CN212715844U - Construction frame - Google Patents

Construction frame Download PDF

Info

Publication number
CN212715844U
CN212715844U CN202021127981.3U CN202021127981U CN212715844U CN 212715844 U CN212715844 U CN 212715844U CN 202021127981 U CN202021127981 U CN 202021127981U CN 212715844 U CN212715844 U CN 212715844U
Authority
CN
China
Prior art keywords
sleeve
way pipe
communicating hole
connecting rod
fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021127981.3U
Other languages
Chinese (zh)
Inventor
李鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021127981.3U priority Critical patent/CN212715844U/en
Application granted granted Critical
Publication of CN212715844U publication Critical patent/CN212715844U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a construction frame, which comprises a support plate, a sleeve, a first communicating hole, a support rod, a fixing frame, a fixing hole, a connecting rod, a fixing pin, a five-way pipe sleeve and a second communicating hole, wherein the fixing frame is in a cross shape, and the middle parts of the four corners of the fixing frame are all provided with fixing holes, the middle part of one side of the fixing frame is welded with a connecting rod, one end of the connecting rod, which is far away from the fixed frame, is provided with a second communicating hole, one side of the five-way pipe sleeve is in a cross shape, and both sides of the outer end of the five-way pipe sleeve are provided with first connecting holes, one end of the connecting rod departing from the fixing frame is sleeved on one side of the five-way pipe sleeve, and the second communicating hole on the connecting rod corresponds to the first communicating hole on the five-way pipe sleeve, the sleeve is welded in the middle of the upper end face of the supporting plate, and the first communicating holes are formed in two sides of one end, deviating from the supporting plate, of the sleeve. The installation and the dismantlement of the construction frame are convenient.

Description

Construction frame
Technical Field
The utility model relates to a building engineering technical field specifically is a construction frame.
Background
The scaffold refers to various supports which are erected on a construction site for workers to operate and solve vertical and horizontal transportation. The general term of the building industry refers to the places which cannot be directly constructed on the building site and are used for exterior wall, interior decoration or high floor height. Mainly for constructor dry life from top to bottom or peripheral safety net enclosure and high altitude installation component etc. say that exactly be the scaffold, scaffold manufacturing material usually has: bamboo, wood, steel pipes or synthetic materials, etc. Some projects also use scaffolds as templates, and in addition, the scaffold is widely used in advertising, municipal administration, traffic roads and bridges, mines and other departments.
A large number of searches find that: chinese utility model patent: the application number [ CN201810237497.7 ], publication number [ CN108412178A ], the utility model discloses a construction frame applied to the technical field of construction equipment, the construction frame is provided with a plurality of cross rod through holes (3) on each cross rod (1), the lower surface of the cross rod (1) at the side of each cross rod through hole (3) is provided with a limit groove (4), the side of each vertical rod (2) is provided with a limit rod (5), when the vertical rod (2) penetrates through the cross rod through hole (3) on the cross rod (1), the limit rod (5) on the vertical rod (2) is arranged into a structure which can be clamped in the limit groove (4) at the lower surface of the cross rod (1) of the construction frame, the construction frame for construction of the invention has simple structure, can conveniently and quickly realize the installation and the disassembly of the construction frame, and has high stability after the installation, the whole scaffold is difficult to loosen or rock, so that the scaffold can be ensured to stand or place heavy objects safely, and the scaffold is convenient and labor-saving to disassemble and assemble.
When the building construction, in order to facilitate the construction of engineering, and be favorable to constructor's operation, guaranteed constructor's safety simultaneously, need a construction scaffold convenient to installation and dismantlement now.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a construction frame possesses the advantage of being convenient for to construction frame's installation and dismantlement, has solved the operation that needs are favorable to the constructor, has guaranteed the problem of constructor's safety simultaneously.
In order to achieve the above object, the utility model provides a following technical scheme: a construction frame comprises a supporting plate, a sleeve, a first communicating hole, a supporting rod, a fixing frame, a fixing hole, a connecting rod, a fixing pin, a five-way pipe sleeve and a second communicating hole, wherein the fixing frame is in a cross shape, the fixing hole is formed in the middle of the four corners of the fixing frame, the connecting rod is welded in the middle of one side of the fixing frame, the second communicating hole is formed in one end, deviating from the fixing frame, of the connecting rod, one side of the five-way pipe sleeve is in a cross shape, the first communicating hole is formed in two sides of the outer end of the five-way pipe sleeve, one end, deviating from the fixing frame, of the connecting rod is sleeved on one side of the five-way pipe sleeve, the second communicating hole in the connecting rod corresponds to the first communicating hole in the five-way pipe sleeve, the fixing pin is movably installed in the first communicating hole and the second communicating hole, the, the second intercommunicating pore has all been seted up to department in the middle of the both ends of bracing piece, the both ends of bracing piece cup joint respectively in the cover pipe and the downside of five-way pipe box, and the both ends of bracing piece are all fixed through the fixed pin.
Preferably, the five corner diameters of the five-way pipe sleeve are equal, and the diameters of the five-way pipe sleeve are equal to the diameter of the sleeve.
Preferably, the diameters of the first communication hole and the second communication hole are equal, the diameters of the first communication hole and the second communication hole are matched with the outer diameter of the fixing pin, and the outer diameters of the sleeve and the five-way pipe sleeve are smaller than the length of the fixing pin.
Preferably, the support plate is square, and the support plate and the sleeve are positioned at the right lower end of the five-way pipe sleeve.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a set up backup pad and mount, be favorable to the support and the fixed effect to the support frame, pass through the inflation screw fixation with the mount on the building, be favorable to fixing the connecting rod on the building, and the five-way pipe cover cup joints the one end at the connecting rod, the lower extreme of five-way pipe cover is connected with the backup pad through the bracing piece simultaneously, realize the effect of support through the backup pad, be favorable to carrying out the effect of fixing to bracing piece and connecting rod through the fixed pin, cup joint the bracing piece respectively in the five-way pipe cover of difference simultaneously, be favorable to the equipment and the use to the scaffold.
Drawings
Fig. 1 is a schematic view of the structure of the present invention;
FIG. 2 is a schematic side view of the fixing frame of the present invention;
fig. 3 is a schematic top view of the supporting plate of the present invention;
fig. 4 is a schematic view of the five-way pipe sleeve structure of the present invention.
In the figure: 1. a support plate; 2. a sleeve; 3. a first communication hole; 4. a support bar; 5. a fixed mount; 6. a fixing hole; 7. a connecting rod; 8. a fixing pin; 9. a five-way pipe sleeve; 10. a second communication hole.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be either fixedly connected or detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1 to 4, the present invention provides an embodiment: a construction frame for buildings comprises a supporting plate 1, a sleeve 2, a first communicating hole 3, a supporting rod 4, a fixing frame 5, a fixing hole 6, a connecting rod 7, a fixing pin 8, a five-way pipe sleeve 9 and a second communicating hole 10, wherein the fixing frame 5 is in a cross shape, the fixing holes 6 are arranged in the middle of four corners of the fixing frame 5, the connecting rod 7 is welded in the middle of one side of the fixing frame 5, the second communicating hole 10 is arranged at one end, away from the fixing frame 5, of the connecting rod 7, one side of the five-way pipe sleeve 9 is in a cross shape, the first communicating holes 3 are arranged at two sides of the outer end of the five-way pipe sleeve 9, one end, away from the fixing frame 5, of the connecting rod 7 is sleeved on one side of the five-way pipe sleeve 9, the second communicating hole 10 on the connecting rod 7 corresponds to the first communicating hole 3 on the five-way pipe sleeve 9, the fixing, first intercommunicating pore 3 has all been seted up to the one end both sides that sleeve pipe 2 deviates from backup pad 1, and second intercommunicating pore 10 has all been seted up to department in the middle of the both ends of bracing piece 4, and the both ends of bracing piece 4 cup joint respectively in sleeve pipe 2 and the downside of five-way pipe box 9, and the both ends of bracing piece 4 are all fixed through fixed pin 8.
The five corner diameters of the five-way pipe sleeve 9 are equal, the diameters of the five-way pipe sleeve 9 are equal to the diameter of the sleeve 2, the diameters of the first communicating hole 3 and the second communicating hole 10 are equal, the diameters of the first communicating hole 3 and the second communicating hole 10 are matched with the outer diameter of the fixing pin 8, the outer diameters of the sleeve 2 and the five-way pipe sleeve 9 are smaller than the length of the fixing pin 8, the fixing frame 5 is fixed on a building through expansion screws, the connecting rod 7 is favorably fixed on the building, the five-way pipe sleeve 9 is sleeved at one end of the connecting rod 7, meanwhile, the lower end of the five-way pipe sleeve 9 is connected with the supporting plate 1 through the supporting rod 4, the supporting function is realized through the supporting plate 1, the fixing pin 8 is favorable for fixing the supporting rod 4 and the connecting rod 7, meanwhile, the support rods 4 are respectively sleeved in the different five-way pipe sleeves 9, so that the assembly and the use of the scaffold are facilitated.
The support plate 1 is square, and the support plate 1 and the sleeve 2 are positioned right below the five-way pipe sleeve 9.
The working principle is as follows: the utility model discloses in operation, pass through the inflation screw fixation with mount 5 on the building, be favorable to fixing connecting rod 7 on the building, and five-way pipe box 9 cup joints the one end at connecting rod 7, the lower extreme of five-way pipe box 9 is connected with backup pad 1 through bracing piece 4 simultaneously, realize the effect of support through backup pad 1, be favorable to carrying out the effect of fixing to bracing piece 4 and connecting rod 7 through fixed pin 8, cup joint bracing piece 4 respectively in the five-way pipe box 9 of difference simultaneously, be favorable to the equipment and the use to the scaffold. The working principle of the present invention is the above.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (4)

1. The utility model provides a construction frame, includes backup pad (1), sleeve pipe (2), first intercommunicating pore (3), bracing piece (4), mount (5), fixed orifices (6), connecting rod (7), fixed pin (8), five-way pipe box (9) and second intercommunicating pore (10), its characterized in that: the fixing frame (5) is in a cross shape, fixing holes (6) are formed in the middle of four corners of the fixing frame (5), a connecting rod (7) is welded in the middle of one side of the fixing frame (5), a second communicating hole (10) is formed in one end, deviating from the fixing frame (5), of the connecting rod (7), one side of the five-way pipe sleeve (9) is in a cross shape, first communicating holes (3) are formed in two sides of the outer end of the five-way pipe sleeve (9), one end, deviating from the fixing frame (5), of the connecting rod (7) is sleeved on one side of the five-way pipe sleeve (9), the second communicating hole (10) in the connecting rod (7) corresponds to the first communicating hole (3) in the five-way pipe sleeve (9), a fixing pin (8) is movably installed in the first communicating hole (3) and the second communicating hole (10), the sleeve (2) is welded in the middle of the upper end face of, first intercommunicating pore (3) have all been seted up to the one end both sides that sleeve pipe (2) deviates from backup pad (1), second intercommunicating pore (10) have all been seted up to department in the middle of the both ends of bracing piece (4), the both ends of bracing piece (4) cup joint respectively in sleeve pipe (2) and the downside of five-way pipe box (9), and the both ends of bracing piece (4) are all fixed through fixed pin (8).
2. A construction frame as claimed in claim 1, wherein: the five corner diameters of the five-way pipe sleeve (9) are equal, and the diameters of the five-way pipe sleeve (9) are equal to the diameter of the sleeve (2).
3. A construction frame as claimed in claim 1, wherein: the diameter of the first communicating hole (3) is equal to that of the second communicating hole (10), the diameter of the first communicating hole (3) is matched with that of the second communicating hole (10) and the diameter of the outer side of the fixing pin (8), and the diameter of the outer side of the sleeve (2) and the diameter of the outer side of the five-way pipe sleeve (9) are smaller than the length of the fixing pin (8).
4. A construction frame as claimed in claim 1, wherein: the supporting plate (1) is square, and the supporting plate (1) and the sleeve (2) are located at the right lower end of the five-way pipe sleeve (9).
CN202021127981.3U 2020-06-18 2020-06-18 Construction frame Active CN212715844U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021127981.3U CN212715844U (en) 2020-06-18 2020-06-18 Construction frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021127981.3U CN212715844U (en) 2020-06-18 2020-06-18 Construction frame

Publications (1)

Publication Number Publication Date
CN212715844U true CN212715844U (en) 2021-03-16

Family

ID=74961779

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021127981.3U Active CN212715844U (en) 2020-06-18 2020-06-18 Construction frame

Country Status (1)

Country Link
CN (1) CN212715844U (en)

Similar Documents

Publication Publication Date Title
CN212715844U (en) Construction frame
CN214090860U (en) Assembled combined scaffold
CN210049599U (en) Security protection device for construction
CN215212255U (en) Suspension type frame combined high-altitude operation platform
CN210888048U (en) Sleeve pipe support module for building
CN211065913U (en) Cross column stand bearing device for exhibition
CN112900822A (en) Aluminum assembled high-altitude operating platform
CN210828248U (en) Assembly beam structure for assembly building
US5456334A (en) Scaffolding for use by bricklayers when working at elevated locations
CN215483942U (en) Steel bar truss building carrier plate convenient to construction
CN213979829U (en) Scaffold frame capable of being rapidly disassembled and assembled and scaffold
CN220203345U (en) Detachable and assembled portable climbing support
CN216587603U (en) Strong-bearing-capacity scaffold for road and bridge engineering
CN219080944U (en) Scaffold for building engineering
CN210947656U (en) Double-ladder scaffold device
CN213324471U (en) Firm in connection's fixed knot for mounting bracket
CN210918143U (en) Assembled engineering scaffold
CN212802477U (en) Strutting arrangement is used in civil engineering construction
CN218028937U (en) Novel quick connection device for scaffold combination
CN220247527U (en) Telescopic scaffold
CN220521907U (en) Scaffold for building construction
CN214739771U (en) Aluminum assembled high-altitude operating platform
CN211923613U (en) Town road foundation ditch safety device
CN114046036A (en) Scaffold device for construction
CN212613600U (en) Scaffold for building engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant