 5: interim ground-connecting-wall 11 is removed to 12 bed course of sole plate, the 13 lower part 300mm of foundation pit, backfills element soil and ram It is real, it then constructs and bottom cushion and improves waterproof layer, steel plate for sealing water 121, rubber water-proof item 122 finally closes sole plate 12, The dismounting of interim ground-connecting-wall is completed, as illustrated in figures 3-6.
The interim ground-connecting-wall Demolition Construction method of the present invention first uses and from top to bottom successively removes provisionally connecting for each floor Wall, and the beam slab post-cast strip of floor is corresponded in the interim ground-connecting-wall rear enclosed for removing each floor;Then, sole plate is being removed When the interim ground-connecting-wall of position, remove using by interim ground-connecting-wall bottom to the bottom soil body below sole plate bottom cushion It is interior, and sole plate is reduced in the rigidity for the bottom structure for provisionally connecting wall displacement by backfill, to reduce basic bottom Plate ensure that the complete of sole plate while guaranteeing basis and operation safety because of bottom plate drawing crack caused by differential settlement Property, it is therefore prevented that underground water leakage.
It is described the invention in detail above in conjunction with accompanying drawings and embodiments, those skilled in the art can basis Above description makes many variations example to the present invention.Thus, certain details in embodiment should not constitute limitation of the invention, The present invention will be using the range that the appended claims define as protection scope of the present invention.

Claims (7)

1. a kind of interim ground-connecting-wall Demolition Construction method, which is characterized in that comprising steps of
It removes in the bottom soil body below interim ground-connecting-wall to sole plate bottom cushion, is corresponded in being formed in the bottom soil body The refill spaces of depth;
In waterproof layer is arranged in the refill spaces, the waterproof layer is completely laid on the refill spaces and extends to sole plate bottom The upper surface of portion's bed course;
The bottom soil body is backfilled to sole plate bottom cushion;
Fill up sole plate bottom cushion;
Close sole plate.
2. interim ground-connecting-wall Demolition Construction method as described in claim 1, which is characterized in that remove interim ground-connecting-wall to basis Before in bottom soil body below bottom base plate bed course, further includes: the interim ground-connecting-wall of each floor is from top to bottom successively removed, and The beam slab post-cast strip of floor is corresponded in the interim ground-connecting-wall rear enclosed for removing each floor.
3. ground-connecting-wall Demolition Construction method as described in claim 1 interim, it is characterised in that: the interim ground-connecting-wall remove to 200mm~400mm below sole plate bottom cushion.
4. interim ground-connecting-wall Demolition Construction method as claimed in claim 3, it is characterised in that: using strong with the bottom soil body It spends the consistent soil body and backfills the refill spaces to the lower surface of sole plate bottom cushion.
5. interim ground-connecting-wall Demolition Construction method as described in claim 1, it is characterised in that: when closing sole plate, in Waterproof construction is set in closure seam.
6. interim ground-connecting-wall Demolition Construction method as claimed in claim 5, it is characterised in that: the waterproof construction includes sealing Steel plate and/or rubber water-proof item.
7. interim ground-connecting-wall Demolition Construction method as described in claim 1, it is characterised in that: the sole plate is foundation pit bottom Plate.
CN201610580185.7A 2016-07-22 2016-07-22 A kind of interim ground-connecting-wall Demolition Construction method Active CN106088146B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610580185.7A CN106088146B (en) 2016-07-22 2016-07-22 A kind of interim ground-connecting-wall Demolition Construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610580185.7A CN106088146B (en) 2016-07-22 2016-07-22 A kind of interim ground-connecting-wall Demolition Construction method

Publications (2)

Publication Number Publication Date
CN106088146A CN106088146A (en) 2016-11-09
CN106088146B true CN106088146B (en) 2018-12-18

Family

ID=57449062

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610580185.7A Active CN106088146B (en) 2016-07-22 2016-07-22 A kind of interim ground-connecting-wall Demolition Construction method

Country Status (1)

Country Link
CN (1) CN106088146B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115404904A (en) * 2022-06-23 2022-11-29 中国建筑第八工程局有限公司 Underground diaphragm wall chamber-divided type dismantling construction method adjacent to subway foundation pit

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012211439A (en) * 2011-03-30 2012-11-01 Taisei Corp Construction method for underground structure, and pile head structure of temporary intermediate pile
CN105002913A (en) * 2015-08-06 2015-10-28 中铁隆工程集团有限公司 Strongly-permeable stratum deep foundation pit bottom sealing water stopping structure and construction method thereof

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5517615B2 (en) * 2007-06-22 2014-06-11 電気化学工業株式会社 Semiconductor wafer grinding method and resin composition and protective sheet used therefor

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012211439A (en) * 2011-03-30 2012-11-01 Taisei Corp Construction method for underground structure, and pile head structure of temporary intermediate pile
CN105002913A (en) * 2015-08-06 2015-10-28 中铁隆工程集团有限公司 Strongly-permeable stratum deep foundation pit bottom sealing water stopping structure and construction method thereof

Also Published As

Publication number Publication date
CN106088146A (en) 2016-11-09

Similar Documents

Publication Publication Date Title
CN104652418B (en) Diaphragm wall underground utilities position construction method
CN103590841B (en) Supporting method for primary support of underground excavated chamber
CN106894428A (en) A kind of multi layer waterproof method for blocking of mass raft foundation dewatering well
CN106088146B (en) A kind of interim ground-connecting-wall Demolition Construction method
CN105178342B (en) Precipitation well casing and method for blocking reserved hole of foundation pit through precipitation well casing
CN104314048B (en) Manufacturing and construction method of air bag type concrete engineering deformation joint water stop type cavity die
CN105951678B (en) A kind of vertical sealing swaging die of concrete works movement joint with projection
CN104314047B (en) Water-bag type concrete works movement joint sealing swaging die and its manufacture and construction method
CN104328802B (en) A kind of concrete works swaging die skeleton and manufacture method thereof
CN105951890A (en) Application method of concrete engineering cavity mold airbag
CN114045849A (en) Foundation pit high-temperature bedrock crack water drainage and plugging structure and method
CN107288141A (en) A kind of contrary sequence method seamless flexible water construction technology
CN208533543U (en) Improve the structure and foundation pit SMW supporting construction of foundation pit side-wall waterproof performance
KR101849531B1 (en) Maintenance methods for waterproofing the bathroom and kitchen floor
CN207794100U (en) One kind is for building elevator foundation pit structure
CN205604304U (en) Leakage structure is prevented to basement reverse construction method shear force wall
JP4749444B2 (en) Impermeable layer connection method
CN205348203U (en) Enclosed construction of precipitation well on deep basal pit soleplate
CN113463689A (en) Basement bottom plate structure
CN106436783A (en) Method for filling of similar test material through underwater tunnel similar model test platform
CN106284435A (en) A kind of method preventing Metro station excavation bedding CS central stand column pile from floating

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant