CN107220808A - A kind of bill of quantities visualization method - Google Patents

A kind of bill of quantities visualization method Download PDF

Info

Publication number
CN107220808A
CN107220808A CN201710383062.9A CN201710383062A CN107220808A CN 107220808 A CN107220808 A CN 107220808A CN 201710383062 A CN201710383062 A CN 201710383062A CN 107220808 A CN107220808 A CN 107220808A
Authority
CN
China
Prior art keywords
bill
quantities
building
template
project
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710383062.9A
Other languages
Chinese (zh)
Inventor
李扬球
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710383062.9A priority Critical patent/CN107220808A/en
Publication of CN107220808A publication Critical patent/CN107220808A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Engineering & Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Data Mining & Analysis (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of bill of quantities visualization method, step is:Set up architectural construction signal chart database;Define building, building components and fittings attribute;Set up patterned bill of quantities template;Template grassroot project is selected, building property value is set according to projects awaiting construction building relevant information, the patterned bill of quantities template of matching is selected from database, item data files are set up;Application template, establishment or recognitive engineering amount inventory;Set up visual bill of quantities.The present invention breaks through the limitation of existing use form or document display, bill of quantities is easier to understand, examined closely, while simplifying complexity, is easy to exchange.

Description

A kind of bill of quantities visualization method
Technical field
The present invention relates to Project Cost Field, more specifically to a kind of bill of quantities visualization method.
Background technology
The usual way of current bill of quantities establishment is:According to relevant drawing, engineering geology report, design atlas, work Journey amount calculates the regulation such as specification, job site situation, engineering characteristic and conventional construction scheme, calculates the engineering of projects awaiting construction Amount, suitable project name is then selected from supporting bill of quantities specification and (or first chooses the project name amount of calculation again, or two Person carry out simultaneously also can), then quantities and project name are corresponded, listings data are eventually formed, with form or text Shelves form is shown.
In fact, using form or this pattern of document display bill of quantities data, engineering is simple or inventory number compared with Hour is less problematic.But, when engineering becomes complicated or more inventory number, the readable of bill of quantities can be with data Quantitative change is big and reduces, and then have impact on establishment speed, the quality of inventory.The particularly not enough professional of working experience, often Occurs the situation that list item leaks item in compilation process.
The content of the invention
To solve the technical problem present in prior art, the present invention provides a kind of bill of quantities visualization method, The limitation of existing use form or document display is broken through, bill of quantities is easier to understand, examined closely, while simplify complexity, It is easy to exchange.
The present invention is realized using following technical scheme:A kind of bill of quantities visualization method, comprises the following steps:
S101, architectural construction signal chart database is set up, design the plan view of all kinds building, sectional view or half Sectional view, then the site decomposition of composition building component and fitting and is identified in plan view, sectional view or half sectional view Come, constitute view in editable, definable, reusable data element, the data element carry out data modeling, store to In database;
S102, defined attribute, the definition for building attribute, building components and fittings attribute in architectural construction schematic diagram;
S103, set up patterned bill of quantities template, building property value be set, architectural construction schematic diagram is associated, Each position property value of the building components and fittings identified in architectural construction schematic diagram is set again, valuating engineering work load with bill is associated, Make building construction schematic diagram ultimately form with bill of quantities to associate, finally these associated data formation templates, build The vertical bill of quantities template with figure;
S104, selection template grassroot project, according to the relevant information of projects awaiting construction building, set building property value, The patterned bill of quantities template of matching is selected from database, further according to Construction Phase, from appropriate engineering List counts specification is measured as inventory storehouse, template file is possessed the necessary condition of establishment bill of quantities, ultimately forms Projects awaiting construction data file;
S105, application template, establishment or recognitive engineering amount inventory;
S106, set up visual bill of quantities.
As can be known from the above technical solutions, the present invention passes through application template establishment or recognitive engineering amount list item, quantities List item is associated with each position that architectural construction schematic diagram is identified, and forms visual bill of quantities;Again by building The various functions provided in organigram are built, further using bill of quantities, operation is more directly perceived, beneficial to understanding, exchange Or examination & verification.By adopting the above-described technical solution, the present invention has the advantage that:
1st, data readability is stronger, beneficial to understanding
It is changed into showing with figure from the pattern of form or document display data, when engineering project data quantitative change is big, it is counted It can be remarkably reinforced according to readability.When needing to retrieve building components and fittings appointed part, user can be directly in schematic diagram Find, this intuitively impression is conducive to the implication of user's fast understanding list item data, and then to clear between promotion Individual event purpose effective communication.
2nd, work out more directly perceived, reduce leakage item
Architectural construction schematic diagram just considers the component and fitting of building, the completeness of safeguard function, building in design comprehensively The list item that thing is usually required is embodied in figure.When working out inventory from same or similar building, according to pre- If item attribute, the position without list item is pointed out, so in compilation process with regard to can reduce inventory leakage item, carry High Compilation Quality.
3rd, audit vivider, it is easy to pinpoint the problems
When being audited to the bill of quantities worked out, professional can be whole by the understanding of schematic diagram quickly The overview of project, with reference to professional experiences, the composition of list item can be understood in a short time, it is easy to find that project name is divided Rationally whether, item characteristic describes the problems such as whether whether accurate, key project leakage item occurs, improves the efficiency of examination.
Brief description of the drawings
Fig. 1 is the flow chart of bill of quantities method for visualizing of the present invention;
Fig. 2 is the schematic diagram of attribute definition provided in an embodiment of the present invention;
Fig. 3 is the schematic diagram of application template provided in an embodiment of the present invention;
Fig. 4 is the schematic diagram of civil buildings structural map provided in an embodiment of the present invention.
Embodiment
With reference to embodiment and accompanying drawing, the present invention is described in further detail, but embodiments of the present invention are not limited In this.
Embodiment
As Figure 1-3, bill of quantities visualization method of the present invention, comprises the following steps:
S101, architectural construction signal chart database is set up, design the plan view of all kinds building, sectional view or half Sectional view, then composition building component and fitting is common, the portion that can standardize in plan view, sectional view or half sectional view Position is decomposed and is identified, constitutes editable, definable, reusable data element in view, and these data elements are carried out Data modeling, is stored into database.
Such as, the present embodiment is in the half sectional view of civil building, common building components and fittings, Ru Liang, plate, post, The site decompositions such as interior wall, exterior wall, stair, balcony, door, window, aproll, rain cover come out, by data modeling, form data element.
S102, defined attribute, the definition for building attribute, building components and fittings attribute in architectural construction schematic diagram.Ginseng See Fig. 2, defined attribute can be divided into:
S201, definition building attribute.According to the various features of building, works category, building classifications, structure class are defined The separate feature composition data element such as type, base form, construction characteristic, action function, quantities calculation specification.The present embodiment pair Civil building is carried out after attribute definition, can be as shown in following table one:
Table one
Property Name Property value
Building name
Works category
Building classifications
Structure type
Base form
Construction characteristic
Action function
S202, definition building components and fittings attribute.Each position of building components and fittings is the constitution element for building schematic diagram, be can be used for The standard module of the function same area of different schematic diagrames, is divided, and define by the project of valuating engineering work load with bill The bill of quantities information composition data element such as project code, project name, item characteristic, measurement unit.The present embodiment is to the people Carried out with the component and fitting position of building after attribute definition, can be as shown in following table two:
Table two
S103, set up patterned bill of quantities template:Building property value is set, architectural construction schematic diagram is associated, Each position property value of the building components and fittings identified in architectural construction schematic diagram is set again, valuating engineering work load with bill is associated, Make building construction schematic diagram ultimately form with bill of quantities to associate, finally these associated data formation templates, build The vertical bill of quantities template with figure.
Patterned bill of quantities template is characterized in:By building property value, corresponding architectural construction can be indexed Schematic diagram and used valuating engineering work load with bill;, can rope by the property value at each position on architectural construction schematic diagram Default bill of quantities project is guided to, so as to realize the effect for showing bill of quantities on figure.
Building attribute determines the building structure identified in the uniqueness of architectural construction schematic diagram, architectural construction schematic diagram Each position property value of accessory, is the guide of valuating engineering work load with bill list item, passes through setting for above-mentioned building property value Put, bill of quantities just possesses the characteristic of visual operation on figure.
Exemplary, with reference to Fig. 4, the schematic diagram of the civil buildings structural map provided for the present embodiment, 401 be step, 402 It is exterior wall for aproll, 403,404 be window, and 405 be beam, and 406 be railing, and 407 be floor, and 408 be stair, and 409 be post, and 410 are Pitched roof.In actual architectural construction figure, the title of each building components and fittings is directly displayed at behind number designation, such as step This building components and fittings in architectural construction figure actual displayed be " 401 step " so that it is user-friendly, use;And this hair In order that Fig. 4 form meets the requirement of patent application document in bright, the title of building components and fittings is rewritten to herein, not shown Show in Fig. 4.Its building attribute is set after the property value as shown in following table three, building construction schematic diagram can be for table Show the residential building of frame structure.
Table three
Property Name Property value
Building name Residential building
Works category Building engineering
Building classifications Civil buildings
Structure type Frame structure
Base form Pile foundation
Construction characteristic Rectangle
Action function Live
The attribute of building components and fittings post 409 in Fig. 4 is set after the property value as shown in following table four, clicked on corresponding to Fig. 4 center pillars Label 409 at can just view corresponding bill of quantities information, as shown in Table 5.
Table four
Table five
S104, selection template grassroot project, for grassroot project file.According to the relevant information of projects awaiting construction building, Such as feasibility study report, engineering information, design drawing, bidding document relevant information, set building property value, from data The patterned bill of quantities template of matching is selected in storehouse, further according to Construction Phase, from appropriate bill of quantities Pricing norms make template file possess the necessary condition of establishment bill of quantities, ultimately form proposed item as inventory storehouse Mesh data file.
S105, application template, after the completion of grassroot project, establishment or recognitive engineering amount inventory.Referring to Fig. 3, this step Including:
S301, application template establishment bill of quantities.After the completion of grassroot project, the parameter according to set by template then may be used With using the bill of quantities guiding function that position is identified in architectural construction schematic diagram, further according to bill of quantities establishment according to According to, design graph parameter, reasonable selection inventory, Divisional mesh establishment bill of quantities project one by one.
S302, application template recognitive engineering amount inventory.After the completion of grassroot project, the Construction Cost Data that can import standard is handed over Exchange of notes part recognizes relevant e-file, and the parameter according to set by template reads bill of quantities project, list item is closed It is linked in architectural construction schematic diagram and identifies position, end user can directly selects to be operated clear in shown position on the diagram Individual event mesh, it is very convenient.
When carrying out establishment bill of quantities, the guide that can be identified according to the component and fitting of building schematic diagram, from default Valuating engineering work load with bill list item, then list item title, coding, measurement unit and engineering number are set by regulation Amount, and necessary description is carried out to item characteristic.When using existing bill of quantities, it can be read by import feature Go out the data such as project name, the coding of inventory, matched with the default attribute of component and fitting in building schematic diagram, the match is successful Afterwards, schematic diagram just possesses graphical function, is available for patterned browsing or editing.
S106, set up visual bill of quantities.Visual bill of quantities design sketch is referring to table five, when in Fig. 4 During middle selection 409 post position of building element, the quantities project associated with " post " is listed in software interface, as shown in Table 5 Frame column project list, including cast-in-situ concrete columns, column template, cylinder decoration etc. information.
Above-described embodiment is preferably embodiment, but embodiments of the present invention are not by above-described embodiment of the invention Limitation, other any Spirit Essences without departing from the present invention and the change made under principle, modification, replacement, combine, simplification, Equivalent substitute mode is should be, is included within protection scope of the present invention.

Claims (5)

1. a kind of bill of quantities visualization method, it is characterised in that comprise the following steps:
S101, set up architectural construction signal chart database, design all kinds building plan view, sectional view or half section Figure, then the site decomposition of composition building component and fitting and is identified, structure in plan view, sectional view or half sectional view The data element, is carried out data modeling, stored to data by editable, definable, reusable data element into view In storehouse;
S102, defined attribute, the definition for building attribute, building components and fittings attribute in architectural construction schematic diagram;
S103, set up patterned bill of quantities template, building property value is set, architectural construction schematic diagram is associated, then set Set up and build each position property value of the building components and fittings identified in organigram, associate valuating engineering work load with bill, make to build Build structure schematic diagram and ultimately formed with bill of quantities and associated, finally these associated data formation templates, set up band The bill of quantities template of figure;
S104, selection template grassroot project, according to the relevant information of projects awaiting construction building, set building property value, from number It is clear from appropriate quantities further according to Construction Phase according to the patterned bill of quantities template that matching is selected in storehouse Single pricing norms make template file possess the necessary condition of establishment bill of quantities, ultimately formed proposed as inventory storehouse Item data files;
S105, application template, establishment or recognitive engineering amount inventory;
S106, set up visual bill of quantities.
2. bill of quantities visualization method according to claim 1, it is characterised in that step S102 includes:
S201, definition building attribute, according to building feature, define works category, building classifications, structure type, basic shape Formula, construction characteristic, action function and quantities calculation specification, composition data element;
S202, definition building components and fittings attribute, are divided by the project of valuating engineering work load with bill, and define project volume Code, project name, item characteristic and measurement unit, composition data element.
3. bill of quantities visualization method according to claim 1, it is characterised in that proposed item described in step S104 The relevant information of mesh building includes feasibility study report, engineering information, design drawing and bidding document.
4. bill of quantities visualization method according to claim 1, it is characterised in that building described in step S101 The position of component and fitting includes beam, plate, post, interior wall, exterior wall, stair, balcony, door, window, aproll and rain cover.
5. bill of quantities visualization method according to claim 1, it is characterised in that step S105 includes:
After the completion of S301, application template establishment bill of quantities, grassroot project, the parameter according to set by template utilizes building The bill of quantities guiding function at position is identified in organigram, basis of compilation, design drawing ginseng further according to bill of quantities Number, selection inventory, mesh works out bill of quantities project to Divisional one by one;
After the completion of S302, application template recognitive engineering amount inventory, grassroot project, the Construction Cost Data swap file of standard is imported Or relevant e-file is recognized, the parameter according to set by template reads bill of quantities project, list item is associated with and built Build and position is identified in organigram.
CN201710383062.9A 2017-05-26 2017-05-26 A kind of bill of quantities visualization method Pending CN107220808A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710383062.9A CN107220808A (en) 2017-05-26 2017-05-26 A kind of bill of quantities visualization method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710383062.9A CN107220808A (en) 2017-05-26 2017-05-26 A kind of bill of quantities visualization method

Publications (1)

Publication Number Publication Date
CN107220808A true CN107220808A (en) 2017-09-29

Family

ID=59945445

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710383062.9A Pending CN107220808A (en) 2017-05-26 2017-05-26 A kind of bill of quantities visualization method

Country Status (1)

Country Link
CN (1) CN107220808A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107977532A (en) * 2017-12-21 2018-05-01 巧夺天宫(深圳)科技有限公司 Wall hole design method, storage device and system based on BIM technology
CN108133049A (en) * 2018-01-16 2018-06-08 中国三峡建设管理有限公司 The method for building up in hydroelectric project structure attribute inventory library
CN108269013A (en) * 2018-01-16 2018-07-10 中国三峡建设管理有限公司 The foundation and coding method in hydroelectric project structure attribute inventory library
CN109146422A (en) * 2018-08-18 2019-01-04 深圳市江益达科技股份有限公司 Project packet generation method, device and storage medium
CN109446597A (en) * 2018-10-10 2019-03-08 广联达科技股份有限公司 A kind of the personalized customization statistical method and equipment of construction equipment dosage
CN109492853A (en) * 2018-09-17 2019-03-19 北京海数宝科技有限公司 Model engineering amount calculates method, apparatus, storage medium and computer equipment
CN109685585A (en) * 2019-02-13 2019-04-26 中国石油工程建设有限公司 Petroleum gas cost compilation integral system and method
CN110443579A (en) * 2019-07-31 2019-11-12 广联达科技股份有限公司 Method, system and the medium of Digital Architecture list of engineering construction part module management

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105956762A (en) * 2016-04-28 2016-09-21 上海宝冶集团有限公司 Engineering budgeting price combination method based on BIM and cloud platform

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105956762A (en) * 2016-04-28 2016-09-21 上海宝冶集团有限公司 Engineering budgeting price combination method based on BIM and cloud platform

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李波: ""基于BIM的施工项目成本管理研究"", 《万方》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107977532A (en) * 2017-12-21 2018-05-01 巧夺天宫(深圳)科技有限公司 Wall hole design method, storage device and system based on BIM technology
CN108133049A (en) * 2018-01-16 2018-06-08 中国三峡建设管理有限公司 The method for building up in hydroelectric project structure attribute inventory library
CN108269013A (en) * 2018-01-16 2018-07-10 中国三峡建设管理有限公司 The foundation and coding method in hydroelectric project structure attribute inventory library
CN109146422A (en) * 2018-08-18 2019-01-04 深圳市江益达科技股份有限公司 Project packet generation method, device and storage medium
CN109492853A (en) * 2018-09-17 2019-03-19 北京海数宝科技有限公司 Model engineering amount calculates method, apparatus, storage medium and computer equipment
CN109446597A (en) * 2018-10-10 2019-03-08 广联达科技股份有限公司 A kind of the personalized customization statistical method and equipment of construction equipment dosage
CN109685585A (en) * 2019-02-13 2019-04-26 中国石油工程建设有限公司 Petroleum gas cost compilation integral system and method
CN110443579A (en) * 2019-07-31 2019-11-12 广联达科技股份有限公司 Method, system and the medium of Digital Architecture list of engineering construction part module management

Similar Documents

Publication Publication Date Title
CN107220808A (en) A kind of bill of quantities visualization method
CN108846639B (en) BIM technology-based design construction pricing management method
CN104699036B (en) Site equipment management device, facility information display methods, computer readable storage medium
Hyun et al. Automated optimization of formwork design through spatial analysis in building information modeling
CN107977487A (en) A kind of assembly concrete architectural design method based on BIM technology
Bansal et al. Potential of geographic information systems in building cost estimation and visualization
CN108268707A (en) A kind of transfer station standard form method for drafting and transfer station construction method based on REVIT
WO2000013114A1 (en) Apparatus for working building material
KR100309582B1 (en) System And Method For Estimate Bill Of Materials Using Two Dimensional CAD Interface
CN113221224A (en) Foundation pit support forward design method and system based on information model technology
CN115081092A (en) Assembled wood structure building component coding mode and system based on revit
CN115496540A (en) Intelligent cost calculation method, system, device and storage medium
US7353144B1 (en) Method for determining a set of materials
JP2932457B2 (en) Construction cost calculation support device
Song et al. Deciphering built form complexity of Chinese cities through plot recognition: A case study of Nanjing, China
CN109711059A (en) Guiding gutter automatic generation method, device and equipment based on assembled architecture
CN108256013A (en) Investment evaluation method based on big data digging technology
CN111062082B (en) Shear wall structural design system based on integrated template installation
Kempton et al. A material stock and flow analysis for Australian detached residential houses: Insights and challenges
DE102008021243A1 (en) Method for detecting and processing e.g. image data, about immovable object i.e. building, involves evaluating individual data with evaluation unit, generating documentation about object, and displaying and/or outputting documentation
Rico Modernism in Qatar: Survival through reuse
KR20100121846A (en) System and method for calculating construction expenses of building project
Tiwari Language of architecture: Diagrams
KR102715732B1 (en) Method for calculating bim quantity using composite family and apparatus using the same
CN114117578B (en) Design device for foundation pit enclosure framework scheme

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170929

RJ01 Rejection of invention patent application after publication