CN107609266A - Fitting-out work management information system - Google Patents
Fitting-out work management information system Download PDFInfo
- Publication number
- CN107609266A CN107609266A CN201710812918.XA CN201710812918A CN107609266A CN 107609266 A CN107609266 A CN 107609266A CN 201710812918 A CN201710812918 A CN 201710812918A CN 107609266 A CN107609266 A CN 107609266A
- Authority
- CN
- China
- Prior art keywords
- dimensional structure
- engineering
- project
- model
- dimensional
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention discloses a kind of fitting-out work management information system.The system includes:Three-dimensional structure storehouse, engineering process database and project computing cloud platform;The three-dimensional structure model of every kind of basic component in engineering project built in the three-dimensional structure storehouse;Utilize the three-dimensional engineering model of the three-dimensional structure modelling engineering project in the three-dimensional structure storehouse;The engineering process databases contain the technique engineering method of every kind of basic component;The project computing cloud platform is used to generate project data according to the technique engineering method of the three-dimensional structure model and the three-dimensional structure model;The project data includes budget data, progress.Fitting-out work management information system provided by the invention, each construction stage can be made to carry out intercommunication, linkage, improve the reply efficiency to catastrophe.
Description
Technical field
The present invention relates to Decorating Project field, more particularly to a kind of fitting-out work management information system.
Background technology
The present situation of Decorating Project circle is to do things in his own way in design phase, construction organization stage and site operation stage.
Design phase, each professional designer use design software (such as:AutoCAD, SketchUp, Revit etc.) complete design work,
Its output result is all types of drawing, such as:Model drawing, node diagram, construction drawing.In the construction organization stage, by budget
Personnel establish construction model according to drawing, and construction model is inputted calculation amount software (such as:Wide connection up to calculation amount software, master craftsman of the Spring and Autumn period's calculation amount,
Wonderful foresight etc.) computation model into quantities, then quantities input budget software (such as:Wide connection is pre- up to preliminary budget, PKPM
Calculate software etc.) cover quota, take expense to calculate the estimated cost of Decorating Project.Engineering department personnel will according to Party A's duration
The schedule of summation construction content compilation is (such as:Project, zebra progress, Excel etc.).Then drawing, estimated cost and enter
Degree plan arrangement is bound into book form, and is issued to site administrator and workmen on hand.Construction stage at the scene, site administrator
Constructed with workmen according to drawing, estimated cost and schedule.Because design, budget and progress are respectively with different
Tool software is worked out, and tripartite's management and control mode and emphases of supervision are had nothing in common with each other, bottom data can not intercommunication, linkage, cause in office
When how a stage changes, other stages can not respond to change quickly, influence efficiency of construction.
The content of the invention
It is an object of the invention to provide a kind of fitting-out work management information system, can carry out each construction stage mutual
Logical, linkage, improves the reply efficiency to catastrophe.
To achieve the above object, the invention provides following scheme:
Fitting-out work management information system, including:Three-dimensional structure storehouse, engineering process database and project computing cloud platform;
The three-dimensional structure model of every kind of basic component in engineering project built in the three-dimensional structure storehouse;Using in the three-dimensional structure storehouse
The three-dimensional engineering model of three-dimensional structure modelling engineering project;The engineering process databases contain every kind of basis
The technique engineering method of component;The project computing cloud platform is used for according to the three-dimensional structure model and the three-dimensional structure model
Technique engineering method generates project data;The project data includes budget data, progress.
Optionally, computation rule and underlying parameter built in the three-dimensional structure model;The underlying parameter is the three-dimensional
The structural parameters of component model, the computation rule are the application conditions of each structural parameters.
Optionally, the project computing cloud platform includes data resolution module, technique engineering method searching modul and data calculating
Module, the data resolution module is used for the practical situations for analyzing each three-dimensional structure model, with reference to the reality
Applicable cases and the computation rule determine all structural parameters for meeting budget data and progress calculating, obtain possible constructions ginseng
Number;The technique engineering method searching modul is used to search with forming the three-dimensional engineering model from the engineering process database
Technique engineering method corresponding to various three-dimensional structure models;The data computation module, for according to the three-dimensional engineering model of composition
Technique engineering method corresponding to various three-dimensional structure models and the possible constructions parameter are calculated described in the budget data and arrangement
Progress.
Optionally, the project computing cloud platform also includes Collision detection module, and the Collision detection module is used to judge
Form between each three-dimensional structure model of the three-dimensional engineering model spatially with the presence or absence of collision, if there is then feeding back
The information of the three-dimensional structure model to collide.
According to specific embodiment provided by the invention, the invention discloses following technique effect:Finishing disclosed by the invention
Project management information system includes:Three-dimensional structure storehouse, engineering process database and project computing cloud platform, designer is using three-dimensional
Three-dimensional structure modelling three-dimensional engineering model in component base, project computing cloud platform is according to three-dimensional structure model and three-dimensional structure
The technique engineering method generation project data of part model, so that when the design link of the present invention changes, can cause simultaneously
The related change of project data, each construction stage is carried out intercommunication, linkage, improve the reply efficiency to catastrophe.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to institute in embodiment
The accompanying drawing needed to use is briefly described, it should be apparent that, drawings in the following description are only some implementations of the present invention
Example, for those of ordinary skill in the art, without having to pay creative labor, can also be according to these accompanying drawings
Obtain other accompanying drawings.
Fig. 1 is the system construction drawing of fitting-out work management information system embodiment of the present invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on
Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made
Embodiment, belong to the scope of protection of the invention.
In order to facilitate the understanding of the purposes, features and advantages of the present invention, it is below in conjunction with the accompanying drawings and specific real
Applying mode, the present invention is further detailed explanation.
Fig. 1 is the system construction drawing of fitting-out work management information system embodiment of the present invention.
Referring to Fig. 1, the fitting-out work management information system, including:Three-dimensional structure storehouse 1, engineering process database 2 and project
Computing cloud platform 3;The three-dimensional structure model of every kind of basic component in engineering project built in the three-dimensional structure storehouse 1;The three-dimensional
Computation rule built in component model and underlying parameter;The underlying parameter is the structural parameters of the three-dimensional structure model, described
Computation rule is the application conditions of each structural parameters;The internal memory of engineering process database 2 contains every kind of basis
The technique engineering method of component;The project computing cloud platform 3 is used for according to the three-dimensional structure model and the three-dimensional structure model
Technique engineering method generation project data;The project data includes budget data, progress.
The detailed process constructed using the fitting-out work management information system of the present invention is as follows:
In the design phase:Utilize the three-dimensional engineering of the three-dimensional structure modelling engineering project in the three-dimensional structure storehouse 1
Model;Then the three-dimensional engineering model is directed in the project computing cloud platform 3;The project computing cloud platform 3 is wrapped
Collision detection module is included, the Collision detection module is used to judge each three-dimensional structure model for forming the three-dimensional engineering model
Between spatially with the presence or absence of collision, if there is the information for then feeding back the three-dimensional structure model to collide, and generate and touch
Hit report;Reported according to the collision, the three-dimensional engineering model is modified.Said process is repeated, is touched until forming nothing
The three-dimensional engineering model hit.
In the construction organization stage:The project computing cloud platform 3 using data resolution module, technique engineering method searching modul and
Data computation module carries out computing to the three-dimensional engineering model;The data resolution module is used to analyze each three-dimensional structure
The practical situations of part model, with reference to the practical situations and the computation rule determine it is all meet budget data and
The structural parameters that progress calculates, obtain possible constructions parameter;The technique engineering method searching modul is used for from the engineering process number
According to the technique engineering method corresponding with the various three-dimensional structure models for forming the three-dimensional engineering model of lookup in storehouse 2;It is every kind of described
Three-dimensional structure model is assigned with unique ID, and the technique engineering method in the engineering process database 2 is also according to the ID points
Class storage, when searching, the technique engineering method searching modul is according to corresponding to being searched the ID of each three-dimensional structure model
Technique engineering method.The data computation module, for according to corresponding to the various three-dimensional structure models for forming three-dimensional engineering model
Technique engineering method and the possible constructions parameter calculate the budget data and arrange the progress.Budgeter can be obtained directly
The budget data, engineering department personnel can directly obtain the progress.
Construction stage at the scene:The project computing cloud platform 3 also includes graphical analysis module, the graphical analysis module
For carrying out graphical analysis to the three-dimensional engineering model, the three-dimensional engineering model is converted into web browser or cell phone application
The form that can directly open, so as to generate the drawing file that can be used in web browser or cell phone application.Field management
Personnel and workmen can be directly viewable drawing file by web browser or cell phone application, for guiding construction.
Fitting-out work management information system disclosed by the invention is in design phase, construction organization stage and site operation stage
Data and data organically integrate, form the digitlization decorating scheme of complete set, so as to finishing each side it is close
Kneading is got up so that when design link of the invention changes, can be caused the related change of project data simultaneously, be made each
Construction stage carries out intercommunication, linkage, improves the reply efficiency to catastrophe.Effectively pair it can be set by Collision detection module
Meter result is tested, and be ensure that collisionless between each three-dimensional structure model of design result, is improved designing quality.Pass through
Project computing cloud platform 3 is automatically performed the calculating of budget data and the arrangement of progress, eliminate budgeter estimated cost and
Time, also eliminate scheduling cost and the time of engineering department personnel, so as to speed up the work, reduce engineering into
This.
Specific case used herein is set forth to the principle and embodiment of the present invention, and above example is said
It is bright to be only intended to help the method and its core concept for understanding the present invention;Meanwhile for those of ordinary skill in the art, foundation
The thought of the present invention, in specific embodiments and applications there will be changes.In summary, this specification content is not
It is interpreted as limitation of the present invention.
Claims (4)
1. fitting-out work management information system, it is characterised in that including:Three-dimensional structure storehouse, engineering process database and project fortune
Calculate cloud platform;The three-dimensional structure model of every kind of basic component in engineering project built in the three-dimensional structure storehouse;Utilize the three-dimensional
The three-dimensional engineering model of three-dimensional structure modelling engineering project in component base;The engineering process databases contain often
The technique engineering method of the kind basic component;The project computing cloud platform is used for according to the three-dimensional structure model and the three-dimensional
The technique engineering method generation project data of component model;The project data includes budget data, progress.
2. fitting-out work management information system according to claim 1, it is characterised in that built in the three-dimensional structure model
Computation rule and underlying parameter;The underlying parameter is the structural parameters of the three-dimensional structure model, and the computation rule is every
The application conditions of the individual structural parameters.
3. fitting-out work management information system according to claim 2, it is characterised in that the project computing cloud platform bag
Data resolution module, technique engineering method searching modul and data computation module are included, the data resolution module is used to analyze each institute
The practical situations of three-dimensional structure model are stated, all meet in advance is determined with reference to the practical situations and the computation rule
The structural parameters that the evidence that counts and progress calculate, obtain possible constructions parameter;The technique engineering method searching modul is used for from the work
Technique engineering method corresponding with the various three-dimensional structure models for forming the three-dimensional engineering model is searched in journey technological data bank;Institute
Data computation module is stated, for technique engineering method and institute according to corresponding to the various three-dimensional structure models for forming three-dimensional engineering model
Possible constructions parameter is stated to calculate the budget data and arrange the progress.
4. fitting-out work management information system according to claim 3, it is characterised in that the project computing cloud platform is also
Including Collision detection module, the Collision detection module is used to judge each three-dimensional structure mould for forming the three-dimensional engineering model
Spatially with the presence or absence of collision between type, if there is the information for then feeding back the three-dimensional structure model to collide.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710812918.XA CN107609266A (en) | 2017-09-11 | 2017-09-11 | Fitting-out work management information system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710812918.XA CN107609266A (en) | 2017-09-11 | 2017-09-11 | Fitting-out work management information system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107609266A true CN107609266A (en) | 2018-01-19 |
Family
ID=61062217
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710812918.XA Pending CN107609266A (en) | 2017-09-11 | 2017-09-11 | Fitting-out work management information system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107609266A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113807573A (en) * | 2021-08-13 | 2021-12-17 | 中国水利水电第六工程局有限公司 | Construction prediction analysis method and system based on data management and three-dimensional search |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2019371A1 (en) * | 2007-07-25 | 2009-01-28 | The Boeing Company | Three-dimensional process planning |
CN104123502A (en) * | 2014-08-18 | 2014-10-29 | 中建安装工程有限公司 | Mechanical and electrical installation overall-planning system and method based on three-dimensional construction drawing model |
CN105956762A (en) * | 2016-04-28 | 2016-09-21 | 上海宝冶集团有限公司 | Engineering budgeting price combination method based on BIM and cloud platform |
CN106682257A (en) * | 2016-11-16 | 2017-05-17 | 上海建工集团股份有限公司 | Construction facility BIM component library construction method |
-
2017
- 2017-09-11 CN CN201710812918.XA patent/CN107609266A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2019371A1 (en) * | 2007-07-25 | 2009-01-28 | The Boeing Company | Three-dimensional process planning |
CN104123502A (en) * | 2014-08-18 | 2014-10-29 | 中建安装工程有限公司 | Mechanical and electrical installation overall-planning system and method based on three-dimensional construction drawing model |
CN105956762A (en) * | 2016-04-28 | 2016-09-21 | 上海宝冶集团有限公司 | Engineering budgeting price combination method based on BIM and cloud platform |
CN106682257A (en) * | 2016-11-16 | 2017-05-17 | 上海建工集团股份有限公司 | Construction facility BIM component library construction method |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113807573A (en) * | 2021-08-13 | 2021-12-17 | 中国水利水电第六工程局有限公司 | Construction prediction analysis method and system based on data management and three-dimensional search |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Alvanchi et al. | Modeling framework and architecture of hybrid system dynamics and discrete event simulation for construction | |
CN103049620B (en) | Ship simulating system and ship simulating method used during shipbuilding | |
Chen et al. | A framework for an automated and integrated project scheduling and management system | |
CN105138802B (en) | A kind of gun barrel intelligent design system and design method | |
CN102117367A (en) | Visual simulation system for airplane assembly site | |
CN103578137A (en) | Three-dimensional modeling system and method for prefabricated parts | |
CN107609217A (en) | Collide the processing method and processing device of check data | |
CN104933481B (en) | Reference electric network model and method for solving for electric system assessment and progressive planning | |
CN103605843A (en) | Complex production assembling ability evaluation system and method based on DELMIA | |
CN106845925A (en) | Engineering based on the BIM amount of calculating quickly and project high in the clouds collaborative platform soon is to amount method | |
CN110990914A (en) | BIM technology-based large boiler installation method | |
Dabirian et al. | Predicting labor costs in construction projects using agent-based modeling and simulation | |
Palmintier et al. | Final technical report: Integrated distribution-transmission analysis for very high penetration solar PV | |
CN107609266A (en) | Fitting-out work management information system | |
CN102110151A (en) | Method for analyzing Petri network model of charge-off system | |
Clausen et al. | Smart grid security method: Consolidating requirements using a systematic approach | |
Xiao et al. | Study on Construction Engineering Management Based on BIM from the perspective of big data | |
Fard et al. | Model And Simulation Scalability Traits For Interaction (Nexus) Modeling Of Water And Energy Systems | |
CN102005769A (en) | Disturbed mode analysis-based dynamic stability assistance decision method for power system | |
Pascual et al. | Optimizing Ergonomics and Productivity by Connecting Digital Human Modeling and Production Flow Simulation Software | |
Qin | The advantages of BIM application in EPC mode | |
Huang | An Analysis of Artificial Intelligence Engineering Cost Information Management Platform | |
CN105843973A (en) | Case-based design knowledge description method and system | |
Gerber et al. | Design agency: prototyping multi-agent system simulation for design search and exploration | |
Jardim | Online dynamic security assessment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180119 |
|
RJ01 | Rejection of invention patent application after publication |