CN108052688A - Calculation amount data processing method, device, storage medium and computer equipment - Google Patents

Calculation amount data processing method, device, storage medium and computer equipment Download PDF

Info

Publication number
CN108052688A
CN108052688A CN201710929592.9A CN201710929592A CN108052688A CN 108052688 A CN108052688 A CN 108052688A CN 201710929592 A CN201710929592 A CN 201710929592A CN 108052688 A CN108052688 A CN 108052688A
Authority
CN
China
Prior art keywords
information
resource
current task
request
task
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710929592.9A
Other languages
Chinese (zh)
Inventor
高东东
朱凌玉
郑文宁
张剑阳
谢绍德
郑文彬
蔡文杭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen High Speed Engineering Consultant Co Ltd
Original Assignee
Shenzhen High Speed Engineering Consultant Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen High Speed Engineering Consultant Co Ltd filed Critical Shenzhen High Speed Engineering Consultant Co Ltd
Priority to CN201710929592.9A priority Critical patent/CN108052688A/en
Publication of CN108052688A publication Critical patent/CN108052688A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Civil Engineering (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Architecture (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a kind of calculation amount data processing method, device, storage medium and computer equipment, the described method includes:Association request is received, current task mark and target member mark are carried in the association request;According to current task mark and target member mark, the model component and current task are established incidence relation by selection and the corresponding model component of target member mark from Building Information Model;Target resource data are obtained from cost storehouse as the corresponding configuration resource of the current task, the configuration resource includes measurement unit information;The corresponding geometric attribute parameter sets of the current task are obtained from the model component;The corresponding quantities of the current task is determined according to the geometric attribute parameter sets and measurement unit information.The present invention can improve quantities calculation efficiency and accuracy.

Description

Calculation amount data processing method, device, storage medium and computer equipment
Technical field
The present invention relates to construction calculation volume technical fields, are situated between more particularly to a kind of calculation amount data processing method, device, storage Matter and computer equipment.
Background technology
Construction calculation volume is generally referred to as the calculating of quantities, wherein, quantities refers in terms of natural measurement unit or physics Measure each subdivisional work of unit expression or the engineering quantity of structural elements.
In traditional technology, quantities calculation be one according to building three-view diagram and other related two-dimentional drawings, according to prior The each part-to-item project of work load evaluation statistics architectural engineering of agreement or the quantity of structural elements, and with physics or certainly Manual calculations process represented by right measurement unit, due to needing to calculate quantities item by item by hand, cumbersome, the degree of automation It is low, especially for the more situation of complex component or component in irregular shape, budgeter workload is larger, it is less efficient and Easily malfunction.
The content of the invention
Based on this, it is necessary to for above-mentioned technical problem, provide a kind of calculation amount data processing method, device, storage medium And computer equipment, to improve the computational efficiency of quantities and accuracy.
A kind of calculation amount data processing method, the described method includes:
Association request is received, current task mark and target member mark are carried in the association request;
According to current task mark and target member mark, chosen and the target structure from Building Information Model Part identifies corresponding model component, and the model component and current task are established incidence relation;
Target resource data are obtained from cost storehouse as the corresponding configuration resource of the current task, the configuration resource Including measurement unit information;
The corresponding geometric attribute parameter sets of the current task are obtained from the model component;
The corresponding quantities of the current task is determined according to the geometric attribute parameter sets and measurement unit information.
In one of the embodiments, the method further includes:
Obtain the corresponding component name of the model component;
Obtain the corresponding construction technology information of the configuration resource;
According to the component name and the corresponding task names of construction technology information generation current task.
In one of the embodiments, target resource data are obtained in the storehouse from cost to correspond to as the current task Configuration resource the step of, including:
Inquiry request is received, the inquiry request carries the corresponding material resources information of the model component;
Fuzzy query is carried out in the cost storehouse according to the material resources information, obtains the material resources information pair The resource data set answered;
Selection request is received, corresponding resource data is chosen from the resource data set according to the selection request and is made For target resource data.
In one of the embodiments, include before the step of reception association request:
Project library request to create is received, project library is created according to the project library request to create;
The method further includes:
The corresponding mission bit stream of current task is obtained, the mission bit stream includes the corresponding model component letter of current task Breath, configuration resource information and quantities information;
The mission bit stream is stored to the project library.
In one of the embodiments, described store the mission bit stream to after the step of the project library includes:
Mission bit stream update request is received, carrying this in the mission bit stream update request updates corresponding goal task Information, the goal task information include model component information, configuration at least one of resource information and quantities information;
The goal task information is updated to the project library.
A kind of calculation amount data processing equipment, described device include:
Association request receiving module, carried for receiving association request, in the association request current task mark and Target member identifies;
Incidence relation establishes module, for being identified according to current task mark and target member, from architecture information Selection and the corresponding model component of target member mark in model associate the model component with current task foundation System;
Target resource data acquisition module, for obtaining target resource data from cost storehouse as the current task pair The configuration resource answered, the configuration resource include measurement unit information;
Geometric attribute parameter acquisition module, for obtaining the corresponding geometry category of the current task from the model component Property parameter sets;
Quantities determining module, it is described current for being determined according to the geometric attribute parameter sets and measurement unit information The corresponding quantities of task.
In one of the embodiments, described device further includes:
Component name acquisition module, for obtaining the corresponding component name of the model component;
Construction technology data obtaining module, for obtaining the corresponding construction technology information of the configuration resource;
Task names generation module, for being corresponded to according to the component name and construction technology information generation current task Task names.
In one of the embodiments, the target resource data acquisition module includes:
Inquiry request receiving unit, for receiving inquiry request, it is corresponding that the inquiry request carries the model component Material resources information;
Query unit, for carrying out fuzzy query in the cost storehouse according to the material resources information, described in acquisition The corresponding resource data set of material resources information;
Request reception unit is selected, for receiving selection request, request is selected from the resource data set according to described It is middle to choose corresponding resource data as target resource data.
A kind of computer readable storage medium is stored with computer program on the computer readable storage medium, described When computer program is executed by processor so that the processor performs the step described in above-mentioned calculation amount data processing method.
A kind of computer equipment, the computer equipment include memory and processor, meter are stored in the memory Calculation machine program, when the computer program is performed by the processor so that the processor performs above-mentioned calculation amount data processing Step described in method.
Above-mentioned calculation amount data processing method, device, storage medium and computer equipment, by first by task and model structure Part establishes incidence relation, and target resource data are obtained from cost storehouse and configure resource as the corresponding task of the current task, The corresponding geometric attribute parameter sets of the current task are obtained from the model component;According to the geometric attribute parameter set It closes and measurement unit information determines the corresponding quantities of the current task, due to taking full advantage of effective letter in BIM models Breath, and the resource combined in cost storehouse calculates quantities automatically, significantly reduces calculation amount person works amount, significantly improves work Journey amount computational efficiency and accuracy.
Description of the drawings
Fig. 1 is the applied environment figure of calculation amount data processing method in one embodiment;
Fig. 2 is the cut-away view of one embodiment Computer equipment;
Fig. 3 is the flow chart of calculation amount data processing method in one embodiment;
Fig. 4 is the flow chart of calculation amount data processing method in another embodiment;
Fig. 5 is the step flow chart that target resource data are obtained in one embodiment;
Fig. 6 is the flow chart of calculation amount data processing method in further embodiment;
Fig. 7 is the corresponding logic relation picture of project library in one embodiment;
Fig. 8 is the flow chart of calculation amount data processing method in further embodiment;
Fig. 9 is the corresponding system framework figure of calculation amount data processing method in one embodiment;
Figure 10 is the structure diagram of calculation amount data processing equipment in one embodiment;
Figure 11 is the structure diagram of calculation amount data processing equipment in another embodiment;
Figure 12 is the structure diagram of target resource data acquisition module in one embodiment;
Figure 13 is the structure diagram of calculation amount data processing equipment in another embodiment;
Figure 14 is the structure diagram of calculation amount data processing equipment in further embodiment.
Specific embodiment
In order to make the foregoing objectives, features and advantages of the present invention clearer and more comprehensible, below in conjunction with the accompanying drawings to the present invention Specific embodiment be described in detail.Many details are elaborated in the following description in order to fully understand this hair It is bright.But the invention can be embodied in many other ways as described herein, those skilled in the art can be not Similar improvement is done in the case of running counter to intension of the present invention, therefore the present invention is not limited to the specific embodiments disclosed below.
Unless otherwise defined, all of technologies and scientific terms used here by the article is with belonging to technical field of the invention The normally understood meaning of technical staff is identical.Term used in the description of the invention herein is intended merely to description tool The purpose of the embodiment of body, it is not intended that the limitation present invention.
Method provided in an embodiment of the present invention can be applied in environment as shown in Figure 1.Refering to what is shown in Fig. 1, server 104 It can be independent physical server or terminal or server cluster that multiple physical servers are formed, can carry For the Cloud Server of the basic cloud computing service such as Cloud Server, cloud database, cloud storage and CDN.Terminal 102 can be intelligent hand Machine, tablet computer, laptop, desktop computer, intelligent sound box, smartwatch etc., but be not limited thereto.Server 104 and terminal 102 can with network etc. communicate connection mode be attached, the present invention be not limited herein.
As shown in Fig. 2, being the internal structure schematic diagram of one embodiment Computer equipment, which can be used as Server.With reference to Fig. 2, which includes the processor, non-volatile memory medium, the memory that are connected by system bus Reservoir and network interface.Wherein, the non-volatile memory medium of the computer equipment can storage program area and computer program, The computer program is performed, and may be such that processor performs a kind of calculation amount data processing method.The computer equipment Processor supports the operation of entire computer equipment for providing calculating and control ability.Meter can be stored in the built-in storage Calculation machine program when the computer program is executed by processor, may be such that processor performs a kind of calculation amount data processing method.It calculates The network interface of machine equipment is used to carry out network communication.It will be understood by those skilled in the art that structure shown in Figure 2, only It is the block diagram with the relevant part-structure of application scheme, does not form the computer being applied thereon to application scheme and set Standby restriction, specific computer equipment can include components more some than more or fewer components shown in figure or combination, Or it is arranged with different components.
In one embodiment, as shown in figure 3, a kind of calculation amount data processing method is provided, in this way applied to Fig. 1 In server exemplified by illustrate, including:
Step S210 receives association request, and current task mark and target member mark are carried in association request.
Specifically, task refers to is subdivided into work that is referable, being easily managed by model component by the requirement of working procedure Task, system peace, the system of reinforcing bar peace and concreting as concrete rectangular column construction can be subdivided into steel form conserve three Task;Current task is identified as the corresponding task identification of current task, by server according to the task in project library task record In order automatic numbering generation, for unique identification current task;Target member is identified as the corresponding structure of object module component Part identifies, and a component ID can uniquely be corresponded to by creating each model component in BIM model process, for unique identification target mould Type component.Wherein, model component refers in Building Information Model (Building Information Modeling, BIM model) Each model pel element of building is formed, such as:Building (room) face, wall, pillar etc..
In the present embodiment, terminal detect user it is operation associated after, to server send association request, the association The corresponding task identification of current task and the corresponding component mark of model component to be associated are carried in request.
Step S220 is identified according to current task mark and target member, selection and target from Building Information Model Model component and current task are established incidence relation by the corresponding model component of component mark.
Specifically, Building Information Model is set up based on every relevant information data of construction-engineering project Three-dimensional building model passes through real information possessed by digital information analogue simulation building.In the present embodiment, server connects After receiving association request, identified and chosen from BIM models and target member mark according to the target member carried in association request Then the model component and current task are established incidence relation by corresponding model component.
Step S230 obtains target resource data as the corresponding configuration resource of current task, configuration money from cost storehouse Source includes measurement unit information.
Specifically, during long-term Engineering Project Construction, people are horizontal, economical according to the construction technique of different times Management level and construction experiences are compiled to obtain a variety of empirical datas, such as engineering data, equipment data, Cost Index, talent Machine price, all kinds of synopsis data structures etc., these empirical datas are the basic datas of engineering metering valuation, therefore cost storehouse is used to deposit The costs resource base data such as government quota data, Discourse of Enterprise's ration data and talent's machine price in storage national each province and city area, It is valuated with the engineering metering for being suitable for different regions, different building enterprises.
Resource data store in cost storehouse is in two tables of data of resource list of content and resource specific item table, resource list of content Storage is the resource data formed based on the division of construction project part-to-item project, and does not contain resources costs data; And stored in resource specific item table be formed according to the different further subdivisions of the feature (such as geometric properties) of subdivisional work contain into Tables 1 and 2 is shown in the resource data of notebook data, the detailed design of tables of data.
1 resource list of content of table
2 resource specific item table of table
In the present embodiment, server obtains PID, ID by carrying out hierarchical structure decomposition coding to cost base resource, Middle PID is for defining hierarchy information, and ID is for link resources list of content and resource sublist.
In the present embodiment, terminal sends resource to server and matches somebody with somebody after the configuration resource selection for detecting user operates Instruction is put, server chooses the corresponding target resource data of resource distribution instruction after receiving resource distribution instruction from cost storehouse As the corresponding configuration resource of current task, wherein, configuration resource, which refers to, completes the resource information that required by task is wanted, and configures in resource Including unit of account information, such as 10m2、10m3, t etc..
Step S240 obtains the corresponding geometric attribute parameter sets of current task from model component.
Step S250 determines the corresponding quantities of current task according to geometric attribute parameter sets and measurement unit information.
Specifically, geometric attribute parameter refers to the parameters such as the length, area, volume of model component.In this implementation In example, after server gets measurement unit information, it is corresponding to obtain current task for the corresponding model component of traversal current task Geometric attribute parameter sets are judged in the aggregate attribute parameter sets with the presence or absence of the geometry category with measurement unit information match Property parameter, if in the presence of using the geometric attribute parameter as target geometric attribute parameter;If being not present, according to the several of acquisition What property parameters carries out that target geometric attribute parameter is calculated by default formula, then by target geometric attribute parameter with Measurement unit does division arithmetic and obtains the corresponding quantities of current task.
It illustrates:For concrete component, corresponding measurement unit is 10m3, since BIM modeling softwares being capable of essence The volume of component really is calculated, therefore can directly extract volume as target geometric attribute parameter;For component template, pass through It extracts the geometric parameters such as component relevant length, width and height and acquisition form work engineering amount is calculated by formula, by taking concrete column as an example, pass through Concrete column sectional dimension b*h and pillar height H is extracted, is calculated through formula 2* (b+h) * H and obtains concrete column surface area, as The target geometric attribute parameter of concrete column template;For steel construction, by extracting the volume V and density p of steel construction, through formula V* ρ calculate target geometric attribute parameter of the weight for obtaining steel construction as steel construction.
In the present embodiment, by the way that task and model component are established incidence relation first, target money is obtained from cost storehouse Source data obtains the corresponding geometric attribute ginseng of current task as the corresponding task configuration resource of current task from model component Manifold is closed;The corresponding quantities of current task is determined according to geometric attribute parameter sets and measurement unit information, due to fully sharp With the effective information in BIM models, and the resource combined in cost storehouse calculates quantities automatically, significantly reduces calculation amount people Member's workload, significantly improves quantities calculation efficiency and accuracy.
In one embodiment, as shown in figure 4, the above method further includes:
Step S260 obtains the corresponding component name of model component.
Specifically, component name refers to the corresponding title of model component in BIM models, for being retouched to model component It states, can be pre-defined by budgeter according to element type, also structure can be obtained automatically according to associated model component by server Part title, e.g., component name can be " concrete walls ", " concrete slab ".
Step S270 obtains the corresponding construction technology information of configuration resource.
Step S280, according to component name and the corresponding task names of construction technology information generation current task.
Specifically, construction technology information refers to the construction method of completion task, material selection etc., due to the resource name in cost storehouse Contain in title with the relevant construction technology information of task, therefore define the construction technology information in resource name as technique name, use In description task object (i.e. the corresponding model component of task) technology characteristics, differentiation task object come into operation different resource when The different task formed.The resource name of resource is such as configured as " non-pumping cast-in-place concrete pours, conserves rectangular column coagulation During soil ", extraction " concreting maintenance " is used as construction technology name.
What deserves to be explained is when task object comes into operation a kind of resource, the technology characteristics of task object are by resource pair The technique name description answered;When task object comes into operation multiple resources, the technology characteristics of task object then need manually to describe.
Further, server is according to the corresponding component name of current task and construction technology Automatic generation of information task names.
In the present embodiment, in the construction technology for the material resources that task is corresponded to model component, due to cost base resource In pre-defined the relevant construction technology information of operation containing with the resource, for describing the technology characteristics of task object, Therefore can distinguish task object come into operation different resource when the different task that is formed.
In one embodiment, as shown in figure 5, acquisition target resource data are corresponding as current task from cost storehouse Resource is configured, including:
Step 230A, receives inquiry request, and inquiry request carries the corresponding material resources information of model component.
Step 230B carries out fuzzy query according to material resources information in cost storehouse, obtains material resources information and corresponds to Resource data set.
Specifically, material resources information refers to task material information used during construction.Fuzzy query Refer to that server carries out fuzzy search according to the synonym of budgeter input keyword automatically, so as to draw more inspection Hitch fruit.
In the present embodiment, terminal sends to server when detecting that user triggers inquiry operation and carries material resources The inquiry request of information after server receives inquiry request, carries out fuzzy query in cost storehouse, obtains all comprising the material Expect the resource data set of resource information, which is sent to terminal.
What deserves to be explained is the acquisition for material resources information, in one embodiment, since BIM models are creating During, can be model component specified structure material, therefore terminal can extract material resources information from model component.
Step S230C receives selection request, and corresponding resource data is chosen from resource data set according to selection request As target resource data.
In the present embodiment, terminal shows the resource data set, user after resource data set is received According to the content of display, further combined with type, geometry of model component etc., other attribute information assisting siftings go out to conform to The resource asked, terminal send selection request, service after detecting and acting on the selection operation of resource data set, to server Device receives the selection request, and the selection is asked corresponding resource data as target resource data.
When for example, if desired for resource is configured to concrete rectangular column, the structural wood of concrete rectangular column is extracted first All resources containing concrete in matter " concrete " and fuzzy query resource name, then user is according to model component type " column ", geometry " rectangle " inquires the resource of " pumping cast-in-place concrete pours, conserves rectangular column concrete ", to the resource Make choice, server will the resource be allocated to concrete rectangular column as target resource.
In the present embodiment, the corresponding resource data set of model component is obtained by fuzzy query, from resource data collection Satisfactory resource data is filtered out in conjunction and configures resource for current task, the accurate of resource data can be realized and quickly match somebody with somebody It puts, so as to improve quantities calculation efficiency and accuracy.
In one embodiment, as shown in fig. 6, including before the step of receiving association request:
Step S290A receives project library request to create, and project library is created according to project library request to create.
The above method further includes:
Step S290B, obtains the corresponding mission bit stream of current task, and mission bit stream includes the corresponding model structure of current task Part information, configuration resource information and quantities information.
Step S290C stores mission bit stream to project library.
Specifically, after the project library request to create that server receiving terminal is sent, project library is created in default position, it will The mission bit stream of acquisition is stored into the project library, and mission bit stream includes model component information, configuration resource information and engineering Information is measured, wherein, model component information includes component name and component mark, and configuration resource, which refers to, completes the resource that required by task is wanted Information, including resource name, measurement unit information etc., such as the corresponding resource name of task " concrete rectangular column (concreting) " Referred to as " non-pumping cast-in-place concrete pours, conserves rectangular column concrete ".In one embodiment, its corresponding logic of project library Relational graph is as shown in Figure 7.In the present embodiment, project library include task Components Matching table, task list, task resource allocation list with And resource table.Wherein, task identification (i.e. task UID), component mark (i.e. component ID) are stored in task list;It is deposited in task list Contain the information such as task object name, technique name;The information such as resource number, configuration amount are stored in task resource allocation list;Resource The information such as resource number, resource name, measurement unit are stored in table.
In the present embodiment, the integrated storage mode using external database as mission bit stream, on the one hand can make storage Data format variation, memory space bigger;On the other hand realize the continuous accumulation from project data to business data, help Enterprise offers reference when participating in sundry item in the future, can be by features such as scale of the project, project region, PROJECT TIMEs, soon Speed forms the investment analysis in project economic activity, preliminary budget etc..
In one embodiment, further included as shown in figure 8, storing mission bit stream to after the step of project library:
Step S290E, receives mission bit stream update request, and carrying this in mission bit stream update request updates corresponding mesh Mission bit stream is marked, goal task information includes at least one in model component information, configuration resource information and quantities information Kind.
Goal task information is updated to project library by step S290F.
Specifically, during due to project construction, it is frequently encountered due to uncertainties such as mistake or changes in the work Factor needs to be updated mission bit stream, and when terminal detects that user triggers more new command, task letter is sent to server Breath update request, server believe the goal task carried in mission bit stream update request after receiving mission bit stream update request Breath is updated to project library, wherein, goal task information is included in model component information, configuration resource information and quantities information At least one.
In one embodiment, server can be according to any one in the request more new task information of terminal, such as at end Model component information is updated during the request update model component information of end, the update configuration when terminal request updates configuration resource information Resource information;
In another embodiment, server can also be according to the request resource information of more new task configuration simultaneously of terminal (including the resource deleted, configured before more new task;And update configuration resource comprehensive unit price), update model component information And reacquire quantities according to associated model component is updated.
In the present embodiment, the mission bit stream in project library is updated when mission bit stream changes, it can be ensured that item The accuracy of data in mesh storehouse.
As shown in figure 9, it is the corresponding system framework figure of calculation amount data processing method in one embodiment, including BIM moulds Type import modul, terminal, server, cost storehouse and project library, wherein, BIM models import modul is based on BIM software developments, It is run in the form of BIM software packages, which can read the various model files in BIM softwares, extract therein effective Information is called for system other parts;HTTP server, ftp server and Database Systems etc. are run on server, as being System core coordinates control disparate modules and normally cooperates, hind computation, data access and transmission are provided for other modules Service;Terminal is the module that contacts directly of user, and user issues the implementation of system every operation, the calling of function, order And system administration etc., it is received by the module and server is transferred to be handled.
In one embodiment, as shown in Figure 10, a kind of calculation amount data processing equipment is additionally provided, which includes:
Association request receiving module 502 for receiving association request, carries current task mark and mesh in association request Mark component mark;
Incidence relation establishes module 504, for being identified according to current task mark and target member, from architecture information mould Selection and the corresponding model component of target member mark in type, incidence relation is established by model component and current task;
Target resource data acquisition module 506, for obtaining target resource data from cost storehouse as current task pair The configuration resource answered, configuration resource include measurement unit information;
Geometric attribute parameter acquisition module 508, for obtaining the corresponding geometric attribute ginseng of current task from model component Manifold is closed;
Quantities determining module 510, for determining current task according to geometric attribute parameter sets and measurement unit information Corresponding quantities.
In one embodiment, above device further includes:
Component name acquisition module 514A, for obtaining the corresponding component name of model component;
Construction technology data obtaining module 514B, for obtaining the corresponding construction technology information of configuration resource;
Task names generation module 514C, for generating corresponding of current task according to component name and construction technology information Business title.
In one embodiment, target resource data acquisition module 506 includes:
Inquiry request receiving unit 506A, for receiving inquiry request, inquiry request carries the corresponding material of model component Resource information;
Query unit 506B for carrying out fuzzy query in cost storehouse according to material resources information, obtains material resources The corresponding resource data set of information;
Request reception unit 506C is selected, for receiving selection request, is selected according to selection request from resource data set Corresponding resource data is taken as target resource data.
In one embodiment, above device further includes:
Project library creates module 516A, and for receiving project library request to create, project is created according to project library request to create Storehouse;
Mission bit stream acquisition module 516B, for obtaining the corresponding mission bit stream of current task, mission bit stream includes current The corresponding model component information of task, configuration resource information and quantities information;
Memory module 516C, for storing mission bit stream to project library.
In one embodiment, above device further includes:
Mission bit stream updates request receiving module 518A, and for receiving mission bit stream update request, mission bit stream update please It asks middle and carries this corresponding goal task information of update, goal task information includes model component information, configuration resource information And at least one of quantities information;
Update module 518C, for goal task information to be updated to project library.
In one embodiment, a kind of computer equipment is provided, including memory and processor, is stored in memory Computer program, when computer program is executed by processor so that processor performs following steps:Receive association request, association Current task mark and target member mark are carried in request;According to current task mark and target member mark, from building Selection and the corresponding model component of target member mark in information model are built, model component is associated with current task foundation System;Target resource data are obtained from cost storehouse as the corresponding configuration resource of current task, configuration resource includes measurement unit Information;The corresponding geometric attribute parameter sets of current task are obtained from model component;According to geometric attribute parameter sets and meter Amount unit information determines the corresponding quantities of current task.
In one embodiment, when computer program is executed by processor so that processor also performs following steps:It obtains The corresponding component name of model component;Obtain the corresponding construction technology information of configuration resource;According to component name and construction technology information Generate the corresponding task names of current task.
In one embodiment, target resource data are obtained from cost storehouse as the corresponding configuration resource of current task, Including:Inquiry request is received, inquiry request carries the corresponding material resources information of model component;It is being made according to material resources information Fuzzy query is carried out in valency storehouse, obtains the corresponding resource data set of material resources information;Selection request is received, it please according to selection It asks and corresponding resource data is chosen from resource data set as target resource data.
In one embodiment, when computer program is executed by processor so that processor, which performs, receives association request Following steps are also performed before step:Project library request to create is received, project library is created according to project library request to create;Computer When program is executed by processor so that processor also performs following steps:Obtain the corresponding mission bit stream of current task, task letter Breath includes the corresponding model component information of current task, configuration resource information and quantities information;By mission bit stream store to Project library.
In one embodiment, when computer program is executed by processor so that processor execution stores mission bit stream It is also performed to after the step of project library:Mission bit stream update request is received, this update is carried in mission bit stream update request Corresponding goal task information, goal task information are included in model component information, configuration resource information and quantities information At least one;Goal task information is updated to project library.
In one embodiment, a kind of computer readable storage medium is provided, is stored thereon with computer program, is calculated When machine program is executed by processor so that processor performs following steps:Association request is received, is carried in association request as predecessor Business mark and target member mark;According to current task mark and target member mark, chosen from Building Information Model With the corresponding model component of target member mark, model component and current task are established into incidence relation;It is obtained from cost storehouse Target resource data include measurement unit information as the corresponding configuration resource of current task, configuration resource;From model component Obtain the corresponding geometric attribute parameter sets of current task;It is determined currently according to geometric attribute parameter sets and measurement unit information The corresponding quantities of task.
In one embodiment, when computer program is executed by processor so that processor also performs following steps:It obtains The corresponding component name of model component;Obtain the corresponding construction technology information of configuration resource;According to component name and construction technology information Generate the corresponding task names of current task.
In one embodiment, target resource data are obtained from cost storehouse as the corresponding configuration resource of current task, Including:Inquiry request is received, inquiry request carries the corresponding material resources information of model component;It is being made according to material resources information Fuzzy query is carried out in valency storehouse, obtains the corresponding resource data set of material resources information;Selection request is received, it please according to selection It asks and corresponding resource data is chosen from resource data set as target resource data.
In one embodiment, when computer program is executed by processor so that processor, which performs, receives association request Following steps are also performed before step:Project library request to create is received, project library is created according to project library request to create;Computer When program is executed by processor so that processor also performs following steps:Obtain the corresponding mission bit stream of current task, task letter Breath includes the corresponding model component information of current task, configuration resource information and quantities information;By mission bit stream store to Project library.
In one embodiment, when computer program is executed by processor so that processor execution stores mission bit stream It is also performed to after the step of project library:Mission bit stream update request is received, this update is carried in mission bit stream update request Corresponding goal task information, goal task information are included in model component information, configuration resource information and quantities information At least one;Goal task information is updated to project library.
One of ordinary skill in the art will appreciate that realizing all or part of flow in above-described embodiment method, being can be with Relevant hardware is instructed to complete by computer program, it is readable which can be stored in a non-volatile computer It takes in storage medium, the program is upon execution, it may include such as the flow of the embodiment of above-mentioned each method.Wherein, the storage Medium can be magnetic disc, CD, read-only memory (Read-Only Memory, ROM) etc..
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, the scope that this specification is recorded all is considered to be.
Embodiment described above only expresses the several embodiments of the present invention, and description is more specific and detailed, but simultaneously It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that come for those of ordinary skill in the art It says, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the protection of the present invention Scope.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (10)

1. a kind of calculation amount data processing method, the described method includes:
Association request is received, current task mark and target member mark are carried in the association request;
According to current task mark and target member mark, chosen and the target member mark from Building Information Model Know corresponding model component, the model component and current task are established into incidence relation;
Target resource data are obtained from cost storehouse as the corresponding configuration resource of the current task, the configuration resource includes Measurement unit information;
The corresponding geometric attribute parameter sets of the current task are obtained from the model component;
The corresponding quantities of the current task is determined according to the geometric attribute parameter sets and measurement unit information.
2. according to the method described in claim 1, it is characterized in that, the method further includes:
Obtain the corresponding component name of the model component;
Obtain the corresponding construction technology information of the configuration resource;
According to the component name and the corresponding task names of construction technology information generation current task.
3. according to the method described in claim 1, it is characterized in that, target resource data are obtained in the storehouse from cost as institute State current task it is corresponding configuration resource the step of, including:
Inquiry request is received, the inquiry request carries the corresponding material resources information of the model component;
Fuzzy query is carried out in the cost storehouse according to the material resources information, it is corresponding to obtain the material resources information Resource data set;
Selection request is received, according to described request is selected to choose corresponding resource data as mesh from the resource data set Mark resource data.
4. according to the method described in claim 1, it is characterized in that, include before described the step of receiving association request:
Project library request to create is received, project library is created according to the project library request to create;
The method further includes:
The corresponding mission bit stream of current task is obtained, the mission bit stream includes the corresponding model component information of current task, matches somebody with somebody Put resource information and quantities information;
The mission bit stream is stored to the project library.
5. according to the method described in claim 4, it is characterized in that, described store the mission bit stream to the project library Include after step:
Mission bit stream update request is received, this is carried in the mission bit stream update request and updates corresponding goal task letter Breath, the goal task information include model component information, configuration at least one of resource information and quantities information;
The goal task information is updated to the project library.
6. a kind of calculation amount data processing equipment, which is characterized in that described device includes:
Association request receiving module for receiving association request, carries current task mark and target in the association request Component mark;
Incidence relation establishes module, for being identified according to current task mark and target member, from Building Information Model Middle selection and the corresponding model component of target member mark, incidence relation is established by the model component and current task;
Target resource data acquisition module, it is corresponding as the current task for obtaining target resource data from cost storehouse Resource is configured, the configuration resource includes measurement unit information;
Geometric attribute parameter acquisition module, for obtaining the corresponding geometric attribute ginseng of the current task from the model component Manifold is closed;
Quantities determining module, for determining the current task according to the geometric attribute parameter sets and measurement unit information Corresponding quantities.
7. device according to claim 6, which is characterized in that described device further includes:
Component name acquisition module, for obtaining the corresponding component name of the model component;
Construction technology data obtaining module, for obtaining the corresponding construction technology information of the configuration resource;
Task names generation module, for generating corresponding of current task according to the component name and the construction technology information Business title.
8. device according to claim 6, which is characterized in that the target resource data acquisition module includes:
Inquiry request receiving unit, for receiving inquiry request, the inquiry request carries the corresponding material of the model component Resource information;
Query unit for carrying out fuzzy query in the cost storehouse according to the material resources information, obtains the material The corresponding resource data set of resource information;
Request reception unit is selected, for receiving selection request, is selected according to the selection request from the resource data set Corresponding resource data is taken as target resource data.
9. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the program is held by processor The calculation amount data processing method as any one of claim 1 to 5 is realized during row.
10. a kind of computer equipment, the computer equipment includes memory, processor and is stored on the memory and can The computer program run on the processor, which is characterized in that the processor is realized when performing the computer program Calculation amount data processing method as any one of claim 1 to 5.
CN201710929592.9A 2017-10-09 2017-10-09 Calculation amount data processing method, device, storage medium and computer equipment Pending CN108052688A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710929592.9A CN108052688A (en) 2017-10-09 2017-10-09 Calculation amount data processing method, device, storage medium and computer equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710929592.9A CN108052688A (en) 2017-10-09 2017-10-09 Calculation amount data processing method, device, storage medium and computer equipment

Publications (1)

Publication Number Publication Date
CN108052688A true CN108052688A (en) 2018-05-18

Family

ID=62119437

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710929592.9A Pending CN108052688A (en) 2017-10-09 2017-10-09 Calculation amount data processing method, device, storage medium and computer equipment

Country Status (1)

Country Link
CN (1) CN108052688A (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109492853A (en) * 2018-09-17 2019-03-19 北京海数宝科技有限公司 Model engineering amount calculates method, apparatus, storage medium and computer equipment
CN110135814A (en) * 2019-05-21 2019-08-16 湖北合联工程管理有限公司 The correlating method of BIM and project data, system and terminal device
CN110378568A (en) * 2019-06-24 2019-10-25 中铁四局集团有限公司 Construction calculation volume method, system, computer equipment and readable storage medium storing program for executing based on BIM technology
CN110489786A (en) * 2019-07-04 2019-11-22 广西汽车集团有限公司 A kind of method and device for the treatment of process resource data model
CN110648400A (en) * 2018-06-27 2020-01-03 西安海平方网络科技有限公司 Model space quantization method, mapping relation establishment method, device and equipment
CN110795811A (en) * 2018-07-16 2020-02-14 西安海平方网络科技有限公司 MEP pipeline adjusting method and device, computer equipment and storage medium
CN110807066A (en) * 2019-10-30 2020-02-18 北京禹数技术有限公司 Method, device, terminal or server for associating data with model
CN110990925A (en) * 2019-11-29 2020-04-10 广联达科技股份有限公司 Template area calculation method and device based on geometric model processing and electronic equipment
CN111985034A (en) * 2020-08-25 2020-11-24 成都建工装饰装修有限公司 Method and system for constructing school civil engineering Building Information Model (BIM)
CN112085474A (en) * 2020-09-14 2020-12-15 北京初云见远数字科技有限公司 Building data processing method and system
CN112329178A (en) * 2020-11-26 2021-02-05 国网河北省电力有限公司经济技术研究院 Method and device for establishing three-dimensional construction cost model of angle steel tower and terminal equipment
CN112948427A (en) * 2021-04-15 2021-06-11 平安国际智慧城市科技股份有限公司 Data query method, device, equipment and storage medium
CN113158292A (en) * 2021-03-02 2021-07-23 广联达科技股份有限公司 Component matching method, engineering quantity calculation method, device and electronic equipment
CN116304225A (en) * 2023-03-22 2023-06-23 联洋国融(上海)科技有限公司 Component retrieval and evaluation method based on MAS system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
高东东: "《建筑信息模型与工程项目管理数据的关联及应用研究》", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110648400A (en) * 2018-06-27 2020-01-03 西安海平方网络科技有限公司 Model space quantization method, mapping relation establishment method, device and equipment
CN110795811B (en) * 2018-07-16 2023-04-25 西安海平方网络科技有限公司 MEP pipeline adjusting method and device, computer equipment and storage medium
CN110795811A (en) * 2018-07-16 2020-02-14 西安海平方网络科技有限公司 MEP pipeline adjusting method and device, computer equipment and storage medium
CN109492853A (en) * 2018-09-17 2019-03-19 北京海数宝科技有限公司 Model engineering amount calculates method, apparatus, storage medium and computer equipment
CN110135814A (en) * 2019-05-21 2019-08-16 湖北合联工程管理有限公司 The correlating method of BIM and project data, system and terminal device
CN110378568A (en) * 2019-06-24 2019-10-25 中铁四局集团有限公司 Construction calculation volume method, system, computer equipment and readable storage medium storing program for executing based on BIM technology
CN110489786A (en) * 2019-07-04 2019-11-22 广西汽车集团有限公司 A kind of method and device for the treatment of process resource data model
CN110807066A (en) * 2019-10-30 2020-02-18 北京禹数技术有限公司 Method, device, terminal or server for associating data with model
CN110807066B (en) * 2019-10-30 2023-09-05 北京禹数技术有限公司 Method, device, terminal or server for associating data with model
CN110990925A (en) * 2019-11-29 2020-04-10 广联达科技股份有限公司 Template area calculation method and device based on geometric model processing and electronic equipment
CN111985034A (en) * 2020-08-25 2020-11-24 成都建工装饰装修有限公司 Method and system for constructing school civil engineering Building Information Model (BIM)
CN112085474A (en) * 2020-09-14 2020-12-15 北京初云见远数字科技有限公司 Building data processing method and system
CN112329178A (en) * 2020-11-26 2021-02-05 国网河北省电力有限公司经济技术研究院 Method and device for establishing three-dimensional construction cost model of angle steel tower and terminal equipment
CN113158292A (en) * 2021-03-02 2021-07-23 广联达科技股份有限公司 Component matching method, engineering quantity calculation method, device and electronic equipment
CN113158292B (en) * 2021-03-02 2024-02-13 广联达科技股份有限公司 Component matching method, engineering amount calculating device and electronic equipment
CN112948427A (en) * 2021-04-15 2021-06-11 平安国际智慧城市科技股份有限公司 Data query method, device, equipment and storage medium
CN112948427B (en) * 2021-04-15 2024-02-06 深圳赛安特技术服务有限公司 Data query method, device, equipment and storage medium
CN116304225A (en) * 2023-03-22 2023-06-23 联洋国融(上海)科技有限公司 Component retrieval and evaluation method based on MAS system
CN116304225B (en) * 2023-03-22 2024-05-17 联洋国融(上海)科技有限公司 Component retrieval and evaluation method based on MAS system

Similar Documents

Publication Publication Date Title
CN108052688A (en) Calculation amount data processing method, device, storage medium and computer equipment
CN101151592B (en) Method and system for de-serializing data objects on demand
CA2570266C (en) Spreadsheet user-interface for an enterprise planning system having multi-dimensional data store
CN104866426A (en) Software test integrated control method and system
Wijayakumar et al. Automation of BIM quantity take-off to suit QS’s requirements
Kim et al. Highway alignment construction comparison using object-oriented 3D visualization modeling
CN111339591A (en) Engineering project intelligent computing method based on BIM and cloud database
Shafiee et al. Streaming smart meter data integration to enable dynamic demand assignment for real-time hydraulic simulation
Dias et al. Layout and process optimisation: using computer-aided design (CAD) and simulation through an integrated systems design tool
Ham et al. A study on application of bim (building information modeling) to pre-design in construction project
Mohamed et al. Simulation‐based scheduling of module assembly yards: case study
CN116821223A (en) Industrial visual control platform and method based on digital twinning
CN111340404A (en) Method and device for constructing index system and computer storage medium
CN113342921B (en) Resource cataloging method and device
CN103345485B (en) A kind of mainframe platform dynamic statement automatic generation method and system
CN107291933B (en) Petri network-based soft PLC system data synchronization method
Dobaev et al. Development of decision support system for data analysis of electric power systems
CN101271550A (en) Data distribution method and device in application system
Kotsyuba et al. Automating MySQL database complexity estimation based on quantitative metrics
CN107451188A (en) A kind of dissemination method and system of power grid regulation model data multistage combination of nodes
CN113743791A (en) Business evaluation method and device for business work order, electronic equipment and medium
Brusaporci et al. The “LoH—Level of History” for an Aware HBIM Process
Powell On-line monitoring for operational control of water distribution networks
Porshnev et al. Problems and Methods for Integrating Heterogeneous Data (on Example, Metallurgical Production)
Li Modeling, design and control of vacuum assisted resin transfer molding (VARTM) for thickness variation reduction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180518

RJ01 Rejection of invention patent application after publication