CN105887933A CN201610383810.9A CN201610383810A CN105887933A CN 105887933 A CN105887933 A CN 105887933A CN 201610383810 A CN201610383810 A CN 201610383810A CN 105887933 A CN105887933 A CN 105887933A
Authority
CN
China
Prior art keywords
cover plate
concrete tunnel
guide rail
closing mechanism
leading screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610383810.9A
Other languages
Chinese (zh)
Other versions
CN105887933B (en
Inventor
齐欢
文东辉
王扬渝
蔡东海
金明生
朱海军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University of Technology ZJUT
Original Assignee
Zhejiang University of Technology ZJUT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University of Technology ZJUT filed Critical Zhejiang University of Technology ZJUT
Priority to CN201610383810.9A priority Critical patent/CN105887933B/en
Publication of CN105887933A publication Critical patent/CN105887933A/en
Application granted granted Critical
Publication of CN105887933B publication Critical patent/CN105887933B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • E02D29/14Covers for manholes or the like; Frames for covers
    • E02D29/1418Covers for manholes or the like; Frames for covers with implements to assist in lifting, e.g. counterweights, springs
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F19/00Hoisting, lifting, hauling or pushing, not otherwise provided for
    • B66F19/005Lifting devices for manhole covers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • E02D29/14Covers for manholes or the like; Frames for covers
    • E02D29/1454Non-circular covers, e.g. hexagonal, elliptic

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Geology (AREA)
  • Mechanical Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Sewage (AREA)

Abstract

A rapid opening and closing mechanism for an underground working well cover plate comprises a concrete underground tunnel poured in a soil pit. The concrete underground tunnel is provided with cover plates. The rapid opening and closing mechanism further comprises lead screw hand wheel mechanisms for the cover plates to ascend and descend, and a sliding block mechanism for the cover plates to slide leftwards and rightwards. The lead screw hand wheel mechanisms are arranged at the left end and the right end of the concrete underground tunnel. The cover plates comprise cover plate blocks. The cover plate blocks comprise the end cover plate blocks and the middle cover plate blocks, and the two or more middle cover plate blocks are arranged. A left containing space used for containing the left end cover plate block is formed between the left end of a guide rail and the inner wall of the left end of the concrete underground tunnel, and a right containing space used for containing the right end cover plate block is formed between the right end of the guide rail and the inner wall of the right end of the concrete underground tunnel. The rapid opening and closing mechanism for the underground working well cover plate is easy to open and low in maintaining cost.

Description

A kind of underground work manhole cover plate quickly opening and closing mechanism
Technical field
The present invention relates to a kind of underground work manhole cover plate quickly opening and closing mechanism.
Background technology
By the comprehensive Corridor Building of underground piping, Important Sections overhead logical in city can be eliminated The electric pole erect on way spider web that the systems such as news, electric power plant and ground, high-pressure tower etc., Serve the effect of beautifying urban environment.City Buried Pipeline is the important set of urban infrastructure Become part, be urban safety Effec-tive Function " life line ", its operation conditions whether safety, Steadily, reliably, efficiently, all kinds of goods and materials of relation, the conveying transmission of information, relation urban environment The preventing and treating of maintenance and City Disasters.
For ease of cities and towns pipeline facility vitals maintenance, safeguard and manage concentratedly, generally will They concentrate in underground activities well, including drainer well, communication work well, power cable work well, Switch cubicle work well etc..These work wells at present more uses traditional cast-in-situ steel reinforced concrete mode, Its upper cover many uses precast concrete cover, when carrying out facility maintenance, needs to move cover plate, Cause the problems such as construction period windrow, occupation of land, airborne dust, big on surrounding enviroment impact, disturb people Production, life, and long construction period, both inconvenience was the most uneconomical.Along with cities and towns are all kinds of The complexity day by day of pipeline facility, city space is the most crowded, being rooted in the hearts of the people of environmental protection concept, This traditional aboveground lid of underground work cannot adapt to the demand for development of new situations, becomes restriction One of pipeline designs, construction enterprises and pipeline major obstacle and difficulty of using department's innovation and development.
Summary of the invention
In order to overcome existing work manhole cover plate to there is stubborn deficiency, the invention provides one Easily open, maintenance cost lower ground descends work manhole cover plate quickly opening and closing mechanism.
The technical solution adopted for the present invention to solve the technical problems is:
A kind of underground work manhole cover plate quickly opening and closing mechanism, including the concrete being cast on earth hole Tunnel, described concrete tunnel is provided with cover plate, and described quickly opening and closing mechanism also includes covering Plate lifting leading screw handwheel and in order to the slide block mechanism slided about cover plate, described leading screw hands Wheel mechanism is arranged on the two ends, left and right in described concrete tunnel;
Described cover plate includes that cover plate block, described cover plate block include end cover plate and middle cover plate, Described end cover plate includes the left end cap plate being positioned at the left end of concrete tunnel length direction With the right end cap plate of the right-hand member being positioned at concrete tunnel length direction, described middle cover plate sets It is equipped with two or more;
Described leading screw handwheel includes that handwheel and screw mechanism, described screw mechanism include vertically Leading screw, nut and the elevating lever in order to the lifting of end cover plate, the vertical cloth of described leading screw arranged Putting and be arranged on the outer wall in described concrete tunnel, described nut sleeve is contained on described leading screw, Described elevating lever is horizontally disposed, and one end of described elevating lever is fixing with described nut to be connected, described The upper end face of nut is provided with draw-in groove for one week, and described handwheel includes sleeve and turning handle, described set Cylinder is vertically arranged and is sleeved on described leading screw, and the lower end of described sleeve is connected in described draw-in groove, The upper end of described sleeve is fixing with described turning handle to be connected, and described concrete tunnel has use The fluting moved up and down with elevating lever, the other end of described elevating lever is positioned at institute through described fluting State the bottom of end cover plate;
Described slide block mechanism includes guide rail and slide block, and described concrete tunnel is at the two of length direction Being mounted on described guide rail on individual inwall, before and after described middle cover plate, the bottom at two ends is all provided with Having described slide block, described slide block is formed with described guide rail and moves left and right pair;
Formed to hold between left end and the left end inwall in described concrete tunnel of described guide rail Receive the left accommodation space of left end cap plate, the right side in the right-hand member of described guide rail and described concrete tunnel Form to accommodate the right accommodation space of right end cap plate between end inwall.
Further, the number of the inwall upper rail in the same side, concrete tunnel and middle cover plate Number identical, the guide rail on two inwalls in concrete tunnel is arranged symmetrically with, each slide block with Each corresponding guide rail one_to_one corresponding, is arranged in parallel between adjacent rails.
Further, described concrete tunnel is respectively equipped with peace on two inwalls of length direction Dress platform, described guide rail is fixed on described erecting bed on the side near concrete tunnel inwall.
Further, the other end of described elevating lever is connected with lifting supporting plate, described lifting supporting plate It is positioned at the bottom of described end cover plate.
Further, before and after two ends, left and right, described concrete tunnel, both sides are equipped with described leading screw Handwheel, in concrete tunnel, two leading screw handwheels with one end are arranged symmetrically with.
Further, the block number of described cover plate block is 2n, and n is the nature more than or equal to 1 Number, the distance between bottom and the end face of described guide rail in described concrete tunnel is less than or equal to The height summation of n-1 cover plate block.
Further, described draw-in groove is regular hexagon draw-in groove, and described sleeve is positive six prismatics.
Further, one end of described elevating lever is connected by bearing and described nut are fixing.
What the present invention mainly showed has the beneficial effect that by manual rotation's handwheel, handles leading screw machine Cover plate just can quickly be opened and close by structure, must destroy road surface when revolutionizing maintenance in the past Traditional maintenance mode, substantially increase maintenance efficiency, improve land utilization ratio, reduce Maintenance cost.
Accompanying drawing explanation
Fig. 1 is the cover plate of present invention structural representation when opening.
Fig. 2 is the structural representation during cover plate closing of the present invention.
Fig. 3 is the structural representation of the cover plate of the present invention.
Fig. 4 is the structural representation bottom the middle cover plate of the present invention.
Fig. 5 is the structural representation of the leading screw of leading screw handwheel.
Fig. 6 is the structural representation of the handwheel of leading screw handwheel.
Detailed description of the invention
The invention will be further described below in conjunction with the accompanying drawings.
With reference to Fig. 1~Fig. 6, a kind of underground work manhole cover plate quickly opening and closing mechanism, including being cast in Concrete tunnel 5 on earth hole 2, described concrete tunnel 5 is provided with cover plate 1, described Quickly opening and closing mechanism also includes the leading screw handwheel 4 in order to cover plate 1 lifting and in order to cover plate 1 The slide block mechanism that left and right is slided, described leading screw handwheel 4 is arranged on described concrete tunnel 5 Two ends, left and right;
Described cover plate 1 includes that cover plate block, described cover plate block include end cover plate and inter panel Block, described end cover plate includes the left end cap being positioned at the left end of concrete tunnel 5 length direction Plate and be positioned at the right end cap plate of right-hand member of concrete tunnel 5 length direction, described middle cover Plate is provided with two or more;
Described leading screw handwheel 4 includes that handwheel and screw mechanism, described screw mechanism include erecting To the leading screw 74 arranged, nut 72 and the elevating lever 71 in order to the lifting of end cover plate, described Leading screw 74 is vertically arranged and is arranged on the outer wall in described concrete tunnel 5, described nut 72 Being sleeved on described leading screw 74, described elevating lever 71 is horizontally disposed is sleeved on described leading screw 74 On, one end of described elevating lever 71 is fixing with described nut 72 to be connected, described nut 72 Upper end face is provided with draw-in groove for one week, and described handwheel includes sleeve 111 and turning handle 112, described Sleeve 111 is vertically arranged, the lower end of described sleeve 111 is connected in described draw-in groove, described set The upper end of cylinder 111 is fixing with described turning handle 112 to be connected, and described concrete tunnel 5 is opened Having the fluting moved up and down in order to elevating lever 71, the other end of described elevating lever 71 is through described Fluting is positioned at the bottom of described end cover plate;
Described slide block mechanism includes guide rail 3 and slide block 7, and described concrete tunnel 5 is in length side To two inwalls on be mounted on described guide rail 3, two ends before and after described middle cover plate Bottom is equipped with described slide block 7, and described slide block 3 is formed with described guide rail 7 and moves left and right pair;
Formed between left end and the left end inwall in described concrete tunnel 5 of described guide rail 3 in order to Accommodate the left accommodation space of left end cap plate, the right-hand member of described guide rail 3 and described concrete tunnel Right-hand member inwall between form to accommodate the right accommodation space of right end cap plate.
Further, the number of the inwall upper rail in the same side, concrete tunnel 5 and inter panel The number of block is identical, and the guide rail on two inwalls in concrete tunnel 5 is arranged symmetrically with, each cunning Block and each corresponding guide rail one_to_one corresponding, be arranged in parallel between adjacent rails.
Further, described concrete tunnel 5 is respectively equipped with on two inwalls of length direction Erecting bed, described guide rail 3 is fixed on described erecting bed near the one of concrete tunnel 5 inwall On side.
Further, the other end of described elevating lever 71 is connected with lifting supporting plate, described lifting Supporting plate is positioned at the bottom of described end cover plate.
Further, before and after two ends, described concrete tunnel about 5, both sides are equipped with described silk Thick stick handwheel 4, in concrete tunnel 5, two leading screw handwheels with one end are arranged symmetrically with.
Further, the block number of described cover plate block is 2n, and n is the nature more than or equal to 1 Number, the distance between bottom and the end face of described guide rail 3 in described concrete tunnel 5 is less than Height summation equal to n-1 cover plate block.
Further, described draw-in groove is regular hexagon draw-in groove, and described sleeve 111 is positive six prisms Type.
Further, one end of described elevating lever 71 is solid with described nut 72 by bearing 73 Fixed connection.
In the present embodiment, described cover plate 1 is made up of ten pieces of cover plate blocks, and middle eight pieces is middle Cover plate block, the spacing in direction before and after length is interior with concrete tunnel 5 before and after described cover plate block Identical;The setting of left accommodation space and right accommodation space be easy to end cover plate lifting and in Between cover plate block be deposited on end cover plate.
As it is shown in figure 1, described leading screw 74 is positioned on the front outer wall in described concrete tunnel 5, Described nut 72 is passing through with the front end of described elevating lever 71 near the side in concrete tunnel 5 Bearing is fixing connects, and described concrete tunnel 5 has and moves up and down in order to elevating lever 71 Fluting, the rear end of described elevating lever 71 is positioned at the end of described end cover plate through described fluting Portion;By manual rotation's handwheel, handle screw mechanism make the end cover plate at two ends decline or on Rising one layer, the height of a layer is the height of a cover plate block, then moves adjacent inter panel Block is to moving to the initial of centre on the end cover plate at two ends or by the inter panel at two ends Position, is rotated further by handwheel and is allowed to down or up one layer, and so operation the most just can be by centre Cover plate block is quickly opened or closes.
As shown in Figure 5 and Figure 6, one end of described elevating lever 71 is by bearing 73 and described spiral shell Female 72 fixing connections, described nut 72 is arranged on the inner ring of described bearing 73, described lifting Bar 71 is arranged on the outer ring of described bearing 73, and the inner ring of this bearing 73 rotates, and outer ring is motionless; The other end of described elevating lever 71 can be consolidated through the bottom of described fluting with described end cover plate Fixed connection, it is possible to do not fix;Described turning handle 112 for cylinder and is vertically arranged, described Cylindrical lower end is fixed on the one end connecting cross bar, and the other end of described connection cross bar is with described The upper end of sleeve 111 is fixing to be connected;The lower end of described leading screw 74 is fixed on mixed by fixing seat On the outer wall in solidifying heatable adobe sleeping platform road 5.
The operation principle of the present invention is: the initial condition of whole mechanism is that cover plate is laid in coagulation On heatable adobe sleeping platform road 5, when needing to overhaul the pipeline in concrete tunnel 5, first pass through artificial turning Dynamic turning handle 112, turning handle 112 band moving sleeve 111 rotates, the rotation of sleeve 111 The rotation of nut 72, so that the nut 72 of screw mechanism declines, nut is driven by draw-in groove 72 drive elevating lever 71 to decline, and sink in concrete tunnel 5 by the end cover plate at two ends, Then by manpower, middle cover plate is shifted onto one end stacking in concrete tunnel 5, stacks mode For stacking to two ends respectively from centre so that cover plate block can stack from level to level, thus can be quick Cover plate 1 is opened;After maintenance, by manually rotating backward turning handle 112, The nut 72 in like manner making screw mechanism rises, and nut 72 drives elevating lever 71 to rise, point The middle cover plate at two ends is not shifted onto initial position during corresponding closure state, repetitive operation Several times, just middle cover plate all can be placed, thus can quick-make cover plate 1.
The present invention is installed in the underground work well of tubing, and its cover plate 1 can cover vegetation, When tubing break down need maintenance time, only the cover plate 1 of this mechanism need to be stacked and open, Workman enters and overhauls inside work well, is covered by cover plate 1 again, exempt from after having overhauled Having gone to destroy road surface or the unnecessary trouble of road closure construction, maintenance cost declines the most accordingly, and Can repeatedly open Guan Bi, sustainability is good, has a extensive future.

Claims (8)

1. a underground work manhole cover plate quickly opening and closing mechanism, including the coagulation being cast on earth hole Heatable adobe sleeping platform road, described concrete tunnel is provided with cover plate, it is characterised in that: described quickly opening and closing machine Structure also includes the leading screw handwheel in order to cover plate lifting and in order to the slide block slided about cover plate Mechanism, described leading screw handwheel is arranged on the two ends, left and right in described concrete tunnel;
Described cover plate includes that cover plate block, described cover plate block include end cover plate and middle cover plate, Described end cover plate includes the left end cap plate being positioned at the left end of concrete tunnel length direction With the right end cap plate of the right-hand member being positioned at concrete tunnel length direction, described middle cover plate sets It is equipped with two or more;
Described leading screw handwheel includes that handwheel and screw mechanism, described screw mechanism include vertically Leading screw, nut and the elevating lever in order to the lifting of end cover plate, the vertical cloth of described leading screw arranged Putting and be arranged on the outer wall in described concrete tunnel, described nut sleeve is contained on described leading screw, Described elevating lever is horizontally disposed, and one end of described elevating lever is fixing with described nut to be connected, described The upper end face of nut is provided with draw-in groove for one week, and described handwheel includes sleeve and turning handle, described set Cylinder is vertically arranged and is sleeved on described leading screw, and the lower end of described sleeve is connected in described draw-in groove, The upper end of described sleeve is fixing with described turning handle to be connected, and described concrete tunnel has use The fluting moved up and down with elevating lever, the other end of described elevating lever is positioned at institute through described fluting State the bottom of end cover plate;
Described slide block mechanism includes guide rail and slide block, and described concrete tunnel is at the two of length direction Being mounted on described guide rail on individual inwall, before and after described middle cover plate, the bottom at two ends is all provided with Having described slide block, described slide block is formed with described guide rail and moves left and right pair;
Formed to hold between left end and the left end inwall in described concrete tunnel of described guide rail Receive the left accommodation space of left end cap plate, the right side in the right-hand member of described guide rail and described concrete tunnel Form to accommodate the right accommodation space of right end cap plate between end inwall.
2. as claimed in claim 1 a kind of underground work manhole cover plate quickly opening and closing mechanism, its feature exists In: the number of the inwall upper rail in the same side, concrete tunnel and the number phase of middle cover plate With, the guide rail on two inwalls in concrete tunnel is arranged symmetrically with, and each slide block is corresponding to each Guide rail one_to_one corresponding, be arranged in parallel between adjacent rails.
3. as claimed in claim 1 or 2 a kind of underground work manhole cover plate quickly opening and closing mechanism, it is special Levy and be: described concrete tunnel is respectively equipped with erecting bed on two inwalls of length direction, Described guide rail is fixed on described erecting bed on the side near concrete tunnel inwall.
4. as claimed in claim 1 or 2 a kind of underground work manhole cover plate quickly opening and closing mechanism, it is special Levy and be: the other end of described elevating lever is connected with lifting supporting plate, and described lifting supporting plate is positioned at institute State the bottom of end cover plate.
5. as claimed in claim 1 or 2 a kind of underground work manhole cover plate quickly opening and closing mechanism, it is special Levy and be: before and after two ends, left and right, described concrete tunnel, both sides are equipped with described leading screw handwheel machine Structure, in concrete tunnel, two leading screw handwheels with one end are arranged symmetrically with.
6. as claimed in claim 1 or 2 a kind of underground work manhole cover plate quickly opening and closing mechanism, it is special Levy and be: the block number of described cover plate block is 2n, and n is the natural number more than or equal to 1, institute State the distance between the end face of the bottom in concrete tunnel and described guide rail less than or equal to n-1 The height summation of cover plate block.
7. as claimed in claim 1 or 2 a kind of underground work manhole cover plate quickly opening and closing mechanism, it is special Levying and be: described draw-in groove is regular hexagon draw-in groove, described sleeve is positive six prismatics.
8. as claimed in claim 1 or 2 a kind of underground work manhole cover plate quickly opening and closing mechanism, it is special Levy and be: one end of described elevating lever is connected by bearing and described nut are fixing.
CN201610383810.9A 2016-06-01 2016-06-01 A kind of underground work manhole cover plate quickly opening and closing mechanism Active CN105887933B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610383810.9A CN105887933B (en) 2016-06-01 2016-06-01 A kind of underground work manhole cover plate quickly opening and closing mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610383810.9A CN105887933B (en) 2016-06-01 2016-06-01 A kind of underground work manhole cover plate quickly opening and closing mechanism

Publications (2)

Publication Number Publication Date
CN105887933A true CN105887933A (en) 2016-08-24
CN105887933B CN105887933B (en) 2017-12-29

Family

ID=56709073

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610383810.9A Active CN105887933B (en) 2016-06-01 2016-06-01 A kind of underground work manhole cover plate quickly opening and closing mechanism

Country Status (1)

Country Link
CN (1) CN105887933B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112225142A (en) * 2020-09-30 2021-01-15 简宁 Sewer well lid that municipal administration was maintained and is used rises and cover device
CN112538869A (en) * 2020-11-30 2021-03-23 广东电网有限责任公司佛山供电局 Cable well lid

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201450303U (en) * 2009-07-03 2010-05-05 黎声零 Cable trench cover structure
KR101063326B1 (en) * 2011-04-27 2011-09-07 (주)케이제이종합엔지니어링 Block construction for protecting anunderground high voltage cable
CN205070367U (en) * 2015-11-04 2016-03-02 国网河南省电力公司濮阳供电公司 Scalable cable trench cover
CN205822243U (en) * 2016-06-01 2016-12-21 浙江工业大学 A kind of underground work manhole cover plate quickly opening and closing mechanism

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201450303U (en) * 2009-07-03 2010-05-05 黎声零 Cable trench cover structure
KR101063326B1 (en) * 2011-04-27 2011-09-07 (주)케이제이종합엔지니어링 Block construction for protecting anunderground high voltage cable
CN205070367U (en) * 2015-11-04 2016-03-02 国网河南省电力公司濮阳供电公司 Scalable cable trench cover
CN205822243U (en) * 2016-06-01 2016-12-21 浙江工业大学 A kind of underground work manhole cover plate quickly opening and closing mechanism

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112225142A (en) * 2020-09-30 2021-01-15 简宁 Sewer well lid that municipal administration was maintained and is used rises and cover device
CN112538869A (en) * 2020-11-30 2021-03-23 广东电网有限责任公司佛山供电局 Cable well lid

Also Published As

Publication number Publication date
CN105887933B (en) 2017-12-29

Similar Documents

Publication Publication Date Title
CN203412327U (en) Rotary lift type stereo garage
CN110578339B (en) Construction method of shaft type underground stereo garage
CN104343263A (en) Rotary lifting type three-dimensional garage
CN207774633U (en) Prefabricated piping lane fast hoisting construction system
CN105887933A (en) Rapid opening and closing mechanism for underground working well cover plate
CN106013885A (en) Lifting cyclic rotating garage
CN205822243U (en) A kind of underground work manhole cover plate quickly opening and closing mechanism
CN106545343B (en) Construction method for underground pipe gallery and storage well
CN105858540B (en) Underground work well capping device based on hydraulic jack and pulley mechanism
CN103470079A (en) Three-dimensional storage shelf warehouse (three-dimensional parking garage) rapid in combination and automatic in storing and picking
CN106241234B (en) A kind of self-propelled transport assembly car for prefabricated pipe gallery
CN205688473U (en) A kind of reverse construction machinery
CN104989139A (en) Circular ring circulation rotating garage partially or totally arranged over ground
CN103321464B (en) Parking system and method for taking vehicle
CN205935831U (en) Rotatory garage of circulation of going up and down
CN206681443U (en) Eccentric screw formula sky parking
CN204804406U (en) Part or whole sets up rotatory garage of ring circulation on ground
CN102182336B (en) Underground garage
CN202073348U (en) Underground garage
CN205668777U (en) A kind of fish-collecting box vertical-lift and horizontal movement system
CN203924411U (en) Prefabricated assembled fire wall
CN203285120U (en) Parking system
CN206503218U (en) A kind of antiseep sewage inspection well apparatus for building wall
CN202531026U (en) Drilling machine for construction of inclined pile
CN102182321B (en) Construction method of underground garage

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant