CN105888292B - 框架结构建筑无托换整体平移方法 - Google Patents
框架结构建筑无托换整体平移方法 Download PDFInfo
- Publication number
- CN105888292B CN105888292B CN201410194848.2A CN201410194848A CN105888292B CN 105888292 B CN105888292 B CN 105888292B CN 201410194848 A CN201410194848 A CN 201410194848A CN 105888292 B CN105888292 B CN 105888292B
- Authority
- CN
- China
- Prior art keywords
- pile
- support
- lotus
- lower railway
- translation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Foundations (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410194848.2A CN105888292B (zh) | 2014-05-10 | 2014-05-10 | 框架结构建筑无托换整体平移方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410194848.2A CN105888292B (zh) | 2014-05-10 | 2014-05-10 | 框架结构建筑无托换整体平移方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105888292A CN105888292A (zh) | 2016-08-24 |
CN105888292B true CN105888292B (zh) | 2017-12-12 |
Family
ID=56999936
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410194848.2A Active CN105888292B (zh) | 2014-05-10 | 2014-05-10 | 框架结构建筑无托换整体平移方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105888292B (zh) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106639390A (zh) * | 2016-11-03 | 2017-05-10 | 宜兴市申益体育设施有限公司 | 一种可自动升降式垫层升降柱结构 |
CN107460888B (zh) * | 2017-09-07 | 2023-09-08 | 鞍山三冶建筑工程有限公司 | 一种混凝土预制管廊的安装结构及方法 |
CN113846869B (zh) * | 2021-10-18 | 2023-04-14 | 南通巨能建筑工程技术有限公司 | 工程遗址大块体分割托换平移保护施工方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1132302A (zh) * | 1995-09-29 | 1996-10-02 | 哈尔滨市道里区房屋土地开发公司 | 建筑物构筑物移位方法 |
CN1197141A (zh) * | 1998-05-06 | 1998-10-28 | 崔合垒 | 框架房屋整体移动的方法 |
JPH11193536A (ja) * | 1998-01-05 | 1999-07-21 | Shimizu Corp | 杭基礎構造およびそれを用いた構造物の建替工法 |
CN2402764Y (zh) * | 1999-01-23 | 2000-10-25 | 李海森 | 建筑物或构筑物整体迁移装置 |
JP2005220536A (ja) * | 2004-02-03 | 2005-08-18 | Shimizu Corp | 交換治具とこれを用いた免震装置の交換方法 |
CN2813778Y (zh) * | 2005-07-26 | 2006-09-06 | 李青哲 | 建筑物整体平移装置 |
CN102913000A (zh) * | 2012-10-23 | 2013-02-06 | 山东建筑大学 | 建筑物移位开发利用地下空间的方法 |
-
2014
- 2014-05-10 CN CN201410194848.2A patent/CN105888292B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1132302A (zh) * | 1995-09-29 | 1996-10-02 | 哈尔滨市道里区房屋土地开发公司 | 建筑物构筑物移位方法 |
JPH11193536A (ja) * | 1998-01-05 | 1999-07-21 | Shimizu Corp | 杭基礎構造およびそれを用いた構造物の建替工法 |
CN1197141A (zh) * | 1998-05-06 | 1998-10-28 | 崔合垒 | 框架房屋整体移动的方法 |
CN2402764Y (zh) * | 1999-01-23 | 2000-10-25 | 李海森 | 建筑物或构筑物整体迁移装置 |
JP2005220536A (ja) * | 2004-02-03 | 2005-08-18 | Shimizu Corp | 交換治具とこれを用いた免震装置の交換方法 |
CN2813778Y (zh) * | 2005-07-26 | 2006-09-06 | 李青哲 | 建筑物整体平移装置 |
CN102913000A (zh) * | 2012-10-23 | 2013-02-06 | 山东建筑大学 | 建筑物移位开发利用地下空间的方法 |
Also Published As
Publication number | Publication date |
---|---|
CN105888292A (zh) | 2016-08-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103469733B (zh) | 一种自落型箱梁钢管贝雷门洞支架及其支承方法 | |
CN103243652B (zh) | 一种大跨度非落地式现浇梁膺架及其施工方法 | |
US20180030684A1 (en) | Arched cut-and-cover structure and method of its construction | |
CN106049289B (zh) | 贝雷梁临时便桥改造为钢混组合永久桥的施工方法 | |
CN105888292B (zh) | 框架结构建筑无托换整体平移方法 | |
JP5015048B2 (ja) | 河川橋梁の桁下空間拡大工法 | |
CN108265618B (zh) | 一种高架桥柱墩基础地下逆向增层施工方法 | |
CN107476341A (zh) | 采用装配整体式结构地铁车站预制板拼装方法 | |
CN111236254A (zh) | 一种临近地铁的基坑支护结构及分区施工方法 | |
CN204266132U (zh) | 采用d型梁的铁路框架墩横梁 | |
CN112211425A (zh) | 一种现浇结构托梁换柱卸荷的施工方法 | |
KR20050108867A (ko) | 철도교량의 상부구조물 교체 및 이를 이용한 유도상화방법. | |
KR101330145B1 (ko) | 교량구조물의 교축방향 이동 시스템 및 이를 이용하는 급속 교량교체공법 | |
CN110159312B (zh) | 一种直墙圆拱形隧道衬砌的修复方法 | |
KR101187282B1 (ko) | 2주식교대 구조를 이용한 철도 교량 시공방법 | |
CN115341785B (zh) | 一种炮楼建筑整体移动的方法 | |
CN216238685U (zh) | 一种对牌坊原位保护基础换托结构 | |
CN113266038B (zh) | 基坑开挖地下建筑施工方法 | |
CN103147591B (zh) | 一种砖混建筑增加隔震层的施工方法 | |
CN108104506A (zh) | 一种用于结构拆除和复建的临时设施及其施工方法 | |
CN104963344B (zh) | 砼支撑拆除和结构施工同步进行的深基坑地下施工方法 | |
CN105155867B (zh) | 一种隧道穿越既有大直径桩建筑物的托换装置 | |
KR100699022B1 (ko) | 장지간 거더를 이용한 철도교 개량공법 | |
CN105822079A (zh) | 一种用于控制地下室后增结构柱竖向变形的方法 | |
JP2006144282A (ja) | 橋梁の撤去方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhang Xiangdong Inventor after: Song Wei Inventor after: Wang Yaming Inventor after: Wang Aiju Inventor after: Lu Changlai Inventor after: Zheng Xinyu Inventor after: Tian Kai Inventor after: Xiao Shengli Inventor after: Xia Qi Inventor after: Guo Yuedong Inventor after: Pan Zizhen Inventor before: Zhang Xiangdong Inventor before: Wang Aiju Inventor before: Lu Changlai Inventor before: Zheng Xinyu Inventor before: Tian Kai Inventor before: Xia Qi Inventor before: Guo Yuedong |
|
GR01 | Patent grant | ||
GR01 | Patent grant |