CN105973007B - A kind of furnace equipment and the method using its making fired brick - Google Patents
A kind of furnace equipment and the method using its making fired brick Download PDFInfo
- Publication number
- CN105973007B CN105973007B CN201610471764.8A CN201610471764A CN105973007B CN 105973007 B CN105973007 B CN 105973007B CN 201610471764 A CN201610471764 A CN 201610471764A CN 105973007 B CN105973007 B CN 105973007B
- Authority
- CN
- China
- Prior art keywords
- tunnel oven
- drying kiln
- centrifugal blower
- wall
- section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27B—FURNACES, KILNS, OVENS, OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
- F27B19/00—Combinations of furnaces of kinds not covered by a single preceding main group
- F27B19/04—Combinations of furnaces of kinds not covered by a single preceding main group arranged for associated working
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F26—DRYING
- F26B—DRYING SOLID MATERIALS OR OBJECTS BY REMOVING LIQUID THEREFROM
- F26B21/00—Arrangements or duct systems, e.g. in combination with pallet boxes, for supplying and controlling air or gases for drying solid materials or objects
- F26B21/14—Arrangements or duct systems, e.g. in combination with pallet boxes, for supplying and controlling air or gases for drying solid materials or objects using gases or vapours other than air or steam, e.g. inert gases
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27D—DETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
- F27D17/00—Arrangements for using waste heat; Arrangements for using, or disposing of, waste gases
- F27D17/004—Systems for reclaiming waste heat
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F26—DRYING
- F26B—DRYING SOLID MATERIALS OR OBJECTS BY REMOVING LIQUID THEREFROM
- F26B2210/00—Drying processes and machines for solid objects characterised by the specific requirements of the drying good
- F26B2210/02—Ceramic articles or ceramic semi-finished articles
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27M—INDEXING SCHEME RELATING TO ASPECTS OF THE CHARGES OR FURNACES, KILNS, OVENS OR RETORTS
- F27M2001/00—Composition, conformation or state of the charge
- F27M2001/03—Charges containing minerals
- F27M2001/035—China
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Drying Of Solid Materials (AREA)
Abstract
The present invention provides a kind of furnace equipment and using the method that it makes fired brick, which includes drying kiln, tunnel oven, ventilating duct and centrifugal blower;Drying kiln is connected to tunnel oven by ventilating duct, and centrifugal blower is connected with ventilating duct, and enters drying kiln for making the hot wind in tunnel oven pass through ventilating duct.The hot gas in tunnel oven can be extracted due to centrifugal blower, is sent in drying kiln, adobe is dried, and thus greatly reduce the consumption of the energy during brickmaking.When using the equipment making fired brick, the temperature of tunnel oven is heated to 700 1000 DEG C, adobe is sent into drying kiln, the outlet of drying kiln is reached from drying kiln entrance, is entered in tunnel oven afterwards, the outlet of tunnel oven is reached to get fired brick from tunnel oven entrance.This method takes full advantage of the architectural characteristic of furnace equipment, need to only be heated to tunnel oven, without being heated to drying kiln so that low energy consumption, simple and fast, and strength of sintered brick obtained is high.
Description
Technical field
The present invention relates to brick equipment fields, and fired brick is made in particular to a kind of furnace equipment and using it
Method.
Background technology
Fired brick is a kind of construction material being widely used at present, especially in China rural area, with the development of economy, people
People's improvement of living standard, fired brick is at being main building material.
Then existing burning process, natural air drying after general brickmaking base use the energy such as coal to fire firing in kiln,
Need a large amount of energy and air-dry time.Moreover, existing firing kiln high energy consumption, low production efficiency, the energy and raw material wave
Take serious.
In view of this, special propose the present invention.
Invention content
The first object of the present invention is to provide a kind of furnace equipment to brickmaking, big for existing furnace equipment energy consumption
The problem of, in furnace equipment provided by the invention, using centrifugal blower, the hot gas that tunnel oven generates in sintering procedure is detached
Into drying kiln, adobe is air-dried, greatly reduces the consumption of energy during brickmaking.
The second object of the present invention is to provide a kind of method making fired brick using the furnace equipment, this method energy
Consume low, simple and fast, the intensity height of fired brick obtained.
In order to realize that the above-mentioned purpose of the present invention, spy use following technical scheme:
A kind of furnace equipment for brickmaking, the equipment include drying kiln, tunnel oven, ventilating duct and centrifugal blower;
The drying kiln is connected to the tunnel oven by the ventilating duct, the centrifugal blower and the ventilating duct phase
Even, and for making the hot wind in the tunnel oven pass through the ventilating duct enter the drying kiln.
In furnace equipment provided by the invention, centrifugal blower can extract the hot gas that tunnel oven generates in sintering procedure, will
It is sent into drying kiln, is dried to adobe, greatly reduces the consumption of energy during brickmaking.
In view of the adobe water content for just entering drying kiln road is relatively high, causes the humidity in kiln road big, be unfavorable for brick
The drying of base.In order to solve this problem, further include exhaust fan in furnace equipment provided by the invention, the air inlet of the exhaust fan
Mouth is connected to the drying kiln.By the continuous work of exhaust fan, the moisture in kiln road is detached.
Contain sulfide in adobe in order to prevent, the moisture that exhaust fan detaches is directly discharged to pollute ring in environment
Border can carry out desulfurization by being sent into desulfurizing tower from the moisture detached in drying kiln, mitigate environmental pollution.
Including desulfurizing tower include mainly:Tower body, wind turbine, spraying mechanism, purification tank for liquid waste, circulating water pool and cycle
Pump.
Tower body is set as cylindrical open tower, sets disc type outlet pipe in tower body middle part, opens up hole for water spraying below water pipe, go out
Water pipe is connect with circulating pump, is sprayed water downwards;Wind turbine is arranged in tower body lower end side, and gas to be treated is sent into tower by wind turbine
Body, gas forms convection current with water mist, to realize desulfurization;Enter purification tank for liquid waste after waste water discharge, is launched in purification tank for liquid waste
Caustic soda is handled, and treated, and water flows into circulating water pool, and tower body is traveled further under the action of circulating pump.
In order to ensure that multilayer is arranged in desulfurization effect, disc type outlet pipe.
In order to ensure the stability of disc type outlet pipe, it is additionally provided with fixed frame, disc type outlet pipe is fixed with tower body
Connection.
Disc type outlet pipe, concrete shape are the shape of coiled mosquito-repellent incense, and end is closed, ring by ring.
In order to which gas is run helter-skelter to plant area, the tower body top of desulfurizing tower is provided with outwardly open edge, between tower body
Angle is 30-45 degree.
Preferably, the furnace equipment further includes pressure fan, and the outlet air end of the pressure fan is connected to the tunnel oven, and
It blows for giving in the tunnel oven.
The pressure fan of setting conveys air into the kiln road of tunnel oven, improves the concentration of oxygen in kiln road, is helped to play
The effect of combustion.
In the present invention, the power of pressure fan is set according to the baking temperature of tunnel oven, by the power for adjusting pressure fan
Size can adjust the temperature in tunnel oven.
Preferably, it is provided with track in the drying kiln.
In the furnace equipment of the present invention, track iron is equipped in drying kiln.Adobe to be dried is put into transport vehicle,
It is exported from drying kiln entrance according to speed row to the drying kiln of setting along track, the adobe on transport vehicle is equably dried.It is logical
This setting is crossed, adobe can be transported into drying kiln incessantly and dried, to greatly improve production efficiency.
Preferably, the top of the tunnel oven is equipped with burner, and the burner penetrates the top of the tunnel oven.
In furnace equipment provided by the invention, there are two effects for burner, first, opening burner heat dissipation, avoid to adobe
Cause finished bricks internal structure uneven because temperature is too high during being toasted;Second is that when the temperature of tunnel oven is low,
By the temperature for improving tunnel oven to burner coal.And it is more than the setting of upper width by lower width so that burner section
Present it is trapezoidal, can avoid heat largely scatter and disappear, to reduce energy consumption.
In order to avoid heat largely scatters and disappears, to reduce energy consumption, the lower width of burner is more than upper width so that burner
Section presents trapezoidal.The design of this " the big mouth of tripe is small ", can effectively reduce the lost speed of heat in tunnel oven.
In order to the temperature of tunnel oven is adjusted in time, ensure that the proper temperature of tunnel oven is toasted in adobe,
It is further preferred that in tunnel oven, one row's burner is set at interval of 1.6-1.8m, often row sets 4-5 side by side, the top of burner
Width is 10-15cm.
Preferably, the wall of the drying kiln is sandwich wall and solid wall from top to bottom;On the madial wall of the sandwich wall
It is provided with air outlet, the air inlet of the centrifugal blower is connected to the ventilating duct, and the inside of air outlet and the sandwich wall is empty
Between be connected to.
By this design, the hot gas that centrifugal blower comes from tunnel oven extraction initially enters the inner space of sandwich wall, so
It is dissipated in the kiln road of drying kiln by exhaust vent again afterwards, realizes being uniformly distributed for heat, avoided brick blank drying uneven and cause
It is cracked.
It is further preferred that the tunnel oven is divided into preheating section, high temperature section and cooling section along entrance to export direction,
The wall of the preheating section and the cooling section is cavity wall and solid wall from top to bottom, and air port is provided on the cavity wall,
The ventilating duct being connected to the air inlet of the centrifugal blower is connected to the inner space of the cavity wall;It is equipped in the high temperature section
Thermocouple, the thermocouple are connect with computer control system.
By this setting, the hot gas in tunnel oven can enter sandwich wall by the exhaust vent in preheating section and cooling section
Inner space is then extracted into drying kiln by the air duct being connected with sandwich wall inner space by centrifugal blower, due to tunnel
The lost outlet for mainly passing through tunnel oven of heat and entrance in kiln, and design through the invention, realize to tunnel oven
Interior after-heat makes full use of.
Simultaneously as the wall of high temperature section is solid wall, the heat high concentration of high temperature section is realized, into tunnel oven
Adobe is adequately calcined in this part, and the property of adobe is made to reach requirement.
And in order to precisely control the temperature of high temperature section, avoid adobe from being led because too high or too low for temperature in baking process
It causes finished bricks exterior quality and property to decline, thermocouple is equipped at the top of the tunnel oven of high temperature section in furnace equipment of the present invention,
Thermocouple is connect with computer control system, monitors the baking temperature in tunnel oven road in real time.
Preferably, the drying kiln includes be connected side by side successively the first drying kiln of setting, the second drying kiln, third drying
The sandwich wall of kiln and the 4th drying kiln, first drying kiln and second drying kiln communicates, the third drying kiln and
The sandwich wall of four drying kilns communicates;The tunnel oven includes be connected side by side the first tunnel oven of setting and the second tunnel oven;It is described from
Heart wind turbine includes the first centrifugal blower, the second centrifugal blower, third centrifugal blower and the 4th centrifugal blower;
The outlet air end of first centrifugal blower and second centrifugal blower with first drying kiln and described
The inner space of the sandwich wall of two drying kilns is connected to, the air intake of first centrifugal blower and the second tunnel oven preheating section
Cavity wall inner space connection, the cavity wall of the air intake of second centrifugal blower and the second tunnel oven cooling section
Inner space connection;The outlet air end of the third centrifugal blower and the 4th centrifugal blower with the third drying kiln and
The inner space of the sandwich wall of shown 4th drying kiln is connected to, the air intake of the third centrifugal blower and first tunnel oven
The inner space of the cavity wall of preheating section is connected to, air intake and the first tunnel oven cooling section of the 4th centrifugal blower
The inner space of cavity wall is connected to.
Include four drying kilns and two tunnel ovens in furnace equipment provided by the invention to improve production efficiency.Its
In, the first drying kiln and the second drying kiln are connected, and third drying kiln and the 4th drying kiln are connected, in this way, being taken out from tunnel oven
The hot wind taken can circulate in two drying kilns.And it can realize be connected two bakings by four centrifugal blowers of setting
Heat is uniformly distributed in dry kiln.
Preferably, the top of the tunnel oven is equipped with fire brick layer, and pearl rock stratum is equipped on the fire brick layer, described
Pearl is laid with concrete prefabricated board on rock stratum.
In the furnace equipment of the present invention, since tunnel oven uses at high temperature, the especially high temperature section of tunnel wall is
Ensure that tunnel wall body disclosure satisfy that the requirement of baking, in furnace equipment of the invention, the top of the tunnel oven is equipped with fire resisting
Brick layer is equipped with pearl rock stratum on the fire brick layer, concrete prefabricated board is laid on the pearl rock stratum.
A method of fired brick being made using furnace equipment provided by the invention, is included the following steps:By tunnel oven
Temperature is heated to 700-1000 DEG C, and adobe is sent into drying kiln, the outlet of the drying kiln is reached from the drying kiln entrance,
Enter in the tunnel oven afterwards, the outlet of the tunnel oven is reached to get fired brick from the tunnel oven entrance.
The method provided by the invention for making fired brick takes full advantage of the architectural characteristic of the furnace equipment, only need to be to tunnel
Kiln is heated, and without being heated to drying kiln, ensure that low energy consumption for method provided by the invention, simple and fast, and is made
The intensity of the fired brick obtained is high.
Preferably, described when the tunnel oven is divided into preheating section, high temperature section and cooling section along entrance to export direction
The wall of preheating section and the cooling section is cavity wall and solid wall from top to bottom, air port is provided on the cavity wall, with institute
The ventilating duct for stating the air inlet connection of centrifugal blower is connected to the inner space of the cavity wall;Thermoelectricity is equipped in the high temperature section
Even, when the thermocouple is connect with computer control system, the high temperature section is divided equally along the tunnel oven entrance to export direction
Temperature for first segment, second segment, third section and the 4th section, the first segment is 700-900 DEG C, and the temperature of the second segment is
920-970 DEG C, the temperature of the third section is 970-920 DEG C, and the 4th section of the temperature is 900-700 DEG C.
The primary structure area that high temperature section is sintered as adobe, temperature affect the inside that adobe is formed in sintering process
Structure, and then influence the intensity of finished bricks.It is in method provided by the invention that high temperature section is equal to export direction along tunnel oven entrance
It is divided into four sections so that the arc-shaped arrangement of temperature of high temperature section.By this method, ensure that the intensity of finished bricks is high.
Compared with prior art, beneficial effects of the present invention are:
(1) in furnace equipment provided by the invention, it the centrifugal blower in drying kiln is set can extract tunnel oven and firing
The hot gas generated in journey, is sent in drying kiln, is carried out to the adobe in drying kiln using from the hot gas extracted in tunnel oven
It air-dries, greatly reduces the consumption of energy during brickmaking.
(2) in furnace equipment provided by the invention, by the way that exhaust fan, and the one of exhaust fan is arranged in the inlet of drying kiln
End is connected to the kiln road of the drying kiln, and the moisture in kiln road is detached, the drying of adobe is conducive to.
(3) in furnace equipment provided by the invention, by the bottoms Yao Dao of drying kiln be arranged two-orbit rail, can not between
Disconnected ground, which transports adobe into drying kiln road, is dried, to greatly improve production efficiency.
(4) in furnace equipment provided by the invention, the wall lower layer of the drying kiln is solid wall, and upper layer is sandwich wall,
It is equipped with exhaust vent close to the wall in kiln road in sandwich wall, and the centrifugal blower is connected to the inner space of sandwich wall.Pass through
This design, the hot gas that centrifugal blower comes from tunnel oven extraction initially enter the inner space of sandwich wall, then pass through outlet air again
Hole is dissipated in kiln road, realizes being uniformly distributed for heat, is avoided brick blank drying uneven and is caused cracked.
(5) include four drying kilns and two in order to improve production efficiency, in the equipment in furnace equipment provided by the invention
A tunnel oven.Wherein, four drying kilns are divided into two groups, two drying kilns in every group be connected to it is logical, by side by side
The connection that exhaust vent realizes two drying kilns is set on the wall of connected sandwich wall, in this way, the hot wind extracted from tunnel oven can
It circulates in two drying kilns.And in order to realize being uniformly distributed for heat in two drying kilns, in every group, two drying kilns
The position of the centrifugal blower of interior setting differs.
(6) in furnace equipment provided by the invention, by tunnel oven be arranged pressure fan, and one end of pressure fan with it is described
The connection of tunnel oven, the other end are connected to outside, can be conveyed air in the kiln road of tunnel oven, be improved the concentration of oxygen in kiln road,
To play combustion-supporting effect.
(7) in furnace equipment provided by the invention, by running through the top burner of tunnel oven in the setting of the top of tunnel oven,
And the lower width of the burner is more than upper width, plays the role of two:Burner heat dissipation is opened when high temperature, is avoided to adobe
Cause finished bricks internal structure uneven because temperature is too high during being toasted;When temperature is low, by burner coal
Improve the temperature of tunnel oven.And it is more than the setting of upper width by lower width so that the presentation of burner section is trapezoidal, can avoid
Heat largely scatters and disappears, to reduce energy consumption.
(8) in furnace equipment provided by the invention, tunnel oven is divided into preheating section, high temperature section and cold along Way in
But the wall lower layer of the tunnel oven of section, the preheating section and the cooling section is solid wall, and upper layer is sandwich wall, is leaned in sandwich wall
The wall in the roads Jin Yao is equipped with exhaust vent;The air duct being connected to the centrifugal blower is connected to the inner space of sandwich wall.Pass through
This setting, the hot gas in tunnel oven can enter the inner space of sandwich wall by the exhaust vent in preheating section and cooling section, and
Be extracted into drying kiln by centrifugal blower by the air duct being connected with sandwich wall inner space afterwards, due in tunnel oven heat dissipate
If outlet and entrance of the owner of lost property by tunnel oven, and design through the invention, realize to the after-heat in tunnel oven
Make full use of.Simultaneously as the wall of high temperature section is solid wall, the heat high concentration of high temperature section is realized, into tunnel
The adobe of kiln is adequately calcined in this part, and the property of adobe is made to reach requirement.
(9) in order to precisely control the temperature of high temperature section, avoid adobe in baking process because too high or too low for temperature
Cause finished bricks exterior quality and property to decline, thermoelectricity is equipped at the top of the tunnel oven of high temperature section in furnace equipment of the present invention
Even, thermocouple is connect with computer control system, monitors the baking temperature in tunnel oven road in real time.
Description of the drawings
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technology description to be briefly described.
Fig. 1 is the vertical view of four drying kilns arranged side by side;
Fig. 2 is the vertical view of two tunnel ovens arranged side by side;
Fig. 3 is the front view of four drying kilns arranged side by side;
Fig. 4 is the front view of two tunnel ovens arranged side by side.
Specific implementation mode
Embodiment of the present invention is described in detail below in conjunction with embodiment, but those skilled in the art will
Understand, the following example is merely to illustrate the present invention, and is not construed as limiting the scope of the invention.It is not specified in embodiment specific
Condition person carries out according to conventional conditions or manufacturer's recommended conditions.Reagents or instruments used without specified manufacturer is
The conventional products that can be obtained by commercially available purchase.
In the description of the present invention, it should be noted that term "center", "upper", "lower", "left", "right", "vertical",
The orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" be based on the orientation or positional relationship shown in the drawings, merely to
Convenient for the description present invention and simplify description, do not indicate or imply the indicated device or element must have a particular orientation,
With specific azimuth configuration and operation, therefore it is not considered as limiting the invention.In addition, term " first ", " second ",
" third " is used for description purposes only, and is not understood to indicate or imply relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase
Even ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can
Can also be electrical connection to be mechanical connection;It can be directly connected, can also indirectly connected through an intermediary, Ke Yishi
Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood at this with concrete condition
Concrete meaning in invention.
As shown in Fig. 1~2, provided by the present invention for the furnace equipment of brickmaking, including drying kiln 101, tunnel oven 201,
Ventilating duct 301 and centrifugal blower;
The drying kiln 101 is connected to the tunnel oven 201 by the ventilating duct 301, the centrifugal blower with it is described
Ventilating duct 301 is connected, and enters the drying kiln for making the hot wind in the tunnel oven 201 pass through the ventilating duct 301
101。
In view of the adobe water content for just entering drying kiln road is relatively high, causes the humidity in kiln road big, be unfavorable for brick
The drying of base.In order to solve this problem, further, further include exhaust fan 401 in furnace equipment provided by the invention, it is described
The air inlet of exhaust fan 401 is connected to the drying kiln 101.By the continuous work of exhaust fan 401, the moisture in kiln road is taken out
From.
Preferably, the exhaust fan 401 is provided with 8, and the nearly arrival end of each drying kiln 101 is both provided with 2 exhausting
Machine 401, and 8 exhaust fans 401 are connected with desulfurizing tower.
Further, furnace equipment provided by the invention further includes pressure fan 501, the outlet air end of the pressure fan 501 with
The tunnel oven 201 is connected to, and for air-supply in the tunnel oven 201.The pressure fan of setting is into the kiln road of tunnel oven 201
Air is conveyed, the concentration of oxygen in kiln road is improved, to play combustion-supporting effect.
Further, in furnace equipment provided by the invention, track 114 is provided in the drying kiln.
In the furnace equipment of the present invention, track 114 is equipped in drying kiln.Adobe to be dried is put into transport vehicle
In, it is exported from drying kiln entrance according to speed row to the drying kiln of setting along track 114, the adobe on transport vehicle is equably dried
It is dry.By this setting, can adobe be transported into drying kiln incessantly and be dried, to greatly improve production efficiency.
Further, the top of the tunnel oven 201 is equipped with burner, and the burner penetrates the top of the tunnel oven.
In furnace equipment provided by the invention, there are two effects for burner, first, opening burner heat dissipation, avoid to adobe
Cause finished bricks internal structure uneven because temperature is too high during being toasted;Second is that when the temperature of tunnel oven is low,
By the temperature for improving tunnel oven to burner coal.And it is more than the setting of upper width by lower width so that burner section
Present it is trapezoidal, can avoid heat largely scatter and disappear, to reduce energy consumption.
In order to avoid heat largely scatters and disappears, to reduce energy consumption, the lower width of burner is more than upper width so that burner
Section presents trapezoidal.The design of this " the big mouth of tripe is small ", can effectively reduce the lost speed of heat in tunnel oven.
In order to the temperature of tunnel oven is adjusted in time, ensure that the proper temperature of tunnel oven is toasted in adobe,
It is further preferred that in tunnel oven, one row's burner is set at interval of 1.6-1.8m, often row sets 4-5 side by side, the top of burner
Width is 10-15cm.
As shown in figure 3, further, the wall of the drying kiln 101 is sandwich wall 111 and solid wall 112 from top to bottom;
Air outlet 113 is provided on the madial wall of the sandwich wall 111, the air inlet of the centrifugal blower connects with the ventilating duct 301
Logical, air outlet is connected to the inner space of the sandwich wall.
By this design, centrifugal blower 601~604 extracts the hot gas come from tunnel oven 201 and initially enters sandwich wall 111
Inner space, be then dissipated in the kiln road of drying kiln 101 by air outlet 113 again, realize being uniformly distributed for heat, avoid brick
Base drying is uneven and causes cracked.
As shown in Fig. 2, further, the tunnel oven 201 is divided into preheating section 211, height along entrance to export direction
The wall of temperature section 212 and cooling section 213, the preheating section 211 and the cooling section 213 is cavity wall 214 and reality from top to bottom
Core-wall 215 is provided with air port 216 on the cavity wall 214, the ventilating duct being connected to the air inlet of the centrifugal blower with it is described
The inner space of cavity wall 214 is connected to, and the bottom of the tunnel oven 201 is additionally provided with tunnel oven track 210 (see Fig. 4);It is described
Thermocouple is equipped in high temperature section 212, the thermocouple is connect with computer control system.
In addition the wall between the high temperature section 212 and the preheating section 211, the high temperature section 212 and the cooling section 213
Being arranged between wall has partition 223, and air duct and air port are not provided in the wall at the high temperature section 212.
By this setting, hot gas in tunnel oven 201 can by the air port 216 in preheating section 211 and cooling section 213 into
Enter the inner space of sandwich wall 111, then by the air duct that is connected with 111 inner space of sandwich wall by centrifugal blower 601~
604 (Fig. 1) are extracted into drying kiln 101, due in tunnel oven 201 heat it is lost mainly by the outlet of tunnel oven 201 and
Entrance, and design through the invention, realize making full use of to the after-heat in tunnel oven 201.
Simultaneously as the wall of high temperature section 212 is solid wall, the heat high concentration of high temperature section 212 is realized, into tunnel
The adobe of road kiln 201 is adequately calcined in this part, and the property of adobe is made to reach requirement.
And in order to precisely control the temperature of high temperature section 212, avoid adobe in baking process because temperature is excessively high or mistake
It is low that finished bricks exterior quality and property is caused to decline, heat is equipped in furnace equipment of the present invention at the top of the tunnel oven of high temperature section 212
Galvanic couple, thermocouple are connect with computer control system, monitor the baking temperature in tunnel oven road in real time.
As shown in Figure 1, further, the drying kiln 101 include be connected side by side successively setting the first drying kiln 121,
Second drying kiln 122, third drying kiln 123 and the 4th drying kiln 124, first drying kiln 121 and second drying kiln
122 sandwich wall communicates, and the sandwich wall of 123 and the 4th drying kiln 124 of the third drying kiln communicates;The tunnel oven 201 wraps
Include be connected side by side the first tunnel oven 221 of setting and the second tunnel oven 222;The centrifugal blower includes the first centrifugal blower 601, the
Two centrifugal blowers 602, third centrifugal blower 603 and the 4th centrifugal blower 604;
The outlet air end of first centrifugal blower 601, second centrifugal blower 602 outlet air end with it is described first dry
Dry kiln 121 is connected to the inner space of the sandwich wall of second drying kiln 122, the air intake of first centrifugal blower 601
Be connected to the inner space of the cavity wall of 222 preheating section of the second tunnel oven, the air intake of second centrifugal blower 602 with
The inner space of the cavity wall of second tunnel oven, 222 cooling section is connected to;The outlet air end of the third centrifugal blower 603, institute
The outlet air end for stating the 4th centrifugal blower 604 is interior with the sandwich wall of the third drying kiln 123 and shown 4th drying kiln 124
Portion space is connected to, the air intake of the third centrifugal blower 603 and the cavity wall of first tunnel oven, 221 preheating section 221
Inner space is connected to, and the air intake of the 4th centrifugal blower 604 is interior with the cavity wall of the first tunnel oven cooling section 213
Portion space is connected to.
Include four drying kilns 101 and two tunnel ovens in furnace equipment provided by the invention to improve production efficiency
201.Wherein, the first drying kiln 121 is connected with the second drying kiln 122, and third drying kiln 123 is connected with the 4th drying kiln 124
It is logical, in this way, the hot wind extracted from tunnel oven can circulate in two drying kilns.And it can by four centrifugal blowers of setting
Heat is uniformly distributed in two drying kilns that realization is connected.
Further, the top of the tunnel oven 201 is equipped with fire brick layer 217, and treasure is equipped on the fire brick layer 217
Pearl rock stratum 218 is laid with concrete prefabricated board 219 on the pearl rock stratum 218.
In the furnace equipment of the present invention, since tunnel oven 201 uses at high temperature, the especially high temperature of tunnel wall
Section, in order to ensure that tunnel wall body disclosure satisfy that the requirement of baking, in furnace equipment of the invention, the top of the tunnel oven 201
Equipped with fire brick layer 217, pearl rock stratum 218 is equipped on the fire brick layer 217, laying mixed on the pearl rock stratum 218
Solidifying soil prefabricated board 219 (referring to Fig. 4).
Based on same consideration, the wall in close kiln road is fire brick layer in tunnel oven 201.
The both sides of 201 wall of tunnel oven are additionally provided with reinforcing column, are connected, are prevented by connecting cross bar between two edge columns
Tunnel oven deforms after firing.
The method that furnace equipment provided by the invention makes fired brick, includes the following steps:The temperature of tunnel oven 201 is added
Adobe is sent into drying kiln 101 to 700-1000 DEG C, going out for the drying kiln 101 is reached from 101 entrance of the drying kiln by heat
Mouthful, enter in the tunnel oven 201 afterwards, the outlet of the tunnel oven 201 is reached to get sintering from 201 entrance of the tunnel oven
Brick.
The above method takes full advantage of the architectural characteristic of the furnace equipment, need to only be heated to tunnel oven 201, without
Drying kiln 101 is heated, ensure that low energy consumption for method provided by the invention, it is simple and fast, and fired brick obtained is strong
Degree is high.
Further, when the tunnel oven 201 is divided into preheating section 211,212 and of high temperature section along entrance to export direction
The wall of cooling section 213, the preheating section 211 and the cooling section 213 is cavity wall 214 and solid wall 215, institute from top to bottom
It states and is provided with air port 216 on cavity wall 214, the ventilating duct being connected to the air inlet of the centrifugal blower and the cavity wall 214
Inner space connection (see Fig. 4);Thermocouple is equipped in the high temperature section 212, the thermocouple connects with computer control system
When connecing, the high temperature section 212 is divided into first segment, second segment, third section and along 201 entrance of the tunnel oven to export direction
Four sections, the temperature of the first segment is 700-900 DEG C, and the temperature of the second segment is 920-970 DEG C, the temperature of the third section
It it is 970-920 DEG C, the 4th section of the temperature is 900-700 DEG C.
The primary structure area that high temperature section 212 is sintered as adobe, temperature affect what adobe was formed in sintering process
Internal structure, and then influence the intensity of finished bricks.By high temperature section 212 along tunnel oven entrance to outlet in method provided by the invention
Direction is divided into four sections so that the arc-shaped arrangement of temperature of high temperature section.By this method, ensure that the intensity of finished bricks is high.
Although illustrate and describing the present invention with specific embodiment, it will be appreciated that without departing substantially from the present invention's
Many other change and modification can be made in the case of spirit and scope.It is, therefore, intended that in the following claims
Including belonging to all such changes and modifications in the scope of the invention.
Claims (7)
1. a kind of furnace equipment, which is characterized in that the equipment includes drying kiln, tunnel oven, ventilating duct and centrifugal blower;
The drying kiln is connected to the tunnel oven by the ventilating duct, and the centrifugal blower is connected with the ventilating duct, and
Enter the drying kiln for making the hot wind in the tunnel oven pass through the ventilating duct;
The top of the tunnel oven is equipped with burner, and the burner penetrates the top of the tunnel oven;The lower width of the burner
More than upper width so that burner section presents trapezoidal;In tunnel oven, one row's burner is set at interval of 1.6-1.8m, is often arranged
4-5 are set side by side, and the upper width of burner is 10-15cm;
The wall of the drying kiln is sandwich wall and solid wall from top to bottom;It is provided with outlet air on the madial wall of the sandwich wall
Mouthful;The air intake of the centrifugal blower is connected to the ventilating duct, and outlet air end is connected to the inner space of the sandwich wall;
The tunnel oven is divided into preheating section, high temperature section and cooling section along entrance to export direction, the preheating section and described
The wall of cooling section is cavity wall and solid wall from top to bottom, air port is provided on the cavity wall, with the centrifugal blower
The ventilating duct of air inlet connection is connected to the inner space of the cavity wall;Thermocouple, the thermoelectricity are equipped in the high temperature section
It is even to be connect with computer control system.
2. furnace equipment according to claim 1, which is characterized in that the furnace equipment further includes exhaust fan, the pumping
The air inlet of wind turbine is connected to the drying kiln.
3. furnace equipment according to claim 1, which is characterized in that the furnace equipment further includes pressure fan, described to send
The outlet air end of wind turbine is connected to the tunnel oven, and for blowing in the tunnel oven.
4. furnace equipment according to claim 1, which is characterized in that be provided with track in the drying kiln.
5. furnace equipment according to claim 1, which is characterized in that the drying kiln includes the setting that is connected side by side successively
First drying kiln, the second drying kiln, third drying kiln and the 4th drying kiln, first drying kiln and second drying kiln
Sandwich wall communicates, and the sandwich wall of the third drying kiln and the 4th drying kiln communicates;The tunnel oven includes the setting that is connected side by side
The first tunnel oven and the second tunnel oven;The centrifugal blower includes the first centrifugal blower, the second centrifugal blower, third centrifugation wind
Machine and the 4th centrifugal blower;
The outlet air end of first centrifugal blower and second centrifugal blower is dried with first drying kiln and described second
The inner space of the sandwich wall of dry kiln is connected to, the sky of the air intake of first centrifugal blower and the second tunnel oven preheating section
The inner space of core-wall is connected to, and the air intake of second centrifugal blower is interior with the cavity wall of the second tunnel oven cooling section
Portion space is connected to;The outlet air end of the third centrifugal blower and the 4th centrifugal blower with the third drying kiln and described
The inner space of the sandwich wall of 4th drying kiln is connected to, and the air intake of the third centrifugal blower is preheated with first tunnel oven
The inner space connection of the cavity wall of section, the air intake of the 4th centrifugal blower are hollow with the first tunnel oven cooling section
The inner space of wall is connected to.
6. a kind of method making fired brick using any one of the claim 1-5 furnace equipments, which is characterized in that including such as
Lower step:The temperature of tunnel oven is heated to 700-1000 DEG C, adobe is sent into drying kiln, is reached from the drying kiln entrance
The outlet of the drying kiln, afterwards enter the tunnel oven in, from the tunnel oven entrance reach the outlet of the tunnel oven to get
Fired brick.
7. according to the method described in claim 6, it is characterized in that, when the tunnel oven is divided into along entrance to export direction
The wall of preheating section, high temperature section and cooling section, the preheating section and the cooling section is cavity wall and solid wall, institute from top to bottom
It states and is provided with air port on cavity wall, the inner space of the ventilating duct being connected to the air inlet of the centrifugal blower and the cavity wall
Connection;Thermocouple is equipped in the high temperature section, when the thermocouple is connect with computer control system, the high temperature section is described in
Tunnel oven entrance to export direction is divided into first segment, second segment, third section and the 4th section, and the temperature of the first segment is 700-
900 DEG C, the temperature of the second segment is 920-970 DEG C, and the temperature of the third section is 970-920 DEG C, the 4th section of the temperature
Degree is 900-700 DEG C.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610471764.8A CN105973007B (en) | 2016-06-24 | 2016-06-24 | A kind of furnace equipment and the method using its making fired brick |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610471764.8A CN105973007B (en) | 2016-06-24 | 2016-06-24 | A kind of furnace equipment and the method using its making fired brick |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105973007A CN105973007A (en) | 2016-09-28 |
CN105973007B true CN105973007B (en) | 2018-07-31 |
Family
ID=57019098
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610471764.8A Active CN105973007B (en) | 2016-06-24 | 2016-06-24 | A kind of furnace equipment and the method using its making fired brick |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105973007B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108302934A (en) * | 2018-03-12 | 2018-07-20 | 练其辉 | A kind of tunnel oven using Heat Treatment organic waste |
CN110356794B (en) * | 2019-07-16 | 2024-06-14 | 涡阳县沪涡多孔矸石砖有限公司 | Track structure for transferring hollow bricks |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4285669A (en) * | 1978-11-23 | 1981-08-25 | Ulrico Walchhutter | Roller kiln provided with a drying tunnel, particularly for ceramic or refractory materials |
CN201583131U (en) * | 2009-11-09 | 2010-09-15 | 寿阳县明鑫铝矾耐火材料有限公司 | Afterheat utilization system of tunnel furnace |
CN102748943A (en) * | 2012-06-14 | 2012-10-24 | 安徽省六安市佳瑞粉末冶金有限公司 | Waste heat utilization technology for metallurgical tunnel kiln |
CN203203413U (en) * | 2013-01-28 | 2013-09-18 | 潮州市新凯陶瓷有限公司 | Waste heat recycling device of kiln |
CN203489719U (en) * | 2013-08-22 | 2014-03-19 | 郑州世兴特种耐火材料有限公司 | Refractory brick drying system |
CN204085158U (en) * | 2014-07-31 | 2015-01-07 | 淄博鹏达环保科技有限公司 | The drying integrated system of roasting |
CN204214282U (en) * | 2014-10-24 | 2015-03-18 | 重庆福希建材有限公司 | A kind of high hole rate shale hollow building block calcining kiln residual heat using device |
CN205228128U (en) * | 2015-12-07 | 2016-05-11 | 贵州修文坤泰绿色有限公司 | Drying system of gangue shale adobe |
CN205860771U (en) * | 2016-06-24 | 2017-01-04 | 常德天厦建材有限公司 | Furnace equipment for brickmaking |
-
2016
- 2016-06-24 CN CN201610471764.8A patent/CN105973007B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4285669A (en) * | 1978-11-23 | 1981-08-25 | Ulrico Walchhutter | Roller kiln provided with a drying tunnel, particularly for ceramic or refractory materials |
CN201583131U (en) * | 2009-11-09 | 2010-09-15 | 寿阳县明鑫铝矾耐火材料有限公司 | Afterheat utilization system of tunnel furnace |
CN102748943A (en) * | 2012-06-14 | 2012-10-24 | 安徽省六安市佳瑞粉末冶金有限公司 | Waste heat utilization technology for metallurgical tunnel kiln |
CN203203413U (en) * | 2013-01-28 | 2013-09-18 | 潮州市新凯陶瓷有限公司 | Waste heat recycling device of kiln |
CN203489719U (en) * | 2013-08-22 | 2014-03-19 | 郑州世兴特种耐火材料有限公司 | Refractory brick drying system |
CN204085158U (en) * | 2014-07-31 | 2015-01-07 | 淄博鹏达环保科技有限公司 | The drying integrated system of roasting |
CN204214282U (en) * | 2014-10-24 | 2015-03-18 | 重庆福希建材有限公司 | A kind of high hole rate shale hollow building block calcining kiln residual heat using device |
CN205228128U (en) * | 2015-12-07 | 2016-05-11 | 贵州修文坤泰绿色有限公司 | Drying system of gangue shale adobe |
CN205860771U (en) * | 2016-06-24 | 2017-01-04 | 常德天厦建材有限公司 | Furnace equipment for brickmaking |
Also Published As
Publication number | Publication date |
---|---|
CN105973007A (en) | 2016-09-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105423748B (en) | A kind of warm area is mutually wrong to arrange double-layer roller hearth furnace | |
CN102748942B (en) | Wide-bodied energy-saving and environment-friendly tunnel kiln | |
CN202869211U (en) | Multi-channel direct-firing tunnel kiln and waste heat recycling utilizing system thereof | |
CN105973007B (en) | A kind of furnace equipment and the method using its making fired brick | |
CN106082971A (en) | Gangue shale clinker bricks production system | |
CN103171009A (en) | Method for drying eucalyptus wood floors | |
CN103836890A (en) | Multi-layer roller way type ceramic drying kiln | |
CN105218075B (en) | The method that continous way fires antique building product | |
CN212620048U (en) | Energy-saving efficient continuous red brick roasting production kiln | |
CN102748926A (en) | Building ceramic single-layer rapid dryer equipment | |
CN104457228B (en) | Tenon type composite flat-top tunnel kiln | |
CN205228024U (en) | Drying system of adobe | |
CN102538448B (en) | Tunnel kiln | |
CN205860771U (en) | Furnace equipment for brickmaking | |
CN206033826U (en) | Pelletizing sintering equipment | |
CN210180150U (en) | Environment-friendly tunnel cave | |
CN202403523U (en) | Straight-through tunnel kiln | |
CN201203349Y (en) | Multichannel energy-saving kiln | |
CN209341810U (en) | A kind of building-block processing calcining kiln | |
CN207299907U (en) | Uprush refractory material burns till tunnel oven | |
CN208313013U (en) | A kind of sintering floor tile tunnel oven | |
CN205893100U (en) | Gangue shale baked brick production system | |
CN208075551U (en) | A kind of kiln car down-draft kiln | |
CN207050216U (en) | High thermal efficiency hot-blast stove | |
CN205262172U (en) | Energy -conserving flat top tunnel cave |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |