CN105973007A - Furnace device and method utilizing furnace device to manufacture sintered bricks - Google Patents
Furnace device and method utilizing furnace device to manufacture sintered bricks Download PDFInfo
- Publication number
- CN105973007A CN105973007A CN201610471764.8A CN201610471764A CN105973007A CN 105973007 A CN105973007 A CN 105973007A CN 201610471764 A CN201610471764 A CN 201610471764A CN 105973007 A CN105973007 A CN 105973007A
- Authority
- CN
- China
- Prior art keywords
- tunnel cave
- drying kiln
- wall
- section
- centrifugal blower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27B—FURNACES, KILNS, OVENS, OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
- F27B19/00—Combinations of furnaces of kinds not covered by a single preceding main group
- F27B19/04—Combinations of furnaces of kinds not covered by a single preceding main group arranged for associated working
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F26—DRYING
- F26B—DRYING SOLID MATERIALS OR OBJECTS BY REMOVING LIQUID THEREFROM
- F26B21/00—Arrangements or duct systems, e.g. in combination with pallet boxes, for supplying and controlling air or gases for drying solid materials or objects
- F26B21/14—Arrangements or duct systems, e.g. in combination with pallet boxes, for supplying and controlling air or gases for drying solid materials or objects using gases or vapours other than air or steam, e.g. inert gases
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27D—DETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
- F27D17/00—Arrangements for using waste heat; Arrangements for using, or disposing of, waste gases
- F27D17/004—Systems for reclaiming waste heat
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F26—DRYING
- F26B—DRYING SOLID MATERIALS OR OBJECTS BY REMOVING LIQUID THEREFROM
- F26B2210/00—Drying processes and machines for solid objects characterised by the specific requirements of the drying good
- F26B2210/02—Ceramic articles or ceramic semi-finished articles
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27M—INDEXING SCHEME RELATING TO ASPECTS OF THE CHARGES OR FURNACES, KILNS, OVENS OR RETORTS
- F27M2001/00—Composition, conformation or state of the charge
- F27M2001/03—Charges containing minerals
- F27M2001/035—China
Abstract
The invention provides a furnace device and a method utilizing the furnace device to manufacture sintered bricks. The furnace device comprises drying kilns, tunnel kilns, ventilation channels and centrifugal fans, wherein the drying kilns communicate with the tunnel kilns through the ventilation channels; and the centrifugal fans are connected with the ventilation channels, and are used for enabling hot air in the tunnel kilns to enter the drying kilns through the ventilation channels. According to the furnace device and the method, the centrifugal fans can extract hot air in the tunnel kilns and feed the hot air into the drying kilns to dry green bricks, so that the energy consumption during the brick manufacturing process is greatly reduced; when the device is utilized to manufacture the sintered bricks, the temperature of the tunnel kilns is increased to 700 to 1000 DEG C, the green bricks are fed into the drying kilns from inlets of the drying kilns to outlets of the drying kilns, and then enter the tunnel kilns from inlet of the tunnel kilns to outlets of the tunnel kilns, and the sintered bricks are obtained; the method fully utilizes the structural characteristics of the furnace device, only the tunnel kilns require to be heated, and the drying kilns do not require to be heated, so that the energy consumption is low, and the method is simple and quick; and besides, the strength of the manufactured sintered bricks is high.
Description
Technical field
The present invention relates to brick equipment field, in particular to a kind of furnace equipment and profit
The method making fired brick with it.
Background technology
Fired brick is a kind of construction material being widely used at present, particularly in China rural area,
Along with expanding economy, the raising of living standards of the people, fired brick becomes for main building a house
Material.
Existing burning process, natural air drying after general brickmaking base, then use coal equal energy source
Fire in firing kiln, need the substantial amounts of energy and air-dry time.And, existing burning
Kiln energy consumption processed is high, production efficiency is low, and the energy and waste of raw materials are serious.
In view of this, the special proposition present invention.
Summary of the invention
The first object of the present invention is to provide a kind of furnace equipment in order to brickmaking, for existing
There is the problem that furnace equipment energy consumption is big, in the furnace equipment that the present invention provides, utilize centrifugal wind
Machine, detaches the steam that tunnel cave produces in sintering procedure to drying kiln, enters adobe
Sector-style is done, and greatly reduces the consumption of the energy during brickmaking.
The second object of the present invention is to provide one to utilize described furnace equipment to make fired brick
Method, the method energy consumption is low, simple and fast, and the intensity of prepared fired brick is high.
In order to realize the above-mentioned purpose of the present invention, spy by the following technical solutions:
A kind of furnace equipment for brickmaking, described equipment comprises drying kiln, tunnel cave, leads to
Air channel and centrifugal blower;
Described drying kiln is connected by described ventilating duct with described tunnel cave, described centrifugal blower
It is connected with described ventilating duct, and for making the hot blast in described tunnel cave by described ventilating duct
Enter described drying kiln.
In the furnace equipment that the present invention provides, centrifugal blower can extract tunnel cave at sintering procedure
The steam of middle generation, is sent in drying kiln, dries adobe, greatly reduce
The consumption of the energy during brickmaking.
Higher, in causing kiln road in view of the adobe water content just entering drying kiln road
High humidity, is unfavorable for the drying of adobe.In order to solve this problem, the kiln that the present invention provides
Also including air exhauster in furnace apparatus, the air inlet of described air exhauster connects with described drying kiln.
By the continuous work of air exhauster, the dampness in kiln road is detached.
In order to prevent containing sulfide in adobe, the dampness that air exhauster detaches is directly discharged to ring
Border pollutes environment, the dampness detached can be sent in desulfurizing tower and carry out from drying kiln
Desulfurization, alleviates environmental pollution.
The desulfurizing tower comprised specifically includes that tower body, blower fan, spraying mechanism, waste water process
Pond, circulating water pool and circulating pump.
Tower body is set to cylindrical uncovered tower, in the middle part of tower body in set disc type outlet pipe, water pipe
Hole for water spraying is offered in lower section, and outlet pipe is connected with circulating pump, sprays water downwards;Blower fan is arranged on tower
Side, body lower end, needs gas to be processed to send into tower body by blower fan, and gas is formed with water smoke
Convection current, thus realize desulfurization;Waste water enters purification tank for liquid waste, in purification tank for liquid waste after discharging
Throwing in Caustic soda to process, the water after process flows into circulating water pool, under the effect of circulating pump
Travel further into tower body.
In order to ensure desulfurized effect, disc type outlet pipe arranges multilamellar.
In order to ensure the stability of disc type outlet pipe, it is additionally provided with fixed mount, by disc type
Outlet pipe is fixing with tower body to be connected.
Disc type outlet pipe, concrete shape is the shape of coiled mosquito-repellent incense, and end is airtight, a ring
One ring.
In order to gas is run helter-skelter to plant area, the tower body top of desulfurizing tower is provided with outwardly open limit
Angle between edge, and tower body is 30-45 degree.
Preferably, described furnace equipment also includes pressure fan, the outlet air end of described pressure fan with
Described tunnel cave connects, and for blowing in described tunnel cave.
The pressure fan arranged carries air in the kiln road of tunnel cave, improves oxygen in kiln road
Concentration, thus play combustion-supporting effect.
In the present invention, the power of pressure fan sets according to the baking temperature of tunnel cave, passes through
The watt level of regulation pressure fan can regulate the temperature in tunnel cave.
Preferably, it is provided with track in described drying kiln.
In the furnace equipment of the present invention, in drying kiln, it is provided with track ferrum.By to be dried
Adobe is put in transport vehicle, walks to dry according to the speed set along track from drying kiln entrance
Kiln exports, and the adobe in transport vehicle is dried equably.By this setting, can be uninterrupted
Ground transports adobe in drying kiln dries, thus is greatly improved production efficiency.
Preferably, the top of described tunnel cave is provided with burner, and described burner penetrates described tunnel
The top of kiln.
In the furnace equipment that the present invention provides, burner has two effects, and one is to open burner
Heat radiation, it is to avoid in causing finished bricks because temperature is the highest during adobe is toasted
Portion's structure is uneven;Two is when the temperature of tunnel cave is low, by improving tunnel to burner coal
The temperature of road kiln.And the setting of upper width it is more than by lower width so that burner cross section
Present trapezoidal, heat can be avoided to scatter and disappear in a large number, thus reduce energy consumption.
In order to avoid heat scatters and disappears in a large number, thus reducing energy consumption, the lower width of burner is more than
Upper width so that burner cross section presents trapezoidal.The design of this " the big mouth of tripe is little ", can
Effectively reduce the lost speed of heat in tunnel cave.
In order in time the temperature of tunnel cave is adjusted, it is ensured that the temperature of tunnel cave
It is suitable for adobe baking, it is further preferred that in tunnel cave, set at interval of 1.6-1.8m
Putting row's burner, often arrange and set 4-5 side by side, the upper width of burner is 10-15cm.
Preferably, the body of wall of described drying kiln is sandwich wall and solid wall from top to bottom;Described
Being provided with air outlet on the medial wall of sandwich wall, the air inlet of described centrifugal blower is logical with described
Air channel connects, and air outlet connects with the inner space of described sandwich wall.
By this design, the steam that centrifugal blower comes from tunnel cave extraction initially enters interlayer
The inner space of wall, is dissipated in the kiln road of drying kiln by exhaust vent, it is achieved heat the most again
Be uniformly distributed, it is to avoid brick blank drying is uneven and causes crackle occur.
It is further preferred that described tunnel cave along entrance to Way out be divided into preheating section,
High temperature section and cooling section, the body of wall of described preheating section and described cooling section is hollow from top to bottom
Wall and solid wall, described cavity wall is provided with air port, with the air inlet of described centrifugal blower
The ventilating duct of connection connects with the inner space of described cavity wall;It is provided with heat in described high temperature section
Galvanic couple, described thermocouple is connected with computer control system.
By this setting, the steam in tunnel cave can be by going out in preheating section and cooling section
Air holes enters the inner space of sandwich wall, then by being connected with sandwich wall inner space
Air channel is extracted in drying kiln by centrifugal blower, owing in tunnel cave, scattering and disappearing of heat is mainly led to
Cross outlet and the entrance of tunnel cave, and by the design of the present invention, it is achieved that in tunnel cave
The making full use of of after-heat.
Simultaneously as the body of wall of high temperature section is solid wall, it is achieved that the heat height of high temperature section
Concentrating, the adobe entering tunnel cave is sufficiently calcined in this part, makes the property of adobe
Matter reaches requirement.
And in order to be precisely controlled the temperature of high temperature section, it is to avoid adobe in baking process because of
Too high or too low for temperature finished bricks exterior quality and character is caused to decline, furnace equipment of the present invention
In be provided with thermocouple, thermocouple and computer control system at the top of the tunnel cave of high temperature section
Connect, in real time the baking temperature in monitoring tunnel cave road.
Preferably, described drying kiln include being connected the most side by side arrange the first drying kiln, the
Two drying kilns, the 3rd drying kiln and the 4th drying kiln, described first drying kiln and described second
The sandwich wall of drying kiln communicates, and the sandwich wall of described 3rd drying kiln and the 4th drying kiln communicates;
Described tunnel cave includes being connected side by side and arranges the first tunnel cave and the second tunnel cave;Described centrifugal
Blower fan includes that the first centrifugal blower, the second centrifugal blower, the 3rd centrifugal blower and the 4th are centrifugal
Blower fan;
The outlet air end of described first centrifugal blower and described second centrifugal blower is all with described first
Drying kiln connects with the inner space of the sandwich wall of described second drying kiln, and described first is centrifuged
The air intake of blower fan connects with the inner space of the cavity wall of described second tunnel cave preheating section,
The air intake of described second centrifugal blower is interior with the cavity wall of described second tunnel cave cooling section
Space, portion connects;The outlet air end of described 3rd centrifugal blower and described 4th centrifugal blower all with
Described 3rd drying kiln connects with the inner space of the sandwich wall of shown 4th drying kiln, described
The air intake of the 3rd centrifugal blower is empty with the inside of the cavity wall of described first tunnel cave preheating section
Between connect, the sky of the air intake of described 4th centrifugal blower and described first tunnel cave cooling section
The inner space connection of core-wall.
In order to improve production efficiency, the furnace equipment that the present invention provides comprises four drying kilns
With two tunnel caves.Wherein, the first drying kiln and the second drying kiln are connected, and the 3rd dries
Kiln and the 4th drying kiln are connected, and so, the hot blast from tunnel cave extraction can be two drying
Circulate in kiln.And two bakings being connected can be realized by four centrifugal blowers arranged
In dry kiln, heat is uniformly distributed.
Preferably, the top of described tunnel cave is provided with fire brick layer, on described fire brick layer
It is provided with Margarita rock stratum, on described Margarita rock stratum, lays concrete prefabricated board.
In the furnace equipment of the present invention, owing to tunnel cave at high temperature uses, especially tunnel
The high temperature section of road body of wall, in order to ensure that tunnel wall body disclosure satisfy that the requirement of baking, the present invention
Furnace equipment in, the top of described tunnel cave is provided with fire brick layer, described fire brick layer it
It is provided with Margarita rock stratum, on described Margarita rock stratum, lays concrete prefabricated board.
The furnace equipment that a kind of present invention of utilization provides makes the method for fired brick, including as follows
Step: the temperature of tunnel cave is heated to 700-1000 DEG C, sends into adobe in drying kiln,
The outlet of described drying kiln is arrived from described drying kiln entrance, in the described tunnel cave of rear entrance,
Arrive the outlet of described tunnel cave from described tunnel cave entrance, obtain fired brick.
The method making fired brick that the present invention provides takes full advantage of the structure of this furnace equipment
Characteristic, only need to heat tunnel cave, and without drying kiln is heated, it is ensured that
The method energy consumption that the present invention provides is low, simple and fast, and the intensity of the fired brick prepared is high.
Preferably, it is divided into preheating section, height when described tunnel cave along entrance to Way out
Temperature section and cooling section, the body of wall of described preheating section and described cooling section is cavity wall from top to bottom
And solid wall, described cavity wall is provided with air port, connects with the air inlet of described centrifugal blower
Logical ventilating duct connects with the inner space of described cavity wall;It is provided with thermoelectricity in described high temperature section
Even, when described thermocouple is connected with computer control system, described high temperature section is along described tunnel
Kiln entrance to Way out is divided into first paragraph, second segment, the 3rd section and the 4th section, described
The temperature of first paragraph is 700-900 DEG C, and the temperature of described second segment is 920-970 DEG C, described
The temperature of the 3rd section is 970-920 DEG C, and the temperature of described 4th section is 900-700 DEG C.
The primary structure district that high temperature section sinters as adobe, its temperature affects adobe at sintering
During the internal structure that formed, and then affect the intensity of finished bricks.The side that the present invention provides
High temperature section is divided into four sections along tunnel cave entrance to Way out by method so that high temperature section
The curved arrangement of temperature.By this method, it is ensured that the intensity of finished bricks is high.
Compared with prior art, the invention have the benefit that
(1), in the furnace equipment that the present invention provides, the centrifugal blower being arranged on drying kiln can be taken out
Take the steam that tunnel cave produces in sintering procedure, be sent in drying kiln, utilize from tunnel
In road kiln, the adobe in drying kiln is air-dried by the steam of extraction, greatly reduces in brickmaking
During the consumption of the energy.
(2), in the furnace equipment that the present invention provides, take out by arranging in the porch of drying kiln
Blower fan, and one end of air exhauster connects with the kiln road of described drying kiln, by the dampness in kiln road
Detach, beneficially the drying of adobe.
(3) in the furnace equipment that the present invention provides, by arranging bottom the kiln road of drying kiln
Two-orbit rail, can transport adobe incessantly in drying kiln road and dry, thus greatly
Improve greatly production efficiency.
(4), in the furnace equipment that the present invention provides, the body of wall lower floor of described drying kiln is entity
Wall, upper strata is sandwich wall, and in sandwich wall, the body of wall near kiln road is provided with exhaust vent, and institute
State centrifugal blower to connect with the inner space of sandwich wall.By this design, centrifugal blower from
The steam that tunnel cave extraction comes initially enters the inner space of sandwich wall, passes through air-out the most again
Hole is dissipated in kiln road, it is achieved being uniformly distributed of heat, it is to avoid brick blank drying is uneven and causes
Crackle occurs.
(5) in the furnace equipment that the present invention provides, in order to improve production efficiency, in this equipment
Comprise four drying kilns and two tunnel caves.Wherein, four drying kilns are divided into two groups,
Often two drying kilns in group are connected to lead to, by the body of wall at the sandwich wall being connected side by side
On exhaust vent be set realize the connection of two drying kilns, so, from the hot blast of tunnel cave extraction
Can circulate in two drying kilns.And in order to realize the uniform of heat in two drying kilns
Distribution, often in group, the position of the centrifugal blower arranged in two drying kilns differs.
(6) in the furnace equipment that the present invention provides, by arranging pressure fan at tunnel cave, and
One end of pressure fan and the connection of described tunnel cave, the other end and ft connection, can tunnel cave
Kiln road in carry air, improve the concentration of oxygen in kiln road, thus play combustion-supporting effect.
(7), in the furnace equipment that the present invention provides, run through by arranging at the top of tunnel cave
The top burner of tunnel cave, and the lower width of described burner is more than upper width, plays two
Individual effect: open during high temperature burner heat radiation, it is to avoid during adobe is toasted because of
Temperature is the highest and causes finished bricks internal structure uneven;When temperature is low, by adding to burner
Coal improves the temperature of tunnel cave.And the setting of upper width it is more than by lower width so that
Burner cross section presents trapezoidal, heat can be avoided to scatter and disappear in a large number, thus reduce energy consumption.
(8), in the furnace equipment that the present invention provides, tunnel cave is divided into along Way in
Preheating section, high temperature section and cooling section, the wall of the tunnel cave of described preheating section and described cooling section
Body lower floor is solid wall, and upper strata is sandwich wall, and in sandwich wall, the body of wall near kiln road is provided with
Exhaust vent;The air channel connected with described centrifugal blower connects with the inner space of sandwich wall.Logical
Crossing this setting, the steam in tunnel cave can be entered by the exhaust vent in preheating section and cooling section
Enter the inner space of sandwich wall, then by the air channel that is connected with sandwich wall inner space by
Centrifugal blower is extracted in drying kiln, owing in tunnel cave, scattering and disappearing of heat mainly passes through tunnel
The outlet of kiln and entrance, and by the design of the present invention, it is achieved that to the residue in tunnel cave
Making full use of of heat.Simultaneously as the body of wall of high temperature section is solid wall, it is achieved that high temperature
Section heat high concentration, enter tunnel cave adobe sufficiently calcine in this part,
The character making adobe reaches requirement.
(9) in order to be precisely controlled the temperature of high temperature section, it is to avoid adobe is in baking process
Causing finished bricks exterior quality and character to decline because of too high or too low for temperature, kiln of the present invention sets
In Bei, the top at the tunnel cave of high temperature section is provided with thermocouple, and thermocouple controls system with computer
System connects, in real time the baking temperature in monitoring tunnel cave road.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, with
Lower the accompanying drawing used required in embodiment or description of the prior art will be briefly described.
Fig. 1 is the top view of four drying kilns being arranged side by side;
Fig. 2 is the top view of two tunnel caves being arranged side by side;
Fig. 3 is the front view of four drying kilns being arranged side by side;
Fig. 4 is the front view of two tunnel caves being arranged side by side.
Detailed description of the invention
Below in conjunction with embodiment, embodiment of the present invention are described in detail, but this
Skilled person is it will be appreciated that the following example is merely to illustrate the present invention, and should not regard
For limiting the scope of the present invention.Unreceipted actual conditions person in embodiment, according to normal condition
Or the condition of manufacturer's suggestion is carried out.Agents useful for same or instrument unreceipted production firm person, all
For the conventional products that can be obtained by commercially available purchase.
In describing the invention, it should be noted that term " " center ", " on ", D score,
The orientation of the instruction such as "left", "right", " vertically ", " level ", " interior ", " outward " or position
Relation is based on orientation shown in the drawings or position relationship, is for only for ease of the description present invention
Describe rather than indicate or imply that the device of indication or element must have specifically with simplifying
Orientation, with specific azimuth configuration and operation, be therefore not considered as limiting the invention.
Additionally, term " first ", " second ", " the 3rd " are only used for describing purpose, and can not manage
Solve as instruction or hint relative importance.
In describing the invention, it should be noted that unless otherwise clear and definite regulation and limit
Fixed, term " is installed ", " being connected ", " connection " should be interpreted broadly, for example, it may be
Fixing connection, it is also possible to be to removably connect, or be integrally connected;Can be to be mechanically connected,
It can also be electrical connection;Can be to be joined directly together, it is also possible to be indirectly connected to by intermediary,
It can be the connection of two element internals.For the ordinary skill in the art, may be used
Above-mentioned term concrete meaning in the present invention is understood with concrete condition.
As shown in Fig. 1~2, the furnace equipment for brickmaking that the present invention provides, including drying
Kiln 101, tunnel cave 201, ventilating duct 301 and centrifugal blower;
Described drying kiln 101 is connected by described ventilating duct 301 with described tunnel cave 201,
Described centrifugal blower is connected with described ventilating duct 301, and is used for making in described tunnel cave 201
Hot blast enter described drying kiln 101 by described ventilating duct 301.
Higher, in causing kiln road in view of the adobe water content just entering drying kiln road
High humidity, is unfavorable for the drying of adobe.In order to solve this problem, further, this
Air exhauster 401, the air inlet of described air exhauster 401 are also provided in the furnace equipment of bright offer
Connect with described drying kiln 101.By the continuous work of air exhauster 401, by kiln road
Dampness detaches.
Preferably, described air exhauster 401 is provided with 8, closely entering of each drying kiln 101
Mouth end is provided with 2 air exhausters 401, and 8 air exhausters 401 are all connected with desulfurizing tower.
Further, the present invention provide furnace equipment also include pressure fan 501, described in give
The outlet air end of blower fan 501 connects with described tunnel cave 201, and for described tunnel cave 201
Interior air-supply.The pressure fan arranged carries air in the kiln road of tunnel cave 201, improves kiln road
The concentration of middle oxygen, thus play combustion-supporting effect.
Further, in the furnace equipment that the present invention provides, in described drying kiln, rail is set
Road 114.
In the furnace equipment of the present invention, in drying kiln, it is provided with track 114.By to be dried
Adobe put in transport vehicle, along track 114 from drying kiln entrance according to set speed row
Export to drying kiln, the adobe in transport vehicle is dried equably.By this setting, can
In drying kiln, transport adobe incessantly dry, thus be greatly improved production efficiency.
Further, the top of described tunnel cave 201 is provided with burner, and described burner penetrates institute
State the top of tunnel cave.
In the furnace equipment that the present invention provides, burner has two effects, and one is to open burner
Heat radiation, it is to avoid in causing finished bricks because temperature is the highest during adobe is toasted
Portion's structure is uneven;Two is when the temperature of tunnel cave is low, by improving tunnel to burner coal
The temperature of road kiln.And the setting of upper width it is more than by lower width so that burner cross section
Present trapezoidal, heat can be avoided to scatter and disappear in a large number, thus reduce energy consumption.
In order to avoid heat scatters and disappears in a large number, thus reducing energy consumption, the lower width of burner is more than
Upper width so that burner cross section presents trapezoidal.The design of this " the big mouth of tripe is little ", can
Effectively reduce the lost speed of heat in tunnel cave.
In order in time the temperature of tunnel cave is adjusted, it is ensured that the temperature of tunnel cave
It is suitable for adobe baking, it is further preferred that in tunnel cave, set at interval of 1.6-1.8m
Putting row's burner, often arrange and set 4-5 side by side, the upper width of burner is 10-15cm.
As it is shown on figure 3, further, the body of wall of described drying kiln 101 is from top to bottom for folder
Layer wall 111 and solid wall 112;It is provided with air outlet on the medial wall of described sandwich wall 111
113, the air inlet of described centrifugal blower connects with described ventilating duct 301, and air outlet is with described
The inner space connection of sandwich wall.
By this design, the steam that centrifugal blower 601~604 comes from tunnel cave 201 extraction
Initially enter the inner space of sandwich wall 111, be dissipated to dry by air outlet 113 the most again
In Yao101Yao road, it is achieved being uniformly distributed of heat, it is to avoid brick blank drying is uneven and leads
There is crackle in cause.
As in figure 2 it is shown, further, described tunnel cave 201 depends on along entrance to Way out
Secondary preheating section 211, high temperature section 212 and the cooling section 213 of being divided into, described preheating section 211 and institute
State the body of wall of cooling section 213 from top to bottom for cavity wall 214 and solid wall 215, described sky
Air port 216 it is provided with, the ventilation connected with the air inlet of described centrifugal blower on core-wall 214
Road connects with the inner space of described cavity wall 214, and the bottom of described tunnel cave 201 also sets
It is equipped with tunnel cave track 210 (see Fig. 4);It is provided with thermocouple, institute in described high temperature section 212
State thermocouple to be connected with computer control system.
The most described high temperature section 212 and described preheating section 211, described high temperature section 212 and institute
State arranging between the walls between cooling section 213 and all have partition 223, and described high temperature section 212
It is not provided with air channel and air port in the wall at place.
By this setting, the steam in tunnel cave 201 can be by preheating section 211 and cooling
Air port 216 in section 213 enters the inner space of sandwich wall 111, then by with interlayer
The air channel that wall 111 inner space is connected is extracted into drying by centrifugal blower 601~604 (Fig. 1)
In kiln 101, owing in tunnel cave 201, scattering and disappearing of heat is mainly by tunnel cave 201
Outlet and entrance, and by the design of the present invention, it is achieved that to the residue in tunnel cave 201
Making full use of of heat.
Simultaneously as the body of wall of high temperature section 212 is solid wall, it is achieved that high temperature section 212
Heat high concentration, enter tunnel cave 201 adobe sufficiently calcine in this part,
The character making adobe reaches requirement.
And in order to be precisely controlled the temperature of high temperature section 212, it is to avoid adobe is in baking process
Middle finished bricks exterior quality and character is caused to decline because of too high or too low for temperature, kiln of the present invention
In equipment, the tunnel cave top in high temperature section 212 is provided with thermocouple, thermocouple and computer control
System processed connects, in real time the baking temperature in monitoring tunnel cave road.
As it is shown in figure 1, further, described drying kiln 101 includes being connected the most side by side
The first drying kiln the 121, second drying kiln the 122, the 3rd drying kiln 123 and the 4th drying put
Kiln 124, the sandwich wall of described first drying kiln 121 and described second drying kiln 122 communicates,
The sandwich wall of described 3rd drying kiln 123 and the 4th drying kiln 124 communicates;Described tunnel cave
201 include being connected side by side arranges the first tunnel cave 221 and the second tunnel cave 222;Described centrifugal
Blower fan includes first centrifugal blower the 601, second centrifugal blower the 602, the 3rd centrifugal blower 603
With the 4th centrifugal blower 604;
The outlet air end of described first centrifugal blower 601, the going out of described second centrifugal blower 602
Wind end all interior with the sandwich wall of described first drying kiln 121 and described second drying kiln 122
Space, portion connects, the air intake of described first centrifugal blower 601 and described second tunnel cave 222
The inner space connection of the cavity wall of preheating section, the air intake of described second centrifugal blower 602
Connect with the inner space of the cavity wall of described second tunnel cave 222 cooling section;Described 3rd
The outlet air end of centrifugal blower 603, described 4th centrifugal blower 604 outlet air end all with described
3rd drying kiln 123 connects with the inner space of the sandwich wall of shown 4th drying kiln 124,
The air intake of described 3rd centrifugal blower 603 and described first tunnel cave 221 preheating section 221
Cavity wall inner space connection, the air intake of described 4th centrifugal blower 604 is with described
The inner space connection of the cavity wall of the first tunnel cave cooling section 213.
In order to improve production efficiency, the furnace equipment that the present invention provides comprises four drying kilns
101 and two tunnel caves 201.Wherein, the first drying kiln 121 and the second drying kiln 122
Being connected, the 3rd drying kiln 123 is connected with the 4th drying kiln 124, so, from tunnel
The hot blast of kiln extraction can circulate in two drying kilns.And be centrifuged by four of setting
Blower fan can realize being uniformly distributed of heat in two drying kilns being connected.
Further, the top of described tunnel cave 201 is provided with fire brick layer 217, described resistance to
Margarita rock stratum 218, laying mixed on described Margarita rock stratum 218 it is provided with on firebrick layer 217
Solidifying soil precoated plate 219.
In the furnace equipment of the present invention, owing to tunnel cave 201 at high temperature uses, especially
It is the high temperature section of tunnel body of wall, in order to ensure that tunnel wall body disclosure satisfy that the requirement of baking, this
In the furnace equipment of invention, the top of described tunnel cave 201 is provided with fire brick layer 217, institute
State and on fire brick layer 217, be provided with Margarita rock stratum 218, the upper berth of described Margarita rock stratum 218
If concrete prefabricated board 219 (seeing Fig. 4).
Based on same consideration, in tunnel cave 201, the body of wall near kiln road is fire brick layer.
The both sides of tunnel cave 201 body of wall are additionally provided with reinforcing column, pass through between two edge columns
Connect cross bar to connect, prevent tunnel cave from firing and deform afterwards.
The present invention provide furnace equipment make fired brick method, comprise the steps: by
The temperature of tunnel cave 201 is heated to 700-1000 DEG C, adobe is sent in drying kiln 101,
The outlet of described drying kiln 101, the described tunnel of rear entrance is arrived from described drying kiln 101 entrance
In road kiln 201, arrive the outlet of described tunnel cave 201 from described tunnel cave 201 entrance,
Obtain fired brick.
Said method takes full advantage of the architectural characteristic of this furnace equipment, only need to be to tunnel cave
201 heat, and without drying kiln 101 is heated, it is ensured that the present invention provides
Method energy consumption low, simple and fast, and the intensity of the fired brick prepared is high.
Further, it is divided into preheating when described tunnel cave 201 along entrance to Way out
Section 211, high temperature section 212 and cooling section 213, described preheating section 211 and described cooling section
The body of wall of 213 is cavity wall 214 and solid wall 215 from top to bottom, described cavity wall 214
On be provided with air port 216, the ventilating duct connected with the air inlet of described centrifugal blower is with described
Inner space connection (see Fig. 4) of cavity wall 214;It is provided with thermoelectricity in described high temperature section 212
Even, when described thermocouple is connected with computer control system, described high temperature section 212 is along described
Tunnel cave 201 entrance to Way out be divided into first paragraph, second segment, the 3rd section and the 4th
Section, the temperature of described first paragraph is 700-900 DEG C, and the temperature of described second segment is
920-970 DEG C, the temperature of described 3rd section is 970-920 DEG C, and the temperature of described 4th section is
900-700℃。
The primary structure district that high temperature section 212 sinters as adobe, its temperature affects adobe and exists
The internal structure formed in sintering process, and then affect the intensity of finished bricks.The present invention provides
Method in high temperature section 212 is divided into four sections along tunnel cave entrance to Way out so that
The curved arrangement of temperature of high temperature section.By this method, it is ensured that the intensity of finished bricks is high.
Although illustrate and describing the present invention with specific embodiment, but it will be appreciated that
May be made that without departing from the spirit and scope of the present invention many other change and
Amendment.It is, therefore, intended that include in the following claims belonging in the scope of the invention
All such changes and modifications.
Claims (10)
1. a furnace equipment, it is characterised in that described equipment comprise drying kiln, tunnel cave,
Ventilating duct and centrifugal blower;
Described drying kiln is connected by described ventilating duct with described tunnel cave, described centrifugal blower
It is connected with described ventilating duct, and for making the hot blast in described tunnel cave by described ventilating duct
Enter described drying kiln.
Furnace equipment the most according to claim 1, it is characterised in that described kiln sets
For also including that air exhauster, the air inlet of described air exhauster connect with described drying kiln.
Furnace equipment the most according to claim 1, it is characterised in that described kiln sets
For also including that pressure fan, the outlet air end of described pressure fan connect with described tunnel cave, and be used for
Blow in described tunnel cave.
Furnace equipment the most according to claim 1, it is characterised in that described drying kiln
Inside it is provided with track.
Furnace equipment the most according to claim 1, it is characterised in that described tunnel cave
Top be provided with burner, described burner penetrates the top of described tunnel cave.
Furnace equipment the most according to claim 1, it is characterised in that described drying kiln
Body of wall be sandwich wall and solid wall from top to bottom;It is provided with on the medial wall of described sandwich wall
Air outlet;The air intake of described centrifugal blower connects with described ventilating duct, and outlet air end is with described
The inner space connection of sandwich wall.
Furnace equipment the most according to claim 6, it is characterised in that described tunnel cave
It is divided into preheating section, high temperature section and cooling section, described preheating section along entrance to Way out
It is cavity wall and solid wall from top to bottom with the body of wall of described cooling section, described cavity wall sets
It is equipped with air port, the ventilating duct connected with the air inlet of described centrifugal blower and described cavity wall
Inner space connects;Thermocouple, described thermocouple and computer control it is provided with in described high temperature section
System processed connects.
Furnace equipment the most according to claim 7, it is characterised in that described drying kiln
Including be connected the most side by side arrange the first drying kiln, the second drying kiln, the 3rd drying kiln and
4th drying kiln, the sandwich wall of described first drying kiln and described second drying kiln communicates, institute
The sandwich wall stating the 3rd drying kiln and the 4th drying kiln communicates;Described tunnel cave includes phase side by side
It is connected with the first tunnel cave and the second tunnel cave put;Described centrifugal blower includes that first is centrifuged wind
Machine, the second centrifugal blower, the 3rd centrifugal blower and the 4th centrifugal blower;
The outlet air end of described first centrifugal blower and described second centrifugal blower is all with described first
Drying kiln connects with the inner space of the sandwich wall of described second drying kiln, and described first is centrifuged
The air intake of blower fan connects with the inner space of the cavity wall of described second tunnel cave preheating section,
The air intake of described second centrifugal blower is interior with the cavity wall of described second tunnel cave cooling section
Space, portion connects;The outlet air end of described 3rd centrifugal blower and described 4th centrifugal blower all with
Described 3rd drying kiln connects with the inner space of the sandwich wall of shown 4th drying kiln, described
The air intake of the 3rd centrifugal blower is empty with the inside of the cavity wall of described first tunnel cave preheating section
Between connect, the sky of the air intake of described 4th centrifugal blower and described first tunnel cave cooling section
The inner space connection of core-wall.
9. one kind utilizes the side that furnace equipment described in any one of claim 1-8 makes fired brick
Method, it is characterised in that comprise the steps: the temperature of tunnel cave is heated to 700-1000 DEG C,
Adobe is sent in drying kiln, arrives the outlet of described drying kiln from described drying kiln entrance,
In the described tunnel cave of rear entrance, arrive the outlet of described tunnel cave from described tunnel cave entrance,
Obtain fired brick.
Method the most according to claim 9, it is characterised in that when described tunnel cave
It is divided into preheating section, high temperature section and cooling section, described preheating section along entrance to Way out
It is cavity wall and solid wall from top to bottom with the body of wall of described cooling section, described cavity wall sets
It is equipped with air port, the ventilating duct connected with the air inlet of described centrifugal blower and described cavity wall
Inner space connects;Thermocouple, described thermocouple and computer control it is provided with in described high temperature section
When system processed connects, described high temperature section is divided into the along described tunnel cave entrance to Way out
One section, second segment, the 3rd section and the 4th section, the temperature of described first paragraph is 700-900 DEG C,
The temperature of described second segment is 920-970 DEG C, and the temperature of described 3rd section is 970-920 DEG C,
The temperature of described 4th section is 900-700 DEG C.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610471764.8A CN105973007B (en) | 2016-06-24 | 2016-06-24 | A kind of furnace equipment and the method using its making fired brick |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610471764.8A CN105973007B (en) | 2016-06-24 | 2016-06-24 | A kind of furnace equipment and the method using its making fired brick |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105973007A true CN105973007A (en) | 2016-09-28 |
CN105973007B CN105973007B (en) | 2018-07-31 |
Family
ID=57019098
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610471764.8A Active CN105973007B (en) | 2016-06-24 | 2016-06-24 | A kind of furnace equipment and the method using its making fired brick |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105973007B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108302934A (en) * | 2018-03-12 | 2018-07-20 | 练其辉 | A kind of tunnel oven using Heat Treatment organic waste |
CN110356794A (en) * | 2019-07-16 | 2019-10-22 | 涡阳县沪涡多孔矸石砖有限公司 | Track structure is used in a kind of transfer of hollow brick |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4285669A (en) * | 1978-11-23 | 1981-08-25 | Ulrico Walchhutter | Roller kiln provided with a drying tunnel, particularly for ceramic or refractory materials |
CN201583131U (en) * | 2009-11-09 | 2010-09-15 | 寿阳县明鑫铝矾耐火材料有限公司 | Afterheat utilization system of tunnel furnace |
CN102748943A (en) * | 2012-06-14 | 2012-10-24 | 安徽省六安市佳瑞粉末冶金有限公司 | Waste heat utilization technology for metallurgical tunnel kiln |
CN203203413U (en) * | 2013-01-28 | 2013-09-18 | 潮州市新凯陶瓷有限公司 | Waste heat recycling device of kiln |
CN203489719U (en) * | 2013-08-22 | 2014-03-19 | 郑州世兴特种耐火材料有限公司 | Refractory brick drying system |
CN204085158U (en) * | 2014-07-31 | 2015-01-07 | 淄博鹏达环保科技有限公司 | The drying integrated system of roasting |
CN204214282U (en) * | 2014-10-24 | 2015-03-18 | 重庆福希建材有限公司 | A kind of high hole rate shale hollow building block calcining kiln residual heat using device |
CN205228128U (en) * | 2015-12-07 | 2016-05-11 | 贵州修文坤泰绿色有限公司 | Drying system of gangue shale adobe |
CN205860771U (en) * | 2016-06-24 | 2017-01-04 | 常德天厦建材有限公司 | Furnace equipment for brickmaking |
-
2016
- 2016-06-24 CN CN201610471764.8A patent/CN105973007B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4285669A (en) * | 1978-11-23 | 1981-08-25 | Ulrico Walchhutter | Roller kiln provided with a drying tunnel, particularly for ceramic or refractory materials |
CN201583131U (en) * | 2009-11-09 | 2010-09-15 | 寿阳县明鑫铝矾耐火材料有限公司 | Afterheat utilization system of tunnel furnace |
CN102748943A (en) * | 2012-06-14 | 2012-10-24 | 安徽省六安市佳瑞粉末冶金有限公司 | Waste heat utilization technology for metallurgical tunnel kiln |
CN203203413U (en) * | 2013-01-28 | 2013-09-18 | 潮州市新凯陶瓷有限公司 | Waste heat recycling device of kiln |
CN203489719U (en) * | 2013-08-22 | 2014-03-19 | 郑州世兴特种耐火材料有限公司 | Refractory brick drying system |
CN204085158U (en) * | 2014-07-31 | 2015-01-07 | 淄博鹏达环保科技有限公司 | The drying integrated system of roasting |
CN204214282U (en) * | 2014-10-24 | 2015-03-18 | 重庆福希建材有限公司 | A kind of high hole rate shale hollow building block calcining kiln residual heat using device |
CN205228128U (en) * | 2015-12-07 | 2016-05-11 | 贵州修文坤泰绿色有限公司 | Drying system of gangue shale adobe |
CN205860771U (en) * | 2016-06-24 | 2017-01-04 | 常德天厦建材有限公司 | Furnace equipment for brickmaking |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108302934A (en) * | 2018-03-12 | 2018-07-20 | 练其辉 | A kind of tunnel oven using Heat Treatment organic waste |
CN110356794A (en) * | 2019-07-16 | 2019-10-22 | 涡阳县沪涡多孔矸石砖有限公司 | Track structure is used in a kind of transfer of hollow brick |
Also Published As
Publication number | Publication date |
---|---|
CN105973007B (en) | 2018-07-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102748942B (en) | Wide-bodied energy-saving and environment-friendly tunnel kiln | |
CN105910437B (en) | A kind of Beijing enamel electrical kiln for producing bavin and burning atmosphere | |
CN202869211U (en) | Multi-channel direct-firing tunnel kiln and waste heat recycling utilizing system thereof | |
CN102012152B (en) | Hanging basket drying equipment for drying household porcelain | |
CN210399933U (en) | Hollow brick kiln capable of uniformly supporting combustion | |
CN108558364A (en) | Colliery wastes brick multifuel combustion lime stone technique | |
CN107560401A (en) | Circulation tunnel type rapid draing room and drying means in a kind of | |
CN103836890B (en) | Multi-layer roller way type ceramic drying kiln | |
CN109237939A (en) | A kind of flue gas, waste heat are kept completely separate energy conservation and environmental protection and bake bricks tunnel oven | |
CN105973007A (en) | Furnace device and method utilizing furnace device to manufacture sintered bricks | |
CN103615885A (en) | Turnover kiln with air distribution system arranged at bottom | |
CN104824820B (en) | A kind of portable flue-curing device | |
CN212620048U (en) | Energy-saving efficient continuous red brick roasting production kiln | |
CN205860771U (en) | Furnace equipment for brickmaking | |
CN104457228B (en) | Tenon type composite flat-top tunnel kiln | |
CN102748926A (en) | Building ceramic single-layer rapid dryer equipment | |
CN205747967U (en) | A kind of bavin that produces burns the Beijing enamel electrical kiln of atmosphere | |
CN206897771U (en) | A kind of vertical spraying curing oven | |
CN205258369U (en) | Energy -concerving and environment -protective tunnel cave of matter is carried in brown coal dry distillation | |
CN205262172U (en) | Energy -conserving flat top tunnel cave | |
CN101749950B (en) | Air return type energy saving annular kiln for producing shale brick and production method | |
CN201203349Y (en) | Multichannel energy-saving kiln | |
CN207299907U (en) | Uprush refractory material burns till tunnel oven | |
CN203744660U (en) | Energy-saving ceramic paste and plaster model drying box | |
CN201018908Y (en) | Natural draft ventilation intensive tobacco roasting room rebuilt from ordinary natural ventilation tobacco roasting room |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||