CN105973007B - A kind of furnace equipment and the method using its making fired brick - Google Patents

A kind of furnace equipment and the method using its making fired brick Download PDF

Info

Publication number
CN105973007B
CN105973007B CN201610471764.8A CN201610471764A CN105973007B CN 105973007 B CN105973007 B CN 105973007B CN 201610471764 A CN201610471764 A CN 201610471764A CN 105973007 B CN105973007 B CN 105973007B
Authority
CN
China
Prior art keywords
kiln
drying kiln
section
wall
tunnel oven
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610471764.8A
Other languages
Chinese (zh)
Other versions
CN105973007A (en
Inventor
姚飞
王琮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changde Xiamen Building Materials Co Ltd
Original Assignee
Changde Xiamen Building Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changde Xiamen Building Materials Co Ltd filed Critical Changde Xiamen Building Materials Co Ltd
Priority to CN201610471764.8A priority Critical patent/CN105973007B/en
Publication of CN105973007A publication Critical patent/CN105973007A/en
Application granted granted Critical
Publication of CN105973007B publication Critical patent/CN105973007B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27BFURNACES, KILNS, OVENS OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
    • F27B19/00Combinations of different kinds of furnaces that are not all covered by any single one of main groups F27B1/00 - F27B17/00
    • F27B19/04Combinations of different kinds of furnaces that are not all covered by any single one of main groups F27B1/00 - F27B17/00 arranged for associated working
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F26DRYING
    • F26BDRYING SOLID MATERIALS OR OBJECTS BY REMOVING LIQUID THEREFROM
    • F26B21/00Arrangements or duct systems, e.g. in combination with pallet boxes, for supplying and controlling air or gases for drying solid materials or objects
    • F26B21/14Arrangements or duct systems, e.g. in combination with pallet boxes, for supplying and controlling air or gases for drying solid materials or objects using gases or vapours other than air or steam, e.g. inert gases
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D17/00Arrangements for using waste heat; Arrangements for using, or disposing of, waste gases
    • F27D17/10Arrangements for using waste heat
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F26DRYING
    • F26BDRYING SOLID MATERIALS OR OBJECTS BY REMOVING LIQUID THEREFROM
    • F26B2210/00Drying processes and machines for solid objects characterised by the specific requirements of the drying good
    • F26B2210/02Ceramic articles or ceramic semi-finished articles
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27MINDEXING SCHEME RELATING TO ASPECTS OF THE CHARGES OR FURNACES, KILNS, OVENS OR RETORTS
    • F27M2001/00Composition, conformation or state of the charge
    • F27M2001/03Charges containing minerals
    • F27M2001/035China

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Drying Of Solid Materials (AREA)

Abstract

本发明提供了一种窑炉设备及利用其制作烧结砖的方法,该窑炉设备包含烘干窑、隧道窑、通风道和离心风机;烘干窑与隧道窑通过通风道连通,离心风机与通风道相连,并用于使隧道窑中的热风通过通风道进入烘干窑。由于离心风机可抽取隧道窑中的热气,将其送入烘干窑中,对砖坯进行烘干,从而大大降低了制砖过程中能源的消耗量。当利用该设备制作烧结砖时,将隧道窑的温度加热至700‑1000℃,将砖坯送入烘干窑中,从烘干窑入口到达烘干窑的出口,后进入隧道窑中,从隧道窑入口到达隧道窑的出口,即得烧结砖。该方法充分利用了窑炉设备的结构特性,只需对隧道窑进行加热,而无需对烘干窑进行加热,使得能耗低,简单快捷,且制得的烧结砖强度高。

The invention provides a kiln equipment and a method for making sintered bricks. The kiln equipment includes a drying kiln, a tunnel kiln, an air passage and a centrifugal fan; the drying kiln and the tunnel kiln are connected through the air passage, and the centrifugal fan and the The air passages are connected and used to make the hot air in the tunnel kiln enter the drying kiln through the air passages. Because the centrifugal fan can extract the hot air in the tunnel kiln and send it into the drying kiln to dry the bricks, thereby greatly reducing the energy consumption in the brick making process. When using this equipment to make sintered bricks, the temperature of the tunnel kiln is heated to 700‑1000 °C, and the bricks are sent into the drying kiln, from the entrance of the drying kiln to the exit of the drying kiln, and then enter the tunnel kiln. When the entrance of the kiln reaches the exit of the tunnel kiln, sintered bricks are obtained. The method makes full use of the structural characteristics of the kiln equipment, only needs to heat the tunnel kiln, and does not need to heat the drying kiln, so that the energy consumption is low, simple and quick, and the obtained sintered brick has high strength.

Description

一种窑炉设备及利用其制作烧结砖的方法A kiln equipment and method for making sintered bricks using it

技术领域technical field

本发明涉及制砖设备领域,具体而言,涉及一种窑炉设备及利用其制作烧结砖的方法。The invention relates to the field of brick-making equipment, in particular to a kiln equipment and a method for making sintered bricks using the same.

背景技术Background technique

烧结砖是目前广泛应用的一种建筑材料,特别是在我国农村,随着经济的发展,人民生活水平的提高,烧结砖成已为主要的建房材料。Sintered brick is a building material widely used at present, especially in rural areas of our country. With the development of economy and the improvement of people's living standards, sintered brick has become the main building material.

现有烧制工艺,一般制砖坯之后自然风干,然后使用煤等能源在烧制窑炉内烧制,需要大量的能源和风干时间。而且,现有的烧制窑炉能耗高、生产效率低,能源和原材料浪费严重。In the existing firing process, the adobes are generally air-dried after being made, and then fired in a firing kiln using energy such as coal, which requires a large amount of energy and air-drying time. Moreover, the existing firing kilns have high energy consumption, low production efficiency, and serious waste of energy and raw materials.

有鉴于此,特提出本发明。In view of this, the present invention is proposed.

发明内容Contents of the invention

本发明的第一目的在于提供一种用以制砖的窑炉设备,针对现有窑炉设备能耗大的问题,本发明提供的窑炉设备中,利用离心风机,将隧道窑在烧制过程中产生的热气抽离至烘干窑中,对砖坯进行风干,大大降低了在制砖过程中能源的消耗量。The first object of the present invention is to provide a kind of kiln equipment for making bricks. To solve the problem of high energy consumption of existing kiln equipment, in the kiln equipment provided by the present invention, a centrifugal fan is used to make the tunnel kiln burn The hot air generated in the process is extracted to the drying kiln to air dry the bricks, which greatly reduces the energy consumption in the brick making process.

本发明的第二目的在于提供一种利用所述窑炉设备制作烧结砖的方法,该方法能耗低,简单快捷,制得的烧结砖的强度高。The second object of the present invention is to provide a method for making sintered bricks by using the kiln equipment, which has low energy consumption, is simple and quick, and the obtained sintered bricks have high strength.

为了实现本发明的上述目的,特采用以下技术方案:In order to realize the above-mentioned purpose of the present invention, special adopt following technical scheme:

一种用于制砖的窑炉设备,所述设备包含烘干窑、隧道窑、通风道和离心风机;A kiln equipment for making bricks, said equipment comprising a drying kiln, a tunnel kiln, an air duct and a centrifugal fan;

所述烘干窑与所述隧道窑通过所述通风道连通,所述离心风机与所述通风道相连,并用于使所述隧道窑中的热风通过所述通风道进入所述烘干窑。The drying kiln communicates with the tunnel kiln through the air passage, and the centrifugal fan is connected with the air passage, and is used to make the hot air in the tunnel kiln enter the drying kiln through the air passage.

本发明提供的窑炉设备中,离心风机可抽取隧道窑在烧制过程中产生的热气,将其送入烘干窑中,对砖坯进行烘干,大大降低了在制砖过程中能源的消耗量。In the kiln equipment provided by the present invention, the centrifugal fan can extract the hot air generated in the firing process of the tunnel kiln and send it into the drying kiln to dry the bricks, which greatly reduces the energy consumption in the brick making process quantity.

考虑到刚刚进入烘干窑道的砖坯含水量比较高,导致窑道内的湿度大,不利于砖坯的烘干。为了解决这一问题,本发明提供的窑炉设备中还包括抽风机,所述抽风机的进风口与所述烘干窑连通。通过抽风机的不断工作,将窑道内的湿气抽离。Considering that the water content of the bricks just entering the drying kiln is relatively high, resulting in high humidity in the kiln, which is not conducive to the drying of the bricks. In order to solve this problem, the kiln equipment provided by the present invention further includes an exhaust fan, and the air inlet of the exhaust fan communicates with the drying kiln. Through the continuous work of the exhaust fan, the moisture in the kiln is sucked away.

为了防止砖坯中含有硫化物,抽风机抽离的湿气直接排放至环境中造成污染环境,可将从烘干窑中抽离的湿气送入脱硫塔中进行脱硫,减轻环境污染。In order to prevent the bricks from containing sulfide, the moisture extracted by the exhaust fan is directly discharged into the environment to cause environmental pollution. The moisture extracted from the drying kiln can be sent to the desulfurization tower for desulfurization to reduce environmental pollution.

所包含的脱硫塔主要包括:塔体、风机、喷淋机构、废水处理池、循环水池和循环泵。The included desulfurization tower mainly includes: tower body, fan, spray mechanism, waste water treatment pool, circulating water pool and circulating pump.

塔体设置为圆柱形敞口塔,塔体中部内设圆盘式出水管,水管下方开设喷水孔,出水管与循环泵连接,向下喷水;风机设置在塔体下端一侧,需要处理的气体通过风机送入塔体,气体与水雾形成对流,从而实现脱硫;废水排出后进入废水处理池,废水处理池中投放烧碱进行处理,处理后的水流入循环水池,在循环泵的作用下进一步进入塔体。The tower body is set as a cylindrical open tower, with a disc-type water outlet pipe in the middle of the tower body, and a water spray hole under the water pipe. The water outlet pipe is connected to the circulating pump and sprays water downward; The treated gas is sent into the tower body through the fan, and the gas and water mist form convection, thereby realizing desulfurization; after the waste water is discharged, it enters the waste water treatment tank, and caustic soda is put in the waste water treatment tank for treatment. Under the action, it further enters the tower body.

为了保证脱硫效果,圆盘式出水管设置多层。In order to ensure the desulfurization effect, the disc outlet pipe is provided with multiple layers.

为了保证圆盘式出水管的稳定性,还设置有固定架,将圆盘式出水管与塔体固定连接。In order to ensure the stability of the disc-type water outlet pipe, a fixing frame is also provided to fixedly connect the disc-type water outlet pipe with the tower body.

圆盘式出水管,具体形状为盘式蚊香的形状,末端密闭,一环一环。The disc-type water outlet pipe is in the shape of a disc-type mosquito-repellent incense, with closed ends and rings.

为了气体向厂区乱窜,脱硫塔的塔体顶端设置有向外敞开的边沿,与塔体之间的夹角为30-45度。In order for the gas to rush to the factory area, the top of the desulfurization tower is provided with an open edge, and the angle between it and the tower body is 30-45 degrees.

优选地,所述窑炉设备还包括送风机,所述送风机的出风端与所述隧道窑连通,并用于给所述隧道窑内送风。Preferably, the kiln equipment further includes a blower, and the air outlet end of the blower communicates with the tunnel kiln, and is used for blowing air into the tunnel kiln.

设置的送风机向隧道窑的窑道中输送空气,提高窑道中氧气的浓度,从而起到助燃的作用。The set air blower sends air to the tunnel kiln tunnel to increase the concentration of oxygen in the tunnel kiln, thereby playing a combustion-supporting role.

在本发明中,送风机的功率根据隧道窑的烘烤温度设定,通过调节送风机的功率大小可以调节隧道窑内的温度。In the present invention, the power of the blower is set according to the baking temperature of the tunnel kiln, and the temperature in the tunnel kiln can be adjusted by adjusting the power of the blower.

优选地,所述烘干窑内设置有轨道。Preferably, a track is provided inside the drying kiln.

在本发明的窑炉设备中,在烘干窑内设有轨道铁。将待烘干的砖坯放入运输车中,沿轨道从烘干窑入口按照设定的速度行至烘干窑出口,将运输车上的砖坯均匀地烘干。通过这一设置,可不间断地向烘干窑中运输砖坯进行烘干,从而大大提高生产效率。In the kiln equipment of the present invention, track iron is provided in the drying kiln. Put the adobes to be dried into the transport vehicle, and move along the track from the entrance of the drying kiln to the exit of the drying kiln at a set speed, and evenly dry the adobes on the transport vehicle. Through this setting, the bricks can be continuously transported to the drying kiln for drying, thereby greatly improving production efficiency.

优选地,所述隧道窑的顶部设有火口,所述火口穿透所述隧道窑的顶部。Preferably, a burner is provided on the top of the tunnel kiln, and the burner penetrates the top of the tunnel kiln.

在本发明提供的窑炉设备中,火口有两个作用,一是打开火口散热,避免在对砖坯进行烘烤的过程中因温度太高而导致成品砖内部结构不均匀;二是在隧道窑的温度低时,通过向火口加煤提高隧道窑的温度。而通过下部宽度大于上部宽度的设置,使得火口截面呈现梯形,可避免热量大量散失,从而降低能耗。In the kiln equipment provided by the present invention, the burner has two functions, one is to open the burner to dissipate heat, so as to avoid the uneven internal structure of the finished brick caused by the high temperature during the baking process of the brick; When the temperature of the tunnel kiln is low, the temperature of the tunnel kiln is increased by adding coal to the burner. By setting the width of the lower part greater than the width of the upper part, the section of the burner is trapezoidal, which can avoid a large amount of heat loss, thereby reducing energy consumption.

为了避免热量大量散失,从而降低能耗,火口的下部宽度大于上部宽度,使得火口截面呈现梯形。这种“肚大口小”的设计,可有效降低隧道窑中热量的散失速度。In order to avoid a large amount of heat loss and reduce energy consumption, the width of the lower part of the burner is greater than that of the upper part, so that the cross section of the burner presents a trapezoidal shape. This "big belly and small mouth" design can effectively reduce the heat loss speed in the tunnel kiln.

为了能够及时地对隧道窑的温度进行调节,保证隧道窑的温度适宜于砖坯烘烤,进一步优选地,在隧道窑中,每间隔1.6-1.8m设置一排火口,每排并列设4-5个,火口的上部宽度为10-15cm。In order to be able to adjust the temperature of the tunnel kiln in a timely manner and ensure that the temperature of the tunnel kiln is suitable for the baking of bricks, it is further preferred that in the tunnel kiln, a row of burners is set at an interval of 1.6-1.8m, and each row is arranged side by side. One, the upper width of the crater is 10-15cm.

优选地,所述烘干窑的墙体自上而下为夹层墙和实体墙;所述夹层墙的内侧壁上设置有出风口,所述离心风机的进风口与所述通风道连通,出风口与所述夹层墙的内部空间连通。Preferably, the wall of the drying kiln is a sandwich wall and a solid wall from top to bottom; an air outlet is provided on the inner wall of the sandwich wall, and the air inlet of the centrifugal fan communicates with the air passage, and the outlet The tuyere communicates with the inner space of the interlayer wall.

通过这一设计,离心风机从隧道窑抽取来的热气首先进入夹层墙的内部空间,然后再通过出风孔散至烘干窑的窑道中,实现热量的均匀分布,避免砖坯烘干不均匀而导致出现裂纹。Through this design, the hot air extracted by the centrifugal fan from the tunnel kiln first enters the inner space of the interlayer wall, and then diffuses into the kiln tunnel of the drying kiln through the air outlet to achieve uniform heat distribution and avoid uneven drying of bricks. lead to cracks.

进一步优选地,所述隧道窑沿入口至出口方向依次分为预热段、高温段和冷却段,所述预热段和所述冷却段的墙体自上而下为空心墙和实心墙,所述空心墙上设置有风口,与所述离心风机的进风口连通的通风道与所述空心墙的内部空间连通;所述高温段内设有热电偶,所述热电偶与计算机控制系统连接。Further preferably, the tunnel kiln is sequentially divided into a preheating section, a high temperature section and a cooling section along the direction from the entrance to the exit, and the walls of the preheating section and the cooling section are hollow walls and solid walls from top to bottom, The hollow wall is provided with a tuyere, and the air passage communicated with the air inlet of the centrifugal fan is communicated with the inner space of the hollow wall; a thermocouple is arranged in the high temperature section, and the thermocouple is connected with a computer control system .

通过这一设置,隧道窑内的热气可通过预热段和冷却段内的出风孔进入夹层墙的内部空间,而后通过与夹层墙内部空间相连通的风道由离心风机抽到烘干窑中,由于隧道窑内热量的散失主要是通过隧道窑的出口和入口,而通过本发明的设计,实现了对隧道窑内的剩余热量的充分利用。Through this setting, the hot air in the tunnel kiln can enter the inner space of the interlayer wall through the air outlet holes in the preheating section and the cooling section, and then be pumped to the drying kiln by the centrifugal fan through the air channel connected with the inner space of the interlayer wall In the tunnel kiln, since the heat loss in the tunnel kiln is mainly through the exit and entrance of the tunnel kiln, the design of the present invention realizes full utilization of the remaining heat in the tunnel kiln.

同时,由于高温段的墙体为实体墙,实现了高温段的热量高度集中,进入隧道窑的砖坯在这一部分进行充分的煅烧,使砖坯的性质达到要求。At the same time, because the wall in the high temperature section is a solid wall, the heat in the high temperature section is highly concentrated, and the bricks entering the tunnel kiln are fully calcined in this part, so that the properties of the bricks meet the requirements.

而为了更精确地控制高温段的温度,避免砖坯在烘烤过程中因温度过高或过低导致成品砖外观品质和性质下降,本发明窑炉设备中在高温段的隧道窑的顶部设有热电偶,热电偶与计算机控制系统连接,实时监测隧道窑道中的烘烤温度。In order to control the temperature of the high-temperature section more accurately and avoid the deterioration of the appearance quality and properties of the finished bricks due to the high or low temperature during the baking process of the bricks, in the kiln equipment of the present invention, a The thermocouple is connected with the computer control system to monitor the baking temperature in the tunnel kiln in real time.

优选地,所述烘干窑包括依次并排相连设置的第一烘干窑、第二烘干窑、第三烘干窑和第四烘干窑,所述第一烘干窑和所述第二烘干窑的夹层墙相通,所述第三烘干窑和第四烘干窑的夹层墙相通;所述隧道窑包括并排相连设置第一隧道窑和第二隧道窑;所述离心风机包括第一离心风机、第二离心风机、第三离心风机和第四离心风机;Preferably, the drying kiln includes a first drying kiln, a second drying kiln, a third drying kiln and a fourth drying kiln arranged side by side in sequence, the first drying kiln and the second drying kiln The interlayer walls of the drying kiln are connected, and the interlayer walls of the third drying kiln and the fourth drying kiln are connected; the tunnel kiln includes a first tunnel kiln and a second tunnel kiln arranged side by side; the centrifugal fan includes the first A centrifugal fan, a second centrifugal fan, a third centrifugal fan and a fourth centrifugal fan;

所述第一离心风机和所述第二离心风机的出风端均与所述第一烘干窑和所述第二烘干窑的夹层墙的内部空间连通,所述第一离心风机的进风端与所述第二隧道窑预热段的空心墙的内部空间连通,所述第二离心风机的进风端与所述第二隧道窑冷却段的空心墙的内部空间连通;所述第三离心风机和所述第四离心风机的出风端均与所述第三烘干窑和所示第四烘干窑的夹层墙的内部空间连通,所述第三离心风机的进风端与所述第一隧道窑预热段的空心墙的内部空间连通,所述第四离心风机的进风端与所述第一隧道窑冷却段的空心墙的内部空间连通。The air outlet ends of the first centrifugal fan and the second centrifugal fan communicate with the inner space of the interlayer wall of the first drying kiln and the second drying kiln, and the inlet of the first centrifugal fan The air end communicates with the inner space of the hollow wall of the preheating section of the second tunnel kiln, and the air inlet end of the second centrifugal fan communicates with the inner space of the hollow wall of the cooling section of the second tunnel kiln; the first The outlet ends of the three centrifugal fans and the fourth centrifugal fan are all connected to the inner space of the interlayer wall of the third drying kiln and the fourth drying kiln shown, and the air inlet end of the third centrifugal fan is connected to the inner space of the interlayer wall of the fourth drying kiln. The inner space of the hollow wall of the first tunnel kiln preheating section communicates with the inner space of the hollow wall of the first tunnel kiln cooling section, and the air inlet end of the fourth centrifugal fan communicates with the inner space of the hollow wall of the first tunnel kiln cooling section.

为了提高生产效率,本发明提供的窑炉设备中包含四个烘干窑和两个隧道窑。其中,第一烘干窑和第二烘干窑相连通,第三烘干窑和第四烘干窑相连通,这样,从隧道窑抽取的热风可在两个烘干窑内进行流通。而通过设置的四个离心风机可实现相连通的两个烘干窑内热量的均匀分布。In order to improve production efficiency, the kiln equipment provided by the present invention includes four drying kilns and two tunnel kilns. Wherein, the first drying kiln is connected with the second drying kiln, and the third drying kiln is connected with the fourth drying kiln, so that the hot air extracted from the tunnel kiln can circulate in the two drying kilns. And the uniform distribution of heat in the two connected drying kilns can be realized by setting four centrifugal fans.

优选地,所述隧道窑的顶部设有耐火砖层,所述耐火砖层之上设有珍珠岩层,所述珍珠岩层之上铺设混凝土预制板。Preferably, a refractory brick layer is arranged on the top of the tunnel kiln, a perlite layer is arranged on the refractory brick layer, and a concrete prefabricated slab is laid on the perlite layer.

在本发明的窑炉设备中,由于隧道窑在高温下使用,尤其是隧道墙体的高温段,为了保证隧道墙体能够满足烘烤的要求,本发明的窑炉设备中,所述隧道窑的顶部设有耐火砖层,所述耐火砖层之上设有珍珠岩层,所述珍珠岩层之上铺设混凝土预制板。In the kiln equipment of the present invention, since the tunnel kiln is used at high temperature, especially the high temperature section of the tunnel wall, in order to ensure that the tunnel wall can meet the requirements of baking, in the kiln equipment of the present invention, the tunnel kiln A refractory brick layer is arranged on the top of the refractory brick layer, a perlite layer is arranged on the refractory brick layer, and a concrete prefabricated slab is laid on the perlite layer.

一种利用本发明提供的窑炉设备制作烧结砖的方法,包括如下步骤:将隧道窑的温度加热至700-1000℃,将砖坯送入烘干窑中,从所述烘干窑入口到达所述烘干窑的出口,后进入所述隧道窑中,从所述隧道窑入口到达所述隧道窑的出口,即得烧结砖。A method for making sintered bricks using the kiln equipment provided by the invention, comprising the following steps: heating the temperature of the tunnel kiln to 700-1000°C, sending the bricks into the drying kiln, and reaching the kiln from the entrance of the kiln The outlet of the drying kiln is then entered into the tunnel kiln, and from the entrance of the tunnel kiln to the outlet of the tunnel kiln, sintered bricks are obtained.

本发明提供的制作烧结砖的方法充分利用了该窑炉设备的结构特性,只需对隧道窑进行加热,而无需对烘干窑进行加热,保证了本发明提供的方法能耗低,简单快捷,且制得的烧结砖的强度高。The method for making sintered bricks provided by the present invention makes full use of the structural characteristics of the kiln equipment, and only needs to heat the tunnel kiln instead of the drying kiln, which ensures that the method provided by the present invention has low energy consumption and is simple and quick , and the strength of the prepared sintered brick is high.

优选地,当所述隧道窑沿入口至出口方向依次分为预热段、高温段和冷却段,所述预热段和所述冷却段的墙体自上而下为空心墙和实心墙,所述空心墙上设置有风口,与所述离心风机的进风口连通的通风道与所述空心墙的内部空间连通;所述高温段内设有热电偶,所述热电偶与计算机控制系统连接时,所述高温段沿所述隧道窑入口至出口方向均分为第一段、第二段、第三段和第四段,所述第一段的温度为700-900℃,所述第二段的温度为920-970℃,所述第三段的温度为970-920℃,所述第四段的温度为900-700℃。Preferably, when the tunnel kiln is sequentially divided into a preheating section, a high temperature section and a cooling section along the direction from the entrance to the exit, the walls of the preheating section and the cooling section are hollow walls and solid walls from top to bottom, The hollow wall is provided with a tuyere, and the air passage communicated with the air inlet of the centrifugal fan is communicated with the inner space of the hollow wall; a thermocouple is arranged in the high temperature section, and the thermocouple is connected with a computer control system , the high temperature section is equally divided into the first section, the second section, the third section and the fourth section along the direction from the entrance to the exit of the tunnel kiln, the temperature of the first section is 700-900°C, and the temperature of the second section is The temperature of the second stage is 920-970°C, the temperature of the third stage is 970-920°C, and the temperature of the fourth stage is 900-700°C.

高温段作为砖坯烧结的主要结构区,其温度影响着砖坯在烧结过程中形成的内部结构,进而影响成品砖的强度。本发明提供的方法中将高温段沿隧道窑入口至出口方向均分为四段,使得高温段的温度呈弧形排布。通过这一方法,保证成品砖的强度高。The high-temperature section is the main structural area of brick sintering, and its temperature affects the internal structure of the brick during sintering, which in turn affects the strength of the finished brick. In the method provided by the present invention, the high-temperature section is divided into four sections along the direction from the entrance to the exit of the tunnel kiln, so that the temperature of the high-temperature section is arranged in an arc. By this method, the strength of the finished brick is guaranteed to be high.

与现有技术相比,本发明的有益效果为:Compared with prior art, the beneficial effect of the present invention is:

(1)本发明提供的窑炉设备中,设置在烘干窑的离心风机可抽取隧道窑在烧制过程中产生的热气,将其送入烘干窑中,利用从隧道窑中抽取的热气对烘干窑中的砖坯进行风干,大大降低了在制砖过程中能源的消耗量。(1) In the kiln equipment provided by the present invention, the centrifugal fan arranged in the drying kiln can extract the hot air produced by the tunnel kiln in the firing process, send it into the drying kiln, and use the hot air extracted from the tunnel kiln to Air-drying the bricks in the drying kiln greatly reduces the energy consumption in the brick-making process.

(2)本发明提供的窑炉设备中,通过在烘干窑的入口处设置抽风机,且抽风机的一端与所述烘干窑的窑道连通,将窑道内的湿气抽离,有利于砖坯的烘干。(2) In the kiln equipment provided by the present invention, by setting an exhaust fan at the entrance of the drying kiln, and one end of the exhaust fan communicates with the kiln passage of the drying kiln, the moisture in the kiln passage is extracted, and there is Conducive to the drying of bricks.

(3)本发明提供的窑炉设备中,通过在烘干窑的窑道底部设置双轨道铁轨,可不间断地向烘干窑道中运输砖坯进行烘干,从而大大提高生产效率。(3) In the kiln equipment provided by the present invention, by arranging double-track rails at the bottom of the kiln tunnel of the drying kiln, the bricks can be continuously transported to the drying kiln tunnel for drying, thereby greatly improving production efficiency.

(4)本发明提供的窑炉设备中,所述烘干窑的墙体下层为实体墙,上层为夹层墙,夹层墙中靠近窑道的墙体上设有出风孔,且所述离心风机与夹层墙的内部空间连通。通过这一设计,离心风机从隧道窑抽取来的热气首先进入夹层墙的内部空间,然后再通过出风孔散至窑道中,实现热量的均匀分布,避免砖坯烘干不均匀而导致出现裂纹。(4) In the kiln equipment provided by the present invention, the lower layer of the wall of the drying kiln is a solid wall, the upper layer is a sandwich wall, and the wall near the kiln road in the sandwich wall is provided with an air outlet, and the centrifugal The fan communicates with the inner space of the sandwich wall. Through this design, the hot air drawn by the centrifugal fan from the tunnel kiln first enters the inner space of the interlayer wall, and then diffuses into the kiln through the air outlet holes to achieve uniform heat distribution and avoid cracks caused by uneven drying of the bricks.

(5)本发明提供的窑炉设备中,为了提高生产效率,该设备中包含四个烘干窑和两个隧道窑。其中,将四个烘干窑均分为两组,每组内的两个烘干窑是相连通的,通过在并排相连的夹层墙的墙体上设置出风孔实现两个烘干窑的连通,这样,从隧道窑抽取的热风可在两个烘干窑内进行流通。而为了实现两个烘干窑内热量的均匀分布,每组内,两个烘干窑内设置的离心风机的位置不相同。(5) In the kiln equipment provided by the present invention, in order to improve production efficiency, four drying kilns and two tunnel kilns are included in the equipment. Among them, the four drying kilns are divided into two groups, and the two drying kilns in each group are connected. In this way, the hot air extracted from the tunnel kiln can circulate in the two drying kilns. In order to realize the uniform distribution of heat in the two drying kilns, the positions of the centrifugal fans arranged in the two drying kilns are different in each group.

(6)本发明提供的窑炉设备中,通过在隧道窑设置送风机,且送风机的一端与所述隧道窑的连通,另一端与外部连通,可隧道窑的窑道中输送空气,提高窑道中氧气的浓度,从而起到助燃的作用。(6) In the kiln equipment provided by the present invention, by setting the blower in the tunnel kiln, and one end of the blower communicates with the tunnel kiln, and the other end communicates with the outside, air can be transported in the kiln passage of the tunnel kiln, and the oxygen in the kiln passage can be improved. concentration, thereby playing a role in supporting combustion.

(7)本发明提供的窑炉设备中,通过在隧道窑的顶部设置贯穿隧道窑的顶部火口,且所述火口的下部宽度大于上部宽度,起到两个作用:高温时打开火口散热,避免在对砖坯进行烘烤的过程中因温度太高而导致成品砖内部结构不均匀;温度低时,通过向火口加煤提高隧道窑的温度。而通过下部宽度大于上部宽度的设置,使得火口截面呈现梯形,可避免热量大量散失,从而降低能耗。(7) In the kiln equipment provided by the present invention, the top burner that runs through the tunnel kiln is set on the top of the tunnel kiln, and the lower width of the burner is greater than the upper width, which plays two roles: open the burner to dissipate heat when high temperature, avoid In the process of baking the adobe, the internal structure of the finished brick is uneven due to the high temperature; when the temperature is low, the temperature of the tunnel kiln is increased by adding coal to the crater. By setting the width of the lower part greater than the width of the upper part, the section of the burner is trapezoidal, which can avoid a large amount of heat loss, thereby reducing energy consumption.

(8)本发明提供的窑炉设备中,将隧道窑沿入口方向依次分为预热段、高温段和冷却段,所述预热段和所述冷却段的隧道窑的墙体下层为实体墙,上层为夹层墙,夹层墙中靠近窑道的墙体上设有出风孔;与所述离心风机连通的风道与夹层墙的内部空间连通。通过这一设置,隧道窑内的热气可通过预热段和冷却段内的出风孔进入夹层墙的内部空间,而后通过与夹层墙内部空间相连通的风道由离心风机抽到烘干窑中,由于隧道窑内热量的散失主要是通过隧道窑的出口和入口,而通过本发明的设计,实现了对隧道窑内的剩余热量的充分利用。同时,由于高温段的墙体为实体墙,实现了高温段的热量高度集中,进入隧道窑的砖坯在这一部分进行充分的煅烧,使砖坯的性质达到要求。(8) In the kiln equipment provided by the present invention, the tunnel kiln is divided into a preheating section, a high temperature section and a cooling section successively along the entrance direction, and the lower wall of the tunnel kiln in the preheating section and the cooling section is an entity The upper layer is a sandwich wall, and the wall close to the kiln in the sandwich wall is provided with an air outlet; the air duct connected with the centrifugal fan communicates with the inner space of the sandwich wall. Through this setting, the hot air in the tunnel kiln can enter the inner space of the interlayer wall through the air outlet holes in the preheating section and the cooling section, and then be pumped to the drying kiln by the centrifugal fan through the air channel connected with the inner space of the interlayer wall In the tunnel kiln, since the heat loss in the tunnel kiln is mainly through the exit and entrance of the tunnel kiln, the design of the present invention realizes full utilization of the remaining heat in the tunnel kiln. At the same time, because the wall in the high temperature section is a solid wall, the heat in the high temperature section is highly concentrated, and the bricks entering the tunnel kiln are fully calcined in this part, so that the properties of the bricks meet the requirements.

(9)为了更精确地控制高温段的温度,避免砖坯在烘烤过程中因温度过高或过低导致成品砖外观品质和性质下降,本发明窑炉设备中在高温段的隧道窑的顶部设有热电偶,热电偶与计算机控制系统连接,实时监测隧道窑道中的烘烤温度。(9) In order to control the temperature of the high-temperature section more accurately, and avoid the deterioration of the appearance quality and properties of the finished bricks due to the high or low temperature during the baking process of the bricks, the kiln equipment of the present invention is placed on the top of the tunnel kiln in the high-temperature section. A thermocouple is provided, and the thermocouple is connected with the computer control system to monitor the baking temperature in the tunnel kiln in real time.

附图说明Description of drawings

为了更清楚地说明本发明实施例或现有技术中的技术方案,以下将对实施例或现有技术描述中所需要使用的附图作简单地介绍。In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following will briefly introduce the drawings that need to be used in the description of the embodiments or the prior art.

图1为并排设置的四个烘干窑的俯视图;Fig. 1 is the top view of four drying kilns arranged side by side;

图2为并排设置的两个隧道窑的俯视图;Fig. 2 is the top view of two tunnel kilns arranged side by side;

图3为并排设置的四个烘干窑的前视图;Fig. 3 is the front view of four drying kilns arranged side by side;

图4为并排设置的两个隧道窑的前视图。Fig. 4 is a front view of two tunnel kilns arranged side by side.

具体实施方式Detailed ways

下面将结合实施例对本发明的实施方案进行详细描述,但是本领域技术人员将会理解,下列实施例仅用于说明本发明,而不应视为限制本发明的范围。实施例中未注明具体条件者,按照常规条件或制造商建议的条件进行。所用试剂或仪器未注明生产厂商者,均为可以通过市售购买获得的常规产品。Embodiments of the present invention will be described in detail below in conjunction with examples, but those skilled in the art will understand that the following examples are only for illustrating the present invention, and should not be considered as limiting the scope of the present invention. Those who do not indicate the specific conditions in the examples are carried out according to the conventional conditions or the conditions suggested by the manufacturer. The reagents or instruments used were not indicated by the manufacturer, and they were all conventional products that could be purchased from the market.

在本发明的描述中,需要说明的是,术语“中心”、“上”、“下”、“左”、“右”、“竖直”、“水平”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。此外,术语“第一”、“第二”、“第三”仅用于描述目的,而不能理解为指示或暗示相对重要性。In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer" etc. The indicated orientation or positional relationship is based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the referred device or element must have a specific orientation, or in a specific orientation. construction and operation, therefore, should not be construed as limiting the invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and should not be construed as indicating or implying relative importance.

在本发明的描述中,需要说明的是,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本发明中的具体含义。In the description of the present invention, it should be noted that unless otherwise specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection or a detachable connection. Connected, or integrally connected; it can be mechanically connected or electrically connected; it can be directly connected or indirectly connected through an intermediary, and it can be the internal communication of two components. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present invention in specific situations.

如图1~2所示,本发明提供的用于制砖的窑炉设备,包括烘干窑101、隧道窑201、通风道301和离心风机;As shown in Figures 1 to 2, the kiln equipment for making bricks provided by the present invention includes a drying kiln 101, a tunnel kiln 201, an air duct 301 and a centrifugal fan;

所述烘干窑101与所述隧道窑201通过所述通风道301连通,所述离心风机与所述通风道301相连,并用于使所述隧道窑201中的热风通过所述通风道301进入所述烘干窑101。The drying kiln 101 communicates with the tunnel kiln 201 through the air passage 301, and the centrifugal fan is connected with the air passage 301, and is used to make the hot air in the tunnel kiln 201 enter through the air passage 301 The drying kiln 101.

考虑到刚刚进入烘干窑道的砖坯含水量比较高,导致窑道内的湿度大,不利于砖坯的烘干。为了解决这一问题,进一步地,本发明提供的窑炉设备中还包括抽风机401,所述抽风机401的进风口与所述烘干窑101连通。通过抽风机401的不断工作,将窑道内的湿气抽离。Considering that the water content of the bricks just entering the drying kiln is relatively high, resulting in high humidity in the kiln, which is not conducive to the drying of the bricks. In order to solve this problem, further, the kiln equipment provided by the present invention further includes an exhaust fan 401 , and the air inlet of the exhaust fan 401 communicates with the drying kiln 101 . The moisture in the kiln is drawn away by the continuous operation of the exhaust fan 401 .

优选的,所述抽风机401设置有8台,每个烘干窑101的近入口端均设置有2台抽风机401,且8台抽风机401均与脱硫塔相连。Preferably, there are eight exhaust fans 401, two exhaust fans 401 are installed near the inlet of each drying kiln 101, and all eight exhaust fans 401 are connected to the desulfurization tower.

进一步地,本发明提供的窑炉设备还包括送风机501,所述送风机501的出风端与所述隧道窑201连通,并用于给所述隧道窑201内送风。设置的送风机向隧道窑201的窑道中输送空气,提高窑道中氧气的浓度,从而起到助燃的作用。Further, the kiln equipment provided by the present invention further includes a blower 501 , the air outlet of the blower 501 communicates with the tunnel kiln 201 and is used to blow air into the tunnel kiln 201 . The set blower sends air to the kiln tunnel of the tunnel kiln 201 to increase the concentration of oxygen in the kiln tunnel, thereby playing a combustion-supporting role.

进一步地,本发明提供的窑炉设备中,所述烘干窑内设置有轨道114。Further, in the kiln equipment provided by the present invention, a track 114 is arranged in the drying kiln.

在本发明的窑炉设备中,在烘干窑内设有轨道114。将待烘干的砖坯放入运输车中,沿轨道114从烘干窑入口按照设定的速度行至烘干窑出口,将运输车上的砖坯均匀地烘干。通过这一设置,可不间断地向烘干窑中运输砖坯进行烘干,从而大大提高生产效率。In the kiln equipment of the present invention, a rail 114 is provided in the drying kiln. Put the adobes to be dried into the transport vehicle, and move along the track 114 from the entrance of the drying kiln to the exit of the drying kiln at a set speed, and evenly dry the adobes on the transport vehicle. Through this setting, the bricks can be continuously transported to the drying kiln for drying, thereby greatly improving production efficiency.

进一步地,所述隧道窑201的顶部设有火口,所述火口穿透所述隧道窑的顶部。Further, the top of the tunnel kiln 201 is provided with a burner, and the burner penetrates the top of the tunnel kiln.

在本发明提供的窑炉设备中,火口有两个作用,一是打开火口散热,避免在对砖坯进行烘烤的过程中因温度太高而导致成品砖内部结构不均匀;二是在隧道窑的温度低时,通过向火口加煤提高隧道窑的温度。而通过下部宽度大于上部宽度的设置,使得火口截面呈现梯形,可避免热量大量散失,从而降低能耗。In the kiln equipment provided by the present invention, the burner has two functions, one is to open the burner to dissipate heat, so as to avoid the uneven internal structure of the finished brick caused by the high temperature during the baking process of the brick; When the temperature of the tunnel kiln is low, the temperature of the tunnel kiln is increased by adding coal to the burner. By setting the width of the lower part greater than the width of the upper part, the section of the burner is trapezoidal, which can avoid a large amount of heat loss, thereby reducing energy consumption.

为了避免热量大量散失,从而降低能耗,火口的下部宽度大于上部宽度,使得火口截面呈现梯形。这种“肚大口小”的设计,可有效降低隧道窑中热量的散失速度。In order to avoid a large amount of heat loss and reduce energy consumption, the width of the lower part of the burner is greater than that of the upper part, so that the cross section of the burner presents a trapezoidal shape. This "big belly and small mouth" design can effectively reduce the heat loss speed in the tunnel kiln.

为了能够及时地对隧道窑的温度进行调节,保证隧道窑的温度适宜于砖坯烘烤,进一步优选地,在隧道窑中,每间隔1.6-1.8m设置一排火口,每排并列设4-5个,火口的上部宽度为10-15cm。In order to be able to adjust the temperature of the tunnel kiln in a timely manner and ensure that the temperature of the tunnel kiln is suitable for the baking of bricks, it is further preferred that in the tunnel kiln, a row of burners is set at an interval of 1.6-1.8m, and each row is arranged side by side. One, the upper width of the crater is 10-15cm.

如图3所示,进一步地,所述烘干窑101的墙体自上而下为夹层墙111和实体墙112;所述夹层墙111的内侧壁上设置有出风口113,所述离心风机的进风口与所述通风道301连通,出风口与所述夹层墙的内部空间连通。As shown in Figure 3, further, the wall of the drying kiln 101 is a sandwich wall 111 and a solid wall 112 from top to bottom; the inner wall of the sandwich wall 111 is provided with an air outlet 113, and the centrifugal fan The air inlet is communicated with the ventilation channel 301, and the air outlet is communicated with the inner space of the sandwich wall.

通过这一设计,离心风机601~604从隧道窑201抽取来的热气首先进入夹层墙111的内部空间,然后再通过出风口113散至烘干窑101的窑道中,实现热量的均匀分布,避免砖坯烘干不均匀而导致出现裂纹。Through this design, the hot air extracted from the tunnel kiln 201 by the centrifugal fans 601-604 first enters the inner space of the interlayer wall 111, and then diffuses into the kiln tunnel of the drying kiln 101 through the air outlet 113, so as to achieve uniform heat distribution and avoid Cracks appear due to uneven drying of the adobe.

如图2所示,进一步地,所述隧道窑201沿入口至出口方向依次分为预热段211、高温段212和冷却段213,所述预热段211和所述冷却段213的墙体自上而下为空心墙214和实心墙215,所述空心墙214上设置有风口216,与所述离心风机的进风口连通的通风道与所述空心墙214的内部空间连通,所述隧道窑201的底部还设置有隧道窑轨道210(见图4);所述高温段212内设有热电偶,所述热电偶与计算机控制系统连接。As shown in Figure 2, further, the tunnel kiln 201 is divided into a preheating section 211, a high temperature section 212, and a cooling section 213 along the direction from the entrance to the exit, and the walls of the preheating section 211 and the cooling section 213 are From top to bottom are a hollow wall 214 and a solid wall 215, the hollow wall 214 is provided with an air outlet 216, and the air passage communicated with the air inlet of the centrifugal fan communicates with the inner space of the hollow wall 214, and the tunnel The bottom of the kiln 201 is also provided with a tunnel kiln track 210 (see FIG. 4 ); a thermocouple is provided in the high temperature section 212, and the thermocouple is connected with a computer control system.

此外所述高温段212与所述预热段211、所述高温段212与所述冷却段213之间的墙壁之间设置均有隔断223,且所述高温段212处的墙壁内是没有设置风道及风口的。In addition, partitions 223 are arranged between the walls between the high temperature section 212 and the preheating section 211, the high temperature section 212 and the cooling section 213, and there is no partition 223 in the wall at the high temperature section 212. Air ducts and vents.

通过这一设置,隧道窑201内的热气可通过预热段211和冷却段213内的风口216进入夹层墙111的内部空间,而后通过与夹层墙111内部空间相连通的风道由离心风机601~604(图1)抽到烘干窑101中,由于隧道窑201内热量的散失主要是通过隧道窑201的出口和入口,而通过本发明的设计,实现了对隧道窑201内的剩余热量的充分利用。Through this setting, the hot air in the tunnel kiln 201 can enter the inner space of the interlayer wall 111 through the tuyere 216 in the preheating section 211 and the cooling section 213, and then pass through the air channel connected with the inner space of the interlayer wall 111 by the centrifugal fan 601 ~604 (Fig. 1) is pumped into the drying kiln 101, because the loss of heat in the tunnel kiln 201 is mainly through the outlet and the entrance of the tunnel kiln 201, and by the design of the present invention, the residual heat in the tunnel kiln 201 has been realized full use of.

同时,由于高温段212的墙体为实体墙,实现了高温段212的热量高度集中,进入隧道窑201的砖坯在这一部分进行充分的煅烧,使砖坯的性质达到要求。At the same time, because the wall body of the high temperature section 212 is a solid wall, the heat of the high temperature section 212 is highly concentrated, and the bricks entering the tunnel kiln 201 are fully calcined in this part, so that the properties of the bricks meet the requirements.

而为了更精确地控制高温段212的温度,避免砖坯在烘烤过程中因温度过高或过低导致成品砖外观品质和性质下降,本发明窑炉设备中在高温段212的隧道窑顶部设有热电偶,热电偶与计算机控制系统连接,实时监测隧道窑道中的烘烤温度。In order to control the temperature of the high-temperature section 212 more precisely, and to avoid the deterioration of the appearance quality and properties of the finished bricks due to the high or low temperature during the baking process of the bricks, the tunnel kiln top of the high-temperature section 212 is installed in the kiln equipment of the present invention. There are thermocouples, and the thermocouples are connected with the computer control system to monitor the baking temperature in the tunnel kiln in real time.

如图1所示,进一步地,所述烘干窑101包括依次并排相连设置的第一烘干窑121、第二烘干窑122、第三烘干窑123和第四烘干窑124,所述第一烘干窑121和所述第二烘干窑122的夹层墙相通,所述第三烘干窑123和第四烘干窑124的夹层墙相通;所述隧道窑201包括并排相连设置第一隧道窑221和第二隧道窑222;所述离心风机包括第一离心风机601、第二离心风机602、第三离心风机603和第四离心风机604;As shown in Figure 1, further, the drying kiln 101 includes a first drying kiln 121, a second drying kiln 122, a third drying kiln 123 and a fourth drying kiln 124 arranged side by side in sequence, the The interlayer walls of the first drying kiln 121 and the second drying kiln 122 are connected, and the interlayer walls of the third drying kiln 123 and the fourth drying kiln 124 are connected; The first tunnel kiln 221 and the second tunnel kiln 222; the centrifugal fans include a first centrifugal fan 601, a second centrifugal fan 602, a third centrifugal fan 603 and a fourth centrifugal fan 604;

所述第一离心风机601的出风端、所述第二离心风机602的出风端均与所述第一烘干窑121和所述第二烘干窑122的夹层墙的内部空间连通,所述第一离心风机601的进风端与所述第二隧道窑222预热段的空心墙的内部空间连通,所述第二离心风机602的进风端与所述第二隧道窑222冷却段的空心墙的内部空间连通;所述第三离心风机603的出风端、所述第四离心风机604的出风端均与所述第三烘干窑123和所示第四烘干窑124的夹层墙的内部空间连通,所述第三离心风机603的进风端与所述第一隧道窑221预热段221的空心墙的内部空间连通,所述第四离心风机604的进风端与所述第一隧道窑冷却段213的空心墙的内部空间连通。The air outlet end of the first centrifugal fan 601 and the air outlet end of the second centrifugal fan 602 are both connected to the inner space of the interlayer wall of the first drying kiln 121 and the second drying kiln 122, The air inlet end of the first centrifugal fan 601 communicates with the inner space of the hollow wall of the second tunnel kiln 222 preheating section, and the air inlet end of the second centrifugal fan 602 is cooled with the second tunnel kiln 222 The interior space of the hollow wall of section is communicated; The inner space of the interlayer wall of 124 communicates, the air inlet end of the third centrifugal fan 603 communicates with the inner space of the hollow wall of the preheating section 221 of the first tunnel kiln 221, and the air inlet of the fourth centrifugal fan 604 The end communicates with the inner space of the hollow wall of the first tunnel kiln cooling section 213.

为了提高生产效率,本发明提供的窑炉设备中包含四个烘干窑101和两个隧道窑201。其中,第一烘干窑121和第二烘干窑122相连通,第三烘干窑123和第四烘干窑124相连通,这样,从隧道窑抽取的热风可在两个烘干窑内进行流通。而通过设置的四个离心风机可实现相连通的两个烘干窑内热量的均匀分布。In order to improve production efficiency, the kiln equipment provided by the present invention includes four drying kilns 101 and two tunnel kilns 201 . Wherein, the first drying kiln 121 is connected with the second drying kiln 122, and the third drying kiln 123 is connected with the fourth drying kiln 124. to circulate. And the uniform distribution of heat in the two connected drying kilns can be realized by setting four centrifugal fans.

进一步地,所述隧道窑201的顶部设有耐火砖层217,所述耐火砖层217之上设有珍珠岩层218,所述珍珠岩层218之上铺设混凝土预制板219。Further, a refractory brick layer 217 is arranged on the top of the tunnel kiln 201, a perlite layer 218 is arranged on the refractory brick layer 217, and a concrete prefabricated slab 219 is laid on the perlite layer 218.

在本发明的窑炉设备中,由于隧道窑201在高温下使用,尤其是隧道墙体的高温段,为了保证隧道墙体能够满足烘烤的要求,本发明的窑炉设备中,所述隧道窑201的顶部设有耐火砖层217,所述耐火砖层217之上设有珍珠岩层218,所述珍珠岩层218之上铺设混凝土预制板219(参见图4)。In the kiln equipment of the present invention, since the tunnel kiln 201 is used at high temperature, especially the high temperature section of the tunnel wall, in order to ensure that the tunnel wall can meet the requirements of baking, in the kiln equipment of the present invention, the tunnel The top of the kiln 201 is provided with a refractory brick layer 217, and above the refractory brick layer 217 is provided a perlite layer 218, and above the perlite layer 218, a concrete prefabricated slab 219 is laid (see FIG. 4 ).

基于同样的考虑,隧道窑201内靠近窑道的墙体为耐火砖层。Based on the same consideration, the wall near the kiln in the tunnel kiln 201 is a refractory brick layer.

隧道窑201墙体的两侧还设置有加固立柱,两边立柱之间通过连接横杆连接,防止隧道窑烧制之后变形。Both sides of the wall of the tunnel kiln 201 are also provided with reinforcement columns, and the columns on both sides are connected by connecting cross bars to prevent deformation of the tunnel kiln after firing.

本发明提供的窑炉设备制作烧结砖的方法,包括如下步骤:将隧道窑201的温度加热至700-1000℃,将砖坯送入烘干窑101中,从所述烘干窑101入口到达所述烘干窑101的出口,后进入所述隧道窑201中,从所述隧道窑201入口到达所述隧道窑201的出口,即得烧结砖。The method for making sintered bricks with kiln equipment provided by the present invention includes the following steps: heating the temperature of the tunnel kiln 201 to 700-1000°C, sending the bricks into the drying kiln 101, and passing from the entrance of the drying kiln 101 to the The outlet of the drying kiln 101 is then entered into the tunnel kiln 201, and from the entrance of the tunnel kiln 201 to the outlet of the tunnel kiln 201, sintered bricks are obtained.

上述方法充分利用了该窑炉设备的结构特性,只需对隧道窑201进行加热,而无需对烘干窑101进行加热,保证了本发明提供的方法能耗低,简单快捷,且制得的烧结砖的强度高。The above method makes full use of the structural characteristics of the kiln equipment, only needs to heat the tunnel kiln 201, and does not need to heat the drying kiln 101, which ensures that the method provided by the present invention is low in energy consumption, simple and quick, and the obtained Sintered bricks have high strength.

进一步地,当所述隧道窑201沿入口至出口方向依次分为预热段211、高温段212和冷却段213,所述预热段211和所述冷却段213的墙体自上而下为空心墙214和实心墙215,所述空心墙214上设置有风口216,与所述离心风机的进风口连通的通风道与所述空心墙214的内部空间连通(见图4);所述高温段212内设有热电偶,所述热电偶与计算机控制系统连接时,所述高温段212沿所述隧道窑201入口至出口方向均分为第一段、第二段、第三段和第四段,所述第一段的温度为700-900℃,所述第二段的温度为920-970℃,所述第三段的温度为970-920℃,所述第四段的温度为900-700℃。Further, when the tunnel kiln 201 is sequentially divided into a preheating section 211, a high temperature section 212 and a cooling section 213 along the direction from the entrance to the exit, the walls of the preheating section 211 and the cooling section 213 are as follows from top to bottom: Hollow wall 214 and solid wall 215, described hollow wall 214 is provided with tuyere 216, and the air channel that communicates with the air inlet of described centrifugal blower communicates with the inner space of described hollow wall 214 (seeing Fig. 4); Section 212 is provided with thermocouples, and when the thermocouples are connected to the computer control system, the high temperature section 212 is equally divided into the first section, the second section, the third section and the second section along the direction from the entrance to the exit of the tunnel kiln 201. Four sections, the temperature of the first section is 700-900°C, the temperature of the second section is 920-970°C, the temperature of the third section is 970-920°C, and the temperature of the fourth section is 900-700°C.

高温段212作为砖坯烧结的主要结构区,其温度影响着砖坯在烧结过程中形成的内部结构,进而影响成品砖的强度。本发明提供的方法中将高温段212沿隧道窑入口至出口方向均分为四段,使得高温段的温度呈弧形排布。通过这一方法,保证成品砖的强度高。The high-temperature section 212 is the main structural area of brick sintering, and its temperature affects the internal structure of the brick during sintering, which in turn affects the strength of the finished brick. In the method provided by the present invention, the high-temperature section 212 is equally divided into four sections along the direction from the entrance to the exit of the tunnel kiln, so that the temperature of the high-temperature section is arranged in an arc. By this method, the strength of the finished brick is guaranteed to be high.

尽管已用具体实施例来说明和描述了本发明,然而应意识到,在不背离本发明的精神和范围的情况下可以作出许多其它的更改和修改。因此,这意味着在所附权利要求中包括属于本发明范围内的所有这些变化和修改。While particular embodiments of the invention have been illustrated and described, it should be appreciated that various other changes and modifications can be made without departing from the spirit and scope of the invention. It is therefore intended to cover in the appended claims all such changes and modifications that are within the scope of this invention.

Claims (7)

1. a kind of furnace equipment, which is characterized in that the equipment includes drying kiln, tunnel oven, ventilating duct and centrifugal blower;
The drying kiln is connected to the tunnel oven by the ventilating duct, and the centrifugal blower is connected with the ventilating duct, and Enter the drying kiln for making the hot wind in the tunnel oven pass through the ventilating duct;
The top of the tunnel oven is equipped with burner, and the burner penetrates the top of the tunnel oven;The lower width of the burner More than upper width so that burner section presents trapezoidal;In tunnel oven, one row's burner is set at interval of 1.6-1.8m, is often arranged 4-5 are set side by side, and the upper width of burner is 10-15cm;
The wall of the drying kiln is sandwich wall and solid wall from top to bottom;It is provided with outlet air on the madial wall of the sandwich wall Mouthful;The air intake of the centrifugal blower is connected to the ventilating duct, and outlet air end is connected to the inner space of the sandwich wall;
The tunnel oven is divided into preheating section, high temperature section and cooling section along entrance to export direction, the preheating section and described The wall of cooling section is cavity wall and solid wall from top to bottom, air port is provided on the cavity wall, with the centrifugal blower The ventilating duct of air inlet connection is connected to the inner space of the cavity wall;Thermocouple, the thermoelectricity are equipped in the high temperature section It is even to be connect with computer control system.
2. furnace equipment according to claim 1, which is characterized in that the furnace equipment further includes exhaust fan, the pumping The air inlet of wind turbine is connected to the drying kiln.
3. furnace equipment according to claim 1, which is characterized in that the furnace equipment further includes pressure fan, described to send The outlet air end of wind turbine is connected to the tunnel oven, and for blowing in the tunnel oven.
4. furnace equipment according to claim 1, which is characterized in that be provided with track in the drying kiln.
5. furnace equipment according to claim 1, which is characterized in that the drying kiln includes the setting that is connected side by side successively First drying kiln, the second drying kiln, third drying kiln and the 4th drying kiln, first drying kiln and second drying kiln Sandwich wall communicates, and the sandwich wall of the third drying kiln and the 4th drying kiln communicates;The tunnel oven includes the setting that is connected side by side The first tunnel oven and the second tunnel oven;The centrifugal blower includes the first centrifugal blower, the second centrifugal blower, third centrifugation wind Machine and the 4th centrifugal blower;
The outlet air end of first centrifugal blower and second centrifugal blower is dried with first drying kiln and described second The inner space of the sandwich wall of dry kiln is connected to, the sky of the air intake of first centrifugal blower and the second tunnel oven preheating section The inner space of core-wall is connected to, and the air intake of second centrifugal blower is interior with the cavity wall of the second tunnel oven cooling section Portion space is connected to;The outlet air end of the third centrifugal blower and the 4th centrifugal blower with the third drying kiln and described The inner space of the sandwich wall of 4th drying kiln is connected to, and the air intake of the third centrifugal blower is preheated with first tunnel oven The inner space connection of the cavity wall of section, the air intake of the 4th centrifugal blower are hollow with the first tunnel oven cooling section The inner space of wall is connected to.
6. a kind of method making fired brick using any one of the claim 1-5 furnace equipments, which is characterized in that including such as Lower step:The temperature of tunnel oven is heated to 700-1000 DEG C, adobe is sent into drying kiln, is reached from the drying kiln entrance The outlet of the drying kiln, afterwards enter the tunnel oven in, from the tunnel oven entrance reach the outlet of the tunnel oven to get Fired brick.
7. according to the method described in claim 6, it is characterized in that, when the tunnel oven is divided into along entrance to export direction The wall of preheating section, high temperature section and cooling section, the preheating section and the cooling section is cavity wall and solid wall, institute from top to bottom It states and is provided with air port on cavity wall, the inner space of the ventilating duct being connected to the air inlet of the centrifugal blower and the cavity wall Connection;Thermocouple is equipped in the high temperature section, when the thermocouple is connect with computer control system, the high temperature section is described in Tunnel oven entrance to export direction is divided into first segment, second segment, third section and the 4th section, and the temperature of the first segment is 700- 900 DEG C, the temperature of the second segment is 920-970 DEG C, and the temperature of the third section is 970-920 DEG C, the 4th section of the temperature Degree is 900-700 DEG C.
CN201610471764.8A 2016-06-24 2016-06-24 A kind of furnace equipment and the method using its making fired brick Active CN105973007B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610471764.8A CN105973007B (en) 2016-06-24 2016-06-24 A kind of furnace equipment and the method using its making fired brick

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610471764.8A CN105973007B (en) 2016-06-24 2016-06-24 A kind of furnace equipment and the method using its making fired brick

Publications (2)

Publication Number Publication Date
CN105973007A CN105973007A (en) 2016-09-28
CN105973007B true CN105973007B (en) 2018-07-31

Family

ID=57019098

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610471764.8A Active CN105973007B (en) 2016-06-24 2016-06-24 A kind of furnace equipment and the method using its making fired brick

Country Status (1)

Country Link
CN (1) CN105973007B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108302934A (en) * 2018-03-12 2018-07-20 练其辉 A kind of tunnel oven using Heat Treatment organic waste
CN110356794B (en) * 2019-07-16 2024-06-14 涡阳县沪涡多孔矸石砖有限公司 Track structure for transferring hollow bricks

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4285669A (en) * 1978-11-23 1981-08-25 Ulrico Walchhutter Roller kiln provided with a drying tunnel, particularly for ceramic or refractory materials
CN201583131U (en) * 2009-11-09 2010-09-15 寿阳县明鑫铝矾耐火材料有限公司 Afterheat utilization system of tunnel furnace
CN102748943A (en) * 2012-06-14 2012-10-24 安徽省六安市佳瑞粉末冶金有限公司 Waste heat utilization technology for metallurgical tunnel kiln
CN203203413U (en) * 2013-01-28 2013-09-18 潮州市新凯陶瓷有限公司 Waste heat recycling device of kiln
CN203489719U (en) * 2013-08-22 2014-03-19 郑州世兴特种耐火材料有限公司 Refractory brick drying system
CN204085158U (en) * 2014-07-31 2015-01-07 淄博鹏达环保科技有限公司 The drying integrated system of roasting
CN204214282U (en) * 2014-10-24 2015-03-18 重庆福希建材有限公司 A kind of high hole rate shale hollow building block calcining kiln residual heat using device
CN205228128U (en) * 2015-12-07 2016-05-11 贵州修文坤泰绿色有限公司 Drying system of gangue shale adobe
CN205860771U (en) * 2016-06-24 2017-01-04 常德天厦建材有限公司 Furnace equipment for brickmaking

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4285669A (en) * 1978-11-23 1981-08-25 Ulrico Walchhutter Roller kiln provided with a drying tunnel, particularly for ceramic or refractory materials
CN201583131U (en) * 2009-11-09 2010-09-15 寿阳县明鑫铝矾耐火材料有限公司 Afterheat utilization system of tunnel furnace
CN102748943A (en) * 2012-06-14 2012-10-24 安徽省六安市佳瑞粉末冶金有限公司 Waste heat utilization technology for metallurgical tunnel kiln
CN203203413U (en) * 2013-01-28 2013-09-18 潮州市新凯陶瓷有限公司 Waste heat recycling device of kiln
CN203489719U (en) * 2013-08-22 2014-03-19 郑州世兴特种耐火材料有限公司 Refractory brick drying system
CN204085158U (en) * 2014-07-31 2015-01-07 淄博鹏达环保科技有限公司 The drying integrated system of roasting
CN204214282U (en) * 2014-10-24 2015-03-18 重庆福希建材有限公司 A kind of high hole rate shale hollow building block calcining kiln residual heat using device
CN205228128U (en) * 2015-12-07 2016-05-11 贵州修文坤泰绿色有限公司 Drying system of gangue shale adobe
CN205860771U (en) * 2016-06-24 2017-01-04 常德天厦建材有限公司 Furnace equipment for brickmaking

Also Published As

Publication number Publication date
CN105973007A (en) 2016-09-28

Similar Documents

Publication Publication Date Title
CN105423749B (en) A kind of energy-saving Split double-layer roller-way electrical kiln for permanent-magnet ferrite sintering
CN104896921B (en) A kind of roller kilns
CN106017072A (en) Energy-saving hot wind circulation tunnel kiln and waste heat recycling method of tunnel kiln
CN110260650B (en) An environmentally friendly tunnel kiln
CN212620048U (en) Energy-saving efficient continuous red brick roasting production kiln
CN108007188A (en) Kiln for ceramic post sintering de-waxing
CN105973007B (en) A kind of furnace equipment and the method using its making fired brick
CN103615885A (en) Turnover kiln with air distribution system arranged at bottom
CN204678878U (en) A kind of portable annular tunnel kiln
CN105218075B (en) The method that continous way fires antique building product
CN108444281B (en) A self-controlled high-efficiency multi-oxygen combustion ultra-low emission industrial kiln and its use method
CN103925788B (en) Fired brick production line large cross-section tunnel kiln circulation adjustable ventilating system
CN214172902U (en) High-efficiency energy-saving tunnel kiln
CN102538448B (en) Tunnel kiln
CN104457228B (en) Tenon type composite flat-top tunnel kiln
CN210180150U (en) An environmentally friendly tunnel kiln
CN214371714U (en) Assembly structure shuttle kiln system that circulation was fired
CN205784530U (en) Sectional type tunnel kiln
CN103925789B (en) Fired brick production line narrow-bore tunnel kiln circulation adjustable ventilating system
CN209341810U (en) A kind of building-block processing calcining kiln
CN104287083B (en) There is the energy-saving air flow rising-type bulk curing barn of balanced ventilation
CN205860771U (en) Furnace equipment for brickmaking
CN204115496U (en) A kind of residual heat of tunnel kiln utilize device
CN112944903A (en) Assembly structure shuttle kiln system that circulation was fired
CN201021872Y (en) a brick kiln

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant