CN106042608A - Flame laminating machine - Google Patents
Flame laminating machine Download PDFInfo
- Publication number
- CN106042608A CN106042608A CN201610456306.7A CN201610456306A CN106042608A CN 106042608 A CN106042608 A CN 106042608A CN 201610456306 A CN201610456306 A CN 201610456306A CN 106042608 A CN106042608 A CN 106042608A
- Authority
- CN
- China
- Prior art keywords
- frame
- composite roll
- smoking
- removing device
- composite
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B32—LAYERED PRODUCTS
- B32B—LAYERED PRODUCTS, i.e. PRODUCTS BUILT-UP OF STRATA OF FLAT OR NON-FLAT, e.g. CELLULAR OR HONEYCOMB, FORM
- B32B39/00—Layout of apparatus or plants, e.g. modular laminating systems
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B32—LAYERED PRODUCTS
- B32B—LAYERED PRODUCTS, i.e. PRODUCTS BUILT-UP OF STRATA OF FLAT OR NON-FLAT, e.g. CELLULAR OR HONEYCOMB, FORM
- B32B37/00—Methods or apparatus for laminating, e.g. by curing or by ultrasonic bonding
- B32B37/06—Methods or apparatus for laminating, e.g. by curing or by ultrasonic bonding characterised by the heating method
Landscapes
- Lining Or Joining Of Plastics Or The Like (AREA)
- Treatment Of Fiber Materials (AREA)
- Laminated Bodies (AREA)
Abstract
The invention discloses a flame laminating machine with high production efficiency. The flame laminating machine comprises a rack; a sponge unwinding device and a plurality of sponge guide rollers are arranged at the upper end of the rack; a middle composite roller is arranged in the middle of the rack; the middle composite roller is rotatably arranged in a middle bearing seat by a middle rotating shaft; the middle bearing seat is fixedly arranged on the rack; the upper end of the middle composite roller is provided with an upper composite roller matched with the middle composite roller; the upper composite roller is rotatably arranged on an upper bearing seat by an upper rotating shaft; the upper bearing seat is fixedly arranged on an upper support frame; an upper sliding rail is arranged at the two sides of the upper end of the rack; the two sides of the upper support frame are respectively arranged in the upper sliding rail in a sliding way by upper sliding blocks; an upper thread sleeve is arranged at the upper end of the upper support frame; an upper gear motor is arranged at the upper end of the rack; a motor shaft of the upper gear motor is provided with an upper screw rod matched with the upper thread sleeve.
Description
Technical field
The present invention relates to a kind of equipment complex, particularly relate to a kind of flame assembly machine.
Background technology
Composite is widely used in the industry such as metal plate, industrial fabrics, household articles, medical protection in automobile.At present
Flame be compounded in all kinds of combination process be compare environmental protection, energy-conservation, laminating effect a kind of, existing flame assembly machine is many
For simple type, compound for two layer materials, such as sponge and cloth or sponge are compound with grid cloth, and special for some
The compound of fabric it is frequently necessary to three kinds of disposable Compound Machining molding, and conventional composite method is to be combined first time, carry out again
Secondary, needs to carry out twice and is combined, and not only labor intensity is big, efficiency is low, and substandard products are high, loss big;The most existing flame
Gap between compounding machine composite roll can not adjust, it is impossible to adapting to the composite that thickness differs, limitation is bigger, additionally existing
Some flame assembly machines can produce multiple harmful exhaust, if can not arrange in time during compound to composite burning
Go out, have a strong impact on working environment, even the health of staff is caused damage.
Summary of the invention
The technical problem to be solved is: provide the flame assembly machine that a kind of production efficiency is high.
In order to solve above-mentioned technical problem, the technical solution used in the present invention is: flame assembly machine, including: frame, in institute
The upper end stating frame is provided with sponge unwinding device and some sponge guide rollers, is provided with middle part at the middle part of described frame compound
Roller, described middle part composite roll is arranged in the bearing block of middle part by middle part axis of rotation, and described middle part bearing block is fixedly installed on
In frame, being provided with the upper composite roll cooperated with it in the upper end of described middle part composite roll, described upper composite roll is by upper
Axis of rotation is arranged on top chock, and described top chock is fixedly installed on upper support frame, in the upper end two of described frame
Side is provided with slide rail, and the both sides of described upper support frame are slidably arranged in upper slide rail by top shoe respectively, props up on described
The upper end of support is provided with swivel nut, and the upper end of described frame is provided with reducing motor, the electricity of reducing motor on described
It is provided with the upper screw rod cooperated with upper swivel nut on arbor, is provided with in the lower end of described middle part composite roll and cooperates with it
Lower composite roll, described lower composite roll by lower rotary shaft rotate be arranged on step, described step is fixedly installed on
On lower bracing frame, being provided with glidepath in the both sides, lower end of described frame, the both sides of described lower bracing frame pass through sliding block respectively
It is slidably arranged in glidepath, the lower end of described upper support frame is provided with lower swivel nut, under the lower end of described frame is provided with
Reducing motor, is provided with the lower screw rod cooperated with lower swivel nut, at described middle part on the motor shaft of described lower reducing motor
The first flame burner and the first composite material unwinding device it is provided with, at described first composite surface in frame on the right side of composite roll
It is evenly arranged with some first composite material guide rollers, on the left of described lower composite roll between material unwinding device and middle part composite roll
Frame on be provided with the second flame burner and the second composite material unwinding device, described second fabric unwinding device and under
It is evenly arranged with some second fabric guide rollers between composite roll, is evenly arranged with some dischargings in the lower end of described frame and guides
Roller, is respectively arranged with the first smoke removing device cooperated with the first flame burner in described frame and fires with the second flame
Burn dress the second smoke removing device of cooperating of device, the upper end of described first smoke removing device and the second smoke removing device respectively with main smoking
Pipeline is connected, and described main smoking pipeline is connected with the air inlet of smoking blower fan, the gas outlet of described smoking blower fan and chimney
It is connected, described chimney is provided with smoke eliminator, described first smoke removing device and the structure phase of the second smoke removing device
With, the structure of described first smoke removing device includes: is arranged on the overhead gage in the first flame burner upper end frame and sets respectively
Put the side shield in flame burner machine frame at two sides, be provided with in described overhead gage and cooperate with the first flame burner
Upper trapezoid smoking chamber, described upper trapezoid smoking chamber is interconnected with main smoking pipeline by upper smoking pipeline, in described side block
Being respectively arranged with smoking chamber trapezoidal with the side that the first flame burner cooperates in plate, trapezoidal smoking chamber, described side is passed through respectively
Smoking pipeline in side is connected with upper smoking pipeline.
The invention have the advantage that above-mentioned flame assembly machine, use double burner to be combined, it is possible to trilaminate material to be carried out multiple simultaneously
Close, evaded and be combined first time, the most secondary conventional composite method, labor intensity can be substantially reduced, improve and produce effect
Rate, can regulate the gap between each composite roll simultaneously at any time, it is possible to adapt to the composite that thickness differs, applied widely,
Easy to use, it additionally is able to the harmful smoke to producing in compounding machine flame recombination process and absorbs, purify and discharge, safety
Environmental protection, provides healthy working environment for staff.
Accompanying drawing explanation
Fig. 1 is the structural representation of flame assembly machine of the present invention.
Fig. 2 is upper composite roll, middle part composite roll and the side-looking mounting structure schematic diagram of lower composite roll in Fig. 1.
Fig. 3 is the side-looking structure for amplifying schematic diagram of the first smoke removing device in Fig. 1.
In figure: 1, frame, 2, sponge unwinding device, 21, sponge guide roller, 3, middle part composite roll, 4, middle part rotating shaft, 5, in
Portion's bearing block, 6, upper composite roll, 7, upper rotating shaft, 8, top chock, 9, upper support frame, 10, upper slide rail, 11, top shoe, 12, on
Swivel nut, 13, upper reducing motor, 14, motor shaft, 15, upper screw rod, 16, lower composite roll, 17, lower rotary shaft, 18, step, 19,
Lower bracing frame, 20, glidepath, 21, sliding block, 22, lower swivel nut, 23, lower reducing motor, 24, motor shaft, 25, lower screw rod, 26,
First flame burner, the 27, first composite material unwinding device, the 28, first composite material guide roller, the 29, second flame combustion
Device, the 30, second composite material unwinding device, the 31, second fabric guide roller, 32, discharging guide roller, the 33, first smoke removing device,
331, overhead gage, 332, side shield, 333, upper trapezoid smoking chamber, 334, upper smoking pipeline, 335, trapezoidal smoking chamber, side, 336, side
Smoking pipeline, the 34, second smoke removing device, 35, main smoking pipeline, 36, smoking blower fan, 37, chimney, 38, smoke eliminator.
Detailed description of the invention
The particular content of the present invention is described in detail below in conjunction with the accompanying drawings with specific embodiment.
As shown in Figure 1, Figure 2, Figure 3 shows, flame assembly machine, including: frame 1, the upper end of described frame 1 is provided with sponge and puts
Winding apparatus 2 and some sponge guide rollers 21, be provided with middle part composite roll 3, described middle part composite roll 3 at the middle part of described frame 1
Being rotated by middle part rotating shaft 4 and be arranged in the bearing block 5 of middle part, described middle part bearing block 5 is fixedly installed in frame 1, described
The upper end of middle part composite roll 3 is provided with the upper composite roll 6 cooperated with it, and described upper composite roll 6 is rotated by upper rotating shaft 7 and sets
Putting on top chock 8, described top chock 8 is fixedly installed on upper support frame 9, arranges in the both sides, upper end of described frame 1
Having upper slide rail 10, the both sides of described upper support frame 9 are slidably arranged in slide rail 10 by top shoe 11 respectively, prop up on described
The upper end of support 9 is provided with swivel nut 12, and the upper end of described frame 1 is provided with reducing motor 13, and slow down on described electricity
It is provided with the upper screw rod 15 cooperated with upper swivel nut 12 on the motor shaft 14 of machine 13, sets in the lower end of described middle part composite roll 3
Being equipped with the lower composite roll 16 cooperated with it, described lower composite roll 16 is rotated by lower rotary shaft 17 and is arranged on step 18
On, described step 18 is fixedly installed on lower bracing frame 19, and the both sides, lower end of described frame 1 are provided with glidepath 20,
The both sides of described lower bracing frame 19 are slidably arranged in glidepath 20 by sliding block 21 respectively, described upper support frame 19 times
End is provided with lower swivel nut 22, the lower end of described frame 1 is provided with lower reducing motor 23, at the motor of described lower reducing motor 23
It is provided with the lower screw rod 25 cooperated with lower swivel nut 22 on axle 24, the frame 1 on the right side of described middle part composite roll 3 is provided with
First flame burner 26 and the first composite material unwinding device 27, multiple at described first composite material unwinding device 27 and middle part
Close and be evenly arranged with some first composite material guide rollers 28 between roller 3, the frame 1 on the left of described lower composite roll 16 is arranged
There is the second flame burner 29 and the second composite material unwinding device 30, at described second fabric unwinding device 27 and lower composite roll
It is evenly arranged with some second fabric guide rollers 31 between 16, is evenly arranged with some dischargings in the lower end of described frame 1 and guides
Roller 32, is respectively arranged with the first smoke removing device 33 cooperated with the first flame burner 26 and with in described frame 1
The second smoke removing device 34 that two flame combustion dress devices 29 cooperate, described first smoke removing device 33 and the second smoke removing device 34
Upper end is connected with main smoking pipeline 35 respectively, and described main smoking pipeline 35 is connected with the air inlet of smoking blower fan 36, described
The gas outlet of smoking blower fan 36 is connected with chimney 37, is provided with smoke eliminator 38 on described chimney 37, and described first
Smoke removing device 33 is identical with the structure of the second smoke removing device 34, and the structure of described first smoke removing device 33 includes: be arranged on first
Overhead gage 331 in flame burner 26 upper end frame 1 and the side shield being separately positioned in flame burner 26 machine frame at two sides 1
332, in described overhead gage 331, be provided with the upper trapezoid smoking chamber 333 cooperated with the first flame burner 26, described on
Trapezoidal smoking chamber 333 is interconnected with main smoking pipeline 35 by upper smoking pipeline 334, sets respectively in described side shield 332
Being equipped with the trapezoidal smoking chamber, side 335 cooperated with the first flame burner 26, side is passed through in trapezoidal smoking chamber, described side 335 respectively
Smoking pipeline 336 is connected with upper smoking pipeline 334.
When above-mentioned flame assembly machine uses, material sponge is guided by some sponges after sponge unwinding device 2 unreels
Roller 21 enters between composite roll 6 and middle part composite roll 3, ground floor composite material on the right side of frame 1 through the first composite material
Unwinding device 27 enters between composite roll 6 and middle part composite roll 3 by the first composite material guide roller 28 after unreeling, and first
Layer composite material is by being combined with material sponge after on the right side of frame 1, the first flame burner 26 burns, and the bilayer being combined is multiple
Condensation material enter into middle part composite roll 3 and lower composite roll 16 between, second layer composite material on the left of frame 1 through the second composite surface
Material unwinding device 30 enters between middle part composite roll 3 and lower composite roll 16 by the second fabric guide roller 31 after unreeling, and second
Layer composite material passes through to be combined with material sponge and ground floor composite material after on the left of frame 1, the second flame burner 29 burns,
The 3-layer composite material finished product being combined is derived outside frame 1 by some discharging guide rollers 32 of frame 1 lower end, it is achieved three kinds
The three-in-one composite molding of material.When the first smoke removing device 33 carries out smoke abatement to the first flame burner 26, start smoking blower fan
36, the first flame burner 26 can produce harmful exhaust after burning composite, and harmful exhaust is from top enters into
In upper trapezoid smoking chamber 333 in baffle plate 331, laterally approach in trapezoidal smoking chamber, the side in side shield 332 335 simultaneously,
The harmful exhaust entered in upper trapezoid smoking chamber 333 is entered in main smoking pipeline 35 by upper smoking pipeline 334, enters into
Harmful exhaust in trapezoidal smoking chamber, side 335 enters back into post after entering into upper smoking pipeline 334 by survey smoking pipeline 336 and inhales
In smoke pipeline 335, smoking blower fan 36 is arranged after evolving in harmful exhaust is drawn into smoke eliminator 38 in chimney 37
Go out.Second smoke removing device 33 is consistent with the second smoke removing device 34 structure, and the second flame burner 29 is entered by the second smoke removing device 34
Row smoke abatement gas.
When the composite roll gap of above-mentioned flame assembly machine is adjusted, when regulation is upper between composite roll 6 and middle part composite roll 3
Gap time, reducing motor 13 in startup, the motor shaft 14 of upper reducing motor 13 drives upper screw rod 15 to rotate, upper swivel nut 12 with
Producing upper and lower displacement on its upper screw rod 15 cooperated, upper swivel nut 12 drives upper support frame 9 to move up and down, and upper support frame 9 leads to
Crossing top shoe 11 to slide in upper slide rail 10, upper support frame 9 drives top chock 8 to move up and down, and top chock 8 drives upper rotating shaft
7 move up and down, thus drive upper composite roll 6 to move up and down the gap reaching to regulate between composite roll 6 and middle part composite roll 3 and come
Adapt to the composite that thickness differs;When regulating lower gap between composite roll 16 and middle part composite roll 3, slow down under startup electricity
Machine 23, the motor shaft 24 of lower reducing motor 23 drives lower screw rod 25 to rotate, and lower swivel nut 22 is at the lower screw rod 25 cooperated with it
Upper generation upper and lower displacement, lower swivel nut 22 drives lower bracing frame 19 to move up and down, and lower bracing frame 19 passes through sliding block 21 at glidepath
Sliding in 20, lower bracing frame 19 drives step 18 to move up and down, and step 8 drives lower rotary shaft 17 to move up and down, thus
Lower compound 16 are driven to move up and down the gap reaching to regulate between lower composite roll 16 and middle part composite roll 3 to adapt to what thickness differed
Composite;
Above-mentioned flame assembly machine, uses double burner to be combined, it is possible to be combined trilaminate material simultaneously, evaded and be combined first
Conventional composite method secondary, the most secondary, can be substantially reduced labor intensity, improves production efficiency, can regulate at any time simultaneously
Gap between each composite roll, it is possible to adapting to the composite that thickness differs, applied widely, easy to use, it is right additionally to be able to
The harmful smoke produced in compounding machine flame recombination process carries out absorbing, purify and discharging, safety and environmental protection, provides for staff
Healthy working environment.
Claims (1)
1. flame assembly machine, it is characterised in that: including: frame (1), the upper end of described frame (1) is provided with sponge and unreels dress
Putting (2) and some sponge guide rollers (21), be provided with middle part composite roll (3) at the middle part of described frame (1), described middle part is combined
Roller (3) is rotated by middle part rotating shaft (4) and is arranged in middle part bearing block (5), and described middle part bearing block (5) is fixedly installed on frame
(1), on, the upper composite roll (6) cooperated with it, described upper composite roll it are provided with in the upper end at described middle part composite roll (3)
(6) being arranged on top chock (8) by upper rotating shaft (7) rotation, described top chock (8) is fixedly installed on upper support frame (9)
On, upper slide rail (10) it is provided with in the both sides, upper end of described frame (1), the both sides of described upper support frame (9) are respectively by upper cunning
Block (11) is slidably arranged in slide rail (10), the upper end of described upper support frame (9) is provided with upper swivel nut (12), at described machine
The upper end of frame (1) is provided with reducing motor (13), is provided with upper on described on the motor shaft (14) of reducing motor (13)
The upper screw rod (15) that swivel nut (12) cooperates, under the lower end at described middle part composite roll (3) is provided with and cooperates with it
Composite roll (16), described lower composite roll (16) is rotated by lower rotary shaft (17) and is arranged on step (18), described lower bearing
Seat (18) is fixedly installed on lower bracing frame (19), is provided with glidepath (20) in the both sides, lower end of described frame (1), described under
The both sides of bracing frame (19) are slidably arranged in glidepath (20) by sliding block (21) respectively, at described upper support frame (19)
Lower end is provided with lower swivel nut (22), and the lower end of described frame (1) is provided with lower reducing motor (23), at described lower reducing motor
(23) the lower screw rod (25) cooperated with lower swivel nut (22) it is provided with on motor shaft (24), at described middle part composite roll (3)
It is provided with the first flame burner (26) and the first composite material unwinding device (27), described first in the frame (1) on right side
Some first composite material guide rollers (28) it are evenly arranged with between composite material unwinding device (27) and middle part composite roll (3),
The frame (1) in described lower composite roll (16) left side is provided with the second flame burner (29) and the second composite material unreels dress
Put (30), between described second fabric unwinding device (27) and lower composite roll (16), be evenly arranged with some second fabrics guide
Roller (31), is evenly arranged with some discharging guide rollers (32), sets respectively in described frame (1) in the lower end of described frame (1)
It is equipped with the first smoke removing device (33) cooperated with the first flame burner (26) and fills device (29) phase with the second flame combustion
The second smoke removing device (34) coordinated mutually, the upper end of described first smoke removing device (33) and the second smoke removing device (34) respectively with master
Smoking pipeline (35) is connected, and described main smoking pipeline (35) is connected with the air inlet of smoking blower fan (36), described smoking wind
The gas outlet of machine (36) is connected with chimney (37), is provided with smoke eliminator (38) on described chimney (37), and described
One smoke removing device (33) is identical with the structure of the second smoke removing device (34), and the structure of described first smoke removing device (33) including: sets
Put the overhead gage (331) on the first flame burner (26) upper end frame (1) and be separately positioned on flame burner (26) two
Side shield (332) on side frame (1), is provided with and the first flame burner (26) phase interworking in described overhead gage (331)
The upper trapezoid smoking chamber (333) closed, described upper trapezoid smoking chamber (333) is by upper smoking pipeline (334) and main smoking pipeline
(35) it is interconnected, in described side shield (332), is respectively arranged with the side ladder cooperated with the first flame burner (26)
Shape smoking chamber (335), trapezoidal smoking chamber, described side (335) is respectively by side smoking pipeline (336) and upper smoking pipeline (334) phase
Connection.
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610456306.7A CN106042608A (en) | 2016-06-22 | 2016-06-22 | Flame laminating machine |
PCT/CN2016/106971 WO2017219599A1 (en) | 2016-06-22 | 2016-11-23 | Flame laminating machine |
JP2019000512U JP3221878U (en) | 2016-06-22 | 2019-02-15 | Frame laminating machine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610456306.7A CN106042608A (en) | 2016-06-22 | 2016-06-22 | Flame laminating machine |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106042608A true CN106042608A (en) | 2016-10-26 |
Family
ID=57168770
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610456306.7A Pending CN106042608A (en) | 2016-06-22 | 2016-06-22 | Flame laminating machine |
Country Status (3)
Country | Link |
---|---|
JP (1) | JP3221878U (en) |
CN (1) | CN106042608A (en) |
WO (1) | WO2017219599A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2017219599A1 (en) * | 2016-06-22 | 2017-12-28 | 江苏金峰轻工装备有限公司 | Flame laminating machine |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108162554A (en) * | 2018-01-04 | 2018-06-15 | 安徽艾迪文新材料有限公司 | A kind of flame assembly machine |
CN109291444B (en) * | 2018-10-24 | 2024-05-03 | 瑞安市永华包装材料股份有限公司 | Processing technology of pearl cotton, pearl cotton and compound machine for processing pearl cotton |
CN110421953A (en) * | 2019-08-30 | 2019-11-08 | 江苏闳业机械股份有限公司 | A kind of economical three-in-one flame assembly machine |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104401094A (en) * | 2014-11-27 | 2015-03-11 | 江苏闳业机械有限公司 | Flame bonding machine double-burner mechanism |
CN105172316A (en) * | 2015-10-22 | 2015-12-23 | 盐城旭华机械有限公司 | Three-layer synchronous flame compounding machine |
CN206217330U (en) * | 2016-06-22 | 2017-06-06 | 江苏金峰轻工装备有限公司 | Flame assembly machine |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103419461A (en) * | 2012-05-23 | 2013-12-04 | 江苏坤泰机械有限公司 | Double-burner flame laminating machine |
CN106042608A (en) * | 2016-06-22 | 2016-10-26 | 江苏金峰轻工装备有限公司 | Flame laminating machine |
CN105966035A (en) * | 2016-06-22 | 2016-09-28 | 江苏金峰轻工装备有限公司 | Double-burner flame bonding machine |
-
2016
- 2016-06-22 CN CN201610456306.7A patent/CN106042608A/en active Pending
- 2016-11-23 WO PCT/CN2016/106971 patent/WO2017219599A1/en active Application Filing
-
2019
- 2019-02-15 JP JP2019000512U patent/JP3221878U/en not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104401094A (en) * | 2014-11-27 | 2015-03-11 | 江苏闳业机械有限公司 | Flame bonding machine double-burner mechanism |
CN105172316A (en) * | 2015-10-22 | 2015-12-23 | 盐城旭华机械有限公司 | Three-layer synchronous flame compounding machine |
CN206217330U (en) * | 2016-06-22 | 2017-06-06 | 江苏金峰轻工装备有限公司 | Flame assembly machine |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2017219599A1 (en) * | 2016-06-22 | 2017-12-28 | 江苏金峰轻工装备有限公司 | Flame laminating machine |
Also Published As
Publication number | Publication date |
---|---|
JP3221878U (en) | 2019-06-27 |
WO2017219599A1 (en) | 2017-12-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106042608A (en) | Flame laminating machine | |
CN100450641C (en) | Automatic lacquer spraying system for surface of rotating body | |
CN110158302A (en) | A kind of composite material production cutting equipment | |
CN111648118A (en) | Textile industry cloth processing side cut device of tailorring | |
CN105632657B (en) | The system for producing copper strips using waste and old only core cable | |
CN108941382A (en) | A kind of reinforcing bar capture device of the construction site with measured length cutting | |
WO2018209459A1 (en) | Seamless small tubular fabric setting machine and setting method thereof | |
CN205927291U (en) | Cutter is used in elevator guide rail processing | |
CN107965064A (en) | It is a kind of based on the flameproof protection system of gypsum base steel construction and its guard method | |
CN206217330U (en) | Flame assembly machine | |
CN206902418U (en) | A kind of seamless small tubular fabric forming machine | |
CN110102803A (en) | A kind of rotatable Table top type CNC milling machine | |
CN103882647A (en) | Flatting machine and method of hand-made wool carpets | |
CN203141274U (en) | Plate feeding device for wood sander | |
CN105966035A (en) | Double-burner flame bonding machine | |
CN213507756U (en) | Textile cutting device with collection structure and capable of reducing wrinkles | |
CN206217123U (en) | A kind of cleaning plant for casting machine condensation rollers | |
CN214736674U (en) | Novel high-speed drying and slitting combination machine | |
CN205660810U (en) | Cutting machine of curtain is receive and release in area | |
CN212582179U (en) | Energy-saving intelligent production equipment for sizing knitted fabric and plain woven fabric | |
CN206217314U (en) | Double-burner flame laminating machine | |
CN113067438B (en) | Permanent magnet direct-drive wind driven generator rotor layering removing device | |
CN205733536U (en) | A kind of single case girth welding machine | |
CN105731150A (en) | Cloth storage rack | |
CN204293542U (en) | A kind of cementing machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20161026 |
|
WD01 | Invention patent application deemed withdrawn after publication |