CN106014451B - 一种盾构机管片注浆栓 - Google Patents
一种盾构机管片注浆栓 Download PDFInfo
- Publication number
- CN106014451B CN106014451B CN201610534579.9A CN201610534579A CN106014451B CN 106014451 B CN106014451 B CN 106014451B CN 201610534579 A CN201610534579 A CN 201610534579A CN 106014451 B CN106014451 B CN 106014451B
- Authority
- CN
- China
- Prior art keywords
- slip casting
- casting bolt
- ontology
- check valve
- shield machine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000007569 slipcasting Methods 0.000 title claims abstract description 52
- 238000005266 casting Methods 0.000 claims description 4
- 239000003292 glue Substances 0.000 claims 1
- 239000002002 slurry Substances 0.000 abstract description 12
- 239000007787 solid Substances 0.000 abstract description 6
- 239000011435 rock Substances 0.000 abstract description 4
- 230000000694 effects Effects 0.000 abstract description 3
- 230000008676 import Effects 0.000 abstract description 3
- 238000007711 solidification Methods 0.000 abstract description 3
- 230000008023 solidification Effects 0.000 abstract description 3
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/105—Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
本发明提出了一种盾构机管片注浆栓,其组成包括:注浆栓本体、延管,所述注浆栓本体下部直径略大于上部,所述注浆栓本体内设有单向阀,在所述注浆栓内壁上设有橡胶围挡,所述橡胶围挡下端位于所述单向阀的上部,所述橡胶围挡表面有均匀的褶皱,在所述注浆栓本体上端设有延管。其有益效果是:盾构专用注浆栓底部是单向阀,能保证浆液只进不出,浆液在橡胶围挡作用下在管片外壁与围岩之间形成一个浆液鼓包,凝固后形成篮球大小的固体。此固体作为受力点顶住整环管片,以控制管片上浮。
Description
技术领域
本发明涉及盾构机领域,特别是指一种盾构机管片注浆栓。
背景技术
现在在地铁施工中,采用–盾构法施工时,盾构刀盘开挖完成后管片拼装机进行管片的拼装,刀盘的开挖直径大于管片的外径,所以采用注浆的方式进行围岩与管片外壁间隙的填充。在注浆时,因浆液自重、流塑性等原因导致浆液向底部流动,在凝固过程中导致底部浆液多,上部少以至于管片上浮。
发明内容
本发明为解决现有技术中存在的问题,提出一种盾构机管片注浆栓。
本发明的技术方案是这样实现的:
一种盾构机管片注浆栓,其组成包括:注浆栓本体、延管,所述注浆栓本体下部直径略大于上部,所述注浆栓本体内设有单向阀,在所述注浆栓本体内壁上设有橡胶围挡,所述橡胶围挡下端位于所述单向阀的上部,所述橡胶围挡表面有均匀的褶皱,在所述注浆栓本体上端设有延管。
所述注浆栓本体安装在注浆孔中,所述注浆栓本体与注浆头连接。
在所述注浆栓本体与吊装孔埋件配合安装。
本发明的有益效果是:本发明结构简单,盾构专用注浆栓底部是单向阀,能保证浆液只进不出;利用注浆栓前端橡胶的膨胀性,浆液在橡胶围挡作用下在管片外壁与围岩之间形成一个浆液鼓包,凝固后形成篮球大小的固体。此固体作为受力点顶住整环管片,以控制管片上浮。
附图说明
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。
图1为本发明的结构示意图;
图2为本发明注浆前的结构示意图;
图3为本发明通孔后的结构示意图;
图4为本发明注浆后的结构示意图。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有付出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
一种盾构机管片注浆栓,其组成包括:注浆栓本体1、延管2,所述注浆栓本体1下部直径略大于上部,所述注浆栓本体1内设有单向阀5,在所述注浆栓本体内壁上设有橡胶围挡3,所述橡胶围挡3下端位于所述单向阀5的上部,所述橡胶围挡3表面有均匀的褶皱,在所述注浆栓本体1上端设有延管2。
所述注浆栓本体1安装在注浆孔中,所述注浆栓本体与注浆头连接。
在所述注浆栓本体1与吊装孔埋件4配合安装。
盾构专用注浆栓其主要目的是控制地铁隧道盾构法施工管片上浮,其原理是:在注浆之前,把本产品放入管片注浆孔,再与注浆头连接进行注浆,盾构专用注浆栓底部是单向阀,能保证浆液只进不出;利用注浆栓前端橡胶的膨胀性,浆液在橡胶围挡作用下在管片外壁与围岩之间形成一个浆液鼓包,凝固后形成篮球大小的固体。此固体作为受力点顶住整环管片,以控制管片上浮
以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。
Claims (3)
1.一种盾构机管片注浆栓,其组成包括:注浆栓本体、延管,其特征在于:所述注浆栓本体下部直径略大于上部,所述注浆栓本体内设有单向阀,在所述注浆栓本体内壁上设有橡胶围挡,所述橡胶围挡下端位于所述单向阀的上部,所述橡胶围挡表面有均匀的褶皱,在所述注浆栓本体上端设有延管。
2.根据权利要求1所述的盾构机管片注浆栓,其特征在于:所述注浆栓本体安装在注浆孔中,所述注浆栓本体与注浆头连接。
3.根据权利要求1所述的盾构机管片注浆栓,其特征在于:在所述注浆栓本体与吊装孔埋件配合安装。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610534579.9A CN106014451B (zh) | 2016-07-08 | 2016-07-08 | 一种盾构机管片注浆栓 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610534579.9A CN106014451B (zh) | 2016-07-08 | 2016-07-08 | 一种盾构机管片注浆栓 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106014451A CN106014451A (zh) | 2016-10-12 |
CN106014451B true CN106014451B (zh) | 2019-02-22 |
Family
ID=57108331
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610534579.9A Active CN106014451B (zh) | 2016-07-08 | 2016-07-08 | 一种盾构机管片注浆栓 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106014451B (zh) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0734791A (ja) * | 1993-07-23 | 1995-02-03 | Shimizu Corp | シールドトンネルの覆工方法 |
CN102352757A (zh) * | 2011-10-28 | 2012-02-15 | 上海市第一市政工程有限公司 | 盾构机空推过矿山法隧道时控制管片上浮的方法 |
CN202380463U (zh) * | 2011-12-19 | 2012-08-15 | 中铁第四勘察设计院集团有限公司 | 一种注浆囊式可回收锚索 |
CN103993895A (zh) * | 2014-06-10 | 2014-08-20 | 中铁二院工程集团有限责任公司 | 一种tbm工法预制管片衬砌吊装及吹填压浆预埋组件 |
CN104074189A (zh) * | 2014-06-24 | 2014-10-01 | 中南大学 | 可回收注浆膨胀扩大头预应力锚索 |
CN104389623A (zh) * | 2014-11-12 | 2015-03-04 | 中铁二院工程集团有限责任公司 | 一种盾构隧道预制管片衬砌背后地层注浆装置 |
CN205918430U (zh) * | 2016-07-08 | 2017-02-01 | 中铁工程装备集团机电工程有限公司 | 一种盾构机管片注浆栓 |
-
2016
- 2016-07-08 CN CN201610534579.9A patent/CN106014451B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0734791A (ja) * | 1993-07-23 | 1995-02-03 | Shimizu Corp | シールドトンネルの覆工方法 |
CN102352757A (zh) * | 2011-10-28 | 2012-02-15 | 上海市第一市政工程有限公司 | 盾构机空推过矿山法隧道时控制管片上浮的方法 |
CN202380463U (zh) * | 2011-12-19 | 2012-08-15 | 中铁第四勘察设计院集团有限公司 | 一种注浆囊式可回收锚索 |
CN103993895A (zh) * | 2014-06-10 | 2014-08-20 | 中铁二院工程集团有限责任公司 | 一种tbm工法预制管片衬砌吊装及吹填压浆预埋组件 |
CN104074189A (zh) * | 2014-06-24 | 2014-10-01 | 中南大学 | 可回收注浆膨胀扩大头预应力锚索 |
CN104389623A (zh) * | 2014-11-12 | 2015-03-04 | 中铁二院工程集团有限责任公司 | 一种盾构隧道预制管片衬砌背后地层注浆装置 |
CN205918430U (zh) * | 2016-07-08 | 2017-02-01 | 中铁工程装备集团机电工程有限公司 | 一种盾构机管片注浆栓 |
Also Published As
Publication number | Publication date |
---|---|
CN106014451A (zh) | 2016-10-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208330397U (zh) | 一种联合受力的压力输水盾构隧洞衬砌结构 | |
CN106014451B (zh) | 一种盾构机管片注浆栓 | |
CN204491585U (zh) | 灌注桩单主管环形多注浆点后压浆装置 | |
CN205918430U (zh) | 一种盾构机管片注浆栓 | |
CN205314534U (zh) | 一种框架柱无损拉结钢模板结构 | |
CN103557007B (zh) | 过地质异常带极破碎软岩巷道的施工方法 | |
CN205689406U (zh) | 抽油泵防垢卡装置 | |
CN204920825U (zh) | 一种气体钻井用排砂管线弯管接头 | |
CN104653210B (zh) | 复合锚杆结构 | |
CN205876389U (zh) | 一种用于深井充填的减压仓 | |
CN104141286A (zh) | 施工支洞封堵结构 | |
CN204609917U (zh) | 复合锚杆结构 | |
CN203783631U (zh) | 一种穿对拉锚杆的柔性充填袋 | |
CN203960984U (zh) | 软土区室内埋设的排水管道的悬挂、加固装置 | |
CN206487493U (zh) | 一种盾构隧道洞门环板预埋注浆止水结构 | |
CN202450511U (zh) | 一种注浆装置 | |
CN203412589U (zh) | 过地质异常带极破碎软岩巷道的支护结构 | |
CN206686525U (zh) | 建筑施工用便于更换的沙铲 | |
CN205557458U (zh) | 一种土建用水管道混凝土预制件 | |
CN205776166U (zh) | 一种水泥搅拌桩防堵喷气装置 | |
CN205742198U (zh) | 一种注浆管 | |
CN204004839U (zh) | 一种排沙潜水泵用输送管 | |
CN203188218U (zh) | 一种灌浆装置 | |
CN203904947U (zh) | 施工支洞回填改建检修支洞的结构 | |
CN103277119A (zh) | 双梁内嵌圆可缩性支架及其使用方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 610000 Jinniu high tech Industrial Park, Chengdu, Sichuan, 666 Applicant after: China Railway Engineering Service Co., Ltd. Address before: 610000 Jinniu high tech Industrial Park, Chengdu, Sichuan, 666 Applicant before: CHINA RAILWAY ENGINEERING EQUIPMENT GROUP ELECTROMECHANICAL ENGINEERING CO., LTD. |
|
CB02 | Change of applicant information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |