CN110135814A - The correlating method of BIM and project data, system and terminal device - Google Patents
The correlating method of BIM and project data, system and terminal device Download PDFInfo
- Publication number
- CN110135814A CN110135814A CN201910424292.4A CN201910424292A CN110135814A CN 110135814 A CN110135814 A CN 110135814A CN 201910424292 A CN201910424292 A CN 201910424292A CN 110135814 A CN110135814 A CN 110135814A
- Authority
- CN
- China
- Prior art keywords
- engineering part
- engineering
- bim
- data files
- mark
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/10—File systems; File servers
- G06F16/11—File system administration, e.g. details of archiving or snapshots
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Abstract
The present invention is suitable for engineering construction technical field, discloses correlating method, system and the terminal device of a kind of BIM and project data.This method comprises: obtaining the ect data files with preset format, engineering part mark and engineering part construction information in ect data files are extracted, engineering part construction information is associated in BIM in engineering part corresponding with engineering part mark.The above method can combine BIM model with construction site, by construction site generate preset format ect data files directly with BIM model interaction, by the information association in ect data files into BIM model, advantage is collected so as to play the information of BIM model, BIM model is combined with ect data files, the artificial link for inputting the information in ect data files in BIM model again is saved, operating efficiency and information association accuracy are improved.
Description
Technical field
The invention belongs to the correlating method of engineering construction technical field more particularly to a kind of BIM and project data, system and
Terminal device.
Background technique
In Process of Engineering Construction, the information such as a large amount of text, chart can be generated, conventional operation mode be by artificial and
Ordinary electronic medium is transmitted and is issued.But for large-scale construction project, such as large bridge, highway, tunnel, they are being built
It has higher requirements in the process for the real-time Transmission publication of information, the management of traditional approach information in this case will appear letter
Breath transmission tomography, working efficiency is low, office cost is high, low-quality problem.
BIM (Building Information Modeling, Building Information Model) is the items with construction-engineering project
Basis of the relevant information data as model, carries out the foundation of buildings model, is had by digital information analogue simulation building
Some real informations, it has many merits, is therefore widely used in engineering construction.Though and engineering construction at this stage can carry out
BIM modeling, but the BIM model established can not be implemented really and be applied on site.
Summary of the invention
In view of this, the embodiment of the invention provides the correlating method of a kind of BIM and project data, system and terminals to set
It is standby, to solve the problems, such as that BIM model can not be implemented really and field application.
The first aspect of the embodiment of the present invention provides the correlating method of a kind of BIM and project data, comprising:
The ect data files with preset format are obtained, include engineering part mark and work in the ect data files
Journey component construction information;
Extract engineering part mark and the engineering part construction information in the ect data files;
The engineering part construction information is associated in BIM engineering part corresponding with engineering part mark.
Optionally, the ect data files of the preset format are excel file, and the engineering part mark corresponds to
A line number and a columns in excel file.
Optionally, the engineering part mark extracted in the ect data files, comprising:
Line number and columns in corresponding excel file are identified according to the engineering part, determines the engineering part mark
Know the position in the ect data files;
Extract the corresponding engineering part mark in determining position and engineering part construction information.
Optionally, it is described the engineering part construction information is associated in BIM it is corresponding with engineering part mark
Engineering part, comprising:
It obtains in BIM and identifies matched engineering part with the engineering part;
Acquired engineering part is associated with by corresponding engineering part construction information is identified with the engineering part.
Optionally, the method also includes:
Engineering part idsplay order is received, and shows that the engineering part of corresponding engineering part is constructed according to the idsplay order
Information.
Optionally, the method also includes:
Each ect data files are classified according to file attribute.
The second aspect of the embodiment of the present invention provides the associated apparatus of a kind of BIM and project data, comprising:
File acquisition module is wrapped in the ect data files for obtaining the ect data files with preset format
Containing engineering part mark and engineering part construction information;
Extraction module, for extracting the mark of the engineering part in the ect data files and engineering part construction information;
Relating module, it is corresponding with engineering part mark for the engineering part construction information to be associated in BIM
Engineering part.
Optionally, the ect data files of the preset format are excel file, and the engineering part mark corresponds to
A line number and a columns in excel file;
The engineering part mark extracted in the ect data files, comprising:
Line number and columns in corresponding excel file are identified according to the engineering part, determines the engineering part mark
Know the position in the ect data files;
Extract the corresponding engineering part mark in determining position.
The third aspect of the embodiment of the present invention provides a kind of terminal device, including memory, processor and is stored in
In memory and the computer program that can run on a processor, processor are realized when executing computer program such as first aspect institute
The step of stating the correlating method of BIM and project data.
The fourth aspect of the embodiment of the present invention provides a kind of computer readable storage medium, computer readable storage medium
It is stored with computer program, BIM and work as described in relation to the first aspect are realized when computer program is executed by one or more processors
The step of correlating method of number of passes evidence.
The embodiment of the present invention obtains the work of the preset format comprising engineering part mark and engineering part construction information first
Then journey data file extracts engineering part mark and engineering part construction information in ect data files, then by engineering department
Part construction information is associated in BIM in engineering part corresponding with engineering part mark, so as to which BIM model and construction is existing
Combine, the ect data files for the preset format that construction site is generated directly with BIM model interaction, by project data
Information association in file collects advantage into BIM model, so as to play the information of BIM model, by BIM model and engineering
Data file combines, and saves the artificial link for inputting the information in ect data files in BIM model again, improves operation
Efficiency and information association accuracy.
Detailed description of the invention
It to describe the technical solutions in the embodiments of the present invention more clearly, below will be to embodiment or description of the prior art
Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is only of the invention some
Embodiment for those of ordinary skill in the art without any creative labor, can also be according to these
Attached drawing obtains other attached drawings.
Fig. 1 is the implementation flow chart of the correlating method of BIM and project data provided in an embodiment of the present invention;
Fig. 2 is the implementation flow chart of step 102 in Fig. 1;
Fig. 3 is the implementation flow chart of step 103 in Fig. 1;
Fig. 4 is the schematic block diagram of the associated apparatus of BIM and project data provided in an embodiment of the present invention;
Fig. 5 is the schematic block diagram of terminal device provided in an embodiment of the present invention.
Specific embodiment
In being described below, for illustration and not for limitation, the tool of such as particular system structure, technology etc is proposed
Body details, so as to provide a thorough understanding of the present application embodiment.However, it will be clear to one skilled in the art that there is no these specific
The application also may be implemented in the other embodiments of details.In other situations, it omits to well-known system, device, electricity
The detailed description of road and method, so as not to obscure the description of the present application with unnecessary details.
In order to illustrate technical solutions according to the invention, the following is a description of specific embodiments.
Fig. 1 is the implementation process schematic diagram of the correlating method of the BIM that one embodiment of the invention provides and project data, in order to
Convenient for explanation, only parts related to embodiments of the present invention are shown.
As shown in Figure 1, the correlating method of the BIM and project data may comprise steps of:
Step 101, the ect data files with preset format are obtained, include engineering part in the ect data files
Mark and engineering part construction information.
In a kind of achievable mode, the ect data files of the preset format can be excel file, the engineering department
Part identifies line number and columns in corresponding excel file.For example, can be by 6 rows and D column corresponding position in excel file
Content is identified as the engineering part.Wherein, the engineering part mark can be engineering part title or engineering part name
Referred to as outer other can characterize the content of the engineering part, not limit this.Certainly, the engineering part mark may be
The content of multiple line numbers and multiple columns corresponding positions in excel file.
In other embodiments, the ect data files may be the file of extended formatting, such as the work
Journey data file can be word document etc., not limit this.
Step 102, engineering part mark and the engineering part construction information in the ect data files are extracted.
Referring to fig. 2, in one embodiment, step 102 be may comprise steps of:
Step 201, line number and columns in corresponding excel file are identified according to the engineering part, determines the work
Journey component identifies the position in the ect data files.
Line number and columns in corresponding excel file, therefore this are identified based on the engineering part described in step 101
The line number and columns in corresponding excel file can be identified in step according to the engineering part, determines the engineering part
Identify the position in the ect data files.
For example, the engineering part mark correspondence can make the content of 6 rows and D column corresponding position in excel file
6 rows and D column in corresponding excel file are identified for the engineering part, then the engineering part mark can be determined in excel
Position in file is that 6 rows and D arrange corresponding position.
In the present embodiment, position of the engineering part mark in excel file can be pre-set, every portion
Engineering part mark is all disposed within the position set in excel file.In addition, the engineering part mark is in excel file
In position corresponding position can also be set according to file attribute, engineering part mark in the excel file of unified attribute
Position is identical.Wherein, file attribute can by file name, file format (such as excel file, word document or other
Formatted file etc.) etc. modes identified or classified.
Step 202, the corresponding engineering part mark in determining position and engineering part construction information are extracted.
After determining position of the engineering part mark in ect data files in step 201, it can be known by text
Other method extracts the corresponding engineering part mark in identified position and engineering part construction information, and wherein engineering part identifies
It can be engineering part title or engineering part number etc., engineering part construction information can be wanted for the construction of the engineering part
It asks, such as height, depth, date etc..
Step 103, the engineering part construction information is associated in BIM engineering corresponding with engineering part mark
Component.
Step 301, it obtains in BIM and identifies matched engineering part with the engineering part.
Wherein it is possible to be identified according to the engineering part extracted in step 102, to the engineering part progress in BIM model
Match, which is BIM model corresponding with construction work, and the mark (example of each engineering part is stored in BIM model
Such as title or number).
In the present embodiment, pass through each engineering that will be stored in the engineering part extracted in step 102 mark and BIM model
The mark of component is matched, and can be determined in BIM model and be identified matched engineering department with the engineering part extracted in step 102
Part.
Step 302, corresponding engineering part construction information will be identified with the engineering part be associated with acquired engineering
Component.
In this step, got after identifying matched engineering part with engineering part in BIM model in step 301, it will
Corresponding engineering part construction information is identified with the engineering part to be associated on accessed engineering part.
Optionally, the correlating method of above-mentioned BIM and project data can also include: reception engineering part idsplay order, and
The engineering part construction information of corresponding engineering part is shown according to the idsplay order.Wherein, construction personnel or aufsichtsrat can
To be inquired by construction information of the BIM model to each engineering part, at this time according to construction personnel or the behaviour of aufsichtsrat
Work can generate engineering part idsplay order, which is used to indicate BIM model and shows corresponding engineering part
Current engineering part construction information.
Optionally, the correlating method of above-mentioned BIM and project data can also include: according to file attribute by each engineering number
Classify according to file.Wherein, file attribute can pass through file name, file format (such as excel file, word document
Or extended formatting file etc.) etc. modes identified or classified.
The embodiment of the present invention obtains the work of the preset format comprising engineering part mark and engineering part construction information first
Then journey data file extracts engineering part mark and engineering part construction information in ect data files, then by engineering department
Part construction information is associated in BIM in engineering part corresponding with engineering part mark, so as to which BIM model and construction is existing
Combine, the ect data files for the preset format that construction site is generated directly with BIM model interaction, by project data
Information association in file collects advantage into BIM model, so as to play the information of BIM model, by BIM model and engineering
Data file combines, and saves the artificial link for inputting the information in ect data files in BIM model again, improves operation
Efficiency and information association accuracy.
It should be understood that the size of the serial number of each step is not meant that the order of the execution order in above-described embodiment, each process
Execution sequence should be determined by its function and internal logic, the implementation process without coping with the embodiment of the present invention constitutes any limit
It is fixed.
Corresponding to the correlating method of BIM and project data described in foregoing embodiments, Fig. 4 shows the embodiment of the present invention and mentions
The schematic diagram of the associated apparatus 400 of the BIM and project data of confession.For ease of description, it illustrates only related to the present embodiment
Part.
Referring to Fig. 4, the associated apparatus 400 of the BIM and project data may include file acquisition module 401, extraction module
402 and relating module 403.
Wherein, file acquisition module 401 is used to obtain the ect data files with preset format, the project data text
Include engineering part mark and engineering part construction information in part.Extraction module 402 is for extracting in the ect data files
Engineering part mark and engineering part construction information.Relating module 403 is for the engineering part construction information to be associated with
Engineering part corresponding with engineering part mark in BIM.
Optionally, the ect data files of the preset format are excel file, and the engineering part mark corresponds to
A line number and a columns in excel file;
The engineering part mark extracted in the ect data files, comprising:
Line number and columns in corresponding excel file are identified according to the engineering part, determines the engineering part mark
Know the position in the ect data files;
Extract the corresponding engineering part mark in determining position.
Optionally, relating module 403 is specifically used for:
It obtains in BIM and identifies matched engineering part with the engineering part;
Acquired engineering part is associated with by corresponding engineering part construction information is identified with the engineering part.
Optionally, which can also include:
Display module shows corresponding engineering part for receiving engineering part idsplay order, and according to the idsplay order
Engineering part construction information.
Optionally, which can also include:
Categorization module, for each ect data files to be classified according to file attribute.
The embodiment of the present invention, first file acquisition module 401 are obtained comprising engineering part mark and engineering part construction letter
The ect data files of the preset format of breath, then extraction module 402 extract ect data files in engineering part mark and
Engineering part construction information, then engineering part construction information is associated in BIM by relating module 403 and is identified with engineering part
In corresponding engineering part, so as to combine BIM model with construction site, by the preset format of construction site generation
Ect data files directly with BIM model interaction, by the information association in ect data files into BIM model, so as to
The information for enough playing BIM model collects advantage, and BIM model is combined with ect data files, saves artificial again in BIM mould
The link that the information in ect data files is inputted in type, improves operating efficiency and information association accuracy.
Fig. 5 is the schematic diagram for the terminal device that one embodiment of the invention provides.As shown in figure 5, the terminal of the embodiment is set
Standby 500 include: processor 501, memory 502 and are stored in the memory 502 and can transport on the processor 501
Capable computer program 503, such as the associated program of BIM and project data.The processor 501 executes the computer program
Realize the step in above-mentioned each embodiment of the method when 503, such as step 101 shown in FIG. 1 is to 103 or step shown in Fig. 2
201 to 202 or step 301 shown in Fig. 3 to 302.Alternatively, reality when the processor 501 executes the computer program 503
The function of each module/unit in existing above-mentioned each Installation practice, such as the function of module 401 to 403 shown in Fig. 4.
Illustratively, the computer program 503 can be divided into one or more program module/units, and described one
A or multiple program module/units are stored in the memory 502, and are executed by the processor 501, to complete this
Invention.One or more of program module/units can be the series of computation machine program instruction that can complete specific function
Section, the instruction segment is for describing implementation procedure of the computer program 503 in the terminal device 500.
For example, computer program 503 can be divided into file acquisition module, extraction module and relating module.
File acquisition module is used to obtain the ect data files with preset format, includes in the ect data files
Engineering part mark and engineering part construction information;Extraction module is used to extract the engineering part mark in the ect data files
Know and engineering part construction information;Relating module is for the engineering part construction information to be associated in BIM and the engineering
Component identifies corresponding engineering part.
The terminal device 500 can be the calculating such as desktop PC, notebook, palm PC and cloud server and set
It is standby.The terminal device 500 may include, but be not limited only to, processor 501, memory 502.Those skilled in the art can manage
Solution, Fig. 5 is only the example of terminal device 500, does not constitute the restriction to terminal device 500, may include more than illustrating
Or less component, certain components or different components are perhaps combined, such as the terminal device can also include that input is defeated
Equipment, network access equipment, bus, display etc. out.
Alleged processor 501 can be central processing unit (Central Processing Unit, CPU), can also be
Other general processors, digital signal processor (Digital Signal Processor, DSP), specific integrated circuit
(Application Specific Integrated Circuit, ASIC), ready-made programmable gate array (Field-
Programmable Gate Array, FPGA) either other programmable logic device, discrete gate or transistor logic,
Discrete hardware components etc..General processor can be microprocessor or the processor is also possible to any conventional processor
Deng.
The memory 502 can be the internal storage unit of the terminal device 500, such as the hard disk of terminal device 8
Or memory.The memory 502 is also possible to the External memory equipment of the terminal device 500, such as the terminal device 500
The plug-in type hard disk of upper outfit, intelligent memory card (Smart Media Card, SMC), secure digital (Secure Digital,
SD) block, flash card (Flash Card) etc..Further, the memory 502 can also both include the terminal device 500
Internal storage unit also include External memory equipment.The memory 502 is for storing the computer program and described
Other programs and data needed for terminal device.The memory 502, which can be also used for temporarily storing, to have exported or has incited somebody to action
The data to be exported.
It is apparent to those skilled in the art that for convenience of description and succinctly, only with above-mentioned each function
Can unit, module division progress for example, in practical application, can according to need and by above-mentioned function distribution by different
Functional unit, module are completed, i.e., the internal structure of described device is divided into different functional unit or module, more than completing
The all or part of function of description.Each functional unit in embodiment, module can integrate in one processing unit, can also
To be that each unit physically exists alone, can also be integrated in one unit with two or more units, it is above-mentioned integrated
Unit both can take the form of hardware realization, can also realize in the form of software functional units.In addition, each function list
Member, the specific name of module are also only for convenience of distinguishing each other, the protection scope being not intended to limit this application.Above system
The specific work process of middle unit, module, can refer to corresponding processes in the foregoing method embodiment, and details are not described herein.
In the above-described embodiments, it all emphasizes particularly on different fields to the description of each embodiment, is not described in detail or remembers in some embodiment
The part of load may refer to the associated description of other embodiments.
Those of ordinary skill in the art may be aware that list described in conjunction with the examples disclosed in the embodiments of the present disclosure
Member and algorithm steps can be realized with the combination of electronic hardware or computer software and electronic hardware.These functions are actually
It is implemented in hardware or software, the specific application and design constraint depending on technical solution.Professional technician
Each specific application can be used different methods to achieve the described function, but this realization is it is not considered that exceed
The scope of the present invention.
In embodiment provided by the present invention, it should be understood that disclosed device/terminal device and method, it can be with
It realizes by another way.For example, device described above/terminal device embodiment is only schematical, for example, institute
The division of module or unit is stated, only a kind of logical function partition, there may be another division manner in actual implementation, such as
Multiple units or components can be combined or can be integrated into another system, or some features can be ignored or not executed.Separately
A bit, shown or discussed mutual coupling or direct-coupling or communication connection can be through some interfaces, device
Or the INDIRECT COUPLING or communication connection of unit, it can be electrical property, mechanical or other forms.
The unit as illustrated by the separation member may or may not be physically separated, aobvious as unit
The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple
In network unit.It can select some or all of unit therein according to the actual needs to realize the mesh of this embodiment scheme
's.
It, can also be in addition, the functional units in various embodiments of the present invention may be integrated into one processing unit
It is that each unit physically exists alone, can also be integrated in one unit with two or more units.Above-mentioned integrated list
Member both can take the form of hardware realization, can also realize in the form of software functional units.
If the integrated module/unit be realized in the form of SFU software functional unit and as independent product sale or
In use, can store in a computer readable storage medium.Based on this understanding, the present invention realizes above-mentioned implementation
All or part of the process in example method, can also instruct relevant hardware to complete, the meter by computer program
Calculation machine program can be stored in a computer readable storage medium, the computer program when being executed by processor, it can be achieved that on
The step of stating each embodiment of the method.Wherein, the computer program includes computer program code, the computer program generation
Code can be source code form, object identification code form, executable file or certain intermediate forms etc..The computer-readable medium
It may include: any entity or device, recording medium, USB flash disk, mobile hard disk, magnetic that can carry the computer program code
Dish, CD, computer storage, read-only memory (Read-Only Memory, ROM), random access memory (Random
Access Memory, RAM), electric carrier signal, telecommunication signal and software distribution medium etc..It should be noted that the meter
The content that calculation machine readable medium includes can carry out increase and decrease appropriate according to the requirement made laws in jurisdiction with patent practice,
Such as in certain jurisdictions, according to legislation and patent practice, computer-readable medium do not include be electric carrier signal and electricity
Believe signal.
Embodiment described above is merely illustrative of the technical solution of the present invention, rather than its limitations;Although referring to aforementioned reality
Applying example, invention is explained in detail, those skilled in the art should understand that: it still can be to aforementioned each
Technical solution documented by embodiment is modified or equivalent replacement of some of the technical features;And these are modified
Or replacement, the spirit and scope for technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution should all
It is included within protection scope of the present invention.
Claims (10)
1. the correlating method of a kind of BIM and project data characterized by comprising
The ect data files with preset format are obtained, include engineering part mark and engineering department in the ect data files
Part construction information;
Extract engineering part mark and the engineering part construction information in the ect data files;
The engineering part construction information is associated in BIM engineering part corresponding with engineering part mark.
2. the correlating method of BIM according to claim 1 and project data, which is characterized in that the work of the preset format
Journey data file is excel file, and the engineering part identifies a line number and a columns in corresponding excel file.
3. the correlating method of BIM according to claim 2 and project data, which is characterized in that described to extract the engineering
Engineering part mark in data file, comprising:
Line number and columns in corresponding excel file are identified according to the engineering part, determines that the engineering part mark exists
Position in the ect data files;
Extract the corresponding engineering part mark in determining position and engineering part construction information.
4. the correlating method of BIM according to claim 3 and project data, which is characterized in that described by the engineering department
Part construction information is associated in BIM engineering part corresponding with engineering part mark, comprising:
It obtains in BIM and identifies matched engineering part with the engineering part;
Acquired engineering part is associated with by corresponding engineering part construction information is identified with the engineering part.
5. the correlating method of BIM according to claim 1 and project data, which is characterized in that the method also includes:
Engineering part idsplay order is received, and shows the engineering part construction letter of corresponding engineering part according to the idsplay order
Breath.
6. the correlating method of BIM according to any one of claims 1 to 5 and project data, which is characterized in that the method
Further include:
Each ect data files are classified according to file attribute.
7. the associated apparatus of a kind of BIM and project data characterized by comprising
File acquisition module includes work in the ect data files for obtaining the ect data files with preset format
Journey component mark and engineering part construction information;
Extraction module, for extracting the mark of the engineering part in the ect data files and engineering part construction information;
Relating module, for the engineering part construction information to be associated in BIM work corresponding with engineering part mark
Journey component.
8. the associated apparatus of BIM according to claim 7 and project data, which is characterized in that the work of the preset format
Journey data file is excel file, and the engineering part identifies a line number and a columns in corresponding excel file;
The engineering part mark extracted in the ect data files, comprising:
Line number and columns in corresponding excel file are identified according to the engineering part, determines that the engineering part mark exists
Position in the ect data files;
Extract the corresponding engineering part mark in determining position.
9. a kind of terminal device, including memory, processor and storage are in the memory and can be on the processor
The computer program of operation, which is characterized in that the processor realizes such as claim 1 to 6 when executing the computer program
The step of correlating method of any one BIM and project data.
10. a kind of computer readable storage medium, which is characterized in that the computer-readable recording medium storage has computer journey
Sequence realizes BIM and work as described in any one of claim 1 to 6 when the computer program is executed by one or more processors
The step of correlating method of number of passes evidence.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910424292.4A CN110135814A (en) | 2019-05-21 | 2019-05-21 | The correlating method of BIM and project data, system and terminal device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910424292.4A CN110135814A (en) | 2019-05-21 | 2019-05-21 | The correlating method of BIM and project data, system and terminal device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110135814A true CN110135814A (en) | 2019-08-16 |
Family
ID=67571877
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910424292.4A Pending CN110135814A (en) | 2019-05-21 | 2019-05-21 | The correlating method of BIM and project data, system and terminal device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110135814A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110807066A (en) * | 2019-10-30 | 2020-02-18 | 北京禹数技术有限公司 | Method, device, terminal or server for associating data with model |
CN113762930A (en) * | 2021-09-10 | 2021-12-07 | 郑州市轨道交通设计研究院有限公司 | BIM-based digital asset transfer method, platform and system |
CN114648014A (en) * | 2022-05-20 | 2022-06-21 | 安徽数智建造研究院有限公司 | Engineering data correlation method based on improved Gaussian mixture model |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20170042464A (en) * | 2015-10-08 | 2017-04-19 | 주식회사비아이엠에스 | A batch processing system for properties of the Building Information Modeling library |
CN107103158A (en) * | 2017-05-24 | 2017-08-29 | 中铁四局集团有限公司 | The method that high-speed rail bridge rapid modeling is dynamically changed is realized using DYNAMO |
CN107358401A (en) * | 2017-06-09 | 2017-11-17 | 上海嘉实(集团)有限公司 | Intelligent management system/method, readable storage medium storing program for executing and the terminal of construction project |
CN108052688A (en) * | 2017-10-09 | 2018-05-18 | 深圳高速工程顾问有限公司 | Calculation amount data processing method, device, storage medium and computer equipment |
CN109558412A (en) * | 2018-09-20 | 2019-04-02 | 中建科技有限公司深圳分公司 | The data growing method and device of assembled architecture construct platform |
-
2019
- 2019-05-21 CN CN201910424292.4A patent/CN110135814A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20170042464A (en) * | 2015-10-08 | 2017-04-19 | 주식회사비아이엠에스 | A batch processing system for properties of the Building Information Modeling library |
CN107103158A (en) * | 2017-05-24 | 2017-08-29 | 中铁四局集团有限公司 | The method that high-speed rail bridge rapid modeling is dynamically changed is realized using DYNAMO |
CN107358401A (en) * | 2017-06-09 | 2017-11-17 | 上海嘉实(集团)有限公司 | Intelligent management system/method, readable storage medium storing program for executing and the terminal of construction project |
CN108052688A (en) * | 2017-10-09 | 2018-05-18 | 深圳高速工程顾问有限公司 | Calculation amount data processing method, device, storage medium and computer equipment |
CN109558412A (en) * | 2018-09-20 | 2019-04-02 | 中建科技有限公司深圳分公司 | The data growing method and device of assembled architecture construct platform |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110807066A (en) * | 2019-10-30 | 2020-02-18 | 北京禹数技术有限公司 | Method, device, terminal or server for associating data with model |
CN110807066B (en) * | 2019-10-30 | 2023-09-05 | 北京禹数技术有限公司 | Method, device, terminal or server for associating data with model |
CN113762930A (en) * | 2021-09-10 | 2021-12-07 | 郑州市轨道交通设计研究院有限公司 | BIM-based digital asset transfer method, platform and system |
CN114648014A (en) * | 2022-05-20 | 2022-06-21 | 安徽数智建造研究院有限公司 | Engineering data correlation method based on improved Gaussian mixture model |
CN114648014B (en) * | 2022-05-20 | 2022-08-23 | 安徽数智建造研究院有限公司 | Engineering data correlation method based on improved Gaussian mixture model |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110135814A (en) | The correlating method of BIM and project data, system and terminal device | |
CN108804322A (en) | Automated testing method, device, computer equipment and storage medium | |
CN109508355A (en) | A kind of data pick-up method, system and terminal device | |
CN101872176A (en) | Method and system for generating measurement and control software | |
CN106202406A (en) | A kind of 3D visualization machine room assets information management method and system | |
CN110263145A (en) | A kind of electronic contract signature method and electronic contract sign equipment | |
CN109241357A (en) | Chain structure model and its construction method, system and terminal device | |
CN106951254B (en) | Method and device for multiplexing similar service function modules in payment system | |
CN109783802A (en) | A kind of business rule processing method, server and computer readable storage medium | |
CN109271423A (en) | A kind of object recommendation method, apparatus, terminal and computer readable storage medium | |
CN108228754A (en) | flow generation method and terminal device | |
CN111435304A (en) | Space unit generation method and device, storage medium and processor | |
CN111563075B (en) | Service verification system, method and equipment and storage medium | |
CN111159897B (en) | Target optimization method and device based on system modeling application | |
CN108170425A (en) | A kind of amending method of program code, modification device and terminal device | |
CN107977504A (en) | A kind of asymmetric in-core fuel management computational methods, device and terminal device | |
CN110472109A (en) | Mobilism Data Quality Analysis method and plateform system | |
CN109656575A (en) | Big data platform quick deployment method, storage medium, electronic equipment and system | |
CN104504221A (en) | Evaluation data processing method and system | |
CN102866985B (en) | For data formatter and the method for on-line analysing processing system | |
CN113094932A (en) | Method, device, equipment and storage medium for acquiring construction cost of power transformation project | |
CN116956326A (en) | Authority data processing method and device, computer equipment and storage medium | |
CN107256167A (en) | The upgrade control method and upgrading control device migrated applied to application system | |
CN110442589A (en) | A kind of electronic map update method, device and equipment | |
CN113987102B (en) | Interactive power data visualization method and system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190816 |