CN114045849A - Foundation pit high-temperature bedrock crack water drainage and plugging structure and method - Google Patents

Foundation pit high-temperature bedrock crack water drainage and plugging structure and method Download PDF

Info

Publication number
CN114045849A
CN114045849A CN202111168398.6A CN202111168398A CN114045849A CN 114045849 A CN114045849 A CN 114045849A CN 202111168398 A CN202111168398 A CN 202111168398A CN 114045849 A CN114045849 A CN 114045849A
Authority
CN
China
Prior art keywords
water
water collecting
pit
layer
collecting well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111168398.6A
Other languages
Chinese (zh)
Inventor
贾胜文
周吉林
尹剑
刘峰
徐铭村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuhai Shizimen Central Business District Construction Holding Co ltd
Original Assignee
Zhuhai Shizimen Central Business District Construction Holding Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhuhai Shizimen Central Business District Construction Holding Co ltd filed Critical Zhuhai Shizimen Central Business District Construction Holding Co ltd
Priority to CN202111168398.6A priority Critical patent/CN114045849A/en
Publication of CN114045849A publication Critical patent/CN114045849A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • E02D19/20Restraining of underground water by damming or interrupting the passage of underground water by displacing the water, e.g. by compressed air
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • E02D31/025Draining membranes, sheets or fabric specially adapted therefor, e.g. with dimples

Abstract

The invention discloses a foundation pit high-temperature bedrock crack water drainage and blocking structure, which relates to the field of constructional engineering and comprises spring holes and water collection pits, wherein the spring holes are connected with the water collection pits through drainage ditches, and two water collection wells which are distributed side by side are arranged at the bottom of each water collection pit. The invention also discloses a water draining and plugging method for the high-temperature bedrock cracks of the foundation pit, which comprises the following parts: A. a spring eye portion; B. a drainage ditch location; C. plugging the water collecting well part, the water outlet point D and the water outlet point; the plugging structure is formed by matching of graded broken stones, reinforced concrete, non-woven fabrics, a finished iron drum and the waterproof air bag, and the water outlet can be plugged quickly and perfectly. According to the invention, the spring holes, the drainage ditches and the water collecting pits are blocked by matching the aggregate and the broken stones, the non-woven fabrics and the reinforced concrete, the water collecting well is formed by matching the finished iron drum and the concrete, and the water collecting well is blocked by the rubber water-stopping air bag, the reinforced concrete and the steel plate layer, so that the blocking efficiency of the invention is improved.

Description

Foundation pit high-temperature bedrock crack water drainage and plugging structure and method
Technical Field
The invention relates to the field of constructional engineering, in particular to a structure and a method for draining and plugging fractured water of a high-temperature bedrock of a foundation pit.
Background
The common method for basement bottom plate construction is 10 cm concrete cushion, waterproof coiled material laying, bottom plate reinforcement and concrete pouring, and the underground water leakage condition of the bottom plate surface layer can easily occur. Because the groundwater pressure is too big, even there is the waterproof layer, the seepage also appears.
The conventional grouting plugging and foaming method in the prior art is labor-consuming, time-consuming and high in cost, and influences the subsequent floor paint construction and delivery for the constructed basement. Therefore, it is necessary to invent a water draining and plugging structure and method for high temperature bedrock cracks of foundation pits to solve the above problems.
Disclosure of Invention
The invention aims to provide a structure and a method for draining and plugging fractured water of high-temperature bedrock of a foundation pit, so as to solve the problems in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme: the utility model provides a foundation ditch high temperature basement rock crack log raft and block structure, includes spring eye and sump pit, link to each other through the escape canal between spring eye and the sump pit, the well bottom of sump pit is provided with two sump pits that distribute side by side, the hole groove has been seted up to the opening part of spring eye, the graded rubble has all been laid to the inside of hole groove, sump pit and sump pit, the upper surface laminating of graded rubble is connected with the non-woven fabrics layer, the bed course has been pour to the upper surface on non-woven fabrics layer, be provided with the reinforcing bar net in the bed course, the position outside of the protruding bed course of sump pit has been pour the C20 concrete.
Preferably, the inner side of the upper end of one of the water collecting wells is provided with a rubber water stop air bag, C30 early-strength concrete is poured at the wellhead of the one of the water collecting wells, and reinforcing ribs are embedded in the C30 early-strength concrete.
Preferably, a steel plate layer is arranged at the lower end of the other water collecting well, a pressure relief pipe penetrates through the middle of the steel plate layer and is connected with the steel plate layer in a sealing mode through a sealing flange, and the bottom end of the pressure relief pipe is connected with a valve.
Preferably, the first section of the water collecting well is formed by welding and connecting two finished iron buckets, and the position with the height of 40cm between the two finished iron buckets is in through connection by adopting a carbon tube.
Preferably, the outer side of the lower end of the finished iron bucket is provided with a plurality of through holes which are vertically distributed at equal intervals, and each group is provided with a plurality of through holes which are distributed in an annular array.
A method for draining and plugging fractured water of a high-temperature bedrock of a foundation pit comprises the following steps:
A. spring hole parts:
a-1: digging a pit with the depth not less than 1500mm and the diameter of 2000mm at the spring hole;
a-2: filling graded broken stones in the pit groove, laying a non-woven fabric layer on the graded broken stones, and pouring a cushion layer on the upper surface of the non-woven fabric layer;
B. drainage ditch position: digging a drainage ditch of 500mmX1000mm between the spring eyes and the water collection wells;
C. a water collecting well part:
c-1: digging a water collecting pit at the position of the water collecting well, and then arranging the water collecting well at the bottom of the water collecting pit;
c-2: welding two finished iron drums with the diameter of 60cm and the height of 90cm to form a first section of a water collecting well, uniformly forming holes below 30cm on the outer wall of each finished iron drum, and simultaneously, connecting the two finished iron drums at the position of 40cm in height by adopting a carbon tube with the thickness of 20mm in a through mode;
c-3: filling graded broken stones within the range of 500mm of the periphery of the first section of the water collecting well, pouring the part of the water collecting well extending out of the cushion layer to the top of the chopstick plate by using C20 concrete and the periphery of the water collecting pit, and plugging after the C20 concrete is poured for 48 hours;
D. plugging a water outlet point:
d-1: before plugging, the water level of the water collecting well is reduced to a position 200mm below a cushion layer, and waterless operation is guaranteed during plugging;
d-2: a rubber water-stopping air bag is adopted to firstly seal one of the water collecting wells, and the rubber water-stopping air bag is 200mm lower than the well mouth of the water collecting well;
d-3: after the rubber water-stopping air bag is inflated, pouring C30 early-strength concrete on the upper side of the rubber water-stopping air bag, and arranging a reinforcing rib inside the C30 early-strength concrete;
d-4: when the other water collecting well is plugged, a steel plate layer with the thickness of 5mm is arranged at the top end of the finished iron bucket, the middle part of the steel plate layer is connected with a pressure relief pipe through a flange sheet, the pressure relief pipe is connected to the bottom of the inner cavity of the pit-side water collecting well through a phi 100 galvanized steel pipe, a valve is additionally arranged at the bottom of the pressure relief pipe, and the valve is closed after the C20 concrete is poured for 48 hours.
Preferably, when the spring hole part is poured on the cushion layer, a reinforcing mesh is arranged in the cushion layer, and the reinforcing mesh is a 12@200 bidirectional single-layer reinforcing mesh.
Preferably, the water collecting well is 500mm lower than the water filtering layer.
Preferably, the size of the rubber water-stopping air bag is phi 600mm multiplied by 650mmX20mm, when the C30 early-strength concrete is poured, a reinforcing rib is arranged in the C30 early-strength concrete, and the reinforcing rib is arranged in a single-layer bidirectional mode at 12@ 200.
The invention has the technical effects and advantages that:
1. according to the invention, the spring holes, the drainage ditches and the water collecting pits are blocked by matching the aggregate and the broken stones, the non-woven fabrics and the reinforced concrete, the finished iron drum is matched with the concrete to form the water collecting well, and the water collecting well is blocked by the rubber water-stopping air bag, the reinforced concrete and the steel plate layer, so that the blocking efficiency of the invention is improved, and the construction cost is reduced;
2. the invention adopts the matching of graded broken stones, reinforced concrete, non-woven fabrics, finished iron drums and waterproof airbags to form a blocking structure, and can rapidly and perfectly block the water outlet.
Drawings
Fig. 1 is a schematic top view of the overall structure of the present invention.
Fig. 2 is a schematic cross-sectional view of the pit structure of the present invention.
Fig. 3 is a schematic cross-sectional view of the overall structure of the present invention.
Fig. 4 is a schematic partial cross-sectional view of a sump structure according to the present invention.
In the figure: 1. spring eyes; 2. a drainage ditch; 3. a sump; 4. a water collecting well; 5. a pit; 6. grading broken stone; 7. a non-woven fabric layer; 8. a cushion layer; 9. a reinforcing mesh; 10. c20 concrete; 11. a rubber water-stopping air bag; 12. c30 early strength concrete; 13. reinforcing ribs; 14. a steel plate layer; 15. a pressure relief pipe; 16. a valve; 17. a finished iron drum; 18. a carbon tube; 19. and a through hole.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The invention provides a foundation pit high-temperature bedrock crack water draining and blocking structure as shown in figures 1-4, which comprises spring holes 1 and water collecting pits 3, wherein the spring holes 1 are connected with the water collecting pits 3 through drainage ditches 2, two water collecting wells 4 distributed side by side are arranged at the bottoms of the water collecting pits 3, a pit 5 is formed in an opening of the spring holes 1, graded broken stones 6 are paved inside the pit 5, the water collecting pits 3 and the water collecting wells 4, a non-woven fabric layer 7 is attached to the upper surface of the graded broken stones 6, the non-woven fabric layer 7 is arranged to prevent cement slurry from flowing into the pits when the cushion layer 8 is poured, a cushion layer 8 is poured on the upper surface of the non-woven fabric layer 7, a reinforcing mesh 9 is arranged in the cushion layer 8, the reinforcing mesh 9 is a 12@200 bidirectional single-layer reinforcing mesh, and C20 concrete 10 is poured outside the part of the water collecting wells 4 protruding out of the cushion layer 8.
Specifically, a rubber water-stopping air bag 11 is arranged on the inner side of the upper end of one of the water collecting wells 4, the rubber water-stopping air bag 11 plays a role in blocking, a C30 early-strength concrete 12 is poured at the well mouth of one of the water collecting wells 4, the C30 early-strength concrete 12 plays a role in further blocking, reinforcing ribs 13 are inlaid in the C30 early-strength concrete 12, the reinforcing ribs 13 are arranged in a 12@200 single-layer bidirectional mode, the strength of the C30 early-strength concrete 12 is improved, a steel plate layer 14 is arranged at the lower end of the other water collecting well 4, the steel plate layer 14 plays a role in blocking, a pressure relief pipe 15 is connected to the middle of the steel plate layer 14 in a penetrating mode, the pressure relief pipe 15 is connected with the steel plate layer 14 in a sealing mode through a sealing flange, a valve 16 is connected to the bottom end of the pressure relief pipe 15, and the pressure relief pipe 15 plays a role in pressure relief in cooperation with the valve 16.
More specifically, the first section of sump pit 4 is linked to each other by two finished product iron buckets 17 welding, and the carbon tube 18 through-connection is adopted in the high department of 40cm between two finished product iron buckets 17, and the through-hole 19 of many constituteing equidistant vertical distribution is seted up in the lower extreme outside of finished product iron bucket 17, and every group is provided with a plurality of through-holes 19 that are the annular array and distributes, and the setting of through-hole 19 has played the effect of water guide.
The invention also discloses a water draining and plugging method for the high-temperature bedrock cracks of the foundation pit, which comprises the following parts:
A. the part of the spring eye 1:
a-1: digging a pit 5 with the depth of not less than 1500mm and the diameter of 2000mm at the spring hole 1, and mainly pumping water for use during the construction of the water collecting pit 3;
a-2: filling graded broken stones 6 in the pit groove 5, then paving a non-woven fabric layer 7 on the graded broken stones 6 to prevent cement paste from flowing into the pit when the cushion layer 8 is poured, then pouring the cushion layer 8 on the upper surface of the non-woven fabric layer 7, and arranging a steel bar mesh 9 in the cushion layer 8 when the cushion layer 8 is poured, wherein the steel bar mesh 9 is a 12@200 bidirectional single-layer steel bar mesh;
B. drainage ditch 2 part: a drainage ditch 2 of 500mmX1000mm is dug between the spring eye 1 and the water collection well 4 to ensure that water can be smoothly drained into the water collection well 4;
C. the position of the water collecting well 4:
c-1: digging a water collecting pit 3 at the position of the water collecting well 4, and then arranging the water collecting well 4 at the bottom of the water collecting pit 3, wherein the water collecting well 4 is 500mm lower than a water filtering layer;
c-2: two finished iron buckets 17 with the diameter of 60cm and the height of 90cm are welded to form a first section of the water collecting well 4, holes are uniformly formed in the outer wall of each finished iron bucket 17 below 30cm, and carbon pipes 18 with the thickness of 20mm are communicated and connected at the position 40cm between the two finished iron buckets 17 to increase the capacity of the water collecting well 4;
c-3: within the range of 500mm of the periphery of the first section of the water collecting well 4, graded broken stones 6 are adopted for filling, the part of the water collecting well 4 extending out of the cushion layer 8 is poured to the top of the chopstick plate by C20 concrete 10 together with the periphery of the water collecting pit 3, and plugging is carried out after the C20 concrete 10 is poured for 48 hours;
D. plugging a water outlet point:
d-1: before plugging, the water level of the water collecting well 4 is reduced to a position 200mm below a cushion layer 8, and waterless operation is guaranteed during plugging;
d-2: one of the water collecting wells 4 is firstly plugged by a rubber water stopping air bag 11, the rubber water stopping air bag 11 is 200mm lower than the well mouth of the water collecting well 4, and the size of the rubber water stopping air bag 11 is phi 600mm multiplied by 650mmX20 mm;
d-3: after the rubber water-stopping air bag 11 is inflated, pouring C30 early-strength concrete 12 on the upper side of the rubber water-stopping air bag 11, arranging a reinforcing rib 13 in the C30 early-strength concrete 12, wherein the reinforcing rib 13 is arranged in a single-layer bidirectional mode at 12@ 200;
d-4: when the other water collecting well 4 is blocked, a steel plate layer 14 with the thickness of 5mm is arranged at the top end of a finished product iron barrel 17, the middle part of the steel plate layer 14 is connected with a pressure relief pipe 15 through a flange sheet, the pressure relief pipe 15 is connected to the bottom of the inner cavity of the pit-side water collecting well 4 through a phi 100 galvanized steel pipe, a valve 16 is additionally arranged at the bottom of the pressure relief pipe 15, and the valve is closed after the C20 concrete 10 is poured for 48 hours.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.

Claims (9)

1. The utility model provides a foundation ditch high temperature basement rock crack water is discharged and block structure, includes spring eye (1) and sump pit (3), its characterized in that: the spring eye (1) link to each other through escape canal (2) between sump pit (3), the well bottom of sump pit (3) is provided with two sump pit (4) that distribute side by side, well groove (5) have been seted up to the opening part of spring eye (1), graded rubble (6) have all been laid to the inside of well groove (5), sump pit (3) and sump pit (4), the upper surface laminating of graded rubble (6) is connected with non-woven fabrics layer (7), bed course (8) have been pour to the upper surface of non-woven fabrics layer (7), be provided with reinforcing bar net (9) in bed course (8), C20 concrete (10) have been pour to the position outside of sump pit (4) protrusion bed course (8).
2. The foundation pit high-temperature bedrock fractured water draining and blocking structure as claimed in claim 1, wherein: the inner side of the upper end of one of the water collecting wells (4) is provided with a rubber water stop air bag (11), C30 early-strength concrete (12) is poured at the well mouth of one of the water collecting wells (4), and reinforcing ribs (13) are embedded in the C30 early-strength concrete (12).
3. The foundation pit high-temperature bedrock fractured water draining and blocking structure as claimed in claim 2, wherein: a steel plate layer (14) is arranged at the lower end of the other water collecting well (4), a pressure relief pipe (15) penetrates through the middle of the steel plate layer (14), the pressure relief pipe (15) is in sealing connection with the steel plate layer (14) through a sealing flange, and the bottom end of the pressure relief pipe (15) is connected with a valve (16).
4. The foundation pit high-temperature bedrock fractured water draining and blocking structure as claimed in claim 3, wherein: the first section of the water collecting well (4) is connected by two finished iron buckets (17) in a welding mode, and the position with the height of 40cm between the two finished iron buckets (17) is in through connection through a carbon tube (18).
5. The foundation pit high-temperature bedrock fractured water draining and blocking structure as claimed in claim 4, wherein: the lower extreme outside of finished product iron bucket (17) is seted up many and is constituteed equidistant vertical distribution's through-hole (19), and every group is provided with a plurality of through-holes (19) that are the annular array and distribute.
6. A method for draining and plugging fractured water of high-temperature bedrock of a foundation pit is characterized by comprising the following parts:
A. the part of the spring eye (1):
a-1: digging a pit (5) with the depth not less than 1500mm and the diameter 2000mm at the spring hole (1);
a-2: filling graded broken stones (6) in the pit groove (5), then paving a non-woven fabric layer (7) on the graded broken stones (6), and then pouring a cushion layer (8) on the upper surface of the non-woven fabric layer (7);
B. the part of the drainage ditch (2): a drainage ditch (2) of 500mmX1000mm is dug between the spring hole (1) and the water collection well (4);
C. the position of the water collecting well (4):
c-1: digging a water collecting pit (3) at the position of the water collecting well (4), and then arranging the water collecting well (4) at the bottom of the water collecting pit (3);
c-2: two finished iron buckets (17) with the diameter of 60cm and the height of 90cm are welded to form a first section of the water collecting well (4), holes are uniformly formed in the outer wall of each finished iron bucket (17) below 30cm, and carbon tubes (18) with the thickness of 20mm are communicated and connected between the two finished iron buckets (17) at the height of 40 cm;
c-3: graded broken stones (6) are filled within the range of 500mm of the periphery of the first section of the water collecting well (4), the part of the water collecting well (4) extending out of the cushion layer (8) is poured to the top of the chopstick plate by using C20 concrete (10) and the periphery of the water collecting pit (3), and plugging is carried out after the C20 concrete (10) is poured for 48 hours;
D. plugging a water outlet point:
d-1: before plugging, the water level of the water collecting well (4) is reduced to a position 200mm below the cushion layer (8), so that no water operation is ensured during plugging;
d-2: one of the water collecting wells (4) is plugged by adopting a rubber water stopping air bag (11), and the rubber water stopping air bag (11) is 200mm lower than the well mouth of the water collecting well (4);
d-3: after the rubber water-stopping air bag (11) is inflated, C30 early-strength concrete (12) is poured on the upper side of the rubber water-stopping air bag (11), and reinforcing ribs (13) are arranged inside the C30 early-strength concrete (12);
d-4: when another collecting well (4) is blocked, a steel plate layer (14) with the thickness of 5mm is arranged at the top end of a finished product iron barrel (17), the middle part of the steel plate layer (14) is connected with a pressure relief pipe (15) through a flange sheet, the pressure relief pipe (15) is connected to the bottom of an inner cavity of the pit edge collecting well (4) through a phi 100 galvanized steel pipe, a valve (16) is additionally arranged at the bottom of the pressure relief pipe (15), and the valve is closed after the C20 concrete (10) is poured for 48 hours.
7. The foundation pit high-temperature bedrock fracture water draining and plugging method according to claim 6, characterized in that: when the spring hole (1) is formed in the cushion layer (8) in a pouring mode, a reinforcing mesh (9) is arranged in the cushion layer (8), and the reinforcing mesh (9) is a 12@200 bidirectional single-layer reinforcing mesh.
8. The foundation pit high-temperature bedrock fracture water draining and plugging method according to claim 6, characterized in that: the water collecting well (4) is 500mm lower than the water filtering layer.
9. The foundation pit high-temperature bedrock fracture water draining and plugging method according to claim 6, characterized in that: the size of the rubber water-stopping air bag (11) is phi 600mm multiplied by 650mmX20mm, when the C30 early-strength concrete is poured, a reinforcing rib (13) is arranged in the C30 early-strength concrete, and the reinforcing rib (13) is arranged in a single-layer double-way mode at 12@ 200.
CN202111168398.6A 2021-09-30 2021-09-30 Foundation pit high-temperature bedrock crack water drainage and plugging structure and method Pending CN114045849A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111168398.6A CN114045849A (en) 2021-09-30 2021-09-30 Foundation pit high-temperature bedrock crack water drainage and plugging structure and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111168398.6A CN114045849A (en) 2021-09-30 2021-09-30 Foundation pit high-temperature bedrock crack water drainage and plugging structure and method

Publications (1)

Publication Number Publication Date
CN114045849A true CN114045849A (en) 2022-02-15

Family

ID=80204914

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111168398.6A Pending CN114045849A (en) 2021-09-30 2021-09-30 Foundation pit high-temperature bedrock crack water drainage and plugging structure and method

Country Status (1)

Country Link
CN (1) CN114045849A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115198758A (en) * 2022-07-05 2022-10-18 中铁四局集团有限公司 Novel method for sealing bottom of foundation pit underwater concrete

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115198758A (en) * 2022-07-05 2022-10-18 中铁四局集团有限公司 Novel method for sealing bottom of foundation pit underwater concrete
CN115198758B (en) * 2022-07-05 2023-05-30 中铁四局集团有限公司 Underwater concrete bottom sealing method for foundation pit

Similar Documents

Publication Publication Date Title
CN103046565B (en) Draining method for ultra-deep batholith deep foundation pit
CN102433876B (en) Multi-compartment casing composite pile and construction method thereof
CN109736340B (en) Dewatering device and method for guaranteeing integrity of cushion layer by reserving dewatering well on foundation slab
CN112281882A (en) Method for treating water and sand gushing from substrate
CN111236284A (en) Basement bottom and periphery underground water drainage method and structure
CN109469042B (en) Anti-seepage storage yard field karst cave processing structure
CN107245989A (en) Bear the tunnel structure and its construction technology of external water pressure in height
CN105178342B (en) Precipitation well casing and method for blocking reserved hole of foundation pit through precipitation well casing
CN114197501A (en) Reinforcement system for large-scale landslide control and construction method thereof
CN114045849A (en) Foundation pit high-temperature bedrock crack water drainage and plugging structure and method
CN112176954A (en) Construction method for newly excavated channel
CN108914959B (en) Foundation structure suitable for mountain house building and construction method thereof
CN216379604U (en) Foundation pit high-temperature bedrock crack water drainage and plugging structure
CN110670613A (en) Anti-seepage structure of foundation pit elevator shaft and construction method thereof
CN113464174B (en) Construction method of tunnel row waterproof comprehensive treatment system
CN210946854U (en) Anti-seepage structure of foundation pit elevator shaft
CN208441115U (en) A kind of diaphram wall piping plugging structure
CN113123358A (en) Ship pool deformation prevention structure under coal mining differential settlement effect and construction method
CN111379251A (en) Controllable rigid pile and compacted gravel pile combined composite foundation and construction method thereof
CN206477347U (en) The water storage structure of basement
CN207277295U (en) Bear the tunnel structure of external water pressure in height
CN107059948B (en) Reset processing method and system for floating open cut tunnel structure
CN112176953A (en) Construction method for newly-built channel
CN111519603A (en) Device for comprehensively treating uneven settlement of underground buried pipe of soft soil foundation by combination of replacement and filling and grouting and construction method
CN220058012U (en) Fertilizer groove backfilling and anti-floating pressure relief observation matching system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination