CN106032029A - 组合模具钢轨布置技术 - Google Patents

组合模具钢轨布置技术 Download PDF

Info

Publication number
CN106032029A
CN106032029A CN201510101875.5A CN201510101875A CN106032029A CN 106032029 A CN106032029 A CN 106032029A CN 201510101875 A CN201510101875 A CN 201510101875A CN 106032029 A CN106032029 A CN 106032029A
Authority
CN
China
Prior art keywords
groove
earthen platform
coagulation earthen
steel
orbit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510101875.5A
Other languages
English (en)
Inventor
朱连吉
孙玉娣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Renqiu Yongji Construction and Installation Engineering Co Ltd
Original Assignee
Renqiu Yongji Construction and Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Renqiu Yongji Construction and Installation Engineering Co Ltd filed Critical Renqiu Yongji Construction and Installation Engineering Co Ltd
Priority to CN201510101875.5A priority Critical patent/CN106032029A/zh
Publication of CN106032029A publication Critical patent/CN106032029A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Abstract

本发明提供一种组合模具钢轨布置技术,该组合模具钢轨布置技术,通过布置基础、制作混凝土台、铺设次轨道和铺设主轨道等工序完成轨道布置,实施方便,布置的轨道安全稳定,可广泛应用于生产车间安装组合模具轨道。

Description

组合模具钢轨布置技术
技术领域
本发明涉及钢轨领域,具体设计一种组合模具钢轨布置技术。
背景技术
在装配式住房的预制墙板生产线中,采用组合模具生产预制墙板可一次产出多块墙板,极大了提高了生产效率。然而多块预制墙板同时生产,预制墙板的重量加上组合模具本身的重量会特别重,常规的轨道有的不足以承受如此重的重量,有的能勉强承受该重量但是在组合磨具行走过程中,很容易走偏,从而损坏轨道,甚至导致轨道塌陷断裂进而影响正常生产。因此急需一种与组合模具匹配的安全的轨道布置技术。
发明内容
为了保障预制墙板在组合模具的正常行走和预制墙板的正常生产,本发明提供了一种组合模具钢轨布置技术。
本发明是通用以下技术方法实现的:该组合模具钢轨布置技术包含以下步骤:第一步,布置基础,每间隔5 m在地下挖一个长30cm、宽30cm、深80cm的凹槽一,再将这些凹槽之间的空隙挖出长5m、宽30cm、深40cm的凹槽二,凹槽一和凹槽二连为一个整体凹槽,凹槽中放入预制好的钢筋笼,然后浇筑混凝土,混凝土凝固后,钢筋混凝土基础完成。
第二步,制作混凝土台,在钢筋混凝土基础之上,放置混凝土架边框,然后浇筑混凝土,使得混凝土台宽30cm、高35cm,其长度根据轨道长度确定,混凝土台上设置有预留孔,供水管、电线管、油管等安装。
第三步,铺设次轨道,在混凝土台上铺设有工字钢支撑架,工字钢支撑架上设置有两组次轨道,工字钢支撑架通过螺栓固定和钢板焊接连接于混凝土台上。
第四步,铺设主轨道,次轨道上面铺设有工字钢主轨道。
本发明的有益效果是:该组合模具钢轨布置技术,通过布置基础、制作混凝土台、铺设次轨道和铺设主轨道等工序完成轨道布置,实施方便,布置的轨道安全稳定,可广泛应用于生产车间安装组合模具轨道。
附图说明
附图是该组合模具钢轨布置技术示意图。其中1是基础凹槽一,2是基础凹槽二,3是混凝土台,4是预留孔,5是工字钢支撑架,6是次轨道,7是主轨道。
具体实施方式
下面结合附图对本发明做进一步说明。如图所示,该组合模具钢轨布置技术包含以下步骤:第一步,布置基础,每间隔5 m在地下挖一个长30cm、宽30cm、深80cm的凹槽一1,再将这些凹槽之间的空隙挖出长5m、宽30cm、深40cm的凹槽二2,凹槽一1和凹槽二2连为一个整体凹槽,凹槽中放入预制好的钢筋笼,然后浇筑混凝土,混凝土凝固后,钢筋混凝土基础完成;第二步,制作混凝土台3,在钢筋混凝土基础之上,放置混凝土架边框,然后浇筑混凝土,待混凝土凝固后撤去混凝土架边框,混凝土台3宽30cm、高35cm,其长度根据轨道长度确定,混凝土台上设置有预留孔4,供水管、电线管、油管等安装;第三步,铺设次轨道6,在混凝土台3上铺设有工字钢支撑架5,工字钢支撑架上设置有两组次轨道6,工字钢支撑架通过螺栓固定和钢板焊接连接于混凝土台上;第四步,铺设主轨道7,次轨道上面铺设有工字钢主轨道。
本发明通过布置基础、制作混凝土台、铺设次轨道和铺设主轨道等工序完成轨道布置,实施方便,布置的轨道安全稳定,可广泛应用于生产车间安装组合模具轨道。
本发明不局限于上述实施方式,任何人在本发明的启示下都可以得出其他各种形式的产品。凡依本发明申请专利范围所做的均等变化与修饰,皆应属于本发明的涵盖范围。

Claims (1)

1.组合模具钢轨布置技术,其特征在于,该技术包含以下步骤:第一步,布置基础,每间隔5 m在地下挖一个长30cm、宽30cm、深80cm的凹槽一,再将这些凹槽之间的空隙挖出长5m、宽30cm、深40cm的凹槽二,凹槽一和凹槽二连为一个整体凹槽,凹槽中放入预制好的钢筋笼,然后浇筑混凝土,混凝土凝固后,钢筋混凝土基础完成;第二步,制作混凝土台,在钢筋混凝土基础之上,放置混凝土架边框,然后浇筑混凝土,混凝土台宽30cm、高35cm,其长度根据轨道长度确定,混凝土台上设置有预留孔,供水管、电线管、油管等安装;第三步,铺设次轨道,在混凝土台上铺设有工字钢支撑架,工字钢支撑架上设置有两组次轨道,工字钢支撑架通过螺栓固定和钢板焊接连接于混凝土台上; 第四步,铺设主轨道,次轨道上面铺设有工字钢主轨道。
CN201510101875.5A 2015-03-09 2015-03-09 组合模具钢轨布置技术 Pending CN106032029A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510101875.5A CN106032029A (zh) 2015-03-09 2015-03-09 组合模具钢轨布置技术

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510101875.5A CN106032029A (zh) 2015-03-09 2015-03-09 组合模具钢轨布置技术

Publications (1)

Publication Number Publication Date
CN106032029A true CN106032029A (zh) 2016-10-19

Family

ID=57150347

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510101875.5A Pending CN106032029A (zh) 2015-03-09 2015-03-09 组合模具钢轨布置技术

Country Status (1)

Country Link
CN (1) CN106032029A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110682432A (zh) * 2018-07-04 2020-01-14 任丘市永基建筑安装工程有限公司 组合模具钢轨布置方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2308957A1 (de) * 1972-02-29 1973-09-06 Swedish Rail System Ab Srs Betonschwellenblock fuer ein bewegbares kranschinenglied
CN2120133U (zh) * 1992-04-29 1992-10-28 罗春建 塔吊装配式基础构件
KR20060124101A (ko) * 2005-05-31 2006-12-05 삼표이앤씨 주식회사 프리케스트 슬래브 궤도 시스템 및 시공방법
CN102094368A (zh) * 2010-12-17 2011-06-15 中国西电电气股份有限公司 一种电动平车轨道及施工方法
CN203474271U (zh) * 2013-09-04 2014-03-12 中建交通建设集团有限公司 门式起重机专用装配式轨道基础

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2308957A1 (de) * 1972-02-29 1973-09-06 Swedish Rail System Ab Srs Betonschwellenblock fuer ein bewegbares kranschinenglied
CN2120133U (zh) * 1992-04-29 1992-10-28 罗春建 塔吊装配式基础构件
KR20060124101A (ko) * 2005-05-31 2006-12-05 삼표이앤씨 주식회사 프리케스트 슬래브 궤도 시스템 및 시공방법
CN102094368A (zh) * 2010-12-17 2011-06-15 中国西电电气股份有限公司 一种电动平车轨道及施工方法
CN203474271U (zh) * 2013-09-04 2014-03-12 中建交通建设集团有限公司 门式起重机专用装配式轨道基础

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110682432A (zh) * 2018-07-04 2020-01-14 任丘市永基建筑安装工程有限公司 组合模具钢轨布置方法

Similar Documents

Publication Publication Date Title
CN104947681B (zh) 一种超大超深地下室基坑的施工方法
CN107130611B (zh) 一种柔性复合防渗装配式可回收圆截面排桩支护结构的设计施工方法
CN106437737B (zh) 一种顶管式煤矿小断面巷道掘进方法
CN103114857A (zh) 一种盾构隧道施工方法
CN205000974U (zh) 一种用于隧道开挖施工的轮胎式自动升降组装台架
CN102094649A (zh) 盾构-浅埋暗挖复合法建造地下空间的施工方法
CN105938067A (zh) 外部加载式盾构管片力学性能试验机及试验方法
CN105972313B (zh) 一种横跨基坑工程管线悬吊方法及悬吊结构
CN104912098A (zh) 一种深基坑支撑梁板与结构板结合施工方法
CN103061771A (zh) 复采矿井综采面切眼掘进及其支护方法
CN205806684U (zh) 一种横跨基坑工程管线悬吊结构
CN107255188A (zh) 一种适用于综合管廊交叉口节点处的管道吊装方法
CN106545019A (zh) 用于级差式地下结构施工的换撑体系及施工方法
CN106032029A (zh) 组合模具钢轨布置技术
CN102747725B (zh) 一种钻孔灌注桩微扰动施工方法
CN110820803A (zh) 一种盾构隧道横向联络通道的明挖施工方法
CN105984034A (zh) 组合模具工钢布置技术
CN109723453B (zh) 顶管机洞内改造方法
CN104805830B (zh) 非爆破岩石抗拔桩施工方法
CN103090107A (zh) 矩形大断面钢结构拼装临时支撑管节顶进机构
CN204385743U (zh) 一种深水桩基钢护筒施工系统
CN205116201U (zh) 一种沉井施工装置
CN205046558U (zh) 逆作法中基坑出土洞口的内支撑梁结构
JP7008539B2 (ja) シールドマシンの後続設備の配置方法
CN207633149U (zh) 一种过街通道建设的辅助系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20161019