CN106080968A - 一种船舶上层建筑无余量合拢施工工艺 - Google Patents
一种船舶上层建筑无余量合拢施工工艺 Download PDFInfo
- Publication number
- CN106080968A CN106080968A CN201610489269.XA CN201610489269A CN106080968A CN 106080968 A CN106080968 A CN 106080968A CN 201610489269 A CN201610489269 A CN 201610489269A CN 106080968 A CN106080968 A CN 106080968A
- Authority
- CN
- China
- Prior art keywords
- superstructure
- surplus
- line
- locations
- structures
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B73/00—Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Harvester Elements (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
一种船舶上层建筑无余量合拢施工工艺,在地面上测量主船体与上层建筑总段对接的各个结构位置,然后通过处理软件计算并得出余量图,进而实现在地面上完成余量修割工作,待余量修割完成后再与主船体进行无余量地合拢对接。该工艺将余量修割工作移到地面上完成,降低了操作难度并提升了工作效率,也有利于保护上层建筑的结构和保证船舶的建造质量,同时,也有效降低了安全风险,和减少起吊设备等辅助设备的使用需要,有利于其它相关工作的顺利进行。
Description
技术领域
本发明涉及船舶建造工艺,特别是涉及一种将无需余量修割的上层建筑安装到船舶上的合拢施工工艺。
背景技术
船舶上层建筑是指在船舶甲板上围成的部分,主要包括用于布置各种用途的舱室,或者首楼、桥楼、尾楼及各种围壁建筑。这些上层建筑主要由型材制作的骨架结构,和板材制作的围壁板组合而成。在建造时,由于这些上层建筑的体积和重量都十分巨大,需要将各个分段逐个地吊装上船体,然后再结合实际的情况进行定位、余量修割和装配等相关作业。
目前的这种施工方式,虽然能够实现船舶上层建筑的安装,但上层建筑的分段结构需要进行多种操作,且这些操作都是在分段结构悬吊的状态下进行的,导致其操作过程极为困难,而且需要耗费大量的工作时间,工作效率低下;同时,长时间的悬吊重量巨大的分段结构,容易导致分段结构造成较大程度上的变形,最终影响船舶的建造质量;再者,长时间的高空作业,不单只施工难度大,还存在极大的安全隐患;还有,分段结构的悬吊需要利用到吊机等起吊装备,长时间的悬吊工作也会占用这些起吊设备资源,导致其它工作无法顺利进行。
发明内容
本发明旨在提供一种在地面上进行围壁板余量修割,再对船舶上层建筑进行无余量合拢的施工工艺。
本发明所述的船舶上层建筑无余量合拢施工工艺,包括以下步骤:
A、作高度基准线,包括在主船体上竖立标有高度的标杆,同时,在上层建筑总段上作高度线,且该高度线的高度与标杆标示的高度一致;
B、在主船体上测出与上层建筑总段对接的结构位置;
C、将测得的结构位置数据导入处理软件中,按照船体结构将各结构位置点用样条曲线连接;
D、将高度基准线放到步骤C的船体坐标系的理论位置,再量取各结构位置与高度基准线之间的理论间距;
E、将各结构位置的余量数据形成余量图;
F、在上层建筑总段上,根据余量图确定每个结构位置与高度基准线的间距,进而确定该结构位置的余量,再将这些余量点进行光顺连接,由此形成的线即为上层建筑总段的余量线;
G、根据余量线进行余量修割,再将修割后的上层建筑总段与主船体进行无余量合拢。
本发明所述的船舶上层建筑无余量合拢施工工艺,在地面上测量主船体与上层建筑总段对接的各个结构位置,然后通过处理软件计算并得出余量图,进而实现在地面上完成余量修割工作,待余量修割完成后再与主船体进行无余量地合拢对接。该工艺成功将船舶上层建筑安装中的一项主要的高空作业工作移到地面上完成,使得其操作难度得到极大的降低,既可以减少所需的工作时间,提升了工作效率,也有利于保护上层建筑的结构,保证船舶的建造质量,同时,也可以将大量的装配以及舾装等作业前移,使其同样在地面上完成作业,进一步提高了工作效率和降低工作难度,除此之外,还可以有效降低安全风险,和减少起吊设备等辅助设备的使用需要,有利于其它相关工作的顺利进行。
附图说明
图1是船舶上层建筑无余量合拢施工工艺的工艺流程图。
图2-5分别是图1所示船舶上层建筑无余量合拢施工工艺中各步骤的工艺示意图。
具体实施方式
如图1-5所示。
一种船舶上层建筑无余量合拢施工工艺,包括以下步骤:
A、作高度基准线,包括在主船体1上竖立标有高度M的标杆2,同时,在上层建筑总段3上作高度线N,且该高度线的高度N与标杆标示的高度M一致;如图1所示;
B、在主船体上测出与上层建筑总段对接的结构位置;如图2所示;
C、将测得的结构位置数据导入处理软件中,如本实施例采用的CAD软件,按照船体结构将各结构位置点用样条曲线连接;如图3所示;
D、将高度基准线放到步骤C的船体坐标系的理论位置,再量取各结构位置与高度基准线之间的理论间距;
E、将各结构位置的余量数据形成余量图;如图4所示;
F、在上层建筑总段上,根据余量图确定每个结构位置与高度基准线的间距,进而确定该结构位置的余量,再将这些余量点进行光顺连接,由此形成的线即为上层建筑总段的余量线;
G、根据余量线进行余量修割,再将修割后的上层建筑总段与主船体进行无余量合拢。
所述的船舶上层建筑无余量合拢施工工艺,在步骤A中,在主船体1上竖立标有高度的标杆2时,在主船体的前后左中右位置设置多根标杆,这更便于测量的操作,也有利于保证测量准确性;在标杆2设置后,在主船体1上安装保护装置,使其不影响甲板上的作业,同时也使甲板上的作业不对标杆进行破坏;还有,在上层建筑总段组装完毕,且必要的舾装件均安装完成后,再在总段的围壁上作高度线N,这有利于保证数据的准确。
在步骤B中,主船体结构位置包括横向肋骨、纵向纵骨和壁板分别与甲板对应的结构位置。这些结构位置的设定,可以更加全面地测量总段与主船体的连接结构,保证测量及后续安装的准确性。
Claims (5)
1.一种船舶上层建筑无余量合拢施工工艺,其特征在于包括以下步骤:
A、作高度基准线,包括在主船体(1)上竖立标有高度(M)的标杆(2),同时,在上层建筑总段(3)上作高度线(N),且该高度线的高度(N)与标杆标示的高度(M)一致;
B、在主船体上测出与上层建筑总段对接的结构位置;
C、将测得的结构位置数据导入处理软件中,按照船体结构将各结构位置点用样条曲线连接;
D、将高度基准线放到步骤C的船体坐标系的理论位置,再量取各结构位置与高度基准线之间的理论间距;
E、将各结构位置的余量数据形成余量图;
F、在上层建筑总段上,根据余量图确定每个结构位置与高度基准线的间距,进而确定该结构位置的余量,再将这些余量点进行光顺连接,由此形成的线即为上层建筑总段的余量线;
G、根据余量线进行余量修割,再将修割后的上层建筑总段与主船体进行无余量合拢。
2.根据权利要求1所述的船舶上层建筑无余量合拢施工工艺,其特征在于:在步骤B中,主船体结构位置包括横向肋骨、纵向纵骨和壁板分别与甲板对应的结构位置。
3.根据权利要求1或2所述的船舶上层建筑无余量合拢施工工艺,其特征在于:在步骤A中,在主船体(1)上竖立标有高度的标杆(2)时,在主船体的前后左中右位置设置多根标杆。
4.根据权利要求1或2所述的船舶上层建筑无余量合拢施工工艺,其特征在于:在步骤A中,在标杆(2)设置后,在主船体(1)上安装保护装置。
5.根据权利要求1或2所述的船舶上层建筑无余量合拢施工工艺,其特征在于:在步骤A中,在上层建筑总段组装完毕,且必要的舾装件均安装完成后,再在总段的围壁上作高度线(N)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610489269.XA CN106080968B (zh) | 2016-06-29 | 2016-06-29 | 一种船舶上层建筑无余量合拢施工工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610489269.XA CN106080968B (zh) | 2016-06-29 | 2016-06-29 | 一种船舶上层建筑无余量合拢施工工艺 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106080968A true CN106080968A (zh) | 2016-11-09 |
CN106080968B CN106080968B (zh) | 2017-10-10 |
Family
ID=57215152
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610489269.XA Active CN106080968B (zh) | 2016-06-29 | 2016-06-29 | 一种船舶上层建筑无余量合拢施工工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106080968B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109334858A (zh) * | 2018-09-05 | 2019-02-15 | 中国葛洲坝集团机械船舶有限公司 | 一种船舶上层建筑建造的方法 |
CN115042934A (zh) * | 2022-06-21 | 2022-09-13 | 中船黄埔文冲船舶有限公司 | 一种复杂上建型线光顺方法 |
CN115158589A (zh) * | 2022-08-18 | 2022-10-11 | 上海外高桥造船有限公司 | 一种绑扎桥无余量搭载方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU472848A1 (ru) * | 1973-04-09 | 1975-06-05 | Предприятие П/Я А-7102 | Способ изготовлени судовых надстроек |
CN101224849A (zh) * | 2007-12-12 | 2008-07-23 | 大连理工大学 | 船舶上层建筑整体吊装用吊架及吊装工艺 |
CN103057661A (zh) * | 2011-10-21 | 2013-04-24 | 上海江南长兴重工有限责任公司 | 船舶上层建筑整体吊装工艺 |
-
2016
- 2016-06-29 CN CN201610489269.XA patent/CN106080968B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU472848A1 (ru) * | 1973-04-09 | 1975-06-05 | Предприятие П/Я А-7102 | Способ изготовлени судовых надстроек |
CN101224849A (zh) * | 2007-12-12 | 2008-07-23 | 大连理工大学 | 船舶上层建筑整体吊装用吊架及吊装工艺 |
CN103057661A (zh) * | 2011-10-21 | 2013-04-24 | 上海江南长兴重工有限责任公司 | 船舶上层建筑整体吊装工艺 |
Non-Patent Citations (1)
Title |
---|
韦晓强: "船舶上层建筑的整体吊装及有限元应用", 《船舶设计通讯》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109334858A (zh) * | 2018-09-05 | 2019-02-15 | 中国葛洲坝集团机械船舶有限公司 | 一种船舶上层建筑建造的方法 |
CN115042934A (zh) * | 2022-06-21 | 2022-09-13 | 中船黄埔文冲船舶有限公司 | 一种复杂上建型线光顺方法 |
CN115042934B (zh) * | 2022-06-21 | 2024-03-26 | 中船黄埔文冲船舶有限公司 | 一种复杂上建型线光顺方法 |
CN115158589A (zh) * | 2022-08-18 | 2022-10-11 | 上海外高桥造船有限公司 | 一种绑扎桥无余量搭载方法 |
Also Published As
Publication number | Publication date |
---|---|
CN106080968B (zh) | 2017-10-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104477779B (zh) | 集装箱码头桥吊下集卡的对位及安全控制系统和方法 | |
US20180370776A1 (en) | Crane 3d workspace spatial techniques for crane operation in proximity of obstacles | |
CN106080964A (zh) | 一种用于超大型集装箱船横隔舱总段双面导轨的安装方法 | |
CN106828789B (zh) | 一种高桩承台登靠作业的波浪补偿装置 | |
CN106080968A (zh) | 一种船舶上层建筑无余量合拢施工工艺 | |
CN109895945A (zh) | 一种矿砂船舷侧总段的纵横舱壁预组装方法 | |
CN108202846B (zh) | 一种船舶二次进坞的定位方法 | |
CN204775829U (zh) | 一种用于集装箱船横隔舱快速搭载的保距梁 | |
JP6667590B1 (ja) | 航空機の着陸支援装置、航空機の着陸支援方法及び航空機の着陸支援プログラム | |
CN105966557B (zh) | 一种水上结构物混合定位系统 | |
CN103979073A (zh) | 锚台、锚唇及锚链筒分段预装的安装方法 | |
JP2007022434A (ja) | 船殻ブロック搭載方法およびその方法に用い得る船殻ブロック搭載シミュレーションシステム | |
CN108216487A (zh) | 一种分段阶段舵杆筒安装的工艺方法 | |
CN102019998A (zh) | 上下水边舱总组搭载方法 | |
CN104724250A (zh) | 一种堪划船体分段余量线的方法 | |
CN105416508A (zh) | 提高舾装先行率的方法 | |
CN102910255A (zh) | 船舶建造中的船台合拢方法 | |
CN110525582A (zh) | 一种船用大型基座总组预装精度控制方法 | |
CN110499702A (zh) | 一种斜拉桥索塔的索鞍定位加固装置 | |
CN104843583A (zh) | 基于岸桥的轮廓信息扫描方法和系统 | |
CN105464049A (zh) | 深水抛填船实时测控验收系统及施工方法 | |
CN104444851B (zh) | 一种船用吊机安装方法 | |
CN103592853A (zh) | 一种动力定位半实物仿真平台及方法 | |
CN101746482A (zh) | 一种造船过程中两总段对接的方法 | |
CN109306699B (zh) | 一种永临结合浅水区域贝雷桥施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |