CN106022875A - Method, device and system for managing engineering machine equipment leasing platform - Google Patents

Method, device and system for managing engineering machine equipment leasing platform Download PDF

Info

Publication number
CN106022875A
CN106022875A CN201610328863.0A CN201610328863A CN106022875A CN 106022875 A CN106022875 A CN 106022875A CN 201610328863 A CN201610328863 A CN 201610328863A CN 106022875 A CN106022875 A CN 106022875A
Authority
CN
China
Prior art keywords
mechanical device
engineering mechanical
lease
engineering
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610328863.0A
Other languages
Chinese (zh)
Inventor
何耀纯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Watongliao Engineering Machinery Service Co Ltd
Original Assignee
Guizhou Watongliao Engineering Machinery Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Watongliao Engineering Machinery Service Co Ltd filed Critical Guizhou Watongliao Engineering Machinery Service Co Ltd
Priority to CN201610328863.0A priority Critical patent/CN106022875A/en
Publication of CN106022875A publication Critical patent/CN106022875A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions
    • G06Q30/0645Rental transactions; Leasing transactions

Abstract

The invention provides a method, device and system for managing an engineering machine equipment leasing platform, and the method comprises the steps: obtaining the information of engineering machine equipment leased by a construction side; calculating the lease expense of the engineering machine equipment in a lease charging mode employed for the leased engineering machine equipment according to the obtained information of the engineering machine equipment; obtaining the weight of the engineering machine equipment, the no-load driving distance of trailing equipment for trailing the engineering machine equipment, and a trailing distance of the leased engineering machine equipment; determining the trailing expense of the engineering machine equipment according to the weight, the no-load driving distance and the trailing distance; enabling the sum of the lease expense and the trailing expense to serve as the total cost for the leasing of the engineering machine equipment; and respectively distributing the total cost to all participating sides according to the preset participating sides and the distribution proportions of the participating sides. According to the invention, the method employs a unified charging and cost distribution standard in the engineering machine equipment leasing industry, and improves the accuracy of the leasing cost of the engineering machine equipment.

Description

A kind of engineering mechanical device the lease management method of platform, Apparatus and system
Technical field
The present invention relates to engineering mechanical device leasing techniques field, in particular to a kind of engineering mechanical device lease The management method of platform, Apparatus and system.
Background technology
At present, along with the in-depth of structure of business unit reform, the demand of leasing of construction machinery business is stepped up, engineering machinery Huge development space, the stage that the coming years, entrance was developed rapidly by construction machinery rental market are bred in leasing market.By In the great market potential of China Construction Machinery charter business, the most become the field that Chinese and overseas companies enter into rivalry.Whole nation engineering Equipment leasing enterprise alreadys more than 11500, but the universal small scale of enterprise, based on middle-size and small-size leasing company, large-scale rent Company of renting is less, the whole nation assets the most over one hundred family of engineering machinery speciality leasing company more than 50,000,000 yuan;In correlation technique, Each leasing company has formulated respective expenses standard and expense allocation standard respectively.
During realizing the present invention, inventor finds at least to there is problems in that in engineering machinery in correlation technique Equipment leasing industry does not has unified charging and expense allocation standard, causes required of the construction party leasing engineering mechanical device The expense paid is difficult to the result calculating or calculating and the expense error actually occurred relatively greatly, affects a control of associated construction progress.
Summary of the invention
In view of this, the purpose of the embodiment of the present invention is to provide the manager of a kind of engineering mechanical device lease platform Method, Apparatus and system, to improve the accuracy of the expense of lease engineering mechanical device.
First aspect, embodiments provides the management method of a kind of engineering mechanical device lease platform, the method Including:
Obtaining the facility information of the engineering mechanical device of construction party lease, wherein, this facility information includes above-mentioned engineering machine The time buying of tool equipment, buying expenses and real work duration;
The said equipment information according to the lease charging way and acquisition of leasing the employing of above-mentioned engineering mechanical device calculates State the lease expenses of engineering mechanical device;
The weight that obtains above-mentioned engineering mechanical device, the towing equipment consigning above-mentioned engineering mechanical device deadhead operation away from From the haul with the above-mentioned engineering mechanical device of lease;
The delivery of above-mentioned engineering mechanical device is determined according to above-mentioned weight, above-mentioned deadhead operation distance and above-mentioned haul Expense;
Using above-mentioned lease expenses and above-mentioned haulage sum as the total cost leasing above-mentioned engineering mechanical device;
Above-mentioned total cost is respectively allocated to according to the allocation proportion that participant set in advance and above-mentioned participant are corresponding Each participant.
Second aspect, the embodiment of the present invention additionally provides the managing device of a kind of engineering mechanical device lease platform, this dress Put and include:
First acquisition module, for obtaining the facility information of the engineering mechanical device of construction party lease, wherein, this equipment is believed Breath includes the time buying of above-mentioned engineering mechanical device, buying expenses and real work duration;
Lease expenses computing module, for according to leasing lease charging way and the acquisition that above-mentioned engineering mechanical device uses The said equipment information calculate above-mentioned engineering mechanical device lease expenses;
Second acquisition module, for obtaining the weight of above-mentioned engineering mechanical device, consigning dragging of above-mentioned engineering mechanical device The deadhead operation distance of vehicle device and the haul of the above-mentioned engineering mechanical device of lease;
Haulage computing module, for determining according to above-mentioned weight, above-mentioned deadhead operation distance and above-mentioned haul The haulage of above-mentioned engineering mechanical device is used;
Total cost determines module, for using above-mentioned lease expenses and above-mentioned haulage sum as leasing above-mentioned engineering machine The total cost of tool equipment;
Expense allocation module, is used for above-mentioned total cost according to corresponding the dividing of participant set in advance and above-mentioned participant Proportioning example is respectively allocated to each participant.
The third aspect, the embodiment of the present invention additionally provides the management system of a kind of engineering mechanical device lease platform, and this is System includes: user terminal, above-mentioned managing device, and wherein, this user terminal includes: construction party terminal, machinery side's terminal, trailer side Terminal, driver's terminal of engineering mechanical device, driver's terminal of towing equipment;Said apparatus is mutual with above-mentioned user terminal The facility information of lease engineering mechanical device and cost information.
In engineering mechanical device the lease management method of platform, the Apparatus and system that the embodiment of the present invention provides, the party Method includes: obtain the facility information of the engineering mechanical device of construction party lease;The lease used according to lease engineering mechanical device The lease expenses of the facility information computational engineering plant equipment of charging way and acquisition;Obtain the weight of engineering mechanical device, torr The deadhead operation distance of the towing equipment of fortune engineering mechanical device and the haul of lease engineering mechanical device;According to weight, Deadhead operation distance and haul determine that the haulage of engineering mechanical device is used;Lease expenses and haulage are used sum as The total cost of lease engineering mechanical device;Total cost is divided according to the allocation proportion that participant set in advance and participant are corresponding Do not distribute to each participant.In the present invention, unified engineering mechanical device rental service charging and expense allocation mark are used Standard, improves the accuracy of the expense of lease engineering mechanical device.
For making the above-mentioned purpose of the present invention, feature and advantage to become apparent, preferred embodiment cited below particularly, and coordinate Appended accompanying drawing, is described in detail below.
Accompanying drawing explanation
In order to be illustrated more clearly that the technical scheme of the embodiment of the present invention, below by embodiment required use attached Figure is briefly described, it will be appreciated that the following drawings illustrate only certain embodiments of the present invention, and it is right to be therefore not construed as The restriction of scope, for those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to according to this A little accompanying drawings obtain other relevant accompanying drawings.
Fig. 1 shows the method that a kind of engineering mechanical device that the embodiment of the present invention is provided leases the management method of platform Schematic flow sheet;
Fig. 2 shows that a kind of engineering mechanical device that the embodiment of the present invention is provided leases the device of the managing device of platform Structural representation;
Fig. 3 shows that a kind of engineering mechanical device that the embodiment of the present invention is provided leases the system of the management system of platform Structural representation.
Detailed description of the invention
For making the purpose of the embodiment of the present invention, technical scheme and advantage clearer, below in conjunction with the embodiment of the present invention Middle accompanying drawing, is clearly and completely described the technical scheme in the embodiment of the present invention, it is clear that described embodiment is only It is a part of embodiment of the present invention rather than whole embodiments.Generally real with the present invention illustrated described in accompanying drawing herein The assembly executing example can be arranged with various different configurations and design.Therefore, below to the present invention's provided in the accompanying drawings The detailed description of embodiment is not intended to limit the scope of claimed invention, but is merely representative of the selected reality of the present invention Execute example.Based on embodiments of the invention, the institute that those skilled in the art are obtained on the premise of not making creative work There are other embodiments, broadly fall into the scope of protection of the invention.
In view of correlation technique does not has in engineering mechanical device rental service unified charging and expense allocation standard, The required expense paid of the construction party leasing engineering mechanical device is caused to be difficult to the result calculating or calculating and the expense actually occurred Relatively big by error, affect a control of associated construction progress, based on this, embodiments provide a kind of engineering mechanical device and rent Rent the management method of platform, be described below by embodiment.
As it is shown in figure 1, embodiments provide the management method of a kind of engineering mechanical device lease platform, the method Including step S102-S112, specific as follows:
Step S102: obtaining the facility information of the engineering mechanical device of construction party lease, wherein, this facility information includes State the time buying of engineering mechanical device, buying expenses and real work duration;
Step S104: according to leasing lease charging way and the said equipment letter of acquisition that above-mentioned engineering mechanical device uses Breath calculates the lease expenses of above-mentioned engineering mechanical device;
Step S106: the weight that obtains above-mentioned engineering mechanical device, the towing equipment of consigning above-mentioned engineering mechanical device Deadhead operation distance and the haul of the above-mentioned engineering mechanical device of lease;
Step S108: determine above-mentioned engineering machinery according to above-mentioned weight, above-mentioned deadhead operation distance and above-mentioned haul The haulage of equipment is used;
Step S110: using total as lease above-mentioned engineering mechanical device to above-mentioned lease expenses and above-mentioned haulage sum Expense;
Step S112: above-mentioned total cost is divided according to the allocation proportion that participant set in advance and above-mentioned participant are corresponding Do not distribute to each participant.
Wherein, the time buying of above-mentioned engineering mechanical device, buying expenses are that machinery side registers time institute on lease platform Input relevant information, above-mentioned real work duration be construction terminate after calculate arrive, can set on engineering mechanical device Put GPS positioner, this GPS positioner in real time by engineering mechanical device current location information, engineering mechanical device when time On-stream time, send to server when the secondary time of knocking off, when secondary on-stream time with when the secondary time of knocking off is for during when secondary real work Long, using work progress each as total as above-mentioned real work duration this engineering mechanical device i.e. of time real work duration sum Operating time.
It addition, the main body during engineering mechanical device lease is illustrated, leasing of construction machinery management system Fang Jian Claim: service platform i.e. platform side;The tenantry needing plant equipment to construct is called for short: construction party or engineering side;Machinery need to be hired out set Standby lessor is called for short: machinery side or lessor;The manipulator that need to operate plant equipment is called for short: tractor driver side i.e. engineering machinery sets Standby driver;The big trailer needing Transport Machinery equipment is called for short: trailer side or transporter;Need the driver that driving trailer works It is called for short: the driver side i.e. driver of towing equipment;Also have gas station, equipment repair side, insurance department, revenue department of country etc..
In the embodiment that the present invention provides, use unified engineering mechanical device rental service charging and expense allocation mark Standard, obtains related data automatically by lease platform, and carries out charging according to the related data obtained and carry out rationalizing distribution again, Improve the lease fairness of expense of engineering mechanical device, reasonability, accuracy, the whole engineering mechanical device lease of specification The development of industry, meanwhile, above-mentioned data are what platform obtained automatically, it is not necessary to manual entry, improve data verity and Reliability, solves the deception of machinery side client, the problem of expense of claiming for charge at random, drive up, and provides justice, reliable for each participant Engineering mechanical device lease transaction platform.
Concrete, according to leasing lease charging way and the said equipment information of acquisition that above-mentioned engineering mechanical device uses Calculate the lease expenses of above-mentioned engineering mechanical device, including:
The service life of above-mentioned engineering mechanical device is determined according to the above-mentioned time buying;
According to leasing lease charging way, the above-mentioned real work duration and above-mentioned that above-mentioned engineering mechanical device uses Service life transfers the computing formula of corresponding lease expenses;
Computing formula according to the lease expenses transferred and above-mentioned buying expenses, above-mentioned real work duration, above-mentioned use The time limit is calculated the lease expenses of above-mentioned engineering mechanical device.
Concrete, according to lease the lease charging way that above-mentioned engineering mechanical device uses, above-mentioned real work duration, with And above-mentioned service life transfers the computing formula of corresponding lease expenses, including:
When the lease charging way leasing the employing of above-mentioned engineering mechanical device is monthly to lease, it is judged that above-mentioned real work Whether duration is less than 160 hours and judges whether above-mentioned service life is less than the depreciable life of above-mentioned engineering mechanical device;If T < 160 and q < a, then the computing formula of the lease expenses transferred isIf T < 160 and q is > a, then transfer The computing formula of lease expenses isIf T > 160 and q < a, then the lease expenses transferred Computing formula beIf T > 160 and q > a, then the lease expenses transferred Computing formula be
When leasing the lease charging way of above-mentioned engineering mechanical device employing for during by week lease, it is judged that during above-mentioned real work Whether length is less than 40 hours and judges whether above-mentioned service life is less than the depreciable life of above-mentioned engineering mechanical device;If T < 40, And q < a, then the computing formula of the lease expenses transferred isIf T < 40 and q > a, then the rent transferred The computing formula of rental fee isIf T > 40 and q is < a, then transfer The computing formula of lease expenses isIf T > 40 and q > a, then the computing formula of the lease expenses transferred is
When the lease charging way leasing the employing of above-mentioned engineering mechanical device is Per Date Basis, it is judged that during above-mentioned real work Whether length is less than 8 hours and judges whether above-mentioned service life is less than the depreciable life of above-mentioned engineering mechanical device;If T < 8, And q < a, then the computing formula of the lease expenses transferred isIf T < 8 and q is > a, then transfer The computing formula of lease expenses isIf T > 8 and q is < a, then transfer The computing formula of lease expenses beIf T > 8 and q > a, then the computing formula of the lease expenses transferred is Wherein, X represents the lease expenses of engineering mechanical device, and M represents engineering The buying expenses of plant equipment, a represents the depreciable life of engineering mechanical device, when T represents the real work of engineering mechanical device Long, η1Represent by penalty coefficient during week lease, η2Penalty coefficient when representing Per Date Basis, q represents that service life, κ represent rental charge Use annual decreasing ratio.
Concrete, every kind of lease charging way all sets minimum lease time (when monthly leasing the minimum lease of correspondence Between be 160 hours, the minimum lease time corresponding by week lease is 40 hours, and the minimum lease time that Per Date Basis is corresponding is 8 Hour), when real work duration is less than minimum lease time, construction party still needs to pay minimum lease expenses, works as real work Duration more than after minimum lease time the most by the hour expenses standard carry out charging;Meanwhile, in the lease of computational engineering plant equipment During expense, referring also to the service life of equipment whether more than the depreciable life of equipment, when the service life of equipment is more than equipment During the depreciable life, turn down the fee-collection standard of lease expenses accordingly, thus, if construction party needs to control hiring cost, permissible Suitably select the engineering mechanical device of service life length;It addition, when construction party uses by week lease or Per Date Basis, accordingly The fee-collection standard heightening lease expenses, thus, for need long rent equipment construction party can by select monthly lease in the way of.
Wherein, the parameters on the above-mentioned formula right side is and combines leasing market rule and determine according to mass data and obtain , prestore in the server, when calculating lease expenses, transfer corresponding computing formula and transfer each of the formula right side The preset value of parameter.
In the embodiment that the present invention provides, give the meter of the lease expenses using three kinds of different lease charging ways Calculate formula, be available for the lease charging way that construction party carries out selecting to be suitable for according to the actual requirements, improve construction party lease engineering The motility of plant equipment.
Concrete, determine that above-mentioned engineering machinery sets according to above-mentioned weight, above-mentioned deadhead operation distance and above-mentioned haul Standby haulage use, including:
Needed for weight according to above-mentioned engineering mechanical device determines towing equipment delivery above-mentioned engineering mechanical device every kilometer Expense;
According to formula Y=m × L1+n×L2The haulage being calculated above-mentioned engineering mechanical device is used;Wherein, Y represents work The haulage use of journey plant equipment, m represents expense needed for towing equipment delivery engineering mechanical device every kilometer, and n represents that trailer sets Expense needed for standby deadhead operation every kilometer, L1Represent the lease haul of engineering mechanical device, L2Represent that delivery engineering machinery sets The deadhead operation distance of standby towing equipment.
Concrete, above-mentioned total cost is distinguished according to the allocation proportion that participant set in advance and above-mentioned participant are corresponding Distribute to each participant, including:
According to formulaIt is calculated the expense distributing to each trailer operation participant respectively With, above-mentioned trailer operation participant includes: trailer side, the driver of towing equipment, insurance department, gas station, towing equipment are repaiied Reason side, functional management department and the expense of service platform, wherein, piRepresent and distribute to i-th ginseng in trailer operation participant The allocation proportion corresponding with side, ∑ pi=1, aiRepresent and distribute to every kilometer of expense of i-th participant in trailer operation participant With, Y represents that the haulage of engineering mechanical device is used;
According to formula xi=ciiT is calculated the expense distributing to each construction operation participant, above-mentioned construction respectively Operation participant includes: machinery side, the driver of engineering mechanical device, insurance department, gas station, engineering mechanical device maintenance Side and the expense of service platform, wherein, T represents the real work duration of engineering mechanical device, ciRepresent that distributing to construction makees The basic wage that in industry participant, i-th participant is corresponding, μiRepresent and distribute to i-th participant in construction operation participant Unit hour expense.
It should be noted that allocation proportion corresponding to participant is and combines leasing market rule and determine according to mass data Obtain, prestore in the server, when carrying out expense allocation, transfer corresponding computing formula and transfer the formula right side The preset value of parameters.
Further, before the facility information of the engineering mechanical device of above-mentioned acquisition construction party lease, also include:
Receive lease charging way, job location and required engineering that the lease engineering mechanical device of construction party input uses The device parameter information of machinery, wherein, the said equipment parameter information includes: required plant equipment type, brand, model, purchase Time, required Mechanical Equipment Quantity, this plant equipment type includes excavator, bull-dozer, loader, road roller, land leveller, stand Paving machine etc.;
Each engineering machinery of coupling is searched according to above-mentioned lease charging way, job location and the said equipment parameter information Equipment, and the intelligent sequencing mode selected according to above-mentioned construction party shows each engineering mechanical device of coupling, executes for above-mentioned Engineering mechanical device needed for the selection of work side;
The engineering mechanical device selected according to the construction party received determines the towing equipment of this subjob;
Sending the request of inviting and business information to the driver that above-mentioned towing equipment is corresponding, wherein, the above-mentioned request of inviting is wrapped Include: the contact method of driver corresponding to engineering mechanical device that construction party selects, above-mentioned business information includes: above-mentioned engineering machine Tool equipment site, above-mentioned job location and above-mentioned engineering mechanical device parameter information;
When the driver receiving driver corresponding to above-mentioned engineering mechanical device corresponding with above-mentioned towing equipment submits to really When recognizing order, the engineering mechanical device that above-mentioned engineering mechanical device is leased as construction party.
In order to improve the utilization rate of towing equipment, reduce the emptying rate of towing equipment, based on this, according to the construction received The engineering mechanical device that side selects determines that the towing equipment of this subjob includes:
Travel route according to each towing equipment judges whether to mate and in approach with above-mentioned engineering mechanical device State the on-site towing equipment of engineering mechanical device;
If existing, then the current towing equipment nearest away from above-mentioned engineering mechanical device is set as the trailer of this subjob Standby.
Use the on-site towing equipment of approach engineering mechanical device as the trailer of this subjob it should be noted that elected During equipment, calculating the haulage expense without collecting deadhead operation generation, the most now the computing formula of haulage is Y=m ×L1, and then it is possible not only to improve the utilization rate of towing equipment, reduce the emptying rate of towing equipment, it is also possible to reduce construction party Hiring cost.
Further, in order to prevent different construction party from selecting same engineering mechanical device, and affect the progress of construction party, will After the engineering mechanical device that above-mentioned engineering mechanical device is leased as construction party, also include:
The current state of above-mentioned engineering mechanical device is designated rental status be set to hidden state;When receiving When above-mentioned engineering mechanical device completes the confirmation signal of this construction operation, the current state of above-mentioned engineering mechanical device is switched For treating rental status;
The current state of above-mentioned towing equipment is labeled as subscription state be set to hidden state;Above-mentioned when receiving When towing equipment completes the confirmation signal of this trailer operation, the current state of above-mentioned towing equipment is switched to idle state.
Further, in order to prevent construction party to be in arrears with expense, can be in the way of using pre-payment, when construction party selects engineering First deducting lowest total overall cost after plant equipment from associated account number, then send invitation to machinery side, this part expense is come by platform Keeping, based on this, after the engineering mechanical device selected according to the construction party received determines towing equipment, also includes:
Obtain the account balance of the associated account number of above-mentioned construction party;
Judge above-mentioned account balance whether more than leasing the lowest total overall cost of above-mentioned engineering mechanical device, wherein, above-mentioned Low total cost is minimum lease expenses and haulage sum;
If above-mentioned account balance is less than above-mentioned lowest total overall cost, then sends to above-mentioned construction party and carry carrying of supplementing with money in time The information of waking up, when determining above-mentioned account balance more than above-mentioned lowest total overall cost, deducts above-mentioned minimum from above-mentioned account balance Total cost, and perform to send to invite to the driver that above-mentioned towing equipment is corresponding to ask and the step of business information.
It should be noted that minimum lease expenses and haulage can be according to above-mentioned lease expenses computing formula and deliverys Expense computing formula determines.
More further, in work progress, the same account balance situation monitoring construction party associated account number in real time, works as inspection When measuring account balance deficiency, remind construction party to supplement with money in time, and remind other participants to enhance your vigilance, it may be necessary to terminate Construction operation, based on this, said method also includes:
In above-mentioned engineering mechanical device work progress, open from away from the timing node corresponding to the lease charging way used Begin, judge that above-mentioned account balance, should be away from the lease charged party used whether more than minimum amount threshold value according to prefixed time interval Timing node corresponding to formula can be the minimum lease time that each lease charging way is corresponding, i.e. grows up when real work When minimum lease time, illustrate that construction party advanced charge is used up, need to continue the account balance of associated account number is supervised Control;
Carry, if it is not, then send to above-mentioned construction party, the prompting message supplemented with money the most in time, and send to above-mentioned participant Carry the construction party prompting message that Sorry, your ticket has not enough value.
In the embodiment that the present invention provides, use the mode of pre-payment, same monitoring in real time in work progress simultaneously The account balance situation of construction party associated account number, when account balance deficiency being detected, reminds construction party to supplement with money in time, and reminds Other participants are enhanced your vigilance, it may be necessary to terminate construction operation, thus avoid the situation of construction party malice debt, it is also possible to Increase participant to the degree of belief of platform the public praise that promotes platform.
Concrete, it is contemplated that in the case of using the mode of pre-payment, after engineering terminates when construction party collection cost Need to deduct the expense of deduction from construction party associated account number, based on this, above-mentioned lease expenses and above-mentioned haulage are used it After the total cost as the above-mentioned engineering mechanical device of lease, also include:
Using above-mentioned total cost and from the associated account number of above-mentioned construction party the difference of the amount of money of deduction as to be collected Expense, and deduct from above-mentioned associated account number and above-mentioned treat fee charged.
Further, in order to improve the service awareness of the driver of towing equipment, and improve driving of engineering mechanical device The construction quality of the person of sailing and service awareness, based on this, said method also includes:
Receive first evaluation information of the driver to above-mentioned engineering mechanical device from construction party terminal and to upper State second evaluation information of the driver of towing equipment;
Distribute to the driver's of above-mentioned engineering mechanical device according to above-mentioned first evaluation information adjustment according to preset rules Expense and update the grade of service of driver of above-mentioned engineering mechanical device, and adjust point according to above-mentioned second evaluation information The expense of the driver of the above-mentioned towing equipment of dispensing and update the grade of service of driver of above-mentioned towing equipment.
Further, determine member's grade of machinery side according to the specification of machinery side, and determine phase according to member's grade The support policy answered, and then attract the addition of high-quality member, based on this, said method also includes:
The engineering mechanical device quantity held according to machinery side determines member's rank of above-mentioned machinery side;
Member's rank according to above-mentioned machinery side determines the support policy that above-mentioned machinery side is enjoyed.
Concrete, introduce the mechanism of evaluation, can be construction party, the driver of engineering mechanical device, the driving of towing equipment Member's mutual evaluation three party, by the wage of the driver of operation engineering mechanical device and the driver of towing equipment directly with The evaluation information of construction party is linked up with, and until corresponding regulation rule, as considered secure context, if trailer operation or execute There is not vehicle condition cause influence letter benefit during work industry, related personnel is rewarded certain amount of money;Consider post aspect, if completing Workflow that platform is reached and system, reward certain amount of money to related personnel;Consider evaluation aspect, if obtaining excellent commenting or indifference Comment, related personnel is rewarded certain amount of money;It addition, the most satisfactory for multinomial evaluation criterion, then encourage accordingly Encourage.Correspondingly, if not meeting preset requirement, then in the expense of related personnel's distribution, deduct certain amount of money, it addition, work as driver When record has difference to comment, the most also will affect the income of its boss, and then the working attitude of driver can be supervised further.
The grade of service record of driver is always good, will become platform high-quality member, when asking rent and haul information, The most preferentially it is pushed to this type of member;Otherwise, violated Tenancy Agreement, no matter either party has record of bad behavior in tripartite, During All Activity, platform can be enhanced your vigilance by remaining participant of active warning, as repeatedly cancelled membership in violation of rules and regulations.
In the embodiment that the present invention provides, by using the mechanism of evaluation, construction party can pass through user terminal uploads pair The evaluation information of equipment driver, and then can realize the service scenario of equipment driver being exercised supervision, for follow-up to driving The examination of member provides valid data, is linked directly by the wage of the evaluation information of construction party with driver, and then raising equipment is driven The work quality of the person of sailing, strengthens the service awareness of equipment driver;It addition, construction party can also good to engineering mechanical device State is evaluated, it is simple to machinery side understands the ruuning situation of equipment in time, it is also possible to increase the participant degree of belief to platform And promote the public praise of platform.
Further, in order to the registration user on lease platform is monitored and to engineering mechanical device and trailer The legitimacy of equipment is examined, and based on this, said method also includes: obtain user profile and equipment letter that registration user uploads Breath;
The authenticity and integrity of above-mentioned user profile, the said equipment information is audited;
If examination & verification is passed through, then above-mentioned user is allowed to register.
Concrete, when the registration on engineering mechanical device lease platform of machinery side, need to upload industrial and commercial registration certificate, pay Pay taxes the relevant certificates such as proof, certification, insurance certificate, operation certification, it is also desirable to upload personal identification papers's part and purchase Install the identity document of standby owner, use system of real name logon mode, it is to avoid occur without industrial and commercial registration, without payment of tax, nothing Certification, without insurance certificate, without the most complete machinery side of the operation certificate such as certification, also avoid the occurrence of pilferage, scrap, extort Rob that surreptitiously obtain or under-buy etc. underproof equipment, it is ensured that the verity of all machinery sides and reliability on platform.
In the embodiment that the present invention provides, use unified engineering mechanical device rental service charging and expense allocation mark Standard, obtains related data automatically by lease platform, and carries out charging according to the related data obtained and carry out rationalizing distribution again, Improve the lease fairness of expense of engineering mechanical device, reasonability, accuracy, the whole engineering mechanical device lease of specification The development of industry, meanwhile, above-mentioned data are what platform obtained automatically, it is not necessary to manual entry, improve data verity and Reliability, solves the deception of machinery side client, the problem of expense of claiming for charge at random, drive up, and provides justice, reliable for each participant Engineering mechanical device lease transaction platform;Further, use the mode of pre-payment, simultaneously same real-time in work progress The account balance situation of monitoring construction party associated account number, when account balance deficiency being detected, reminds construction party to supplement with money in time, and Other participants are reminded to enhance your vigilance, it may be necessary to terminate construction operation, thus avoid the situation of construction party malice debt, also Participant can be increased to the degree of belief of platform the public praise that promotes platform;Further, preferential selection approach engineering machinery The on-site towing equipment of equipment is as the towing equipment of this subjob, and then is possible not only to improve the utilization rate of towing equipment, Reduce the emptying rate of towing equipment, it is also possible to reduce the hiring cost of construction party.
The embodiment of the present invention additionally provides the managing device of a kind of engineering mechanical device lease platform, as in figure 2 it is shown, this dress Put and include:
First acquisition module 202, for obtaining the facility information of the engineering mechanical device of construction party lease, wherein, above-mentioned Facility information includes the time buying of above-mentioned engineering mechanical device, buying expenses and real work duration;
Lease expenses computing module 204, for according to lease above-mentioned engineering mechanical device use lease charging way and The said equipment information obtained calculates the lease expenses of above-mentioned engineering mechanical device;
Second acquisition module 206, for obtaining the weight of above-mentioned engineering mechanical device, consigning above-mentioned engineering mechanical device The deadhead operation distance of towing equipment and the haul of the above-mentioned engineering mechanical device of lease;
Haulage computing module 208, for true according to above-mentioned weight, above-mentioned deadhead operation distance and above-mentioned haul The haulage of fixed above-mentioned engineering mechanical device is used;
Total cost determines module 210, for using above-mentioned lease expenses and above-mentioned haulage sum as leasing above-mentioned work The total cost of journey plant equipment;
Expense allocation module 212, for corresponding according to participant set in advance and above-mentioned participant by above-mentioned total cost Allocation proportion be respectively allocated to each participant.
In the managing device of the engineering mechanical device lease platform of embodiment of the present invention offer, use unified engineering machine Tool equipment leasing industry charging and expense allocation standard, obtain related data automatically by lease platform, and according to the phase obtained Pass data carry out charging and carry out rationalizing distribution again, improve the lease fairness of expense of engineering mechanical device, reasonability, standard True property, the specification development of whole engineering mechanical device rental service, meanwhile, above-mentioned data are what platform obtained automatically, nothing Need manual entry, improve verity and the reliability of data, solve machinery side's deception client, claim for charge at random, drive up expense Problem, provides justice, reliable engineering mechanical device lease transaction platform for each participant.
The embodiment of the present invention additionally provides the management system of a kind of engineering mechanical device lease platform, as it is shown on figure 3, this is System includes: the managing device 20 of user terminal 10, above-mentioned engineering mechanical device lease platform, wherein, this user terminal includes: execute Work side's terminal, machinery side's terminal, trailer side's terminal, driver's terminal of engineering mechanical device, driver's terminal of towing equipment; Said apparatus and above-mentioned user terminal lease facility information and the cost information of engineering mechanical device alternately.
Concrete, user terminal can be one with the wireless signal transmission-receiving function mobile terminal equipped with appointment APP (such as mobile phone, panel computer, or other portable electric appts), the personnel holding this mobile terminal register and log in APP, registration Time, need to upload related data, such as essential informations such as identity card original paper, addresses, machinery side and trailer side are also needed to upload Equipment related data.
In the embodiment that the present invention provides, by engineering mechanical device lease platform, individual machinery side is carried out whole Closing, construction party can lease required various engineering mechanical devices by platform, saves construction party and finds equipment required time, Also solve owing to individual machinery method, apparatus quantity is few, and the problem that construction party actual demand cannot be met;Simultaneously, moreover it is possible to realize The effect that each engineering mechanical device is publicized;It addition, each participant all can be checked by corresponding user terminal Related data and transaction record.
In the management system of the engineering mechanical device lease platform of embodiment of the present invention offer, first, obtain construction party The facility information of the engineering mechanical device of lease;According to leasing the lease charging way of engineering mechanical device employing and setting of acquisition The lease expenses of standby information computational engineering plant equipment;Then, the weight of engineering mechanical device, delivery engineering mechanical device are obtained Towing equipment deadhead operation distance and lease engineering mechanical device haul;According to weight, deadhead operation distance and Haul determines that the haulage of engineering mechanical device is used;Lease expenses and haulage sum are set as lease engineering machinery Standby total cost;Finally, total cost is respectively allocated to according to the allocation proportion that participant set in advance and participant are corresponding Each participant.In the present invention, use unified engineering mechanical device rental service charging and expense allocation standard, by renting Platform of renting obtains related data automatically, and carries out charging according to the related data obtained and carry out rationalizing distribution again, improves rent Rent the fairness of expense of engineering mechanical device, reasonability, accuracy, specification the sending out of whole engineering mechanical device rental service Exhibition, meanwhile, above-mentioned data are what platform obtained automatically, it is not necessary to manual entry, improve verity and the reliability of data, solve The mechanical side that determined cheats client, the problem of expense of claiming for charge at random, drive up, and provides justice, reliable engineering machine for each participant Tool equipment leasing transaction platform.
The managing device of engineering mechanical device that the embodiment of the present invention is provided lease platform can be specific on equipment Hardware or the software being installed on equipment or firmware etc..The device that the embodiment of the present invention is provided, it realizes principle and generation Technique effect identical with preceding method embodiment, for briefly describe, the not mentioned part of device embodiment part, refer to aforementioned Corresponding contents in embodiment of the method.Those skilled in the art is it can be understood that arrive, for convenience and simplicity of description, front State the specific works process of the system of description, device and unit, be all referred to the corresponding process in said method embodiment, This repeats no more.
In embodiment provided by the present invention, it should be understood that disclosed apparatus and method, can be by other side Formula realizes.Device embodiment described above is only that schematically such as, the division of described unit, the most only one are patrolled Volume function divides, and actual can have other dividing mode when realizing, the most such as, multiple unit or assembly can in conjunction with or can To be integrated into another system, or some features can be ignored, or does not performs.Another point, shown or discussed each other Coupling direct-coupling or communication connection can be the INDIRECT COUPLING by some communication interfaces, device or unit or communication link Connect, can be electrical, machinery or other form.
The described unit illustrated as separating component can be or may not be physically separate, shows as unit The parts shown can be or may not be physical location, i.e. may be located at a place, or can also be distributed to multiple On NE.Some or all of unit therein can be selected according to the actual needs to realize the mesh of the present embodiment scheme 's.
It addition, each functional unit in the embodiment that the present invention provides can be integrated in a processing unit, it is possible to Being that unit is individually physically present, it is also possible to two or more unit are integrated in a unit.
If described function is using the form realization of SFU software functional unit and as independent production marketing or use, permissible It is stored in a computer read/write memory medium.Based on such understanding, technical scheme is the most in other words The part contributing prior art or the part of this technical scheme can embody with the form of software product, this meter Calculation machine software product is stored in a storage medium, including some instructions with so that a computer equipment (can be individual People's computer, server, or the network equipment etc.) perform all or part of step of method described in each embodiment of the present invention. And aforesaid storage medium includes: USB flash disk, portable hard drive, read only memory (ROM, Read-Only Memory), random access memory are deposited The various media that can store program code such as reservoir (RAM, Random Access Memory), magnetic disc or CD.
It should also be noted that similar label and letter represent similar terms, therefore, the most a certain Xiang Yi in following accompanying drawing Individual accompanying drawing is defined, then need not it be defined further and explains in accompanying drawing subsequently, additionally, term " the One ", " second ", " the 3rd " etc. are only used for distinguishing and describe, and it is not intended that instruction or hint relative importance.
It is last it is noted that the detailed description of the invention of embodiment described above, the only present invention, in order to the present invention to be described Technical scheme, be not intended to limit, protection scope of the present invention is not limited thereto, although with reference to previous embodiment to this Bright it is described in detail, it will be understood by those within the art that: any those familiar with the art In the technical scope that the invention discloses, the technical scheme described in previous embodiment still can be modified or can be light by it It is readily conceivable that change, or wherein portion of techniques feature is carried out equivalent;And these are revised, change or replace, do not make The essence of appropriate technical solution departs from the spirit and scope of embodiment of the present invention technical scheme.All should contain the protection in the present invention Within the scope of.Therefore, protection scope of the present invention should described be as the criterion with scope of the claims.

Claims (16)

1. the management method of an engineering mechanical device lease platform, it is characterised in that described method includes:
Obtaining the facility information of the engineering mechanical device of construction party lease, wherein, described facility information includes described engineering machinery The time buying of equipment, buying expenses and real work duration;
According to leasing lease charging way and the described facility information described work of calculating of acquisition that described engineering mechanical device uses The lease expenses of journey plant equipment;
The weight that obtains described engineering mechanical device, the deadhead operation distance of the towing equipment consigning described engineering mechanical device and Lease the haul of described engineering mechanical device;
The haulage of described engineering mechanical device is determined according to described weight, described deadhead operation distance and described haul With;
Using described lease expenses and described haulage sum as the total cost leasing described engineering mechanical device;
Described total cost is respectively allocated to each according to the allocation proportion that participant set in advance and described participant are corresponding Participant.
Management method the most according to claim 1, it is characterised in that according to leasing the rent that described engineering mechanical device uses The described facility information of charging way of renting and acquisition calculates the lease expenses of described engineering mechanical device, including:
The service life of described engineering mechanical device is determined according to the described time buying;
According to leasing lease charging way, described real work duration and the described use that described engineering mechanical device uses The time limit transfers the computing formula of corresponding lease expenses;
Computing formula according to the lease expenses transferred and described buying expenses, described real work duration, described service life It is calculated the lease expenses of described engineering mechanical device.
Management method the most according to claim 2, it is characterised in that according to leasing the rent that described engineering mechanical device uses Rent charging way, described real work duration and described service life transfers the computing formula of corresponding lease expenses, bag Include:
When the lease charging way leasing the employing of described engineering mechanical device is monthly to lease, it is judged that described real work duration Whether it is less than 160 hours and judges whether described service life is less than the depreciable life of described engineering mechanical device;If T is < 160 and q < a, then the computing formula of the lease expenses transferred isIf T < 160 and q > a, then the rent transferred The computing formula of rental fee isIf T > 160 and q < a, then the lease expenses transferred Computing formula isIf T > 160 and q > a, then the lease expenses transferred Computing formula is
When leasing the lease charging way of described engineering mechanical device employing for during by week lease, it is judged that described real work duration is No it be less than 40 hours and judge that described service life is whether less than the depreciable life of described engineering mechanical device;If T < 40 and q < a, then the computing formula of the lease expenses transferred isIf T < 40 and q > a, then the rent transferred The computing formula of rental fee isIf T > 40 and q is < a, then transfer The computing formula of lease expenses isIf T > 40 and q > a, then the computing formula of the lease expenses transferred is
When the lease charging way leasing the employing of described engineering mechanical device is Per Date Basis, it is judged that described real work duration is No it be less than 8 hours and judge that described service life is whether less than the depreciable life of described engineering mechanical device;If T < 8 and q is < A, then the computing formula of the lease expenses transferred isIf T < 8 and q > a, then the rent transferred The computing formula of rental fee isIf T > 8 and q is < a, then transfer The computing formula of lease expenses isIf T > 8 and q > a, then the computing formula of the lease expenses transferred is Wherein, X represents the lease expenses of engineering mechanical device, and M represents engineering machine The buying expenses of tool equipment, a represents the depreciable life of engineering mechanical device, and T represents the real work duration of engineering mechanical device, η1Represent by penalty coefficient during week lease, η2Penalty coefficient when representing Per Date Basis, q represents that service life, κ represent lease expenses Annual decreasing ratio.
Management method the most according to claim 1, it is characterised in that according to described weight, described deadhead operation distance and Described haul determines the haulage use of described engineering mechanical device, including:
Weight according to described engineering mechanical device determines expense needed for towing equipment delivery described engineering mechanical device every kilometer;
According to formula Y=m × L1+n×L2The haulage being calculated described engineering mechanical device is used;Wherein, Y represents engineering machine The haulage use of tool equipment, m represents expense needed for towing equipment delivery engineering mechanical device every kilometer, and n represents that towing equipment is empty Carry expense needed for travelling every kilometer, L1Represent the lease haul of engineering mechanical device, L2Represent delivery engineering mechanical device The deadhead operation distance of towing equipment.
Management method the most according to claim 1, it is characterised in that by described total cost according to participant set in advance And allocation proportion corresponding to described participant is respectively allocated to each participant, including:
According to formulaIt is calculated the expense distributing to each trailer operation participant, institute respectively State trailer operation participant to include: trailer side, the driver of towing equipment, insurance department, gas station, towing equipment repairing side, Functional management department and the expense of service platform, wherein, piRepresent and distribute to i-th participant in trailer operation participant Corresponding allocation proportion, ∑ pi=1, aiRepresent and distribute to every kilometer of expense of i-th participant, Y table in trailer operation participant Show that the haulage of engineering mechanical device is used;
According to formula xi=ciiT is calculated the expense distributing to each construction operation participant, described construction operation respectively Participant includes: machinery side, the driver of engineering mechanical device, insurance department, gas station, engineering mechanical device maintenance side, with And the expense of service platform, wherein, T represents the real work duration of engineering mechanical device, ciRepresent and distribute to construction operation ginseng The basic wage corresponding with i-th participant in side, μiRepresent and distribute to the unit of i-th participant in construction operation participant Hour expense.
6. according to the management method described in any one of claim 1-5, it is characterised in that the engineering of described acquisition construction party lease Before the facility information of plant equipment, also include:
Receive lease charging way, job location and required engineering machinery that the lease engineering mechanical device of construction party input uses Device parameter information, wherein, described device parameter information includes: required plant equipment type, brand, model, the time buying, Required Mechanical Equipment Quantity;
Set according to each engineering machinery that described lease charging way, job location and described device parameter information searching mate Standby, and the intelligent sequencing mode selected according to described construction party shows each engineering mechanical device of coupling, for described construction Engineering mechanical device needed for side's selection;
The engineering mechanical device selected according to the construction party received determines the towing equipment of this subjob;
Send the request of inviting and business information to driver corresponding to described towing equipment, wherein, described in the request of inviting include: execute The contact method of driver corresponding to engineering mechanical device that work side selects, described business information includes: described engineering machinery sets Standby site, described job location and described engineering mechanical device parameter information;
When the driver receiving driver corresponding to described engineering mechanical device corresponding with described towing equipment submits to confirmation to order Dan Shi, the engineering mechanical device that described engineering mechanical device is leased as construction party.
Management method the most according to claim 6, it is characterised in that the engineering machinery selected according to the construction party received Equipment determines that the towing equipment of this subjob includes:
Travel route according to each towing equipment judges whether to mate and work described in approach with described engineering mechanical device The on-site towing equipment of journey plant equipment;
If existing, then using currently away from the nearest towing equipment of described engineering mechanical device as the towing equipment of this subjob.
Management method the most according to claim 6, it is characterised in that using described engineering mechanical device as construction party lease Engineering mechanical device after, also include:
The current state of described engineering mechanical device is designated rental status be set to hidden state;Described when receiving When engineering mechanical device completes the confirmation signal of this construction operation, the current state of described engineering mechanical device is switched to and treats Rental status;
The current state of described towing equipment is labeled as subscription state be set to hidden state;When receiving described trailer When equipment completes the confirmation signal of this trailer operation, the current state of described towing equipment is switched to idle state.
Management method the most according to claim 6, it is characterised in that the engineering machinery selected according to the construction party received After equipment determines towing equipment, also include:
Obtain the account balance of the associated account number of described construction party;
Judge described account balance whether more than leasing the lowest total overall cost of described engineering mechanical device, wherein, described minimum always Expense is minimum lease expenses and haulage sum;
If described account balance is less than described lowest total overall cost, then sends to described construction party and carry the prompting letter supplemented with money in time Breath, when determining described account balance more than described lowest total overall cost, deducts described minimum total expense from described account balance With, and perform to send to invite to the driver that described towing equipment is corresponding to ask and the step of business information.
Management method the most according to claim 9, it is characterised in that described method also includes:
In described engineering mechanical device work progress, from away from the timing node corresponding to the lease charging way used, Judge that whether described account balance is more than minimum amount threshold value according to prefixed time interval;
Carry, if it is not, then send to described construction party, the prompting message supplemented with money the most in time, and carry to the transmission of described participant There is the prompting message that Sorry, your ticket has not enough value for construction party.
11. management methods according to claim 10, it is characterised in that described lease expenses and described haulage are used it After the total cost as the described engineering mechanical device of lease, also include:
Using described total cost and from the associated account number of described construction party the difference of the amount of money of deduction as treating fee charged, And treat fee charged described in deduction from described associated account number.
12. management methods according to claim 1, it is characterised in that described method also includes:
Receive first evaluation information of the driver to described engineering mechanical device from construction party terminal and drag described Second evaluation information of the driver that vehicle device is corresponding;
According to preset rules according to described first evaluation information adjust distribute to described engineering mechanical device driver expense, And update the grade of service of the driver of described engineering mechanical device, and adjust according to described second evaluation information and distribute to institute The expense stating the driver of towing equipment and the grade of service of the driver updating described towing equipment.
13. management methods according to claim 1, it is characterised in that described method also includes:
The engineering mechanical device quantity held according to machinery side determines member's rank of described machinery side;
Member's rank according to described machinery side determines the support policy that described machinery side is enjoyed.
14. management methods according to claim 1, it is characterised in that described method also includes:
Obtain user profile and facility information that registration user uploads;
The authenticity and integrity of described user profile, described facility information is audited;
If examination & verification is passed through, then described user is allowed to register.
The managing device of 15. 1 kinds of engineering mechanical device lease platforms, it is characterised in that described device includes:
First acquisition module, for obtaining the facility information of the engineering mechanical device of construction party lease, wherein, described facility information Time buying, buying expenses and real work duration including described engineering mechanical device;
Lease expenses computing module, for according to leasing lease charging way and the institute of acquisition that described engineering mechanical device uses State facility information and calculate the lease expenses of described engineering mechanical device;
Second acquisition module, sets for the weight obtaining described engineering mechanical device, the trailer of consigning described engineering mechanical device Standby deadhead operation distance and the haul of the described engineering mechanical device of lease;
Haulage computing module, described for determining according to described weight, described deadhead operation distance and described haul The haulage of engineering mechanical device is used;
Total cost determines module, for described lease expenses and described haulage sum being set as leasing described engineering machinery Standby total cost;
Expense allocation module, for by described total cost according to distribution ratio corresponding to participant set in advance and described participant Example is respectively allocated to each participant.
The management system of 16. 1 kinds of engineering mechanical device lease platforms, it is characterised in that described system includes: user terminal, power Profit requires the managing device described in 15, and wherein, described user terminal includes: construction party terminal, machinery side's terminal, trailer side are eventually End, driver's terminal of engineering mechanical device, driver's terminal of towing equipment;Described device is rented alternately with described user terminal Rent the facility information of engineering mechanical device and cost information.
CN201610328863.0A 2016-05-17 2016-05-17 Method, device and system for managing engineering machine equipment leasing platform Pending CN106022875A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610328863.0A CN106022875A (en) 2016-05-17 2016-05-17 Method, device and system for managing engineering machine equipment leasing platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610328863.0A CN106022875A (en) 2016-05-17 2016-05-17 Method, device and system for managing engineering machine equipment leasing platform

Publications (1)

Publication Number Publication Date
CN106022875A true CN106022875A (en) 2016-10-12

Family

ID=57098733

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610328863.0A Pending CN106022875A (en) 2016-05-17 2016-05-17 Method, device and system for managing engineering machine equipment leasing platform

Country Status (1)

Country Link
CN (1) CN106022875A (en)

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106651503A (en) * 2016-10-17 2017-05-10 李素军 Mechanical equipment leasing method, server and system
CN107067301A (en) * 2017-03-31 2017-08-18 柳州易农科技有限公司 A kind of joint project machine and equipment leasing system
CN107292725A (en) * 2017-07-25 2017-10-24 浙江聚励云机械科技有限公司 Engineering equipment leasing service system and method
CN107330651A (en) * 2017-06-27 2017-11-07 昆山亚比斯环保包装材料有限公司 The method of pallet management system and circulation management pallet
CN107451933A (en) * 2017-07-25 2017-12-08 浙江聚励云机械科技有限公司 Engineering equipment driver's distribute leaflets service system and method
CN107481110A (en) * 2017-08-14 2017-12-15 刁洪庚 A kind of e-commerce platform is to rent the purchase method of commission
CN107679975A (en) * 2017-11-03 2018-02-09 厦门大学 A kind of cutter shares leasing system and its operation method
CN108805301A (en) * 2018-06-05 2018-11-13 北京智行者科技有限公司 Unmanned cleaning equipment rents the processing method of safeguard service demand
CN109313780A (en) * 2018-08-28 2019-02-05 深圳市元征科技股份有限公司 Diagnostic device rent method, server and storage medium
CN109598557A (en) * 2018-12-10 2019-04-09 拓卡奔马机电科技有限公司 A kind of charging method and system of layout machine operation
CN109615453A (en) * 2018-10-29 2019-04-12 中交第二航务工程局有限公司 Circulation material self-help settlement method and system
CN109685627A (en) * 2018-12-27 2019-04-26 郑州建租联网络科技有限公司 A kind of architecture machinery rental business model based on internet platform
CN109872207A (en) * 2017-12-04 2019-06-11 南京天朝机网络科技有限公司 The method and device of leasing of construction machinery expense is set for intelligence
CN109886720A (en) * 2018-12-20 2019-06-14 四机赛瓦石油钻采设备有限公司 Pressure break equipment lease charging method, equipment and storage equipment based on Internet of Things
CN111612578A (en) * 2020-05-15 2020-09-01 众能联合数字技术有限公司 Engineering data recommendation method for engineering machinery rental scene by means of multi-attribute analysis
CN113329405A (en) * 2021-05-28 2021-08-31 湖南响箭重工科技股份有限公司 Engineering machinery data monitoring interconnection system and method
CN115578158A (en) * 2022-11-21 2023-01-06 天津建设发展集团有限公司 Construction machinery circulation management method and system
CN113329405B (en) * 2021-05-28 2024-04-30 湖南响箭重工科技股份有限公司 Engineering machinery data monitoring interconnection system and method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1499409A (en) * 2002-11-08 2004-05-26 株式会社日立制作所 Lease of appts. and machine and requirement method of fee, choosing device and analg tool
CN104376449A (en) * 2014-11-26 2015-02-25 彭益民 Storage, distribution and dispatching method and system
CN105162806A (en) * 2015-10-11 2015-12-16 合肥协力仪表控制技术股份有限公司 Engineering machinery intelligent management platform and management method based on Internet of Things technology
CN105488604A (en) * 2014-09-23 2016-04-13 常熟市天添美承网络服务有限公司 Allocation and management method of engineering machinery

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1499409A (en) * 2002-11-08 2004-05-26 株式会社日立制作所 Lease of appts. and machine and requirement method of fee, choosing device and analg tool
CN105488604A (en) * 2014-09-23 2016-04-13 常熟市天添美承网络服务有限公司 Allocation and management method of engineering machinery
CN104376449A (en) * 2014-11-26 2015-02-25 彭益民 Storage, distribution and dispatching method and system
CN105162806A (en) * 2015-10-11 2015-12-16 合肥协力仪表控制技术股份有限公司 Engineering machinery intelligent management platform and management method based on Internet of Things technology

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106651503A (en) * 2016-10-17 2017-05-10 李素军 Mechanical equipment leasing method, server and system
CN107067301A (en) * 2017-03-31 2017-08-18 柳州易农科技有限公司 A kind of joint project machine and equipment leasing system
CN107330651A (en) * 2017-06-27 2017-11-07 昆山亚比斯环保包装材料有限公司 The method of pallet management system and circulation management pallet
CN107292725A (en) * 2017-07-25 2017-10-24 浙江聚励云机械科技有限公司 Engineering equipment leasing service system and method
CN107451933A (en) * 2017-07-25 2017-12-08 浙江聚励云机械科技有限公司 Engineering equipment driver's distribute leaflets service system and method
CN107481110A (en) * 2017-08-14 2017-12-15 刁洪庚 A kind of e-commerce platform is to rent the purchase method of commission
CN107679975A (en) * 2017-11-03 2018-02-09 厦门大学 A kind of cutter shares leasing system and its operation method
CN109872207A (en) * 2017-12-04 2019-06-11 南京天朝机网络科技有限公司 The method and device of leasing of construction machinery expense is set for intelligence
CN108805301A (en) * 2018-06-05 2018-11-13 北京智行者科技有限公司 Unmanned cleaning equipment rents the processing method of safeguard service demand
CN109313780A (en) * 2018-08-28 2019-02-05 深圳市元征科技股份有限公司 Diagnostic device rent method, server and storage medium
WO2020041981A1 (en) * 2018-08-28 2020-03-05 深圳市元征科技股份有限公司 Diagnostic device rental method, server, and storage medium
CN109615453A (en) * 2018-10-29 2019-04-12 中交第二航务工程局有限公司 Circulation material self-help settlement method and system
CN109598557A (en) * 2018-12-10 2019-04-09 拓卡奔马机电科技有限公司 A kind of charging method and system of layout machine operation
CN109598557B (en) * 2018-12-10 2021-01-26 拓卡奔马机电科技有限公司 Charging method and system for operation of cloth paving machine
CN109886720A (en) * 2018-12-20 2019-06-14 四机赛瓦石油钻采设备有限公司 Pressure break equipment lease charging method, equipment and storage equipment based on Internet of Things
CN109886720B (en) * 2018-12-20 2021-06-22 四机赛瓦石油钻采设备有限公司 Fracturing equipment lease charging method and equipment based on Internet of things and storage equipment
CN109685627A (en) * 2018-12-27 2019-04-26 郑州建租联网络科技有限公司 A kind of architecture machinery rental business model based on internet platform
CN111612578A (en) * 2020-05-15 2020-09-01 众能联合数字技术有限公司 Engineering data recommendation method for engineering machinery rental scene by means of multi-attribute analysis
CN113329405A (en) * 2021-05-28 2021-08-31 湖南响箭重工科技股份有限公司 Engineering machinery data monitoring interconnection system and method
CN113329405B (en) * 2021-05-28 2024-04-30 湖南响箭重工科技股份有限公司 Engineering machinery data monitoring interconnection system and method
CN115578158A (en) * 2022-11-21 2023-01-06 天津建设发展集团有限公司 Construction machinery circulation management method and system

Similar Documents

Publication Publication Date Title
CN106022875A (en) Method, device and system for managing engineering machine equipment leasing platform
Starkey et al. Domestic Tradable Quotas: A policy instrument for reducing greenhouse gas emissions from energy use
US20090018902A1 (en) Commuter credits system and method
CN107330622A (en) One kind trip uses platform and its application process
CN105787722A (en) System and method for realizing subway charging by mileage based on advanced online payment
CN106469469A (en) A kind of method and system realizing the lease control of Parking position
CN105894849A (en) Orderly parking system based on cloud platform and realization method thereof
CN101354769A (en) Business trip service system and method
CN107330758A (en) A kind of shared method of shared car timesharing usufruct
JP2009087317A (en) Emission right transaction processing system of carbon dioxide of automobile having automobile information data bank and assessment processing system utilizing the transaction processing system
Kelley et al. Monitoring in target contracts: Theory and experiment in Kenyan public transit
Berdiyorov Issues of development of marketing research on the autotransport system
Kelley et al. Monitoring in small firms: Experimental evidence from Kenyan public transit
Reshetnikova et al. ASSESSMENT OF EFFECTIVENESS OF MODERNIZATION OF TRANSPORT ENTERPRISES IN THE CONTEXT OF ANALYSIS OF INNOVATION DETERMINANT.
Greene et al. Policies for promoting low-emission vehicles and fuels: Lessons from recent analyses
Brocklebank Private sector involvement in road financing
Hadas et al. Assessing public transport passenger attitudes towards a dynamic fare model based on in-vehicle crowdedness levels and additional waiting time
Fayard et al. Motorway provision and management in France: Analyses and policy issues
CN116402515A (en) One-stop full life cycle service method and system for electric automobile user
Richter et al. Exploring the financial implications of operating a shared autonomous electric vehicle fleet in Zurich
Baker et al. Exploratory study: vehicle mileage fees in Texas.
CN115861000A (en) Cloud vehicle getting-on station system and interaction method thereof
He et al. Promoting service quality with incentive contracts in rural bus integrated passenger-freight service
CN112419049A (en) Quota determining method and device
JP2020194445A (en) Information processing method and computer program

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161012