CN106033872B CN201510108276.6A CN201510108276A CN106033872B CN 106033872 B CN106033872 B CN 106033872B CN 201510108276 A CN201510108276 A CN 201510108276A CN 106033872 B CN106033872 B CN 106033872B
Authority
CN
China
Prior art keywords
plate
connection
simply connected
card
bottle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510108276.6A
Other languages
Chinese (zh)
Other versions
CN106033872A (en
Inventor
朱建军
张运库
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Xiangyang Power Supply Co of State Grid Hubei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Xiangyang Power Supply Co of State Grid Hubei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Xiangyang Power Supply Co of State Grid Hubei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510108276.6A priority Critical patent/CN106033872B/en
Publication of CN106033872A publication Critical patent/CN106033872A/en
Application granted granted Critical
Publication of CN106033872B publication Critical patent/CN106033872B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Installation Of Bus-Bars (AREA)

Abstract

一种等电位更换单联双软母线耐张绝缘子的工具,涉及电力检修技术领域,前卡与后卡经绝缘拉板连接,拖瓶架分别与前卡、后卡连接,前卡上设有固定联板卡口,还设有放置直角挂板螺栓U型槽,后卡上设有竖直U型卡槽、水平U型卡槽,保险板组件、蝶形螺母对挂环串固定;丝杆组件、左、右旋丝杆与绝缘拉板连接,绝缘拉板锁紧销对绝缘拉板固定;托瓶架锁紧销对托瓶架紧固,前卡上设球头销钉,弹子、弹簧、螺塞对球头销钉定位,挂环串由两个挂环串装连接。本发明采用联板及直角挂板与双软母线连接,另一侧用串装结构挂环与门架相连,其外形、功能及场所均区别于现有工具,可在等电位条件下对单联双软母线绝缘子更换工作,结构简单,可操作性强。

A tool for equipotentially replacing tension insulators of single-connected double flexible busbars, which relates to the technical field of electric power maintenance. There is also a U-shaped slot for the right-angled hanging plate bolts on the fixed joint plate bayonet. The rear card is provided with a vertical U-shaped slot and a horizontal U-shaped slot. The safety plate assembly and wing nut are fixed to the hanging ring string; The rod assembly, the left and right screw rods are connected with the insulating pull plate, and the locking pin of the insulating pull plate is fixed to the insulating pull plate; the locking pin of the bottle holder is fastened to the bottle holder. The spring and the screw plug are positioned on the ball stud, and the hanging ring string is connected in series by two hanging rings. The invention adopts connecting boards and right-angle hanging boards to connect with double flexible busbars, and the other side is connected with the door frame with series-mounted hanging rings. The insulator replacement work of the double flexible busbar has a simple structure and strong operability.

Description

等电位更换单联双软母线耐张绝缘子的工具Tool for equipotential replacement of tension insulators for single-connected double soft busbars

技术领域technical field

本发明涉及电力检修技术领域,尤其是一种等电位更换单联双软母线耐张绝缘子的工具。The invention relates to the technical field of electric power maintenance, in particular to a tool for equipotentially replacing tension insulators of single-connected double flexible busbars.

背景技术Background technique

现有技术中,更换单联耐张绝缘子的工具有两种,分别是应用于变电站过桥线上的耐张绝缘子更换工具,及应用在110kV输电线路上的单联耐张绝缘子带电更换工具。其中,前者不能满足等电位作业条件,绝缘子的更换必须在设备停电状态下完成;而后者只能在110kV输电线路的单联耐张绝缘子上开展带电检修,无法在变电站双软母线上更换绝缘子。并且,这二者均无法满足变电站单联双软母线现场设备情况,其前、后卡不能实现对单联双软母线耐张绝缘子串两端的固定,从而无法使绝缘子串处于松弛状态,也就不能开展绝缘子的更换工作。In the prior art, there are two kinds of tools for replacing single-connected tension insulators, namely, the tool for replacing tensile insulators used on substation bridge lines, and the tool for replacing single-connected tensile insulators on live lines used on 110kV transmission lines. Among them, the former cannot meet the conditions of equipotential operation, and the replacement of insulators must be completed when the equipment is powered off; while the latter can only carry out live maintenance on single-connected tensile insulators of 110kV transmission lines, and cannot replace insulators on double soft busbars in substations. Moreover, neither of them can meet the field equipment conditions of single-connected double-flexible busbars in substations. The front and rear clamps cannot fix the two ends of the single-connected double-flexible busbar tension insulator strings, so that the insulator strings cannot be in a relaxed state. Insulator replacement work cannot be carried out.

在变电站中有大量110kV、220kV母线采用单联双软母线接线形式(单联耐张绝缘子串紧固双软母线形式),绝缘子在长期运行中不可避免地出现劣化(低零值)或发生闪络,从而影响母线的安全运行,因此必须及时对劣化或闪络的绝缘子进行更换。由于现有技术的不足,电力行业内普遍采取停电检修绝缘子的方式,还没有实施等电位更换单联双软母线绝缘子的先例,究其原因是缺乏相应的绝缘子卡具。In substations, a large number of 110kV and 220kV buses adopt single-connected double-flexible busbar wiring (single-connected tension insulators are fastened in series with double flexible busbars), and insulators will inevitably deteriorate (low zero value) or flashover during long-term operation. Therefore, the deteriorated or flashover insulators must be replaced in time. Due to the lack of existing technology, the method of power outage inspection and maintenance of insulators is generally adopted in the power industry, and there is no precedent for implementing equipotential replacement of single-connected double flexible busbar insulators. The reason is the lack of corresponding insulator fixtures.

发明内容Contents of the invention

为克服现有技术的不足,本发明提供一种等电位更换单联双软母线耐张绝缘子的工具,以实现220 kV及以下电压等级的单联双软母线耐张绝缘子的带电检修的需要。In order to overcome the deficiencies of the prior art, the present invention provides a tool for equipotential replacement of single-connected double-flexible busbar tension insulators to meet the needs of live maintenance of single-connected double-flexible busbar tension insulators with a voltage level of 220 kV and below.

为实现上述发明目的,本发明的单联耐张绝缘子串一端经联板、直角挂板与双软母线连接;另一端经挂环串与变电站门架连接,其特征在于:前卡与后卡通过两根绝缘拉板连接,承载单联耐张绝缘子串的拖瓶架一端经托瓶环组件与前卡联接,另一端经托瓶架固定组件与后卡连接;所述前卡上设有固定联板的卡口,前卡上还设有放置直角挂板及螺栓的U型槽。In order to achieve the purpose of the above invention, one end of the single-connection tension insulator string of the present invention is connected to the double flexible busbar through the connecting plate and the right-angle hanging plate; Connected by two insulated pull plates, one end of the dragging bottle rack carrying a single tension insulator string is connected to the front card through the bottle holder ring assembly, and the other end is connected to the rear card through the bottle holder fixing assembly; the front card is equipped with The bayonet for fixing the connecting plate, and the front card also has a U-shaped groove for placing the right-angle hanging plate and bolts.

所述后卡上设有固定挂环串的竖直U型卡槽、水平U型卡槽,保险板组件、蝶形螺母对挂环串固定;丝杆组件、左、右旋丝杆经绝缘拉板固定口与绝缘拉板连接,绝缘拉板锁紧销对绝缘拉板固定;托瓶架固定组件的托瓶架锁紧销对托瓶架紧固。The rear card is provided with a vertical U-shaped card slot and a horizontal U-shaped card slot for fixing the hanging ring string, and the safety plate assembly and the butterfly nut are fixed to the hanging ring string; the screw assembly, left and right screw rods are insulated The fixing port of the pull plate is connected with the insulating pull plate, and the locking pin of the insulating pull plate is fixed to the insulating pull plate; the locking pin of the bottle holder of the bottle holder fixing component is fastened to the bottle holder.

所述绝缘拉板一端设有后卡连接孔一,另一端设有多个前卡连接孔。One end of the insulating pull plate is provided with a rear card connection hole 1, and the other end is provided with a plurality of front card connection holes.

所述托瓶架由两根圆柱形绝缘棒经间隔调节板连接,圆柱形绝缘棒一端设有后卡连接孔二。The bottle holder is connected by two cylindrical insulating rods via a spacing adjustment plate, and one end of the cylindrical insulating rods is provided with a rear card connection hole two.

所述前卡上设有连接绝缘拉板的通孔及对其锁紧的球头销钉,弹子、弹簧、螺塞对球头销钉卡位。The front card is provided with a through hole connecting the insulating pull plate and a ball pin for locking it, and a marble, a spring, and a screw plug are in place for the ball pin.

所述挂环串由两个挂环串装连接。The hanging ring string is connected in series by two hanging rings.

所述双软母线经联板、直角挂板及液压型耐张线夹与单联耐张绝缘子串连接。The double soft busbars are connected in series with single tension insulators via connecting plates, right-angled hanging plates and hydraulic tension clamps.

所述双软母线之间设有软母线间隔线夹。Between the double soft busbars, there is a soft busbar spacer clamp.

与现有技术相比,本发明从外形、功能及使用场所方面均区别于现有同类型的工具,实现了在等电位条件下对单联双软母线绝缘子的更换工作,本发明主要实现了以下三个方面的效果:Compared with the prior art, the present invention is different from the existing tools of the same type in terms of appearance, function and place of use, and realizes the replacement of single-connected double flexible busbar insulators under equipotential conditions. The present invention mainly realizes The effect of the following three aspects:

效果一:实现在等电位条件下对单联双软母线绝缘子的更换作业,解决更换绝缘子时必须致母线停电的难题,减少母线倒闸操作程序,减轻作业人员的劳动强度,工作效率得到提高,保证供电可靠性及检修效益。Effect 1: Realize the replacement of single-connected double soft busbar insulators under equipotential conditions, solve the problem of busbar power failure when replacing insulators, reduce busbar switching operation procedures, reduce labor intensity of operators, and improve work efficiency. Ensure power supply reliability and maintenance benefits.

效果二:前卡实现了对单联双软母线耐张绝缘子串母线端联板的固定,其中前卡的卡口、U型槽、托瓶环及通孔等关键部位的设计合理,与现场设备相吻合且固定牢靠。Effect 2: The front card has realized the fixation of the single-connected double soft busbar tension insulator string busbar terminal board, and the design of key parts such as the bayonet, U-shaped groove, bottle support ring and through hole of the front card is reasonable, and it is consistent with the site The equipment fits well and is secured securely.

效果三:后卡实现了对单联双软母线耐张绝缘子串门架端挂环串的固定,其中后卡的竖直U型卡槽、水平U型卡槽,保险板组件、蝶形螺母等关键部位与挂环串匹配合理,实现对挂环串的牢靠固定。Effect 3: The rear card realizes the fixing of the single-connected double flexible busbar tension insulator string, the door frame end hanging ring string, and the vertical U-shaped card slot, horizontal U-shaped card slot, insurance board assembly, wing nut, etc. of the rear card The key parts are reasonably matched with the hanging ring string, so as to realize the firm fixing of the hanging ring string.

本发明结构简单,使用方便,可操作性强。The invention has the advantages of simple structure, convenient use and strong operability.

附图说明Description of drawings

图1是本发明的结构示意图。Fig. 1 is a structural schematic diagram of the present invention.

图2是本发明的使用状态示意图。Fig. 2 is a schematic diagram of the use state of the present invention.

图3是本发明的前卡结构示意图。Fig. 3 is a schematic diagram of the structure of the front card of the present invention.

图4是图3的侧视图。FIG. 4 is a side view of FIG. 3 .

图5是图3的俯视图。FIG. 5 is a top view of FIG. 3 .

图6是本发明的后卡结构示意图。Fig. 6 is a schematic diagram of the rear card structure of the present invention.

图7是图6的仰视图。FIG. 7 is a bottom view of FIG. 6 .

图8是本发明的绝缘拉板结构示意图。Fig. 8 is a schematic diagram of the structure of the insulating pull plate of the present invention.

图9是本发明的托瓶架结构示意图。Fig. 9 is a structural schematic diagram of the bottle holder of the present invention.

图中,1、前卡,2、后卡,3、绝缘拉板,4、托瓶架,5、变电站门架,6、挂环,7、挂环串,8、单联耐张绝缘子串,9、联板,10、直角挂板,11、双软母线,12、液压型耐张线夹,13、软母线间隔线夹,14、卡口,15、U型槽,16、托瓶环组件,17、弹子,18、弹簧,19、螺塞,20、球头销钉,21、通孔,22、竖直U型卡槽,23、水平U型卡槽,24、保险板组件,25、蝶形螺母,26、丝杆组件,27、左、右旋丝杆,28、绝缘拉板固定口,29、绝缘拉板锁紧销,30、托瓶架固定组件,31、托瓶架锁紧销,32、后卡连接孔一、33、前卡连接孔,34、后卡连接孔二,35、圆柱形绝缘棒,36、间隔调节板。In the figure, 1. Front card, 2. Rear card, 3. Insulation pull plate, 4. Bottle holder, 5. Substation door frame, 6. Hanging ring, 7. Hanging ring string, 8. Single-connected strain insulator string , 9. Connecting board, 10. Right-angle hanging board, 11. Double soft busbar, 12. Hydraulic tension clamp, 13. Soft busbar spacer clamp, 14. Bayonet, 15. U-shaped groove, 16. Bottle support Ring assembly, 17, marble, 18, spring, 19, screw plug, 20, ball pin, 21, through hole, 22, vertical U-shaped slot, 23, horizontal U-shaped slot, 24, safety plate assembly, 25. Wing nut, 26. Screw assembly, 27. Left and right rotation screw, 28. Insulation pull plate fixing port, 29. Insulation pull plate locking pin, 30. Bottle holder fixing component, 31, Bottle support Frame locking pin, 32, rear card connection hole one, 33, front card connection hole, 34, rear card connection hole two, 35, cylindrical insulating rod, 36, interval adjustment plate.

具体实施方式Detailed ways

如图1、图2、图3、图4、图5所示, 单联耐张绝缘子串8一端经LV-0712型联板9、Z-10型直角挂板10与双软母线11连接;另一端经U-10型挂环串7与变电站门架5连接,前卡1与后卡2通过两根绝缘拉板3连接,承载单联耐张绝缘子串8的拖瓶架4一端经托瓶环组件16与前卡1联接,另一端经托瓶架固定组件30与后卡2连接;托瓶环组件16、托瓶架固定组件30分别装在前卡1、后卡2上;所述前卡1上设有固定联板9的卡口14,前卡1上还设有放置直角挂板10及螺栓的U型槽15,为Z-10型直角挂板10上的螺栓预留空间,以保证前卡1上的卡口14能对LV-0712型联板9进行固定。As shown in Fig. 1, Fig. 2, Fig. 3, Fig. 4 and Fig. 5, one end of the single tension insulator string 8 is connected to the double soft busbar 11 through the LV-0712 type connecting plate 9 and the Z-10 type right angle hanging plate 10; The other end is connected to the substation door frame 5 through the U-10 type hanging ring string 7, the front card 1 and the rear card 2 are connected through two insulating pull plates 3, and one end of the drag bottle rack 4 carrying the single-connected strain insulator string 8 is supported The bottle ring assembly 16 is connected with the front card 1, and the other end is connected with the rear card 2 through the bottle holder fixing assembly 30; the bottle holder ring assembly 16 and the bottle holder fixing assembly 30 are installed on the front card 1 and the rear card 2 respectively; The front card 1 is provided with a bayonet 14 for fixing the connecting plate 9, and the front card 1 is also provided with a U-shaped groove 15 for placing the right-angle hanging plate 10 and bolts, which is reserved for the bolts on the Z-10 type right-angle hanging plate 10. space, to ensure that the bayonet 14 on the front card 1 can fix the LV-0712 type connecting plate 9.

所述挂环串7由两个Z-10型挂环6串装连接。The hanging ring string 7 is connected in series by two Z-10 type hanging rings 6 .

所述双软母线11经LV-0712型联板9、Z-10型直角挂板10及液压型耐张线夹12与单联耐张绝缘子串8连接。The double flexible busbar 11 is connected to the single tension insulator string 8 through the LV-0712 connecting plate 9, the Z-10 right angle hanging plate 10 and the hydraulic tension clamp 12.

所述双软母线11之间设有软母线间隔线夹13。Between the double soft busbars 11, there is a soft busbar spacer clip 13.

所述前卡1上设有对绝缘拉板3锁紧的球头销钉20,弹子17、弹簧18、螺塞19对球头销钉20定位,防止绝缘拉板3从通孔21中脱落。The front card 1 is provided with a ball stud 20 for locking the insulating pull plate 3 , and the marble 17 , spring 18 , and screw plug 19 are positioned on the ball stud 20 to prevent the insulating pull plate 3 from falling off from the through hole 21 .

如图6、图7所示,所述后卡2上设有固定挂环串7的竖直U型卡槽22、水平U型卡槽23,其中,竖直U型卡槽22放置串装连接的第一个(门架侧)U-10型挂环6,水平U型卡槽23放置串装连接的第二个U-10型挂环6;保险板组件24、蝶形螺母25配合使用对挂环串7固定。As shown in Figures 6 and 7, the rear card 2 is provided with a vertical U-shaped card slot 22 and a horizontal U-shaped card slot 23 for fixing the hanging ring string 7, wherein the vertical U-shaped card slot 22 is placed in a string The first (mast side) U-10 hanging ring 6 connected, the horizontal U-shaped card slot 23 places the second U-10 hanging ring 6 connected in series; the safety plate assembly 24 and wing nut 25 cooperate Use pair of hanging loops to secure on string 7.

丝杆组件26、左、右旋丝杆27经绝缘拉板固定口28与绝缘拉板3连接,左、右旋丝杆27通过调节丝杆,实现对前卡1、后卡2间距的控制,从而使单联耐张绝缘子串8达到松驰状态或收紧状态。其可调范围宽度在0-18cm之间。The screw assembly 26, the left and right screw rods 27 are connected to the insulating pull plate 3 through the fixing opening 28 of the insulating pull plate, and the left and right screw rods 27 realize the control of the distance between the front card 1 and the rear card 2 by adjusting the screw rods , so that the single tension insulator string 8 reaches a relaxed state or a tightened state. Its adjustable range width is between 0-18cm.

绝缘拉板锁紧销29对绝缘拉板3固定,防止绝缘拉板3滑落;托瓶架固定组件30的托瓶架锁紧销31与后卡连接孔二34连接,对托瓶架4紧固。The insulating pull plate locking pin 29 is fixed to the insulating pull plate 3 to prevent the insulating pull plate 3 from slipping; solid.

本发明的前卡1、后卡2主体部分均采用铝合金材料制造(也可采用钛合金材料),工作负荷达30KN,动试验负荷达 30KN,可满足变电站单联双软母线设备的检修要求。The main parts of the front card 1 and the rear card 2 of the present invention are made of aluminum alloy materials (titanium alloy materials can also be used), the working load can reach 30KN, and the dynamic test load can reach 30KN, which can meet the maintenance requirements of single-connected double soft busbar equipment in substations .

如图8所示,所述绝缘拉板3一端设有与后卡绝缘拉板固定口28连接的后卡连接孔一32;另一端设有多个可供选择的前卡连接孔33与前卡通孔21连接,根据单联耐张绝缘子串8的长度在绝缘拉板3上选择合适的前卡连接孔33,以适应不同类型的单联耐张绝缘子串8的要求。As shown in Figure 8, one end of the insulating pull plate 3 is provided with a rear card connection hole 32 connected to the rear card insulation pull plate fixing port 28; the other end is provided with a plurality of optional front card connection holes 33 and front Cartoon hole 21 connection, according to the length of the single tension insulator string 8, select the appropriate front card connection hole 33 on the insulating pull plate 3, to meet the requirements of different types of single tension insulator string 8.

如图9所示,所述托瓶架4由两根圆柱形绝缘棒35经间隔调节板36连接,间隔调节板36可调节圆柱形绝缘棒35的间距,间距范围在0-20cm之间,方便运输与保管;圆柱形绝缘棒35一端设有后卡连接孔二34,与后卡托瓶架固定组件30连接,并由托瓶架锁紧销31对其紧固;圆柱形绝缘棒35由高性能绝缘材料制成,能够承受较大的机械负荷。As shown in Figure 9, the bottle holder 4 is connected by two cylindrical insulating rods 35 via a spacer adjusting plate 36, and the spacer adjusting plate 36 can adjust the distance between the cylindrical insulating rods 35, and the distance range is between 0-20cm. Convenient transportation and storage; one end of the cylindrical insulating rod 35 is provided with a rear card connection hole 2 34, which is connected with the rear card holder bottle holder fixing component 30, and is fastened by the bottle holder locking pin 31; the cylindrical insulating rod 35 Made of high-performance insulating material capable of withstanding high mechanical loads.

使用时,本发明按以下步骤进行:During use, the present invention carries out according to the following steps:

第一步:地面操作人员对前卡1、后卡2及绝缘拉板3进行组装,在组装时需严格执行以下步骤:1、两根绝缘拉板3的一端分别穿过前卡1左右侧的通孔21,根据现场双软母线绝缘子串8的长度,选择合适的前卡连接孔33,并用球头销钉20将绝缘拉板3锁紧。2、后卡2与绝缘拉板3组装前,先调整左、右旋丝杆27,使左、右丝杆的长度为总长度的一半左右;再将两根绝缘拉板3的另一端分别放入后卡2上的绝缘拉板固定口28,并将绝缘拉板锁紧销29锁紧。The first step: the ground operator assembles the front card 1, the rear card 2 and the insulating pull plate 3, and the following steps must be strictly followed during assembly: 1. One end of the two insulating pull plates 3 passes through the left and right sides of the front card 1 respectively According to the length of the on-site double flexible busbar insulator string 8, select the appropriate front card connection hole 33, and use the ball pin 20 to lock the insulating pull plate 3. 2. Before assembling the rear card 2 and the insulating pull plate 3, first adjust the left and right screw rods 27 so that the length of the left and right screw rods is about half of the total length; Put it into the insulating pull plate fixing port 28 on the rear card 2, and lock the insulating pull plate locking pin 29.

第二步:地面操作人员通过设置在变电站门架5与双软母线11两处的滑车,用绝缘绳索将组装好的前卡1、后卡2及绝缘拉3板传递给双软母线11上的等电位作业人员和变电站门架5上的地电位作业人员。Step 2: The ground operator transfers the assembled front card 1, rear card 2 and insulating puller 3 boards to the double flexible busbar 11 with insulated ropes through the pulleys set at the substation gantry 5 and the double flexible busbar 11 The equipotential operators and the ground potential operators on the substation gantry 5.

第三步:等电位作业人员将前卡1的卡口14卡在两Z-10型直角挂板10之间的LV-0712型联板9的边沿上,同时地电位作业人员将后卡2上的竖直U型卡槽22与水平U型卡槽23分别置入门架侧的两个串装连接的U-10型挂环串7上,盖上保险板组件24,并用蝶形螺母25将U-10型挂环串7紧固牢靠。Step 3: The equipotential operator clamps the bayonet 14 of the front card 1 on the edge of the LV-0712 connecting plate 9 between two Z-10 type right-angle hanging plates 10, and the ground potential operator places the rear card 2 The vertical U-shaped draw-in groove 22 and the horizontal U-shaped draw-in groove 23 on the top are respectively placed on two U-10 type hanging ring strings 7 connected in series on the door frame side, cover the safety plate assembly 24, and use wing nuts 25 Fasten the U-10 type hanging ring string 7 firmly.

第四步:地面操作人员将托瓶架4传递至等电位作业人员与地电位作业人员,由等电位作业人员先将托瓶架4的一端分别放进前卡1两个托瓶环组件16中,再由地电位作业人员将托瓶架4后卡连接孔二34分别置入后卡托瓶架固定组件30,并用托瓶架锁紧销31紧固。Step 4: The ground operator transfers the bottle holder 4 to the equipotential operator and the ground potential operator, and the equipotential operator first puts one end of the bottle holder 4 into the two bottle holder ring assemblies 16 of the front card 1 respectively In the middle, the card holder connection hole 2 34 after the bottle holder 4 is inserted into the rear card holder bottle holder fixing assembly 30 respectively by the ground potential operator, and is fastened with the bottle holder locking pin 31.

第五步:工具安装完毕后,地电位作业人员调节后卡左、右旋丝杆27,直至单联耐张绝缘子串8处于完全松驰状态,托瓶架4承担绝缘子串的全部重量。Step 5: After the tool has been installed, the ground potential operator will lock the left and right screw rods 27 after adjustment, until the single tension insulator string 8 is in a completely relaxed state, and the bottle holder 4 bears the full weight of the insulator string.

第六步:根据母线绝缘子劣化或闪络的程度,采取两种方式对绝缘子进行更换:1、整串更换:由等电位人员与地电位人员相互配合拆下整串绝缘子串后通过两端滑车将其传弟至地面,地面操作人员再将新绝缘子串传递给等电位和地电位作业人员,实现整串绝缘子的更换。2、部分更换:由等电位作业人员或者地电位作业人员摘下需要更换的绝缘子对其进行更换。Step 6: According to the degree of deterioration or flashover of the bus insulators, two methods are adopted to replace the insulators: 1. The replacement of the whole string: the equipotential personnel and the ground potential personnel cooperate to remove the entire string of insulators and pass through the pulleys at both ends Pass it to the ground, and the ground operator will pass the new insulator string to the equipotential and ground potential operators to realize the replacement of the entire string of insulators. 2. Partial replacement: Equipotential workers or ground potential workers remove the insulators that need to be replaced and replace them.

第七步:绝缘子更换工作结束后,由地电位作业员调节后卡左、右旋丝杆27,恢复绝缘子串原始受力状态。Step 7: After the replacement of the insulators is completed, the operator of the ground potential adjusts and locks the left and right screw rods 27 to restore the original stress state of the insulator string.

第八步:拆除前卡1、后卡2、绝缘拉板3及托瓶架4,拆除顺序与安装过程相反。Step 8: Remove the front card 1, the rear card 2, the insulating pull plate 3 and the bottle holder 4. The removal sequence is opposite to the installation process.

第九步:工具完全拆除后,通过绝缘绳索传递至地面。地电位作业人员与等电位作业人员脱离母线设备回到地面,绝缘子更换工作顺利完成。Step Nine: After the tool is completely removed, it is passed to the ground by an insulated rope. The ground potential workers and equipotential workers left the bus equipment and returned to the ground, and the insulator replacement work was successfully completed.

Claims (6)

1. a kind of equipotential changes the instrument of the double soft bus strain insulators of simply connected, simply connected strain insulator string(8)One end is through connection Plate(9), right angle hanging plate(10)With double soft buses(11)Connection;The other end is through link string(7)With transformer station's door frame(5)Connection, its It is characterised by:Preceding card(1)With rear card(2)Pass through two insulation pulling plates(3)Connection, carry simply connected strain insulator string(8)Drag Bottle stand(4)One end is through bottle supporting ring assemblies(16)With preceding card(1)Connection, the other end is through bottle-holding rack fixation kit(30)With rear card(2) Connection;Block before described(1)It is provided with fixed yoke plate(9)Bayonet socket(14), preceding card(1)On be additionally provided with place right angle hanging plate(10)And The U-type groove of bolt(15);
Block after described(2)It is provided with fixed link string(7)Vertical U-type neck(22), horizontally U-shaped neck(23), safeguard group Part(24), wing nut(25)To link string(7)It is fixed;Screw component(26), left and right rotation screw mandrel(27)Fixed through insulation pulling plate Mouthful(28)With insulation pulling plate(3)Connection, insulation pulling plate locking pin(29)To insulation pulling plate(3)It is fixed;Bottle-holding rack fixation kit (30)Bottle-holding rack locking pin(31)To bottle-holding rack(4)Fastening;
Block before described(1)It is provided with connection insulation pulling plate(3)Through hole(21)And the bulb pin locked to it(20), pellet (17), spring(18), plug screw(19)To bulb pin(20)Screens.
2. equipotential according to claim 1 changes the instrument of the double soft bus strain insulators of simply connected, it is characterised in that:Institute State insulation pulling plate(3)Card connecting hole one after one end is provided with(32), the other end is provided with multiple preceding card connecting holes(33).
3. equipotential according to claim 1 changes the instrument of the double soft bus strain insulators of simply connected, it is characterised in that:Institute State bottle-holding rack(4)By two cylindrical insulating bars(35)Through being spaced adjustable plate(36)Connection, cylindrical insulating bar(35)One end is set Card connecting hole two after having(34).
4. equipotential according to claim 1 changes the instrument of the double soft bus strain insulators of simply connected, it is characterised in that:Institute State link string(7)By two links(6)Connection in tandem.
5. equipotential according to claim 1 changes the instrument of the double soft bus strain insulators of simply connected, it is characterised in that:Institute State double soft buses(11)Through yoke plate(9), right angle hanging plate(10)And hydraulic strain clamp(12)With simply connected strain insulator string(8) Connection.
6. equipotential according to claim 1 changes the instrument of the double soft bus strain insulators of simply connected, it is characterised in that:Institute State double soft buses(11)Between be provided with soft bus interval wire clamp(13).
CN201510108276.6A 2015-03-12 2015-03-12 Equipotential changes the instrument of the double soft bus strain insulators of simply connected Active CN106033872B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510108276.6A CN106033872B (en) 2015-03-12 2015-03-12 Equipotential changes the instrument of the double soft bus strain insulators of simply connected

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510108276.6A CN106033872B (en) 2015-03-12 2015-03-12 Equipotential changes the instrument of the double soft bus strain insulators of simply connected

Publications (2)

Publication Number Publication Date
CN106033872A CN106033872A (en) 2016-10-19
CN106033872B true CN106033872B (en) 2018-04-10

Family

ID=57149879

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510108276.6A Active CN106033872B (en) 2015-03-12 2015-03-12 Equipotential changes the instrument of the double soft bus strain insulators of simply connected

Country Status (1)

Country Link
CN (1) CN106033872B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108512120A (en) * 2018-05-30 2018-09-07 广东电网有限责任公司 Insulator replacement tool
CN110364960B (en) * 2019-07-16 2024-06-25 云南电网有限责任公司曲靖供电局 Strain insulator single-string insulator overhauls platform
CN111313320B (en) * 2020-02-24 2021-07-27 国网福建省电力有限公司龙岩供电公司 A replacement appliance for live replacement of tensile insulator strings
CN115149455B (en) * 2022-05-13 2024-10-01 国网江苏省电力有限公司超高压分公司 Tool and method for replacing tension insulator of extra-high voltage line

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5377402A (en) * 1993-10-27 1995-01-03 Semple, Jr.; Alan R. Electrical insulator change-out tool
CN201336531Y (en) * 2009-01-13 2009-10-28 福建省三明电业局 Clamping tool for replacing charged insulators of pre-stranded hardware fittings
CN201438396U (en) * 2009-06-29 2010-04-14 中国电力工程顾问集团公司 A double I-type and V-type tension insulator string for UHV substation
CN203014262U (en) * 2012-02-28 2013-06-19 云南电网公司带电作业分公司 V-shaped twin insulator string replacement fixture for compact type 500kV transmission line
CN103746313A (en) * 2013-12-16 2014-04-23 国家电网公司 Protection strengthening type wing-shaped fixture
CN104252926A (en) * 2014-10-13 2014-12-31 国家电网公司 Combined type strain insulator string of overhead transmission line
CN104361958A (en) * 2014-11-20 2015-02-18 国家电网公司 Quintuplet double-hanging-point strain insulator string
CN204424804U (en) * 2015-03-12 2015-06-24 国家电网公司 Equipotential changes the instrument of the two soft bus strain insulator of simply connected

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5377402A (en) * 1993-10-27 1995-01-03 Semple, Jr.; Alan R. Electrical insulator change-out tool
CN201336531Y (en) * 2009-01-13 2009-10-28 福建省三明电业局 Clamping tool for replacing charged insulators of pre-stranded hardware fittings
CN201438396U (en) * 2009-06-29 2010-04-14 中国电力工程顾问集团公司 A double I-type and V-type tension insulator string for UHV substation
CN203014262U (en) * 2012-02-28 2013-06-19 云南电网公司带电作业分公司 V-shaped twin insulator string replacement fixture for compact type 500kV transmission line
CN103746313A (en) * 2013-12-16 2014-04-23 国家电网公司 Protection strengthening type wing-shaped fixture
CN104252926A (en) * 2014-10-13 2014-12-31 国家电网公司 Combined type strain insulator string of overhead transmission line
CN104361958A (en) * 2014-11-20 2015-02-18 国家电网公司 Quintuplet double-hanging-point strain insulator string
CN204424804U (en) * 2015-03-12 2015-06-24 国家电网公司 Equipotential changes the instrument of the two soft bus strain insulator of simply connected

Also Published As

Publication number Publication date
CN106033872A (en) 2016-10-19

Similar Documents

Publication Publication Date Title
CN105914646B (en) Charged for replacement 35kV strain insulator string operational methods
WO2012088987A1 (en) Maintenance tool for insulator of direct current transmission line
CN106033872B (en) Equipotential changes the instrument of the double soft bus strain insulators of simply connected
CN105514877B (en) Common-tower double-return steel pipe pole replacement insulation subjob cross-arm fixture
CN105932599A (en) Tool set capable of replacing insulator chain of ultra-high-voltage transmission line under electrified state and use method for tool set
CN205791227U (en) Charged for replacement UHV transmission line insulator chain tool set
CN204424804U (en) Equipotential changes the instrument of the two soft bus strain insulator of simply connected
CN106300138A (en) A kind of fixture of live-line replacing strain single insulator
CN102623927B (en) Charged for replacement 220kV circuit multiloop double bundle conductor insulator tool and method
CN202602171U (en) A tool for power-on replacing multi-loop double split conductor insulator of 220kV line
CN205141528U (en) Three angle steel mounts
CN106992466A (en) The strain insulator string electrification replacing tool of extra-high voltage six and replacing options
CN104253394B (en) A kind of replacing instrument of strain insulator string
CN203813330U (en) Tool for live replacement of 500kV tension insulator string
CN102545102B (en) 1000-Kv tension-resistant horizontal insulator charged exchange device
CN103746317B (en) A kind of general utility tool changing straight-line angle tower insulator string
CN105790158B (en) Charged for replacement 35kV strain insulator string specific purpose tools
CN105896372A (en) Cable insulation support device for substation maintenance
CN204144800U (en) The special cross-arm card of a kind of ZML type tower
CN211701243U (en) Electrified defect eliminating device for jumper spacer
CN108847617A (en) The device and method of UHV transmission line live-line replacing strain wire jumper insulator chain
CN210007228U (en) insulating operating rod for transformer maintenance
CN202930836U (en) Tension Insulator Replacement Tool
CN207490436U (en) The double models for hanging V-type composite insulator string replacing options of ± 500kV DC power transmission lines duplex
CN203967627U (en) Charged for replacement 110kV strain insulator string bilateral hook bottle supporting Work tool

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant