CN105423748B - A kind of warm area is mutually wrong to arrange double-layer roller hearth furnace - Google Patents

A kind of warm area is mutually wrong to arrange double-layer roller hearth furnace Download PDF

Info

Publication number
CN105423748B
CN105423748B CN201510881858.8A CN201510881858A CN105423748B CN 105423748 B CN105423748 B CN 105423748B CN 201510881858 A CN201510881858 A CN 201510881858A CN 105423748 B CN105423748 B CN 105423748B
Authority
CN
China
Prior art keywords
lower floor
upper strata
area
preheating
drying
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510881858.8A
Other languages
Chinese (zh)
Other versions
CN105423748A (en
Inventor
刘金平
周时宇
苏文生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan ShuoKe thermal Intelligent Equipment Co.,Ltd.
Original Assignee
CETC 48 Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CETC 48 Research Institute filed Critical CETC 48 Research Institute
Priority to CN201510881858.8A priority Critical patent/CN105423748B/en
Publication of CN105423748A publication Critical patent/CN105423748A/en
Application granted granted Critical
Publication of CN105423748B publication Critical patent/CN105423748B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27BFURNACES, KILNS, OVENS, OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
    • F27B9/00Furnaces through which the charge is moved mechanically, e.g. of tunnel type; Similar furnaces in which the charge moves by gravity
    • F27B9/02Furnaces through which the charge is moved mechanically, e.g. of tunnel type; Similar furnaces in which the charge moves by gravity of multiple-track type; of multiple-chamber type; Combinations of furnaces
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27BFURNACES, KILNS, OVENS, OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
    • F27B9/00Furnaces through which the charge is moved mechanically, e.g. of tunnel type; Similar furnaces in which the charge moves by gravity
    • F27B9/14Furnaces through which the charge is moved mechanically, e.g. of tunnel type; Similar furnaces in which the charge moves by gravity characterised by the path of the charge during treatment; characterised by the means by which the charge is moved during treatment
    • F27B9/20Furnaces through which the charge is moved mechanically, e.g. of tunnel type; Similar furnaces in which the charge moves by gravity characterised by the path of the charge during treatment; characterised by the means by which the charge is moved during treatment the charge moving in a substantially straight path tunnel furnace
    • F27B9/24Furnaces through which the charge is moved mechanically, e.g. of tunnel type; Similar furnaces in which the charge moves by gravity characterised by the path of the charge during treatment; characterised by the means by which the charge is moved during treatment the charge moving in a substantially straight path tunnel furnace being carried by a conveyor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27BFURNACES, KILNS, OVENS, OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
    • F27B9/00Furnaces through which the charge is moved mechanically, e.g. of tunnel type; Similar furnaces in which the charge moves by gravity
    • F27B9/30Details, accessories, or equipment peculiar to furnaces of these types

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Processing Of Solid Wastes (AREA)
  • Furnace Details (AREA)

Abstract

The invention discloses a kind of warm area, mutually mistake arranges double-layer roller hearth furnace, including body of heater, the body of heater is divided into by upper strata kiln road and lower floor Yao Dao by intermediate thermal insulating layer, upper strata roller tables is provided with the upper strata kiln road, upper strata roller rod is provided with the roller tables of upper strata, lower floor's roller tables is provided with lower floor's kiln road, lower floor's roller rod is provided with lower floor's roller tables;The ferrite products of different batches are fired respectively on the contrary, the upper strata kiln road and lower floor Yao Dao are provided with complete sintering process section in the direction of rotation of the upper strata roller rod and lower floor's roller rod.The present invention has the advantages that simple and compact for structure, raising efficiency, increase production capacity, saves energy consumption.

Description

A kind of warm area is mutually wrong to arrange double-layer roller hearth furnace
Technical field
Present invention relates generally to roller kilns field, a kind of double-layer roller hearth furnace using the mutual wrong arrangement of warm area is refered in particular to.
Background technology
Roller kilns are a kind of new rapid continuous industry calcining kilns, with automaticity is high, labor intensity is low, operation The advantages that facilitating.For roller kilns using the roller that rotates as base substrate delivery vehicle, it is very close that product to be fired is placed on many bar intervals Horizontal refractory roll rod on, roller rest rotation by fire product be sent to kiln tail from kiln hood.Roller kilns are widely used in ceramics The products such as material, magnetic material, electrode material, chemical powder are rapidly fired to.
At present, the roller kilns of in the market are mainly individual layer roller kilns, are divided into Electric heating and gas heating mode, have More ripe technology is simultaneously widely used.Traditional individual layer roller-way electrical kiln enters kiln when firing permanent-magnet ferrite material from kiln hood, Kiln discharge completes the sintering period after preheating and drying section, warming-up section, constant temperature zone, cooling section successively.Permanent-magnet ferrite product sinters It is preceding to contain a large amount of water(≤13%), according to technological requirement, it is necessary to slowly, uniformly discharged in pre-heating drying section, the production otherwise sintered out Cracking and piebald before kiln just occurs in product.According to statistics, when firing product using roller kilns, really it is used for the sintering procedure of product Heat is less than 2/3, and its excess heat is not by kiln self-radiating, is exactly directly directly to exclude outdoor in kiln tail, its thermal efficiency It is low, cause substantial amounts of energy waste.
For example, there is practitioner to propose a kind of roller way kiln residual heat using device(Chinese patent 201420686869), institute's public affairs The roller kilns opened are individual layer kiln, and for the production of ceramic wall and floor bricks, its leading portion is provided with dry kiln, and dry kiln wind is provided with dry kiln Machine, the back segment that the chilling band burnt till is located at roller kilns is cooled down, the end of quench zone is provided with waste heat mouth, and the intraoral roller-way that is provided with of waste heat burns Into kiln blower fan, it is connected by airduct with dry kiln blower fan, the airduct is located above roller kilns.But general individual layer roller kilns kiln body Typically more than 45 meters, the airduct in such scheme is long, and waste heat gas heat in long airduct easily scatters and disappears, and airduct In easy ponding.
Therefore, deficiency existing for the kiln structure of traditional structure is that:
(1)For existing individual layer roller kilns body of heater typically more than 45 meters, floor space is big.This is due to Ferrite Material sintering During, it is necessary to strictly control heating curve, need to carry out pre-heating drying before heating, and cooling rate is unsuitable in temperature-fall period It is too fast, therefore body of heater is longer.
(2)Roller kilns are high to transmission conveying saggar or load bearing board precision prescribed, and are typically set in existing double-layer roller hearth furnace kiln Lifting platform is put, control difficulty is larger, it is difficult to smooth orderly when keeping saggar or load bearing board to come out of the stove.This is due to that roller kilns roller rod passes Dynamic conveying saggar or load bearing board require that transmission accuracy is especially high, and existing double-layer roller hearth furnace burns because material needs to circulate in body of heater Knot, therefore lifting platform is generally equipped with, have an impact for saggar or load bearing board transmission precision, be difficult to control.
(3)Existing energy-saving roller kiln high-temperature residual heat gas transmission pipeline is long, waste of materials, easy ponding, and heat exists Easily it is lost in course of conveying.Existing roller kilns residual-heat utilization technology by the high-temperature gas of kiln tail cooling section, it is necessary to be extracted into kiln hood Drying and preheating section utilizes, and required pipeline is longer, and air draft pipe is easily deformed during long-time use, causes part Moisture condensation is fallen within pipeline, is formed ponding and is even passed back into furnace chamber, agglomerated material is adversely affected.
The content of the invention
The technical problem to be solved in the present invention is that:For technical problem existing for prior art, the present invention provides one Kind is simple and compact for structure, improves efficiency, increase production capacity, the mutual mistake arrangement double-layer roller hearth furnace of warm area for saving energy consumption.
In order to solve the above technical problems, the present invention uses following technical scheme:
A kind of warm area mutually wrong arrangement double-layer roller hearth furnace, including body of heater, is divided into upper strata by intermediate thermal insulating layer by the body of heater Kiln road and lower floor Yao Dao, upper strata roller tables is provided with the upper strata kiln road, upper strata roller rod, the lower floor are provided with the roller tables of upper strata Lower floor's roller tables is provided with kiln road, lower floor's roller rod is provided with lower floor's roller tables;The rotation side of the upper strata roller rod and lower floor's roller rod To on the contrary, the upper strata kiln road and lower floor Yao Dao are provided with complete sintering process section, the ferrites of different batches are fired respectively Product.
As a further improvement on the present invention:The upper strata Yao Dao be divided into from front to back upper strata preheating and drying area, on Layer heating zone, upper strata flat-temperature zone, upper strata cooling area;The lower floor Yao Dao is divided into lower floor cooling area, lower floor's perseverance from front to back Warm area, lower floor's heating zone, preheating and drying area of lower floor;Be provided with before preheating and drying area of the upper strata preheating and drying area and lower floor into Material mouth, the cooling area are provided with discharging opening afterwards.
As a further improvement on the present invention:The upper strata preheating and drying area is equal to first with upper strata heating section length sum Lower floor cooling area and the length sum of the second lower floor cooling area;First upper strata cooling area and the length of the second upper strata cooling area Equal to lower floor's heating zone and the length sum in preheating and drying area of lower floor.
As a further improvement on the present invention:The length of the upper strata flat-temperature zone is equal to the length of lower floor flat-temperature zone.
As a further improvement on the present invention:The top in the upper strata preheating and drying area sets upper strata air exhauster and upper strata Air draft pipe, negative pressure is formed in furnace roof exhausting, makes the waste heat air in lower floor cooling area enter in the preheating and drying area of upper strata, is supplied Upper strata Ferrite Material pre-heating drying is used, and caused steam imports total pipeline by upper strata air draft pipe and discharges stove in drying course Body.
As a further improvement on the present invention:Preheating and drying area of lower floor bottom is communicated with the top of the upper strata cooling area Airduct, lower floor's air exhauster is provided with above furnace roof, exhaust outlet and lower floor's exhaust column are provided with above preheating and drying area of lower floor side Road, lower floor's air draft pipe import total pipeline and are connected with lower floor air exhauster;During lower floor's air exhauster work, lower floor's preheating is dry Negative pressure is formed in dry area so that upper strata high-temperature residual heat gas enters lower floor's pre-heating drying section bottom by airduct, for lower floor's iron oxygen The drying of body material preheater is used, and caused steam imports total pipeline by lower floor's air draft pipe and discharges kiln body in drying course.
As a further improvement on the present invention:Between the upper strata cooling area and preheating and drying area of lower floor of the body of heater be provided with every Layer.
As a further improvement on the present invention:Between the upper strata heating zone of the body of heater and lower floor cooling area be provided with first every Thermosphere, second thermal insulation layer is provided between lower floor's preheating and drying area, lower floor's heating zone and upper strata cooling area.
As a further improvement on the present invention:Material table is set respectively on the upper strata roller rod and lower floor's roller rod.
As a further improvement on the present invention:The material table is saggar or load bearing board, for permanent-magnet ferrite material Hold.
Compared with prior art, the advantage of the invention is that:
1st, warm area of the invention is mutually wrong arranges double-layer roller hearth furnace, is respectively provided with two layers of kiln road up and down, the operation of up-down rollers rod It is independent of each other, is easy to control, the sintering of two batches product can be carried out simultaneously, efficiency is improved, save space;It can will be cold But the dryer section of the waste heat supply homonymy of section uses, and so as to which airduct total length be greatly reduced, improves utilization rate of waste heat.
2nd, warm area of the invention is mutually wrong arranges double-layer roller hearth furnace, and using double-layer roller table body of heater, and body of heater length can be according to reality Border requires to extend, and saves space and material, the sintering of two batches Ferrite Material can be carried out simultaneously, improves yield, adapted to The needs of market development.Roller-way independent operating in upper and lower kiln road, the accuracy of transmission system can be ensured by being independent of each other.Due to Be not provided with thermal insulation board between the cooling area in lower floor's kiln road and the preheating and drying area in upper strata kiln road, by set in cooling area bottom into Gas port, dry section top set blower fan and exhaust outlet so that high temperature caused by cooling area can be used directly to upper layer of material Preheating and drying, the devices such as airduct are eliminated, increase utilization rate of waste heat.And pass through in the other end, the cooling area in upper strata kiln road High-temperature residual heat gas is supplied preheating and drying area of homonymy lower floor and used by blower fan and airduct, is saved pipeline development length, is avoided The influence that long airduct is brought, equally adds utilization rate of waste heat.And thermal insulation board is not provided between levels flat-temperature zone, can To share heat, heat utilization rate is improved, reduces energy consumption.The arrangement of whole kiln body warm area dislocation type so that kiln body both sides The waste heat of cooling area can be fully used.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention.
Fig. 2 is the cross section structure diagram at A-A in Fig. 1.
Fig. 3 is the cross section structure diagram at B-B in Fig. 1.
Marginal data:
1st, upper strata preheating and drying area;2nd, upper strata heating zone;3rd, upper strata flat-temperature zone;4th, the first upper strata cooling area;5th, on second Layer cooling area;6th, lower floor's preheating and drying area;7th, lower floor's heating zone;8th, lower floor flat-temperature zone;9th, the first lower floor cooling area;10th, second Lower floor cooling area;11st, upper strata roller rod;12nd, lower floor's roller rod;13rd, first thermal insulation layer;14th, second thermal insulation layer;15th, upper strata air exhauster; 16th, upper strata air draft pipe;17th, lower floor's air exhauster;18th, lower floor's air draft pipe;19th, airduct.
Embodiment
The present invention is described in further details below with reference to Figure of description and specific embodiment.
As shown in FIG. 1 to 3, a kind of warm area of the invention mutually wrong arrangement double-layer roller hearth furnace, including body of heater, passes through middle interval The body of heater is divided into upper strata kiln road and lower floor Yao Dao by thermosphere;Upper strata roller tables is provided with the upper strata kiln road, in the roller tables of upper strata It is provided with upper strata roller rod 11;Lower floor's roller tables is provided with lower floor's kiln road, lower floor's roller rod 12 is provided with lower floor's roller tables;Upper strata Roller rod 11 is opposite with the direction of rotation of lower floor roller rod 12.Upper strata kiln road and lower floor Yao Dao are provided with complete sintering process, respectively Fire the ferrite product of different batches.That is, the upper strata Yao Dao of furnace interior furnace chamber is divided into upper strata preheating and drying from front to back Area 1(Pre-heating drying area), upper strata heating zone 2, upper strata flat-temperature zone 3, upper strata cooling area(First upper strata cooling area 4 and the second upper strata Cooling area 5);Lower floor Yao Dao is divided into lower floor cooling area from front to back(First lower floor cooling area 9 and the second lower floor cooling area 10), lower floor flat-temperature zone 8, lower floor's heating zone 7, preheating and drying area of lower floor 6(Pre-heating drying area).In above-mentioned pre-heating drying area(Upper strata Preheating and drying area 1 and preheating and drying area of lower floor 6)Charging aperture is provided with before, in cooling area(Upper strata cooling area and lower floor's cooling Area)Discharging opening is provided with afterwards.Among said structure, the preheating and drying area of body of heater is aqueous for drying institute in ferrite Point;Heating zone is used for ferrite by drying temperature lifting to heat preservation method temperature, and this process should strictly control technique bent Line;Flat-temperature zone is sintering process section;Inside structure and reduction ferrite when cooling area process is to keep ferrite sintered Stress, cooling velocity are unsuitable too fast.
In the said structure of the present invention, kiln road pre-heating drying section in upper strata is equal to lower floor's kiln road with heating segment length sum Cool segment length, i.e. upper strata preheating and drying area 1 is equal to lower floor cooling area with the length sum of upper strata heating zone 2(First lower floor cools The lower floor cooling area 10 of area 9 and second)Length.The length of upper strata flat-temperature zone 3 is equal to the length of lower floor flat-temperature zone 8.Upper strata cools Area(First upper strata cooling area 4 and the second upper strata cooling area 5)Length be equal to lower floor's heating zone 7 and preheating and drying area of lower floor 6 Length sum.By this design, the waste heat gas of cooling area just can be used in the residual heat drying area of homonymy, so as to save wind Pipe total length;The flat-temperature zone in upper and lower two layers of kiln road can greatly reduce energy consumption with common heater element.
Further, the present invention is not provided with thermal insulation layer, upper strata between the upper strata preheating and drying area 1 of body of heater and lower floor cooling area Resistive heater is not provided with preheating and drying area 1, lower floor cooling area bottom sets air inlet and sets valve regulated, pre- on upper strata The top in heated drying area 1 sets upper strata air exhauster 15 and upper strata air draft pipe 16, forms negative pressure in furnace roof exhausting so that lower floor Waste heat air in cooling area is entered in upper strata preheating and drying area 1, for upper strata Ferrite Material pre-heating drying, so as to save The energy, caused steam, which passes through upper strata air draft pipe 16 and imports total pipeline, in drying course discharges body of heater.
Further, the present invention is provided with interlayer, upper strata cooling between the upper strata cooling area of body of heater and preheating and drying area of lower floor 6 Air inlet is set below area side and valve regulated is set, the wind of the bottom of preheating and drying area of lower floor 6 is communicated with the top of cooling area Pipe 19,(Referring to Fig. 1).Lower floor's air exhauster 17 is provided with above furnace roof, exhaust outlet is provided with above the side of preheating and drying area of lower floor 6 With lower floor air draft pipe 18, lower floor's air draft pipe 18 imports total pipeline and is connected with lower floor air exhauster 17.Lower floor's air exhauster 17 works When, preheating and drying area of lower floor 6 is interior to form negative pressure so that upper strata high-temperature residual heat gas enters lower floor's pre-heating drying section by airduct 19 Bottom, for lower floor's Ferrite Material pre-heating drying, caused steam imports total pipeline by air draft pipe and arranged in drying course Go out kiln body.
Further, the present invention is provided with first thermal insulation layer 13 between the upper strata heating zone 2 of body of heater and lower floor cooling area, under Second thermal insulation layer 14 is provided between floor pre-heating drying area 6, lower floor's heating zone 7 and upper strata cooling area.In this example, upper strata constant temperature Thermal insulation layer is not provided between area 3 and lower floor flat-temperature zone 8.
In concrete application example, heating element heater can be resistance wire in body of heater of the invention, make it that resistance wire is uniform Heating and horizontal rigidity, resistance wire are wrapped on earthenware.Resistance wire plug is in quartz ampoule, to prevent from sintering caused discarded object With moisture corrosion resistance wire and cause short circuit.
As preferred application example, the present invention sets material table respectively on upper strata roller rod 11 and lower floor's roller rod 12, with full Sufficient different structure demand.According to being actually needed, above-mentioned material table can be saggar or load bearing board, and load bearing board can be used for permanent magnet oxygen Body material is held.
Also include lock as preferred application example, at the furnace roof of body of heater of the present invention every beam, to prevent gas stream in furnace chamber The dynamic influence to furnace chamber temperature distribution.
As preferred application example, the present invention can set air blower in the leading portion of each cooling area, with increase cooling speed Degree.
As preferred application example, body of heater of the invention includes shell and internal furnace lining, to reach energy-saving and improving Working environment, shell are metal shell, using frame steel structure, i.e., are welded to form using steel profile, steel plate sectional;And in body of heater There is heat-insulation layer, heat-insulation layer is refractory material, and the refractory material is based on light heat-insulating brick and refractory fibre.
Operation principle:Ferrite is placed on load bearing board, enters pre-heating drying area from the feeding mouth in upper and lower kiln road respectively, it is even The roller rod of speed motion drives load bearing board progressively to move, successively by heating zone, flat-temperature zone, cooling area, its motion from first to last It is to be driven by carborundum roller rod uniform roll, power motor can adjust rotating speed by frequency converter, so as to adjust saggar motion Speed.Also, power motor drive sprocket is designed with type rotational speed measuring device, reality output rotating speed is monitored in real time.
For upper strata Yao Dao, in upper strata preheating and drying area 1, heating element heater is not provided with, the heat of residual heat drying comes completely From the high-temperature residual heat gas discharged in lower floor cooling area, ferrite is heated, and powder granule surface steam and partial impurities can be with Discharged by upper strata air draft pipe 16;By upper strata heating zone 2, heating element heater is provided with, ferrite temperature steeply rises, discharge The impurity such as colloid, waste gas, to be extracted out by the upper strata air draft pipe 16 above furnace roof, air draft pipe is designed with volume adjusting apparatus, Air draft speed can accurately be adjusted according to technological requirement;During by upper strata flat-temperature zone 3, because levels constant temperature section length is the same, And thermal insulation board is not provided with, therefore can improve heat service efficiency with common heater element, reduce energy consumption;Dropped by upper strata During temperature section, in upper strata cooling area, side bottom sets air inlet, sets discharge duct at the top of the back segment of upper strata cooling area, passes through wind Pipe 19 is connected with preheating and drying area of lower floor bottom.
In preheating and drying area of lower floor 6, exhaust outlet and lower floor's air draft pipe 18, lower floor's air draft pipe 18 are provided with above side Total pipeline is imported with lower floor air exhauster 17 to be connected.When lower floor's air exhauster 17 works, negative pressure is formed in preheating and drying area of lower floor 6, is made The bottom that upper strata high-temperature residual heat gas enters preheating and drying area of lower floor 6 by airduct 19 is obtained, is dried for lower floor's Ferrite Material preheating Dry to use, caused steam imports total pipeline by lower floor's air draft pipe 18 and discharges kiln body in drying course.And in lower floor cooling area In, lower floor cooling area bottom sets air inlet and sets valve regulated, and upper strata air exhauster is set at the top of upper strata preheating and drying area 1 15 and upper strata air draft pipe 16, due to being not provided with thermal insulation board between lower floor cooling area and upper strata preheating and drying area 1, when furnace roof is taken out During blower fan work, upper strata preheating and drying area 1 forms negative pressure so that it is dry that the waste heat air in lower floor's temperature descending section enters upper strata preheating In dry area 1, supply the upper strata Ferrite Material pre-heating drying inversely to advance and use, so as to save the energy, caused by drying course Steam imports total pipeline by air draft pipe and discharges body of heater.After ferrite cools by cooling area, under discharging opening out enters One process.
The above is only the preferred embodiment of the present invention, protection scope of the present invention is not limited merely to above-described embodiment, All technical schemes belonged under thinking of the present invention belong to protection scope of the present invention.It should be pointed out that for the art For those of ordinary skill, some improvements and modifications without departing from the principles of the present invention, the protection of the present invention should be regarded as Scope.

Claims (6)

1. a kind of warm area mutually wrong arrangement double-layer roller hearth furnace, including body of heater, it is characterised in that by intermediate thermal insulating layer by the body of heater It is divided into upper strata kiln road and lower floor Yao Dao, upper strata roller tables is provided with the upper strata kiln road, upper strata roller rod is provided with the roller tables of upper strata (11), lower floor's roller tables is provided with lower floor's kiln road, and lower floor's roller rod is provided with lower floor's roller tables(12);The upper strata roller rod (11)With lower floor's roller rod(12)Direction of rotation on the contrary, the upper strata kiln road and lower floor Yao Dao are provided with complete sintering process area Section, fires the ferrite product of different batches respectively, and the upper strata Yao Dao is divided into upper strata preheating and drying area from front to back(1)、 Upper strata heating zone(2), upper strata flat-temperature zone(3), upper strata cooling area;The lower floor Yao Dao is divided into lower floor's cooling from front to back Area, lower floor flat-temperature zone(8), lower floor's heating zone(7), preheating and drying area of lower floor(6);The upper strata preheating and drying area(1)And lower floor Preheating and drying area(6)It is provided with charging aperture before, is provided with discharging opening after the cooling area, the upper strata cooling area includes the One upper strata cooling area(4)With the second upper strata cooling area(5), the lower floor cooling area includes the first lower floor cooling area(9)With second Lower floor cooling area(10), the upper strata preheating and drying area(1)With upper strata heating zone(2)Length sum is equal to the first lower floor cooling area (9)With the second lower floor cooling area(10)Length sum;First upper strata cooling area(4)With the second upper strata cooling area(5)'s Length sum is equal to lower floor's heating zone(7)With preheating and drying area of lower floor(6)Length sum, the upper strata flat-temperature zone(3)Length Degree is equal to lower floor flat-temperature zone(8)Length, the upper strata preheating and drying area(1)Top set upper strata air exhauster(15)On and Layer air draft pipe(16), negative pressure is formed in furnace roof exhausting, makes the waste heat air in lower floor cooling area enter upper strata preheating and drying Area(1)In, for upper strata Ferrite Material pre-heating drying, caused steam passes through upper strata air draft pipe in drying course(16)Converge Enter total pipeline discharge body of heater.
2. warm area according to claim 1 is mutually wrong to arrange double-layer roller hearth furnace, it is characterised in that at the top of the upper strata cooling area It is communicated with preheating and drying area of lower floor(6)The airduct of bottom(19), lower floor's air exhauster is provided with above furnace roof(17), it is pre- in lower floor Heated drying area(6)Exhaust outlet and lower floor's air draft pipe are provided with above side(18), lower floor's air draft pipe(18)Import house steward Road and lower floor's air exhauster(17)It is connected;Lower floor's air exhauster(17)During work, preheating and drying area of lower floor(6)Interior formation negative pressure, So that upper strata high-temperature residual heat gas passes through airduct(19)Into lower floor's pre-heating drying section bottom, dried for lower floor's Ferrite Material preheating Dry to use, caused steam passes through lower floor's air draft pipe in drying course(18)Import total pipeline discharge kiln body.
3. warm area according to claim 1 is mutually wrong to arrange double-layer roller hearth furnace, it is characterised in that the upper strata cooling of the body of heater Area and preheating and drying area of lower floor(6)Between be provided with interlayer.
4. warm area according to claim 1 is mutually wrong to arrange double-layer roller hearth furnace, it is characterised in that the upper strata heating of the body of heater Area(2)With being provided with first thermal insulation layer between lower floor cooling area(13), in lower floor's preheating and drying area(6), lower floor's heating zone(7) Second thermal insulation layer is provided between the cooling area of upper strata(14).
5. warm area according to claim 1 is mutually wrong to arrange double-layer roller hearth furnace, it is characterised in that the upper strata roller rod(11)With Lower floor's roller rod(12)It is upper that material table is set respectively.
6. the mutual wrong arrangement double-layer roller hearth furnace of warm area according to claim 5, it is characterised in that the material table be saggar or Load bearing board, for holding for permanent-magnet ferrite material.
CN201510881858.8A 2015-12-04 2015-12-04 A kind of warm area is mutually wrong to arrange double-layer roller hearth furnace Active CN105423748B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510881858.8A CN105423748B (en) 2015-12-04 2015-12-04 A kind of warm area is mutually wrong to arrange double-layer roller hearth furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510881858.8A CN105423748B (en) 2015-12-04 2015-12-04 A kind of warm area is mutually wrong to arrange double-layer roller hearth furnace

Publications (2)

Publication Number Publication Date
CN105423748A CN105423748A (en) 2016-03-23
CN105423748B true CN105423748B (en) 2018-01-19

Family

ID=55502134

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510881858.8A Active CN105423748B (en) 2015-12-04 2015-12-04 A kind of warm area is mutually wrong to arrange double-layer roller hearth furnace

Country Status (1)

Country Link
CN (1) CN105423748B (en)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105783507B (en) * 2016-03-28 2018-01-26 格林美(无锡)能源材料有限公司 Produce the double-layer roller hearth furnace and its production technology of lithium ion anode material
CN105890313A (en) * 2016-05-31 2016-08-24 浙江力泰炉窑科技有限公司 Multi-layer conveying device for dismounting-free insulating template drying kiln
CN106595300B (en) * 2016-11-11 2018-08-14 中国电子科技集团公司第四十八研究所 A kind of elevating transport apparatus
CN106524751B (en) * 2016-12-30 2019-01-11 重庆凌达磁材科技有限公司 Full-automatic string stacked type double-layer roller table kiln
CN106524752A (en) * 2016-12-30 2017-03-22 重庆凌达磁材科技有限公司 Double-layer roller kiln
CN106524753A (en) * 2016-12-30 2017-03-22 重庆凌达磁材科技有限公司 Full-automatic double-layer electric heating roller way kiln
CN106766875B (en) * 2016-12-30 2019-03-19 重庆凌达磁材科技有限公司 Double-layer stacked type roller way kiln
CN110626770A (en) * 2018-06-25 2019-12-31 安徽省宁国市宁星耐磨材料有限公司 Alloy steel casting unpowered conveying device and conveying method thereof
CN109269301B (en) * 2018-11-17 2024-09-24 上海固帝实业有限公司 Automatic circulating sintering device for sintering active carbon filter element
CN110487074A (en) * 2019-08-28 2019-11-22 佛山市德力泰科技有限公司 A kind of smoke evacuation plot structure of energy-saving binary channels roller kilns
CN110421703B (en) * 2019-09-16 2021-06-11 广东中鹏节能科技有限公司 Double-layer microcrystal foaming plate roller kiln
CN110986578B (en) * 2019-12-21 2021-06-08 深圳东忠窑炉有限公司 Energy-saving roller kiln
CN115247955A (en) * 2021-07-27 2022-10-28 苏州科尔珀恩机械科技有限公司 Lithium battery anode and cathode material sintering furnace

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2100222A (en) * 1936-09-23 1937-11-23 Gen Electric Enameling furnace
AU5055501A (en) * 2000-03-22 2001-10-03 Anglo American Corporation Of South Africa Limited Heating solid material in two opposite streams
CN101358275B (en) * 2008-09-03 2010-09-01 杭州金舟电炉有限公司 Upper layer heat exchange type continuous annealing furnace
CN201449138U (en) * 2009-07-27 2010-05-05 沂源嘉丽轻工业品有限公司 Integrative double-layer reversal energy-saving tunnel kiln
ITVR20130222A1 (en) * 2013-10-01 2015-04-02 Siti B & T Group S P A COOKING OVEN FOR CERAMIC AND SIMILAR PRODUCTS.
CN204141989U (en) * 2014-09-26 2015-02-04 瑞彩科技股份有限公司 A kind of energy-saving double-layer fuel gas table kiln

Also Published As

Publication number Publication date
CN105423748A (en) 2016-03-23

Similar Documents

Publication Publication Date Title
CN105423748B (en) A kind of warm area is mutually wrong to arrange double-layer roller hearth furnace
CN205262173U (en) Double -deck sintering furnace
CN206339094U (en) Heating using microwave produces the product line device of alloy
CN204141989U (en) A kind of energy-saving double-layer fuel gas table kiln
CN106546096B (en) The product line device and production method of microwave heating production alloy
CN106017072A (en) Energy-saving hot wind circulation tunnel kiln and waste heat recycling method of tunnel kiln
CN203432300U (en) Hot air circulation device of tunnel kiln
CN103940221A (en) Novel energy-saving kiln
CN107917615A (en) One kind fires exterior insulation multisection type roller kilns
CN108870958A (en) Hot air circulation heat accumulation type radiant tube heating sealing roller way kiln
CN102620559A (en) Novel tunnel-type folded-rail continuous sintering furnace and sintering method thereof
CN203163478U (en) Novel energy-saving kiln
CN209960963U (en) Heat treatment kiln
CN112050631A (en) Tunnel kiln system for firing ceramsite and ceramsite firing method
CN204787775U (en) Continuous type enamel fritting furnace
CN102042750A (en) Energy-saving electrothermal tunnel kiln
CN106885469A (en) A kind of ceramic kiln with cooling control structure
CN208505002U (en) Hot air circulation heat accumulation type radiant tube heating sealing roller way kiln
CN110057192A (en) A kind of large scale push plate nitrogen atmosphere protection sintering furnace
CN207231196U (en) A kind of roller kilns
CN202393206U (en) Novel tunnel type folding rail continuous sintering kiln
CN206583296U (en) A kind of ceramic kiln with cooling control structure
CN109751599A (en) Heat-storage type burner, industrial furnace and the manufacturing method for being burnt into product
CN105157393B (en) One kind production is without vanadium rare-earth-based titanium tungsten powder continuous drying system
CN205066422U (en) Multipurpose microwave high temperature roller kilns

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201215

Address after: 410000, 1 / F, microelectronic equipment center building, 1025 xinkaipu Road, Tianxin District, Changsha City, Hunan Province

Patentee after: Hunan ShuoKe thermal Intelligent Equipment Co.,Ltd.

Address before: 410111, No. 1025, paving road, Tianxin District, Hunan, Changsha

Patentee before: FORTY-EIGHTH RESEARCH INSTITUTE OF CHINA ELECTRONICS TECHNOLOGY Group Corp.