CN105956762A - Engineering budgeting price combination method based on BIM and cloud platform - Google Patents
Engineering budgeting price combination method based on BIM and cloud platform Download PDFInfo
- Publication number
- CN105956762A CN105956762A CN201610273846.1A CN201610273846A CN105956762A CN 105956762 A CN105956762 A CN 105956762A CN 201610273846 A CN201610273846 A CN 201610273846A CN 105956762 A CN105956762 A CN 105956762A
- Authority
- CN
- China
- Prior art keywords
- bim
- model
- bill
- budgeting
- cloud
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 16
- 238000010276 construction Methods 0.000 claims abstract description 21
- 230000008569 process Effects 0.000 claims abstract description 7
- 238000004364 calculation method Methods 0.000 claims description 26
- 238000005516 engineering process Methods 0.000 claims description 6
- 239000000463 material Substances 0.000 claims description 4
- 238000005259 measurement Methods 0.000 claims description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 4
- 238000009825 accumulation Methods 0.000 claims description 3
- 230000008878 coupling Effects 0.000 claims description 3
- 238000010168 coupling process Methods 0.000 claims description 3
- 238000005859 coupling reaction Methods 0.000 claims description 3
- 238000010586 diagram Methods 0.000 claims description 3
- 230000008676 import Effects 0.000 claims description 3
- 230000010354 integration Effects 0.000 claims description 3
- 238000004519 manufacturing process Methods 0.000 description 2
- 239000000843 powder Substances 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000005662 electromechanics Effects 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0633—Workflow analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06395—Quality analysis or management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- General Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Primary Health Care (AREA)
- General Health & Medical Sciences (AREA)
- Health & Medical Sciences (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention relates to an engineering budgeting price combination method based on BIM and cloud platform, and the method comprises the following steps: a CAD drawing is imported in a BIM 3D modeling software, and a 3D model is established; vertical height and elevation of components is determined in the 3D model, an axis net is established to determine the planar positioning dimension, component attributes of each component are defined, and the components are drawn on the axis net; a bill of quantity is exported from the 3D model through a BIM budgeting module; the bill of quantity is exported to the cloud valuation platform to quickly combine the prince; in the construction process, the 3D model is associated with a budgeting file, a sub-contract, construction drawings and a scheduled plan, and the model is divided into manageable work places through a flow section division method; according to the invention, the method improves the budgeting precision, budgeting efficiency and model use ratio, and is good for cost management.
Description
Technical field
The present invention relates to a kind of construction calculation volume composing exes, particularly relate to a kind of construction calculation volume composing exes based on BIM and cloud platform.
Background technology
Originally calculation amount work is all according to local valuation model and design drawing by budgeter, by the instrument such as abacus, computer carry out on paper document engineering list, the work such as calculating.Work efficiency is low, is susceptible to mistake, and report form statistics the most repeatedly collects.
After the popularization and application of computer, calculation is measured work and is carried out by office software (such as EXCLE, ACCESS etc.) by increasing budget worker, and the calculation of relative paper medium slightly increases little work efficiency.But it is still required for accuracy and the collection work of form manually controlling to calculate.
BIM technology (BIM) is the digital technology direct application in architectural engineering, solve architectural engineering description problem in software, enable designer and engineers and technicians that various architecture informations to be made correct reply, and provide solid foundation for collaborative work.BIM is again a kind of digitizing solution being applied to and designing, build, manage simultaneously, and this method supports the integrated management environment of architectural engineering, and architectural engineering can be made to significantly improve efficiency in its whole process and reduce risks in a large number.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of construction calculation volume composing exes based on BIM and cloud platform, calculation accuracy of measurement should be improve and calculates amount efficiency by construction calculation volume composing exes based on BIM and cloud platform, it is more beneficial for cost management, improves the utilization rate of model.
In order to solve above-mentioned technical problem, the construction calculation volume composing exes based on BIM and cloud platform of the present invention, the method comprises the following steps:
Step one, imports BIM 3 d modeling software by CAD diagram paper, sets up threedimensional model, it then follows modeling rule is signed in point-shaped component, linear structure dough-making powder shape component in the middle of BIM 3 d modeling software, determines height with floor height;Attribute determines cross section;Axle net determines position;
Step 2, determines the vertical height size of component, absolute altitude in the three-dimensional model, sets up axle net and determines plane positioning size, for each component, defines structure attribute, after having defined component, component is plotted in axle online;
Step 3, bill of quantities derived by threedimensional model: above-mentioned threedimensional model is imported BIM calculation amount module, and user is according to unified project name, bullets, computation rule, measurement unit derived score subitem bill of quantities, measure item, other item bill respectively;
Step 4, bill of quantities being imported cloud valuation platform and quickly organizes valency, user quickly realizes a key smart group valency by the accumulation of historical data, for accumulating without historical data, push the group valency scheme of coupling according to industry data, complete the inventory group valency of construction unit, projects;
Step 5, in work progress, is associated threedimensional model with documents of estimate, subcontract, construction drawing, schedule, by flowing water section dividing mode, threedimensional model is divided into the work surface that can manage.
Described structure attribute includes cross section, thickness, material.
Described cloud valuation platform is that to realize valuation full-service integration, whole process covers based on big data, cloud computing information technology.
Use this construction calculation volume composing exes based on BIM and cloud platform, have the advantage that
1, improve work efficiency.Traditional calculation amount mode of operation intensity is very big, and the time is the longest.The present invention is by simple engineering whole installation-modeling-calculating three step, it is possible to complete construction calculation volume work, whole during only need to put energy into construction modular ring and save, calculating process is all automatically performed by software.Report form statistics is the most flexible, is not required to manually again collect fill in.
2, the accuracy of calculation amount result is promoted.Often there are the lower level error such as plus-minus is miscalculated, arithmetic point dislocation in manual calculation quantities, and it is relatively big to check difficulty, and the loss being likely to result in that once makes mistakes is the hugest.More complicated plus modern building fabric, the kind of special-shaped component increases, and hand computation can not meet accurate result and calculate.The present invention can be according to the shape of component, automatic result of calculation, allows calculation amount personnel fully and completely leave computer and pencil behind, is easily accomplished calculation amount work.
3, data application and management are more convenient.Past hand computation form out is all to order into book, by the unified keeping of documenter.If needing to search wherein certain project data, require to look up for a long time.And inconvenience keeping, it is easily damaged loss.The present invention can directly by search, counter look into, the various modes of operation such as condition statistics are quickly found out required data, form form, whole process only needs several seconds, can arbitrarily back up, and will not lose.
4, the progress control in the BIM model work progress simultaneously of the amount of calculation group valency, quality management, safety management, cost management etc., it is also possible to the building operation maintenance management after going into operation, substantially increase model utilization rate.
Detailed description of the invention
Construction calculation volume composing exes based on BIM and cloud platform, the method comprises the following steps:
Step one, CAD diagram paper is imported BIM 3 d modeling software, set up threedimensional model, can import as required each specialty drawing: building, structure, electromechanics, finishing etc., follow modeling rule and point-shaped component, linear structure dough-making powder shape component are signed in the middle of BIM 3 d modeling software, determine height with floor height;Attribute determines cross section;Axle net determines position (point, line, surface);
Step 2, determines the vertical height size of component, absolute altitude in the three-dimensional model, sets up axle net and determines plane positioning size, for each component, defines structure attribute, after having defined component, component is plotted in axle online;
Step 3, bill of quantities derived by threedimensional model: above-mentioned threedimensional model is imported BIM calculation amount module, and user is according to unified project name, bullets, computation rule, measurement unit derived score subitem bill of quantities, measure item, other item bill respectively;
Step 4, bill of quantities being imported cloud valuation platform and quickly organizes valency, user quickly realizes a key smart group valency by the accumulation of historical data, for accumulating without historical data, push the group valency scheme of coupling according to industry data, complete the inventory group valency of construction unit, projects;
Step 5, in work progress, threedimensional model is associated with documents of estimate, subcontract, construction drawing, schedule etc., draw grading mode by flowing water section and threedimensional model is divided into the work surface that can manage, can be with the steel project of each flowing water section of rapid extraction, component quantities, drawing, inventory quantities, required goods and materials amount, work strength by norm etc., help the production management personnel reasonable arrangement production schedule, evade work surface conflict in advance.
Described structure attribute includes cross section, thickness, material.
Described cloud valuation platform is that to realize valuation full-service integration, whole process covers based on big data, cloud computing information technology.
Not having the technical characteristic described in detail in the application is prior art.The principle of above-described embodiment only illustrative the application and effect thereof, not for limiting the application.Any person skilled in the art all can without prejudice to spirit herein and under the scope of, above-described embodiment is modified or changes.Therefore, art has all equivalence modification or changes that usually intellectual is completed under without departing from spirit disclosed herein and technological thought, must be contained by claims hereof.
Claims (3)
1. a construction calculation volume composing exes based on BIM and cloud platform, it is characterised in that: the method comprises the following steps:
Step one, imports BIM 3 d modeling software by CAD diagram paper, sets up threedimensional model;
Step 2, determines the vertical height size of component, absolute altitude in the three-dimensional model, sets up axle net and determines plane positioning size, for each component, defines structure attribute, after having defined component, component is plotted in axle online;
Step 3, bill of quantities derived by threedimensional model: above-mentioned threedimensional model is imported BIM calculation amount module, and user is according to unified project name, bullets, computation rule, measurement unit derived score subitem bill of quantities, measure item, other item bill respectively;
Step 4, bill of quantities being imported cloud valuation platform and quickly organizes valency, user quickly realizes a key smart group valency by the accumulation of historical data, for accumulating without historical data, push the group valency scheme of coupling according to industry data, complete the inventory group valency of construction unit, projects;
Step 5, in work progress, is associated threedimensional model with documents of estimate, subcontract, construction drawing, schedule, by flowing water section dividing mode, threedimensional model is divided into the work surface that can manage.
2. according to the construction calculation volume composing exes based on BIM and cloud platform described in claim 1, it is characterised in that: described structure attribute includes cross section, thickness, material.
3. according to the construction calculation volume composing exes based on BIM and cloud platform described in claim 1, it is characterised in that: described cloud valuation platform is that to realize valuation full-service integration, whole process covers based on big data, cloud computing information technology.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610273846.1A CN105956762A (en) | 2016-04-28 | 2016-04-28 | Engineering budgeting price combination method based on BIM and cloud platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610273846.1A CN105956762A (en) | 2016-04-28 | 2016-04-28 | Engineering budgeting price combination method based on BIM and cloud platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105956762A true CN105956762A (en) | 2016-09-21 |
Family
ID=56915550
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610273846.1A Pending CN105956762A (en) | 2016-04-28 | 2016-04-28 | Engineering budgeting price combination method based on BIM and cloud platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105956762A (en) |
Cited By (29)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106845925A (en) * | 2016-12-26 | 2017-06-13 | 钟炜 | Engineering based on the BIM amount of calculating quickly and project high in the clouds collaborative platform soon is to amount method |
CN107038603A (en) * | 2017-03-17 | 2017-08-11 | 东易日盛家居装饰集团股份有限公司 | A kind of engineering quotation generation method and system based on BIM softwares |
CN107194578A (en) * | 2017-05-19 | 2017-09-22 | 河北省电力勘测设计研究院 | The digitizing solution of construction management |
CN107220808A (en) * | 2017-05-26 | 2017-09-29 | 李扬球 | A kind of bill of quantities visualization method |
CN107256005A (en) * | 2017-08-15 | 2017-10-17 | 广东星层建筑科技股份有限公司 | A kind of reinforcing steel bar numerical control processing method and equipment based on BIM technology |
CN107357957A (en) * | 2017-06-09 | 2017-11-17 | 上海嘉实(集团)有限公司 | Intelligent supervision method/system, readable storage medium storing program for executing and the terminal of live project |
CN107392793A (en) * | 2017-07-17 | 2017-11-24 | 四川隧唐科技股份有限公司 | Construction data exchange method and device |
CN107609266A (en) * | 2017-09-11 | 2018-01-19 | 北京唐吉诃德科技有限公司 | Fitting-out work management information system |
CN108268707A (en) * | 2017-12-31 | 2018-07-10 | 安徽马钢工程技术集团有限公司 | A kind of transfer station standard form method for drafting and transfer station construction method based on REVIT |
CN108280281A (en) * | 2018-01-18 | 2018-07-13 | 宋强 | A kind of construction cost control method and system based on BIM technology |
CN108364134A (en) * | 2018-02-11 | 2018-08-03 | 武汉理工大学 | Cost of construction based on BIM technology manages system |
CN108427697A (en) * | 2017-08-12 | 2018-08-21 | 中民筑友科技投资有限公司 | Assembled architecture data export method based on BIM and device |
CN108763727A (en) * | 2018-05-24 | 2018-11-06 | 广州市建筑科学研究院有限公司 | A kind of base pit engineering amount automatic calculating method and system based on BIM |
CN109242284A (en) * | 2018-08-24 | 2019-01-18 | 国网天津市电力公司 | Method based on BIM technology export power engineering standard engineering amount inventory |
CN109447481A (en) * | 2018-10-31 | 2019-03-08 | 广西路桥工程集团有限公司 | A kind of live cost monitoring system and method based on threedimensional model |
CN109492875A (en) * | 2018-10-15 | 2019-03-19 | 筑梦高科建筑有限公司 | Construction site role's management-control method based on BIM |
CN109785018A (en) * | 2019-03-21 | 2019-05-21 | 广州翔实工程咨询有限公司 | Automatic budget and balance method and system based on BIM |
CN109784758A (en) * | 2019-01-30 | 2019-05-21 | 北京筑业志远软件开发有限公司 | Construction quality supervision early warning system and method based on BIM model |
CN110046364A (en) * | 2018-01-16 | 2019-07-23 | 中国建筑第八工程局有限公司 | A kind of method for computing work amount based on BIM technology |
CN110310027A (en) * | 2019-06-24 | 2019-10-08 | 中建八局第一建设有限公司 | A kind of management of investment cloud platform and management of investment method based on BIM |
CN110389998A (en) * | 2019-07-18 | 2019-10-29 | 广联达科技股份有限公司 | Build the quick composing exes of project, system and computer readable storage medium in pricing |
CN110442903A (en) * | 2019-06-28 | 2019-11-12 | 万翼科技有限公司 | The method and Related product of operation cost calculation amount |
CN111339591A (en) * | 2020-02-26 | 2020-06-26 | 久翔环保工程(上海)有限公司 | Engineering project intelligent computing method based on BIM and cloud database |
CN111400430A (en) * | 2020-03-11 | 2020-07-10 | 广联达科技股份有限公司 | Method and system for quickly combining prices in digital building list pricing |
CN111476542A (en) * | 2020-04-08 | 2020-07-31 | 中德华建(北京)国际工程技术有限公司 | Professional division cooperative landing operation scheme for construction cost business |
CN112308670A (en) * | 2020-10-30 | 2021-02-02 | 上海东方投资监理有限公司 | Cloud pricing method, system, device and storage medium |
CN112734392A (en) * | 2021-01-15 | 2021-04-30 | 广州市新誉工程咨询有限公司 | BIM project cost rapid calculation system and method |
CN112785257A (en) * | 2021-01-15 | 2021-05-11 | 广州市新誉工程咨询有限公司 | Engineering cost operation evaluation method and system based on BIM technology |
CN117635248A (en) * | 2023-12-11 | 2024-03-01 | 永道工程咨询有限公司 | Investment measuring and calculating method, system, equipment and medium based on BIM technology |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104732034A (en) * | 2015-04-01 | 2015-06-24 | 中铁隆工程集团有限公司 | Constructional engineering budgeting system and working mechanism thereof |
CN105302978A (en) * | 2015-11-10 | 2016-02-03 | 上海建工集团股份有限公司 | Quantity calculation method and device |
CN105335905A (en) * | 2015-11-24 | 2016-02-17 | 广州拓欧信息技术有限公司 | Building engineering computation and evaluation system and method |
-
2016
- 2016-04-28 CN CN201610273846.1A patent/CN105956762A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104732034A (en) * | 2015-04-01 | 2015-06-24 | 中铁隆工程集团有限公司 | Constructional engineering budgeting system and working mechanism thereof |
CN105302978A (en) * | 2015-11-10 | 2016-02-03 | 上海建工集团股份有限公司 | Quantity calculation method and device |
CN105335905A (en) * | 2015-11-24 | 2016-02-17 | 广州拓欧信息技术有限公司 | Building engineering computation and evaluation system and method |
Cited By (35)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106845925A (en) * | 2016-12-26 | 2017-06-13 | 钟炜 | Engineering based on the BIM amount of calculating quickly and project high in the clouds collaborative platform soon is to amount method |
CN107038603A (en) * | 2017-03-17 | 2017-08-11 | 东易日盛家居装饰集团股份有限公司 | A kind of engineering quotation generation method and system based on BIM softwares |
CN107194578A (en) * | 2017-05-19 | 2017-09-22 | 河北省电力勘测设计研究院 | The digitizing solution of construction management |
CN107220808A (en) * | 2017-05-26 | 2017-09-29 | 李扬球 | A kind of bill of quantities visualization method |
CN107357957A (en) * | 2017-06-09 | 2017-11-17 | 上海嘉实(集团)有限公司 | Intelligent supervision method/system, readable storage medium storing program for executing and the terminal of live project |
CN107392793A (en) * | 2017-07-17 | 2017-11-24 | 四川隧唐科技股份有限公司 | Construction data exchange method and device |
CN108427697A (en) * | 2017-08-12 | 2018-08-21 | 中民筑友科技投资有限公司 | Assembled architecture data export method based on BIM and device |
CN107256005A (en) * | 2017-08-15 | 2017-10-17 | 广东星层建筑科技股份有限公司 | A kind of reinforcing steel bar numerical control processing method and equipment based on BIM technology |
CN107609266A (en) * | 2017-09-11 | 2018-01-19 | 北京唐吉诃德科技有限公司 | Fitting-out work management information system |
CN108268707A (en) * | 2017-12-31 | 2018-07-10 | 安徽马钢工程技术集团有限公司 | A kind of transfer station standard form method for drafting and transfer station construction method based on REVIT |
CN108268707B (en) * | 2017-12-31 | 2021-08-06 | 马钢集团设计研究院有限责任公司 | ReVIT-based transfer station standard template drawing method and transfer station construction method |
CN110046364B (en) * | 2018-01-16 | 2022-10-25 | 中国建筑第八工程局有限公司 | Engineering quantity calculation method based on BIM technology |
CN110046364A (en) * | 2018-01-16 | 2019-07-23 | 中国建筑第八工程局有限公司 | A kind of method for computing work amount based on BIM technology |
CN108280281A (en) * | 2018-01-18 | 2018-07-13 | 宋强 | A kind of construction cost control method and system based on BIM technology |
CN108364134A (en) * | 2018-02-11 | 2018-08-03 | 武汉理工大学 | Cost of construction based on BIM technology manages system |
CN108364134B (en) * | 2018-02-11 | 2021-07-23 | 武汉理工大学 | Building engineering cost management system based on BIM technology |
CN108763727A (en) * | 2018-05-24 | 2018-11-06 | 广州市建筑科学研究院有限公司 | A kind of base pit engineering amount automatic calculating method and system based on BIM |
CN109242284A (en) * | 2018-08-24 | 2019-01-18 | 国网天津市电力公司 | Method based on BIM technology export power engineering standard engineering amount inventory |
CN109492875A (en) * | 2018-10-15 | 2019-03-19 | 筑梦高科建筑有限公司 | Construction site role's management-control method based on BIM |
CN109447481A (en) * | 2018-10-31 | 2019-03-08 | 广西路桥工程集团有限公司 | A kind of live cost monitoring system and method based on threedimensional model |
CN109784758A (en) * | 2019-01-30 | 2019-05-21 | 北京筑业志远软件开发有限公司 | Construction quality supervision early warning system and method based on BIM model |
CN109785018A (en) * | 2019-03-21 | 2019-05-21 | 广州翔实工程咨询有限公司 | Automatic budget and balance method and system based on BIM |
CN111523928A (en) * | 2019-03-21 | 2020-08-11 | 广州翔实工程咨询有限公司 | Automatic pre-settlement system and method for single-party settlement |
CN110310027A (en) * | 2019-06-24 | 2019-10-08 | 中建八局第一建设有限公司 | A kind of management of investment cloud platform and management of investment method based on BIM |
CN110442903A (en) * | 2019-06-28 | 2019-11-12 | 万翼科技有限公司 | The method and Related product of operation cost calculation amount |
CN110389998A (en) * | 2019-07-18 | 2019-10-29 | 广联达科技股份有限公司 | Build the quick composing exes of project, system and computer readable storage medium in pricing |
CN111339591A (en) * | 2020-02-26 | 2020-06-26 | 久翔环保工程(上海)有限公司 | Engineering project intelligent computing method based on BIM and cloud database |
CN111400430A (en) * | 2020-03-11 | 2020-07-10 | 广联达科技股份有限公司 | Method and system for quickly combining prices in digital building list pricing |
CN111476542A (en) * | 2020-04-08 | 2020-07-31 | 中德华建(北京)国际工程技术有限公司 | Professional division cooperative landing operation scheme for construction cost business |
CN112308670A (en) * | 2020-10-30 | 2021-02-02 | 上海东方投资监理有限公司 | Cloud pricing method, system, device and storage medium |
CN112734392A (en) * | 2021-01-15 | 2021-04-30 | 广州市新誉工程咨询有限公司 | BIM project cost rapid calculation system and method |
CN112785257A (en) * | 2021-01-15 | 2021-05-11 | 广州市新誉工程咨询有限公司 | Engineering cost operation evaluation method and system based on BIM technology |
CN112734392B (en) * | 2021-01-15 | 2023-09-01 | 广州市新誉工程咨询有限公司 | BIM engineering project cost rapid calculation system and method |
CN112785257B (en) * | 2021-01-15 | 2023-09-26 | 广州市新誉工程咨询有限公司 | Construction cost operation evaluation method and system based on BIM technology |
CN117635248A (en) * | 2023-12-11 | 2024-03-01 | 永道工程咨询有限公司 | Investment measuring and calculating method, system, equipment and medium based on BIM technology |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105956762A (en) | Engineering budgeting price combination method based on BIM and cloud platform | |
CN102750739B (en) | Construction method of three-dimensional geologic model | |
US20150019178A1 (en) | System And Method For Managing Changes In Building Information Models | |
CN101739478B (en) | Spacecraft assembly simulation technique-based virtual assembly system and virtual assembly method | |
Wijayakumar et al. | Automation of BIM quantity take-off to suit QS’s requirements | |
CN111259535A (en) | Method for developing logistics simulation system of ship pipeline production line | |
CN108052688A (en) | Calculation amount data processing method, device, storage medium and computer equipment | |
CN110533389A (en) | The determination method and device of Project Cost | |
CN109242284A (en) | Method based on BIM technology export power engineering standard engineering amount inventory | |
CN110990914A (en) | BIM technology-based large boiler installation method | |
CN109165399A (en) | A kind of automatized three-dimensional Buildings Modeling method and system based on SketchUp API | |
CN115796972B (en) | BIM technology-based quantitative price fusion implementation method | |
Vimonsatit et al. | Use of BIM tools for site layout planning | |
Erzaij et al. | Application of building information modeling (3D and 4D) in construction sector in Iraq | |
Grishina et al. | Monitoring of the construction site using an information model | |
Sun et al. | Specification and application of manufacturability analysis system based on process knowledge | |
KR101834448B1 (en) | A method of 3D volume based automatically work order system using 3D modeling | |
Wang et al. | Constructing a building information modelling (BIM) execution plan for quantity surveying practice | |
Meneiluik et al. | Knowledge management by construction management template for sustainable entrepreneurship | |
Ji et al. | Research on Comprehensive Benefit Analysis Method of Prefabricated Buildings Based on BIM and RFID Technology | |
Xin et al. | Research and Application of BIM+ GIS Information Technology for Land Acquisition and Resettlement of Pumped Storage Power Station | |
Artamonova et al. | Evaluating the effectiveness of cyber-physical systems and technologies in the construction complex | |
Zhu et al. | Research on fine management of construction cost based on BIM | |
KR20130100804A (en) | Light weight calculation system and its method using erp system | |
Gallego-Fernández et al. | BIM from Concept Design to Fabrication: A Customized Methodology for Façade Consultancies |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160921 |