CN106005936A - Transferring and furnace-entering device for refractory material and transferring and furnace-entering method for refractory material - Google Patents

Transferring and furnace-entering device for refractory material and transferring and furnace-entering method for refractory material Download PDF

Info

Publication number
CN106005936A
CN106005936A CN201610567899.4A CN201610567899A CN106005936A CN 106005936 A CN106005936 A CN 106005936A CN 201610567899 A CN201610567899 A CN 201610567899A CN 106005936 A CN106005936 A CN 106005936A
Authority
CN
China
Prior art keywords
platform
fixed pulley
refractory material
air port
heater
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610567899.4A
Other languages
Chinese (zh)
Other versions
CN106005936B (en
Inventor
李庆刚
胡宝臣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei 20 Smelting Construction Co Ltd
Original Assignee
Hebei 20 Smelting Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei 20 Smelting Construction Co Ltd filed Critical Hebei 20 Smelting Construction Co Ltd
Priority to CN201610567899.4A priority Critical patent/CN106005936B/en
Publication of CN106005936A publication Critical patent/CN106005936A/en
Application granted granted Critical
Publication of CN106005936B publication Critical patent/CN106005936B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G35/00Mechanical conveyors not otherwise provided for
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G65/00Loading or unloading
    • B65G65/30Methods or devices for filling or emptying bunkers, hoppers, tanks, or like containers, of interest apart from their use in particular chemical or physical processes or their application in particular machines, e.g. not covered by a single other subclass
    • B65G65/32Filling devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G2201/00Indexing codes relating to handling devices, e.g. conveyors, characterised by the type of product or load being conveyed or handled
    • B65G2201/04Bulk

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Abstract

The invention relates to a transferring and furnace-entering device for refractory material and a transferring and furnace-entering method for the refractory material. According to the device, a casting house platform and a tuyere platform are arranged on the outer side of a furnace body, and a first tuyere and a second tuyere are formed in the part, located above the tuyere platform, of the furnace body; a scaffold is erected on the casting house platform, a working platform is laid at the top of the scaffold and is provided with a track platform, the track platform penetrates through the second tuyere for entering the furnace body, and a transportation track is laid on the track platform and is provided with a track car; the tuyere platform is provided with a winching mechanism, and the winching mechanism is provided with a steel wire rope; a first fixed pulley is arranged on the inner side wall of the part, corresponding to the first tuyere, of the furnace body, a second fixed pulley is arranged at the top of the furnace body, a third fixed pulley is arranged on the inner side wall of the part, corresponding to the second tuyere, of the furnace body, and the steel wire is connected to the track car after sequentially winding around the three fixed pulleys. According to the device and the method, the transferring efficiency can be greatly improved, and the integrity of the refractory material can be guaranteed.

Description

A kind of refractory material is had bad luck and is had bad luck into stove method into furnace apparatus and refractory material
Technical field
The present invention relates to a kind of transporting device and have bad luck method, specifically a kind of refractory material is had bad luck and is had bad luck into stove method into furnace apparatus and refractory material.
Background technology
Blast furnace or shaft furnace are important smelting equipments, and the outer layer of body of heater is box hat, interior block refractory brick furnace lining.During building blast furnace or shaft furnace, the construction of the refractory lining materials such as refractory brick typically just proceeds by after shell stove skin and equipment component install.Conventional refractory lining material have bad luck be manually utilize crane that refractory material is transported to air port after, then have bad luck to blast furnace or shaft furnace.But, said method has bad luck quantities greatly, and costly, speed is the most slow for plant, and during having bad luck, refractory brick is the most damaged, causes the waste of resource.
Summary of the invention
An object of the present invention is just to provide a kind of refractory material and has bad luck into furnace apparatus, to solve the problem that existing transport process labor intensity is high, efficiency is low and refractory material breakage rate is high.
The two of the purpose of the present invention are just to provide a kind of refractory material and have bad luck into stove method, to reduce labor intensity, save artificial, improve and have bad luck efficiency, reduce the breakage rate of refractory material.
An object of the present invention is achieved in that a kind of refractory material is had bad luck into furnace apparatus, is provided with cast house platform and tuyere platform in the outside of body of heater, the body of heater above tuyere platform is provided with the first air port and the second air port;Described cast house platform is erected with scaffold, it is equipped with work platforms at the top of described scaffold, described work platforms is provided with orbital platform, described orbital platform enters the inside of body of heater through described second air port, the travelling platform for people's walking it is provided with in the side of described orbital platform, described orbital platform is equipped with transport track, described transport track is provided with small rail car;Being provided with hoisting mechanism on described tuyere platform, connecting on hoisting mechanism has steel wire rope;The furnace body inside wall corresponding with described first air port is provided with the first fixed pulley, the roof of body of heater is provided with the second fixed pulley, being provided with the 3rd fixed pulley on the furnace body inside wall corresponding with described second air port, the first air port described in described steel wire penetrating is also connected on described small rail car after passing around described first fixed pulley, described second fixed pulley and described 3rd fixed pulley successively.
Described 3rd fixed pulley is just to described transport track.
Described work platforms is made up of 20 channel-section steels, and described transport track is made up of angle steel.
One end of described orbital platform is fixed on described work platforms, and the other end of described orbital platform enters furnace interior through described second air port, and is fixed on the inboard wall of furnace body relative with the second air port.
Apparatus of the present invention simple in construction, easy for installation, overall structure is for being rigidly connected, and steadiness is good, and security performance is high, and easy and simple to handle.Apparatus of the present invention can effectively protect refractory material, it is ensured that its integrity, greatly reduces the spoilage that refractory material is caused by the process of having bad luck.Apparatus of the present invention substantially increase labor efficiency, save artificial, it is achieved that engineering cross-operation cross construction, accelerate construction speed, it is ensured that duration of a project and quality, have the highest economic benefit.
The two of the purpose of the present invention are achieved in that a kind of refractory material is had bad luck into stove method, comprise the steps:
A, on the cast house platform of body of heater, build scaffold, the scaffold put up is laid work platforms;
B, setting up orbital platform on the work platforms laid, one end of orbital platform is fixedly mounted on work platforms, and the other end enters furnace interior through the second air port on body of heater, and is fixed on the inboard wall of furnace body relative with the second air port;The travelling platform for people's walking is set up in the side of orbital platform;
C, on the orbital platform set up lay transport track, attachment rail dolly on the transport track laid, be mounted with refractory material in small rail car;
D, on the tuyere platform of body of heater install hoisting mechanism, hoisting mechanism is relative with the first tuyere position of body of heater, on hoisting mechanism installation steel wire rope;
E, on the furnace body inside wall relative with the first air port, the first fixed pulley is installed, the roof of body of heater is installed the second fixed pulley, installing the 3rd fixed pulley on the furnace body inside wall relative with the second air port, the 3rd fixed pulley is positioned at the top of orbital platform, and the most right with transporting track;
F, passed around the first fixed pulley, the second fixed pulley and the 3rd fixed pulley the most successively by behind steel wire penetrating the first air port, and its end was connected on small rail car, and made steel wire rope between the 3rd fixed pulley and small rail car and transport parallel track;Start hoisting mechanism, make steel wire rope pull small rail car to move in stove, to be had bad luck to stove by refractory material along transporting track;
G, at the internally installed vertical conveyer of body of heater, enter the refractory material of furnace interior be transported to differing heights position in stove via vertical conveyer, for construction usage along transporting track.
Described work platforms is made up of 20 channel-section steels, and described transport track is made up of angle steel.
Refractory material is first contained in brick frame, reinstalls in small rail car.
The inventive method can be substantially reduced labor intensity, saves artificial, improves and have bad luck efficiency, accelerates construction speed, and greatly reduces the breakage rate of refractory material, has the highest economic benefit.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present invention.
In figure: 1, body of heater, 2, cast house platform, 3, tuyere platform, 4, the first air port, the 5, second air port, 6, scaffold, 7, work platforms, 8, orbital platform, 9, transport track, 10, small rail car, 11, hoisting mechanism, 12, steel wire rope, the 13, first fixed pulley, 14, the second fixed pulley, the 15, the 3rd fixed pulley.
Detailed description of the invention
Embodiment 1: refractory material is had bad luck into furnace apparatus.
As shown in Figure 1, apparatus of the present invention are to be provided with cast house platform 2 and tuyere platform 3 in the outside of body of heater 1, tuyere platform 3 is positioned at the top of cast house platform 2, it is provided with the first air port 4 and the second air port 5 on body of heater 1 above tuyere platform 3, body of heater 1 inwall below the second air port 5 is erected with steel frame construction.
Being erected with scaffold 6 on cast house platform 2, the top of scaffold 6 is positioned at the lower section of tuyere platform 3.Be equipped with work platforms 7 at the top of scaffold 6, work platforms 7 is laid by 20 channel-section steels and is formed, its surfacing, Stability Analysis of Structures.Being provided with orbital platform 8 on work platforms 7, one end of orbital platform 8 is fixedly mounted on work platforms 7, and the other end enters the inside of body of heater 1 through the second air port 5, and is fixed on the inboard wall of furnace body relative with the second air port.The side of orbital platform 8 being provided with travelling platform, is available for workmen's walking, convenient construction personnel pass in and out body of heater 1.Being equipped with transport track 9 on orbital platform 8, transport track 9 is angle steel track, and its steadiness is good, is unlikely to deform.Being provided with small rail car 10 transporting on track 9, small rail car 10 can move back and forth, to realize the transport of refractory material on track 9 along transporting.
Being provided with hoisting mechanism 11 on tuyere platform 3, hoisting mechanism 11 is relative with the first position, air port 4, is provided with steel wire rope 12 on hoisting mechanism 11.Body of heater 1 medial wall corresponding with the first air port 4 is provided with the first fixed pulley 13, the roof of body of heater 1 is provided with the second fixed pulley 14, body of heater 1 inwall corresponding with the second air port 5 is provided with the 3rd fixed pulley 15.Steel wire rope 12 on hoisting mechanism 11 passes the most successively after passing the first air port 4 after walking around first fixed pulley the 13, second fixed pulley 14 and the 3rd fixed pulley 15 and is connected on small rail car 10,3rd fixed pulley 15 is the most right with transport track 9, to ensure the parallel axis with transport track 9 of steel wire rope 12 between the 3rd fixed pulley 15 and small rail car 10, so that small rail car 10 stably moves along transport track 9 under the traction of steel wire rope 12, it is to avoid offset track or the danger of overturning occur.
Embodiment 2: refractory material is had bad luck into stove method.
A, building scaffold 6 on the cast house platform 2 of body of heater 1, the top of scaffold 6 is positioned at the lower section of the tuyere platform 3 of body of heater 1;Laying work platforms 7 on the top of the scaffold 6 put up, work platforms 7 is laid by 20 channel-section steels and is formed, surfacing, Stability Analysis of Structures.
B, setting up orbital platform 8 on the work platforms 7 laid, one end of orbital platform 8 is fixedly mounted on work platforms 7, and it is internal that the other end enters body of heater 1 through the second air port 5 on body of heater 1, and is fixed on body of heater 1 inwall relative with the second air port 5;Meanwhile, the travelling platform for people's walking is set up in the side at orbital platform 8, in order to workmen is in the inside and outside turnover of body of heater 1.
C, on the orbital platform 8 set up lay transport track 9, transport track 9 is angle steel track, its steadiness is good, it is unlikely to deform, attachment rail dolly 10 on the transport track 9 laid, is mounted with refractory material in small rail car 10, refractory material first loads in brick frame, in integral installation enters small rail car 10 again, pick and place to facilitate.
D, on the tuyere platform 3 of body of heater 1 install hoisting mechanism 11, hoisting mechanism 11 is relative with the first position, air port 4 of body of heater 1, on hoisting mechanism 11 installation steel wire rope 12.
E, on body of heater 1 medial wall relative with the first air port 4, first fixed pulley 13 is installed, the roof of body of heater 1 is installed the second fixed pulley 14, body of heater 1 medial wall relative with the second air port 5 is installed the 3rd fixed pulley 15,3rd fixed pulley 15 is positioned at the top of orbital platform 8, and the most right with transporting track 9.
F, steel wire rope 12 was passed around the first fixed pulley the 13, second fixed pulley 14 and the 3rd fixed pulley 15 behind the first air port 4 the most successively, and its end is connected on small rail car 10, should ensure that the steel wire rope 12 between the 3rd fixed pulley 15 and small rail car 10 and the axis parallel transporting track 9;Hoist structure 11, makes steel wire rope 12 pull small rail car 10 to move in stove along transporting track 9, to be had bad luck to stove by refractory material.
G, at the internally installed vertical conveyer of body of heater 1, enter refractory material within body of heater 1 be transported to differing heights position in stove via vertical conveyer, for construction usage along transporting track 9.

Claims (7)

1. refractory material is had bad luck into a furnace apparatus, is provided with cast house platform and tuyere platform in the outside of body of heater, it is characterized in that, the body of heater above tuyere platform is provided with the first air port and the second air port;Described cast house platform is erected with scaffold, it is equipped with work platforms at the top of described scaffold, described work platforms is provided with orbital platform, described orbital platform enters the inside of body of heater through described second air port, the travelling platform for people's walking it is provided with in the side of described orbital platform, described orbital platform is equipped with transport track, described transport track is provided with small rail car;Being provided with hoisting mechanism on described tuyere platform, connecting on hoisting mechanism has steel wire rope;The furnace body inside wall corresponding with described first air port is provided with the first fixed pulley, the roof of body of heater is provided with the second fixed pulley, being provided with the 3rd fixed pulley on the furnace body inside wall corresponding with described second air port, the first air port described in described steel wire penetrating is also connected on described small rail car after passing around described first fixed pulley, described second fixed pulley and described 3rd fixed pulley successively.
Refractory material the most according to claim 1 is had bad luck into furnace apparatus, it is characterized in that, described 3rd fixed pulley is just to described transport track.
Refractory material the most according to claim 1 is had bad luck into furnace apparatus, it is characterized in that, described work platforms is made up of 20 channel-section steels, and described transport track is made up of angle steel.
Refractory material the most according to claim 1 is had bad luck into furnace apparatus, it is characterized in that, one end of described orbital platform is fixed on described work platforms, and the other end of described orbital platform enters furnace interior through described second air port, and is fixed on the inboard wall of furnace body relative with the second air port.
5. refractory material is had bad luck into a stove method, it is characterized in that, comprises the steps:
A, on the cast house platform of body of heater, build scaffold, the scaffold put up is laid work platforms;
B, setting up orbital platform on the work platforms laid, one end of orbital platform is fixedly mounted on work platforms, and the other end enters furnace interior through the second air port on body of heater, and is fixed on the inboard wall of furnace body relative with the second air port;The travelling platform for people's walking is set up in the side of orbital platform;
C, on the orbital platform set up lay transport track, attachment rail dolly on the transport track laid, be mounted with refractory material in small rail car;
D, on the tuyere platform of body of heater install hoisting mechanism, hoisting mechanism is relative with the first tuyere position of body of heater, on hoisting mechanism installation steel wire rope;
E, on the furnace body inside wall relative with the first air port, the first fixed pulley is installed, the roof of body of heater is installed the second fixed pulley, installing the 3rd fixed pulley on the furnace body inside wall relative with the second air port, the 3rd fixed pulley is positioned at the top of orbital platform, and the most right with transporting track;
F, passed around the first fixed pulley, the second fixed pulley and the 3rd fixed pulley the most successively by behind steel wire penetrating the first air port, and its end was connected on small rail car, and made steel wire rope between the 3rd fixed pulley and small rail car and transport parallel track;Start hoisting mechanism, make steel wire rope pull small rail car to move in stove, to be had bad luck to stove by refractory material along transporting track;
G, at the internally installed vertical conveyer of body of heater, enter the refractory material of furnace interior be transported to differing heights position in stove via vertical conveyer, for construction usage along transporting track.
Refractory material the most according to claim 5 is had bad luck into stove method, it is characterized in that, described work platforms is made up of 20 channel-section steels, and described transport track is made up of angle steel.
Refractory material the most according to claim 5 is had bad luck into stove method, it is characterized in that, refractory material is first contained in brick frame, reinstalls in small rail car.
CN201610567899.4A 2016-07-19 2016-07-19 A kind of refractory material is had bad luck into furnace apparatus and refractory material and had bad luck into stove method Active CN106005936B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610567899.4A CN106005936B (en) 2016-07-19 2016-07-19 A kind of refractory material is had bad luck into furnace apparatus and refractory material and had bad luck into stove method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610567899.4A CN106005936B (en) 2016-07-19 2016-07-19 A kind of refractory material is had bad luck into furnace apparatus and refractory material and had bad luck into stove method

Publications (2)

Publication Number Publication Date
CN106005936A true CN106005936A (en) 2016-10-12
CN106005936B CN106005936B (en) 2018-03-16

Family

ID=57118355

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610567899.4A Active CN106005936B (en) 2016-07-19 2016-07-19 A kind of refractory material is had bad luck into furnace apparatus and refractory material and had bad luck into stove method

Country Status (1)

Country Link
CN (1) CN106005936B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112897062A (en) * 2021-01-21 2021-06-04 江苏理工学院 Automatic carrying device for refractory bricks

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2042458U (en) * 1988-12-20 1989-08-09 徐州第二煤矿机械厂 Hydraulic desintering machine for bogie truck
CN2513972Y (en) * 2001-11-05 2002-10-02 冶金工业部北京冶金设备研究院 Electric bridge crane
CN101418357A (en) * 2008-11-28 2009-04-29 中冶京诚工程技术有限公司 Overturn type top dust cover
CN101509049A (en) * 2009-03-27 2009-08-19 二十三冶建设集团有限公司 Construction method for internal cooling wall and furnace liner of blast furnace
CN201330259Y (en) * 2008-12-30 2009-10-21 沈阳远大环境工程有限公司 Blast furnace taphole-suspended lifting top-draft soot collector
CN101580888A (en) * 2009-06-17 2009-11-18 中冶赛迪工程技术股份有限公司 Processing arrangement of blast furnace cast house
CN201871524U (en) * 2010-11-30 2011-06-22 中冶京诚工程技术有限公司 Local overturning type dust hood
CN102146488A (en) * 2010-02-09 2011-08-10 上海宝冶建设有限公司 Modularized and integrative disassembling and installing methods for blast furnace
CN102618677A (en) * 2012-03-21 2012-08-01 马钢(集团)控股有限公司 Method for cleaning materials in large-scale blast furnace in overhaul
CN102690662A (en) * 2011-03-23 2012-09-26 五冶集团上海有限公司 Loading and transporting method of dry quenching furnace constructing refractory material
CN202828787U (en) * 2012-07-12 2013-03-27 北京国电清新环保技术股份有限公司 Automatic material receiving and discharging conveyor
CN203229229U (en) * 2013-04-28 2013-10-09 江西稀有稀土金属钨业集团有限公司 Electric ore dumping device for ore unloading of underground mine car
CN203820814U (en) * 2014-05-28 2014-09-10 宝钢集团新疆八一钢铁有限公司 Replacement and transport device for blast furnace cooling wall
CN104726625A (en) * 2015-02-26 2015-06-24 河北二十冶建设有限公司 Method for quickly eliminating waste materials and remaining iron in a furnace during blast furnace overhaul
CN205873139U (en) * 2016-07-19 2017-01-11 河北二十冶建设有限公司 Refractory material has bad luck into stove device

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2042458U (en) * 1988-12-20 1989-08-09 徐州第二煤矿机械厂 Hydraulic desintering machine for bogie truck
CN2513972Y (en) * 2001-11-05 2002-10-02 冶金工业部北京冶金设备研究院 Electric bridge crane
CN101418357A (en) * 2008-11-28 2009-04-29 中冶京诚工程技术有限公司 Overturn type top dust cover
CN201330259Y (en) * 2008-12-30 2009-10-21 沈阳远大环境工程有限公司 Blast furnace taphole-suspended lifting top-draft soot collector
CN101509049A (en) * 2009-03-27 2009-08-19 二十三冶建设集团有限公司 Construction method for internal cooling wall and furnace liner of blast furnace
CN101580888A (en) * 2009-06-17 2009-11-18 中冶赛迪工程技术股份有限公司 Processing arrangement of blast furnace cast house
CN102146488A (en) * 2010-02-09 2011-08-10 上海宝冶建设有限公司 Modularized and integrative disassembling and installing methods for blast furnace
CN201871524U (en) * 2010-11-30 2011-06-22 中冶京诚工程技术有限公司 Local overturning type dust hood
CN102690662A (en) * 2011-03-23 2012-09-26 五冶集团上海有限公司 Loading and transporting method of dry quenching furnace constructing refractory material
CN102618677A (en) * 2012-03-21 2012-08-01 马钢(集团)控股有限公司 Method for cleaning materials in large-scale blast furnace in overhaul
CN202828787U (en) * 2012-07-12 2013-03-27 北京国电清新环保技术股份有限公司 Automatic material receiving and discharging conveyor
CN203229229U (en) * 2013-04-28 2013-10-09 江西稀有稀土金属钨业集团有限公司 Electric ore dumping device for ore unloading of underground mine car
CN203820814U (en) * 2014-05-28 2014-09-10 宝钢集团新疆八一钢铁有限公司 Replacement and transport device for blast furnace cooling wall
CN104726625A (en) * 2015-02-26 2015-06-24 河北二十冶建设有限公司 Method for quickly eliminating waste materials and remaining iron in a furnace during blast furnace overhaul
CN205873139U (en) * 2016-07-19 2017-01-11 河北二十冶建设有限公司 Refractory material has bad luck into stove device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112897062A (en) * 2021-01-21 2021-06-04 江苏理工学院 Automatic carrying device for refractory bricks
CN112897062B (en) * 2021-01-21 2023-07-07 江苏理工学院 Automatic carrying device for refractory bricks

Also Published As

Publication number Publication date
CN106005936B (en) 2018-03-16

Similar Documents

Publication Publication Date Title
CN201494438U (en) Simple and fast installation cableway for maintenance and rush repair of mountain pipeline
US11898447B2 (en) Full-circle secondary lining inverted arch construction formwork system for long-distance tunnel and formwork transporting method
CN201411900Y (en) Hydraulic die lifter for chimneys
CN107304631A (en) The installation method and system of a kind of high-rise building large area cell cube curtain wall block
CN103266192A (en) Hoisting method for replacing cooling wall in overhauling of blast furnace
CN101363069B (en) Simple upper furnace repair equipment and furnace repair technology
CN101566005B (en) Chimney hydraulic mould lifting device
CN102877637A (en) Method for implementing operating platform in bottom wall construction of cantilever beam
CN105569692A (en) Trolley for welding tunnel waterproof board hanging cloth
CN203359745U (en) Hot blast stove refractory vertical transport device
CN106005936A (en) Transferring and furnace-entering device for refractory material and transferring and furnace-entering method for refractory material
CN201546176U (en) Curtain board installing trolley
CN108625270A (en) Nose girder gantry crane installs bridge prefabrication box girder construction method
CN201507112U (en) Sliding template system
CN102399925A (en) Method for replacing cooling wall of blast furnace
CN205873139U (en) Refractory material has bad luck into stove device
CN107060474A (en) A kind of sleeve-type chimney people goods shunting vertical transferring apparatus and construction method
CN215247649U (en) Transportation system of blast furnace carbon bricks
CN103982046A (en) Lifting and installation method of buckling restrained braces
CN103486330B (en) Either inside high-altitude pipeline mounting construction method
CN205688820U (en) A kind of installation system of high-rise building large area cell cube curtain wall block
CN202208696U (en) Construction platform used for dry quenching furnace
CN212223029U (en) Blast furnace down pipe spraying construction device
CN101215616A (en) Upper repairing method for mammoth converter lining
CN104344075B (en) Shaft construction hangs the quick handling of interim edema due to wind pathogen pipeline and installation method using the borehole wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant