CN105908963A - Standing board of scaffold - Google Patents

Standing board of scaffold Download PDF

Info

Publication number
CN105908963A
CN105908963A CN201610400377.5A CN201610400377A CN105908963A CN 105908963 A CN105908963 A CN 105908963A CN 201610400377 A CN201610400377 A CN 201610400377A CN 105908963 A CN105908963 A CN 105908963A
Authority
CN
China
Prior art keywords
plate
scaffold
standing
cavity
standing board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610400377.5A
Other languages
Chinese (zh)
Other versions
CN105908963B (en
Inventor
邓永莲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changshu southeast high tech Venture Service Co., Ltd
Original Assignee
Suzhou Lianjing Mechanical Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Lianjing Mechanical Engineering Technology Co Ltd filed Critical Suzhou Lianjing Mechanical Engineering Technology Co Ltd
Priority to CN201610400377.5A priority Critical patent/CN105908963B/en
Publication of CN105908963A publication Critical patent/CN105908963A/en
Application granted granted Critical
Publication of CN105908963B publication Critical patent/CN105908963B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/08Scaffold boards or planks

Abstract

The invention discloses a standing board of a scaffold. The standing board of the scaffold is provided with a standing board made of metal. The standing board is of a rectangular structure, symmetrical guide rails are arranged on the parts, close to the two long sides, of the bottom of the standing board, guide grooves with downward openings are formed in the bottoms of the guide rails, clamping devices are connected into the guide grooves, two clamping devices are arranged on each guide rail, rubber non-slip mats are arranged on the symmetrical inner sides of a left chuck and a right chuck, multiple non-slip bulges arrayed in an equal interval are arranged on the upper surface of the standing board, the two ends of drainage holes are communicated with the outside, and the top faces of the drainage holes are provided with down-drain holes communicated with the upper surface of the standing board. The standing board of the scaffold is made of metal, thus being firm in structure, the standing face has the functions of being non-slip and permeable, and the bottom of the standing board is connected with supported joint steel tubes of the scaffold through clamping of the chucks, so that higher stability after installation is realized, and the safety of construction personnel is improved.

Description

A kind of scaffold is stood plate
Technical field
The present invention relates to civil engineering field, particularly relate to a kind of scaffold and stand plate.
Background technology
Scaffold refers to that job site is operative and solves vertically and horizontally to transport the various supports set up.The generic term on building circle, refers to be used in the higher place that cannot directly construct of exterior wall, inside fitting or floor height on construction site.Working up and down mainly for workmen or perimeter security net is gone along with sb. to guard him and high-altitude installation component etc., build a framework the most exactly, scaffold makes material generally to be had: bamboo and wood, steel pipe or synthetic material etc..Some engineering also uses when template with scaffold, and the department such as this external advertising, municipal administration, traffic road and bridge, mine is the most extensively used.
For a long time, owing to erecting tools itself and constructing technology and use management of safe operation thereof are in the state more fallen behind, the incidence rate causing accident is higher.
Currently use the scaffold being mostly to make of tube material, different according to structure, fastener type steel pipe scaffold, bowl fastening type steel pipe scaffold, Bayenet type steel tube scaffold, door-type scaffold, internal scaffolding the most miscellaneous, extension outrigger scaffold and other tube material scaffold can be divided into.Workmen stands on scaffold for convenience, and scaffold is all placed with plate of standing.
Existing plate of standing mostly is plank or bamboo cane establishment, and its mass ratio is relatively light, but structure is insecure, long-time use after be easily broken off, cause potential safety hazard.Also having now the plate of standing that metal is made, this plate structure ratio of standing is stronger, but easily and slides between the torr extension bar of scaffold, and mass ratio is heavier, in-convenience in use.
Summary of the invention
The technical problem to be solved is to provide a kind of install firm and well-set scaffold and stands plate.
In order to solve above-mentioned technical problem, the present invention is achieved by the following technical solutions: a kind of scaffold is stood plate, there is the plate of standing being made of metal, described plate of standing is in rectangular configuration, bottom described plate of standing, the position near long limit, both sides is provided with symmetrical guide rail, the bottom of described guide rail is provided with the guide groove that Open Side Down, connects to have on clamping device, and every guide rail in described guide groove and is provided with two clamping devices;Described clamping device includes the left chuck of guide thimble, connecting rod and semicircular in shape structure and right chuck;Described left chuck and right chuck are symmetrical arranged, its top is flexibly connected with the bottom of guide thimble by resilient key, described guide thimble be internally provided with cavity, top is provided with the pilot hole inside and outside connection cavity, the diameter of described pilot hole is less than the diameter of cavity, the end of described connecting rod is within the cavity through pilot hole, head is positioned at outside pilot hole, it is positioned at the head outside pilot hole in described connecting rod and is provided with the guide runner being slidably matched with guide groove, end within the cavity is provided with outside flange, the diameter of the described flange diameter less than cavity and the diameter more than pilot hole, it is provided with spring in cavity below flange.
As preferably, the medial surface of described left chuck and right chuck symmetry is provided with rubber antiskid pad.
As preferably, described in the stand upper surface of plate be provided with the anti-skidding projection of some equidistant arrangements.
As preferably, described in stand multiple conduction hole that is internally provided with of plate, the two ends of described conduction hole communicate with outside, and its end face is provided with the drainage hole communicated with plate upper surface of standing.
Compared with prior art, the invention have benefit that: this scaffold plate of standing is made of metal, sound construction, standing surface has anti-skidding and pervious function, and bottom is connect with the torr of scaffold and to be connected by grips between steel pipe, will not be more stable after installation, improve the safety of workmen.
Accompanying drawing explanation
The present invention is further described below in conjunction with the accompanying drawings.
Fig. 1 is that one scaffold of the present invention is stood plate external structure schematic diagram;
Fig. 2 is that a kind of scaffold of the present invention is stood and accommodated the external structure schematic diagram of device in plate;
Fig. 3 is that a kind of scaffold of the present invention is stood and accommodated the plan structure schematic diagram of device in plate;
Fig. 4 is the structure sectional view of A-A in Fig. 3.
In figure: plate of 1, standing;2, guide rail;3, anti-skidding projection;4, conduction hole;5, guide groove;6, clamping device;61, left chuck;62, right chuck;63, resilient key;64, guide thimble;65, connecting rod;66, cavity;67, spring;68, pilot hole;7, guide runner;8, rubber antiskid pad.
Detailed description of the invention
Describe the present invention with detailed description of the invention below in conjunction with the accompanying drawings.
A kind of scaffold shown in Fig. 1 is stood plate, there is the plate 1 of standing being made of metal, described plate 1 of standing is in rectangular configuration, its upper surface is provided with anti-skidding protruding the 3 of some equidistant arrangements, make it have anti-skidding effect, and, in order to alleviate the weight of plate 1 of standing, enable the water stood on plate 1 run off rapidly simultaneously, described plate 1 of standing be internally provided with multiple conduction hole 4, the two ends of described conduction hole 4 communicate with outside, its end face is provided with the drainage hole communicated with plate 1 upper surface of standing, bottom described plate 1 of standing, the position near long limit, both sides is provided with symmetrical guide rail 2, the bottom of described guide rail 2 is provided with the guide groove 5 that Open Side Down, connect in described guide groove 5 and have clamping device 6, and on every guide rail 2, it is provided with two clamping devices 6.
As shown in Figures 2 to 4, described clamping device 6 includes left chuck 61 and the right chuck 62 of guide thimble 64, connecting rod 65 and semicircular in shape structure;Described left chuck 61 and right chuck 62 are symmetrical arranged, its top is flexibly connected with the bottom of guide thimble 64 by resilient key 63, in order to prevent left chuck 61 and right chuck 62 from slipping from holder, the medial surface of described left chuck 61 and right chuck 62 symmetry is provided with rubber antiskid pad 8;Described guide thimble 64 be internally provided with cavity 66, top is provided with the pilot hole 68 inside and outside connection cavity 66, the diameter of described pilot hole 68 is less than the diameter of cavity 66, the end of described connecting rod 65 is positioned at cavity 66 through pilot hole 68, head is positioned at outside pilot hole 68, it is positioned at the head outside pilot hole 68 in described connecting rod 65 and is provided with the guide runner 7 being slidably matched with guide groove 5, the end being positioned at cavity 66 is provided with outside flange, the diameter of the described flange diameter less than cavity 66 and the diameter more than pilot hole 68, it is provided with spring 67 in cavity 66 below flange.
During use, the plate pressure pin of standing that the clamping device 6 stood on plate 1 bottom guide track 2 is directed on scaffold, then the left chuck 61 on clamping device 6 and right chuck 62 are clamped on pressure pin, and by the effect of resilient key 63, make left chuck 61 and right chuck 62 clamping fastener, on scaffold, install plate 1 of standing in this way;Workmen stands and by the spring 67 in guide thimble 64, connecting rod 65 played resilient support effect after standing on plate 1, it is to avoid firmly contacting of stand plate 1 and pressure pin, improves service life.
This scaffold plate of standing is made of metal, sound construction, standing surface has an anti-skidding and pervious function, and bottom is connect with the torr of scaffold and is connected by grips between steel pipe, will not be more stable after installation, improves the safety of workmen.
It is emphasized that: be the most only presently preferred embodiments of the present invention, not the present invention is made any pro forma restriction, every any simple modification, equivalent variations and modification made above example according to the technical spirit of the present invention, all still falls within the range of technical solution of the present invention.

Claims (4)

1. a scaffold is stood plate, there is the plate of standing (1) being made of metal, described plate of standing (1) is in rectangular configuration, it is characterized in that: described in plate (1) bottom of standing the position on long limit, both sides is provided with symmetrical guide rail (2), the bottom of described guide rail (2) is provided with the guide groove (5) that Open Side Down, connect to have on clamping device (6), and every guide rail (2) in described guide groove (5) and be provided with two clamping devices (6);Described clamping device (6) includes left chuck (61) and the right chuck (62) of guide thimble (64), connecting rod (65) and semicircular in shape structure;nullDescribed left chuck (61) and right chuck (62) are symmetrical arranged,Its top is flexibly connected with the bottom of guide thimble (64) by resilient key (63),Described guide thimble (64) be internally provided with cavity (66),Top is provided with the pilot hole (68) inside and outside connection cavity (66),The diameter of described pilot hole (68) is less than the diameter of cavity (66),The end of described connecting rod (65) is positioned at cavity (66) through pilot hole (68),Head is positioned at pilot hole (68) outward,The head being positioned at pilot hole (68) outside in described connecting rod (65) is provided with the guide runner (7) being slidably matched with guide groove (5),The end being positioned at cavity (66) is provided with outside flange,The diameter of the described flange diameter less than cavity (66) and the diameter more than pilot hole (68),It is provided with spring (67) in cavity (66) below flange.
Scaffold the most according to claim 1 is stood plate, it is characterised in that: it is provided with rubber antiskid pad (8) on described left chuck (61) and the symmetrical medial surface of right chuck (62).
Scaffold the most according to claim 1 is stood plate, it is characterised in that the upper surface of plate (1) of standing described in: is provided with the anti-skidding projection (3) of some equidistant arrangements.
Scaffold the most according to claim 1 is stood plate, it is characterized in that: described in stand plate (1) be internally provided with multiple conduction hole (4), the two ends of described conduction hole (4) communicate with outside, and its end face is provided with the drainage hole communicated with plate of standing (1) upper surface.
CN201610400377.5A 2016-06-08 2016-06-08 A kind of scaffold standing plate Active CN105908963B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610400377.5A CN105908963B (en) 2016-06-08 2016-06-08 A kind of scaffold standing plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610400377.5A CN105908963B (en) 2016-06-08 2016-06-08 A kind of scaffold standing plate

Publications (2)

Publication Number Publication Date
CN105908963A true CN105908963A (en) 2016-08-31
CN105908963B CN105908963B (en) 2018-09-11

Family

ID=56750891

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610400377.5A Active CN105908963B (en) 2016-06-08 2016-06-08 A kind of scaffold standing plate

Country Status (1)

Country Link
CN (1) CN105908963B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106869483A (en) * 2016-12-15 2017-06-20 宁波二十冶建设有限公司 Combination foot palm and its installation method
CN108005370A (en) * 2017-12-04 2018-05-08 广东中南建设有限公司 The scaffold board and construction method of scaffold
CN108240107A (en) * 2018-03-21 2018-07-03 西南科技大学 A kind of steel bamboo combines scaffold board
CN109112924A (en) * 2018-07-25 2019-01-01 邹雅芳 A kind of pallet device of road construction
CN110525605A (en) * 2019-07-10 2019-12-03 沪东中华造船(集团)有限公司 A kind of Novel scaffold board and its building method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201176706Y (en) * 2008-02-02 2009-01-07 吉泰企业股份有限公司 Pedal fixing structure
CN202577940U (en) * 2012-04-14 2012-12-05 中国三冶集团有限公司管道工程公司 Sliding support gang board
JP2014034821A (en) * 2012-08-09 2014-02-24 Asahi Kasei Homes Co Form transfer device
DE102013006380A1 (en) * 2013-04-12 2014-10-16 Polytech Gmbh Decking for scaffolding
CN205713060U (en) * 2016-06-08 2016-11-23 苏州莲敬机械工程科技有限公司 Scaffold is stood plate

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201176706Y (en) * 2008-02-02 2009-01-07 吉泰企业股份有限公司 Pedal fixing structure
CN202577940U (en) * 2012-04-14 2012-12-05 中国三冶集团有限公司管道工程公司 Sliding support gang board
JP2014034821A (en) * 2012-08-09 2014-02-24 Asahi Kasei Homes Co Form transfer device
DE102013006380A1 (en) * 2013-04-12 2014-10-16 Polytech Gmbh Decking for scaffolding
CN205713060U (en) * 2016-06-08 2016-11-23 苏州莲敬机械工程科技有限公司 Scaffold is stood plate

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106869483A (en) * 2016-12-15 2017-06-20 宁波二十冶建设有限公司 Combination foot palm and its installation method
CN106869483B (en) * 2016-12-15 2020-09-15 浙江二十冶建设有限公司 Combined scaffold board and mounting method thereof
CN108005370A (en) * 2017-12-04 2018-05-08 广东中南建设有限公司 The scaffold board and construction method of scaffold
CN108240107A (en) * 2018-03-21 2018-07-03 西南科技大学 A kind of steel bamboo combines scaffold board
CN108240107B (en) * 2018-03-21 2023-10-10 西南科技大学 Steel-bamboo combined scaffold board
CN109112924A (en) * 2018-07-25 2019-01-01 邹雅芳 A kind of pallet device of road construction
CN110525605A (en) * 2019-07-10 2019-12-03 沪东中华造船(集团)有限公司 A kind of Novel scaffold board and its building method

Also Published As

Publication number Publication date
CN105908963B (en) 2018-09-11

Similar Documents

Publication Publication Date Title
CN105908963A (en) Standing board of scaffold
CN205558226U (en) Quick detachable and assemble scaffold frame
CN107119899A (en) Scaffold for building with auto-lock function
CN104372923B (en) Scaffolding
CN205713060U (en) Scaffold is stood plate
CN205025081U (en) Take formula that cut straightly scaffold of safety lock
CN209976009U (en) Steel structure connecting piece for building
CN210621500U (en) A basket is hung in construction that is used for municipal works and room to build engineering
CN205558249U (en) Steel pipe scaffold
CN209760752U (en) Scaffold for building engineering
CN202658877U (en) Support connection assembly for scaffolding
CN109826419A (en) A kind of scaffold connecting joint structure
CN203488077U (en) Ladder for building workers
CN104328900A (en) Gantry type scaffold
CN206693590U (en) A kind of Quick-mounting aluminium alloy scaffold
CN215670982U (en) Building scaffold connecting piece
CN103615106B (en) Scaffold
CN104372935A (en) Scaffold
CN216641364U (en) People's corridor ladder is used in construction of instrument formula
CN217759865U (en) Wheel buckle type scaffold
CN109826417A (en) A kind of building scaffold connection structure
CN219080921U (en) Assembled temporary support for overhauling thermal power plant
CN105863247A (en) Direct-plug type scaffold with locking block
CN216076177U (en) Bowl buckle type multifunctional scaffold
CN212715844U (en) Construction frame

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200619

Address after: 215500 Qiuzhen building, Southeast campus, Changshu Institute of technology, No. 99, Hushan Road, Changshu Southeast Economic Development Zone, Suzhou City, Jiangsu Province

Patentee after: Changshu southeast high tech Venture Service Co., Ltd

Address before: Guo Xiang Street Wuzhong Economic Development Zone in Suzhou City, Jiangsu province 215100 Suzhou Antique City building 11 room 217

Patentee before: SUZHOU LIANJING MECHANICAL ENGINEERING TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right